About this file

This document is an addendum to an invitation to bid on the Flagler Palm Coast Vehicle Maintenance Shop project for the Florida Army National Guard Construction & Facility Management Office. The addendum modifies the original bidding documents and includes a revised bid opening date of September 20, 2023 at 2:00 PM in St. Augustine. The addendum also contains a request for information (RFI) log with responses from the design team regarding fluid-applied flooring thickness, pre-engineered metal building specifications, AISC certification requirements, commissioning coordinator duties, and geothermal well field design. Additional attachments include a geotechnical report and a conceptual design for the geothermal HVAC system.

The geotechnical report provides soil thermal conductivity test results, while the geothermal HVAC design details a 92.6 GPM system with approximately 35 vertical wells. Contractors are required to provide an alternative bid item cost for the complete design and construction of the geothermal system. The base bid is for a direct expansion split system HVAC design. Contractors are also permitted to propose the use of precast concrete wall panels in lieu of site-cast tilt wall panels.

View the file

Other files

File Type Posted
120324 Addendum 3.pdf PDF
120324 Bid Form_Subcontractor List update.docx DOCX document
120324 Addendum 1.pdf PDF
120324 Addendum 4.pdf PDF
120324 Plans and Specifications Instructions.docx DOCX document
120324 FNG5085_Preaward Requirements_Level_5.docx DOCX document
120324 PRE_BID_MEETING.pdf PDF
120324_ITB.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Army National Guard

Construction & Facility Management Office

ISSUED ADDENDUM

Rev. 11/2018

Date September 7, 2023

ADDENDUM Number 2

Project Number and Name 120324 Flagler Palm Coast Vehicle Maintenance Shop

Invitation to Bid Date August 4, 2023

Number of Attachments 2

Bid Opening Date and Time September 20, 2023 (2:00 PM – St. Augustine)

From: Department of Military Affairs, CFMO Contracting Office

This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum on Bid Proposal form is required.

Concerns with this addendum should be addressed to:

ng.fl.flarng.list.cfmo-contracting@army.mil

Bid Opening Date is changed to September 20, 2023 (2:00 PM)

Questions (Q) / Answers (A)

See Attached RFI Log

Attachments:

1. Request for Information (RFI) Log (4 pages)

2. Geothermal system ABI clarification (5 pages)

END OF ADDENDUM #2

RFI LOG

Project Name:

Project Address:

MRI Project Number:

DMA Project Number:

Date Description A/E Response

8/16/2023 Ref. Spec Section 09 67 00, 2.01 & 2.02:

Part 2.01.A states Basis of Design for fluid-applied flooring is Dex-O-Tex ColorFlake L which has a max thickness of 1/8” and Part 2.02.A.4 states required system thickness is 1/4”. Please clarify required thickness of fluid-applied flooring.

MRI: 1/8" thickness is correct for maximum thickness.

8/16/2023 Please confirm the Pre-Engineered Metal Building is not sole sourced to Butler Manufacturing, but simply a basis of design.

MRI: Butler is presented as the basis of design.

Any pre-engineered metal building (PEMB) manufactuer is acceptable if they meet or exceed specifications/basis of design

8/16/2023 According to section 051200-3 of the project specifications, AISC Certification for fabricator and erector is required. Is it acceptable to waive that requirement for the erector as it may limit subcontractor participation?

TLC: Provide Bid as specified.

8/16/2023 According to section 019113-3, a Commissioning Coordinator is required.

Please confirm this does not need to be a full-time staffed position and can be shared with other management duties.

TLC: The Commissioning Coordinator does not need to be an independent full-time staffed position and may be shared with other management duties. This person must be responsible for all activities noted within the specification. Qualifications must be met as specified.

8/16/2023 Per the Pre-Bid site visit on 8/15/2023, please confirm that Fire Marshall and Water management district costs are to be or have been paid by Engineer/Architect and not the contractor.

MRI: Design team is providing permit review costs for the State Fire Marshall and St. Johns Water Management District.

