Amendment1.docx

DOCX document 26 KB Posted

Attached to
Tri-Forest Road Maintenance Federal contract opportunity
Solicitation number
1204M318Q0002
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

A. Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to Tri-Forest Road Maintenance, newest first.
File Type Posted
LIST_OF_AWARDEES_FOR_THE.docx DOCX document
M.FireSuppressionCommunicationR6630054.pdf PDF
A.Quoters_Package.pdf PDF
G.Whitman_Blading_Maps.pdf PDF
H.West_Chicken_Call_Order_CULVERT.pdf PDF
C.Umatilla_Brushing_Final_Call_Order.pdf PDF
D.Umatilla_Brushing_Maps.pdf PDF
K.FireProtectionandSuppressionr6_fS_6300_52.pdf PDF
B.FinalTriSolicitation.pdf PDF
F.Whitman_Final_Call_Order.pdf PDF
L.FireSuppressiontanktruckR6630053.pdf PDF
I.West_Chicken_Specs.pdf PDF
E.Malheur_Final_Call_Order.pdf PDF
J.West_Chicken_Drawings.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE
PAGE 1 OF 3 PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

01/05/2018

4. REQUISITION/PUCHASE REQ. NO.
5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)

9A.Amend Solicitation. 1204M318Q0002

9B.Dated 12/08/2017

10A.Mod Contract/Order #

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[x] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [x] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION

Project Name and Location: Tri-Forest Road Maintenance This amendment addresses the following (see attached addendum)

1. Revisions (see attached addendum and call order bid sheet).

2. Pre-Bid Inquiries (PBI’s) for Contract Bidding (see attached addendum).

3. Due date for base soliciation and call orders remain unchanged.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED
16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

Addendum to Amendment 1

REVISIONS, PRE-BID INQUIRIES, REQUEST FOR INFORMATION TRI FOREST ROAD MAINTENANCE

REVISIONS

Revision-001

Updated Link to website that contains the Tri-Forest Specifications, Details, and Drawings:

Specification
Address
Road Maintenance Specifications and Drawings
Tri-Forest Performance Based Specifications and Drawings

Revision-002

Whitman Blading Call Order, Optional Bid Items total 63.3 miles (attached is revised bid sheet)

Revision-003

Bonding is required for West Chicken Culvert Replacement, the following shall be added to the call order:

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS. (JUL 2000)

(a) The Contractor shall submit one of the following payment protections: Surety bond, irrevocable letter of credit, or certified check.

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 15 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

452.228-70 ALTERNATIVE FORMS OF SECURITY. (NOV 1996)

If furnished as security, money orders, drafts, cashiers checks, or certified checks shall be drawn payable to: USDA Forest Service.

Pre-Bid Inquiries (PBI’s) for Contract Bidding

PBI-001 West Chicken Culvert Replacement Call Order Question: Clearing limits are shown on the Road Structure Details Sheet 11 yet there is no pay item for clearing, grubbing, or roadside brushing?

Answer: Roadside clearing and grubbing or roadside brushing are not included in this call order. The clearing limits are a part of the road structure standard detail included in most road contracts. Roadside clearing and grubbing will be completed by a separate contract. Offerors should be aware of two contracts performing in same general area during the period of performance.

PBI-002 West Chicken Culvert Replacement Call Order Question: Under pay item 64804 the estimate of quantities states that streambed material may be sorted from excavation. However, on Culvert Stream Simulation Details Sheet 9 the statement says “Bed Class 16 Streambed (TYP) Material may need to be imported from designated sources.”

Answer: The Forest Service will allow the contractor to sort streambed material from the excavation. Previous projects in the area have produced minimal onsite material. The Forest Service believes that the rock necessary to produce the large Class 16 streambed material surrounding the footings will need to be imported from designated sources shown on Sheet 2, however, some of the smaller Class 6 mateial may aslo need to be imported. Approximately 30 CY of streambed material may need to be imported for stream simulation and is indirect to pay item 64804.

Addendum to Amendment 1

CALL ORDER NO.

IF THIS ORDER IS GREATER THAN $2,500.00, IT IS

NOT VALID UNTIL SIGNED BY THE CONTRACTING OFFICER

Contract No.

Project Name:
Whitman Blading FY 18
County: Baker, Grant

Contractor:

Issuing and Billing Office:

Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814

Item No.

Subitem No.

Description

Quantity to Date
Quantity

Order

Unit

Amount

01
Base Items
Roadway Surface Maintenance
57.3
Mile
02
Optional Items
Roadway Surface Maintenance
63.3
Mile
Required Delivery Date: All work shall be completed by November 30, 2018, base items shall be completed in the spring. Work is estimated to begin May 01, 2018.
Total Price:

Contractor: (Name and Signature)

Requested By: (Name and Signature)

COR Dan Story

Fund Authorization: (Name and Signature)

Line Officer SEE IAS REQUISITION

Ordered By: (Name and Signature)

Contracting Officer

Order Date:
Job Code:

Original to CO, CC to Contractor, B&F and COR

File details come from the government source that posted it.