Flagler Palm Coast Vehicle Maintenance Shop 100 Finn Way, Palm Coast, FL 32164 120324

Flagler Palm Coast Vehicle Maintenance Shop Page 1 of 4

Date Description A/E Response

8/16/2023 Drawing C-100 states, Geothermal well field area (ABI #5), see MEP for exact well layout.

However, in the MEP drawings, no well layout or information on the Geothermal Wells can be found. Please provide the necessary drawings/information for the geothermal wells and resulting changes to the MEP drawings for the ABI #5.

TLC: ABI#5 Geothermal HVAC Option: As directed by ABI#5 contractor is to provide an alternative bid item cost for the complete design and construction of a geothermal water source heat pump system and associated well field to support the project HVAC system requirements.

Base bid is for the direct expansion split system design shown. Well field can be assumed to be located north of the building footprint within the grass area adjacent.

8/16/2023 Specification section 020614 references a geotechnical report. Please provide the geotechnical report if available.

MRI: Two Geotechnical Reports are attached:

Armed Forces Reserve Center Geo Report ECS 56-1473 digi.pdf and PCASE Pavement Design Geo Report ECS 56-1473_digi.pdf.

8/22/2023 The drawings and specs I reviewed are not very detailed regarding the oil systems and the tank sizes. Do you have a CAD file that you can send me that has the oil and air lines represented?

TLC: CAD drawings will be provided to awarded Contractor.

Flagler Palm Coast Vehicle Maintenance Shop Page 2 of 4

Date Description A/E Response

8/23/2023 I am writing again to inquire about the compressed air basis of design. We calculate air consumption based on a specific set of criteria. I have attached what I calculated as consumption for this facility and unless I am missing something such as a diesel particulate filter or some other large pneumatically driven mechanism, we estimate your demand for compressed air volume will be in the 50 CFM range. I researched the model you have specified as a basis of design; the Atlas Copco GA-45 and it produces nearly 230 acfm. With two if these units which is what the drawing shows, that would be 460 acfm. It is our opinion that this system is substantially oversized and ask fort this to be clarified as to the demand requirement.

TLC: Contractor to bid as designed on plans.

Value engineering including discussions of allowed diversity will be discussed with the successfully awarded contractor.

8/28/2023 1.Does the FNG5085 have to be submitted with the bid documents at bid time, or can the FNG5085 be submitted after bid prior to intent to award?

MRI: Submit with Bid

8/28/2023 2. Will the DMA \ Design Team consider the use of precast concrete wall panels in lieu of site cast tilt wall panels?

MRI/TLC: Precast panels are acceptable.

Consider panel widths at overhead doors and transit limits.

8/28/2023 3. The instructions say the contractor is responsible for all permits and paying for all permits. Does that include the State Fire Marshal permit and the storm water management \ environmental permits?

Those two items are frequently secured by the design team prior to bid. Please verify.

MRI: Design team is providing permit review costs for the State Fire Marshall and St. Johns Water Management District.

Flagler Palm Coast Vehicle Maintenance Shop Page 3 of 4

Date Group Description A/E Response

8/28/2023

4. Are there as built utility drawings available for the current facility and site?

MRI: The latest survey and previous as-built survey are attached. "Palm Coast Readiness Center As-Built Sheet C5.0" and "Palm Coast Survey". Existing utilities are also identified on Sheet C-401 "Utility Plan".

9/6/2023 “In regards to the RFI #2 response on the

Geothermal wells, since it is being requested to provide complete design and construction costs it adds a new dynamic to that item. Has TLC done a preliminary investigation of the required Gallons Per Minute to run the HVAC system and at what pressure that GPM would be?

TLC: We didn’t take the field design far enough to determine the pressure, however the GPM was calculated at 92.6 GPM.

Flagler Palm Coast Vehicle Maintenance Shop Page 4 of 4

The following is provided for clarification purposes only and is not to be used as a design for the system. The Geothermal system is a delegated design. This information is provided in response to questions related to the geothermal system, ABI 5.

“The geothermal ABI consists of the replacement of the office side direct expansion split systems and DOAS with equivalent sized water source heat pumps and associated geothermal vertical well field.

BASE DESIGN

The base design consists of a direct expansion (DX) dedicated outside air unit with exterior condensing unit (DOAS) with energy recovery ventilator (ERV) which provides outside air to the occupied spaces.

The base design space conditioning is done via DX concealed indoor air handling units, with paired exterior condensing units, ducted to diffusers and grilles.

GEOTHERMAL ABI

The Geothermal ABI replaces the indoor equipment (DOAS and DX Air handling units) with equivalent water source heat pump units. The zoning and controllability remain the same. The exterior condensing units associated with the DX units are deleted from the design as the well field provides the necessary heating and cooling source. The refrigerant lines routed from the condensing units to the indoor units are deleted from the design.

The geothermal well field ABI also includes required controls, associated pumps, associated condenser water piping, and the vertical well field. The field piping shall be high density polyethylene (HPDE). The well field shall consist of multiple vertical geothermal wells with looped piping. The configuration of the well field (depth, number of loops, piping configuration, etc) shall be determined by the contractor.

Wells shall be spaced a minimum of 20 feet apart. Well field and geothermal (interior and exterior) design shall be by a licensed professional engineer and signed and sealed documents shall be provided.

IT rooms and Equipment rooms shall remain served via the dedicated DX mini splits as per the base design.

Refer to attached conceptual design document that outlines one potential design solution. The conceptual design does not necessarily include all components and consideration as outlined in the design/performance requirements outlined in the design documents but is provided for illustrative purpose to convey general design intent.

Also attached is a preliminary soil analysis to assist in sizing of well field based on soil conditions including conductivity.

Initial Geothermal conceptual design included provisions for a 92.6 GPM system with 3 inch condenser water piping and approximately 35 wells. Well depth, configuration and quantity to be determined by the contractor. This information is provided for conceptual purposes only. Acceptable well field configurations include reverse return extended manifold, and close‐spaced manifold options. Contractor to obtain all required permits and follow all regulations and standards for geothermal closed loop design.”

TH

TH TH

TH

TH

TH

TH

TH

T H

T H

T H

T H

TH

TH

C O N O

CO

CO

NO2

NO2

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

1 32 4 5 6 87 9 10

A

C

E

B

D

C.1

BAY 2

32'-0"X64'-0"

BAY 1

32'-0"X64'-0"

BULKY

EQUIPMENT

STORAGE

CIRCULATION

COMMON IT

SPACE

BULK POL

STO LUBE

SYSTEM

MEN'S

LATRINE

SHOWERS/

LOCKER

ROOM

PHYSICAL

FITNESS

AREA

CLASSROOM

CLASSROOM

CLASSROOM

STORAGE

IT SERVER

ADMINISTRATION

WOMEN'S

LATRINE

SHOWERS

AND

LOCKER

ROOM

SUPERVISOR

INSPECTION

AND

LIBRARY

WOMEN

ADA

LATRINE 122

MEN ADA

LATRINE

FIRE

RISER

SUPPLY

ROOM

BATTERY

ROOM

ELECT

MECHANICAL

TEL / IT

PRODUCTION

CONTROLLER

BREAKROOM

AREA

CORRIDOR

HALL

WASHER-DRYER

UTILITY/JANITOR

TOOL ROOM

MAINTENANCE

AND

STORAGE

EGRESS

Space

Space

CIRCULATION

HP-03

HP-01 HP-02

60 CFM

HP-5

HP-8

HP-4

HP-7

HP-9

HP-6

AC-1

AC-2

AC-3 AC-4

HP-10

1"CWS

3.3 GPM

1 1/4"CWS

12.2 GPM

1 1/2"CWS

15.5 GPM

1"CWS

3.3 GPM

1 1/2"CWS

18.8 GPM

1"CWS

4.4 GPM

2"CWS

23.2 GPM

1 1/4"CWS

12.2 GPM

2"CWS

35.4 GPM

1 1/4"CWS

6.5 GPM

1 1/4"CWS

6.5 GPM

1 1/4"CWS

13.0 GPM

1 1/4"CWS

13.0 GPM

1 1/4"CWS

13.0 GPM

1"CWS

4.4 GPM

1 1/2"CWS

17.4 GPM

2 1/2"CWS

52.8 GPM

1"CWS

3.3 GPM

2 1/2"CWS

56.1 GPM

1 1/4"CWS

6.5

2 1/2"CWS

62.6 GPM

2"CWS

30 GPM

3"CWS

92.6 GPM

REFRIGERANT LINES TO ASSOCIATED CONDENSING UNITS

REFRIGERANT LINES TO ASSOCIATED CONDENSING UNITS

HP-DOAS

M6.1

P-2

P-1

C-1 C-2

C-4C-3

3" Ø CONDENSER WATER LINES OUT TO GEOTHERMAL WELL FIELD

LOCATED NORTH OF BUILDING. REFER TO CIVIL SITE PLAN FOR LOCATION.

WELL FIELD SHALL CONSIST OF (35) 250 FEET DEEP VERTICAL WELLS, SPACED 20 FEET APART.

MANIFOLD AND LOOP PIPING SHALL BE HIGH DENSITY POLYETHYLENE.

TLC Engineering Solutions 7370 Cabot Court, Ste. 103 Melbourne, FL 32940

© Copyright 2022 TLC Engineering Solutions, Inc.

COA #15 TLC NO:

Phone: 321-636-0274

Fax: 321-639-8986 www.tlc-engineers.com

521140

ARCHITECTURAL GROUP, INC.

A

B

C

1 2 3 4

D

E

F

G

H

5 6 7 8 9 10

J

K

L

M

N

P

Q

R

1 2 3 4 5 6 7 8 9 10

11 12 13 14 15 16 17

11 12 13 14 15 16 17

PROJECT TITLE AND OWNERS NAME

CONSULTANTS

SEAL AND SIGNATURE

REVISIONS

DRAWN BY

CHECKED

JOB

DATE

DRAWING TITLE

DRAWING NUMBER

SHEET OF

FL LIC. # AA0002264

5032 GODDARD AVENUE, SUITE A

ORLANDO, FLORIDA 32804

(407) 245-3660

COPYRIGHT © 2022 MRI ARCHITECTURAL GROUP INC.

FLORIDA NATIONAL GUARD

DEPARTMENT OF MILITARY AFFAIRS

FLAGLER PALM COAST

VEHICLE MAINTENANCE SHOP

DMA PROJECT NUMBER: 120324

NGB 60% SUBMITTAL

/3

/2

:1 :4

P

M B

IM

/2

F M

S

F la g le r P a lm

C o a s t/ M

E P

R

.r v t

M1.101

Author

Checker

MRI PROJ NUMBER

08/31/2022

MECHANICAL FLOOR

PLAN - PIPING - AREA A

20'8'4'0

1/8" = 1'-0"

N

1/8" = 1'-0"1

MECHANICAL FLOOR PLAN - PIPING - AREA A

October 27, 2021

Mr. David A. King, P.E.

Vice President Mead & Hunt, Inc.

4401 Eastport Parkway Port Orange, FL 32137

ECS Project No. 56-1473

Reference: Thermal Conductivity Test Results Armed Forces Reserve Center – Palm Coast 41 Laguna Forest Trail Palm Coast, Florida 32164

Dear Mr. King:

ECS Florida, LLP (ECS) has completed the Thermal Conductivity laboratory testing for the above referenced project. In summary, the ASTM D5334 testing (Thermal Conductivity by Thermal Needle Probe) was performed on a representative bulk sample obtained from Boring T-01. The test results are attached. If you have any questions concerning the information presented in this letter, please do not hesitate to contact us.

Respectfully, ECS FLORIDA, LLC represented by:

Vinay Kumar Arebelli Robert W. Clark, P.E.

Geotechnical Staff Project Manager Senior Engineer VArebelli@ecslimited.com Registered Georgia No. 19985

RWClark@ecslimited.com

Attachments:

Thermal Conductivity of Soil by ASTM D5334

FOR INFORMATION/CLARIFICATION PURPOSES

Client: ECS Limited Project Name: Armed Forces Reserve Center Project Location: Palm Coast, FL

GTX #: 314399

Start Date: 10/15/21 End Date: 10/15/21 Tested By: sjt Checked By: bfs Preparation:

Boring Sample Depth, ft Sample Description Moisture Content, Wet Density, pcf

Dry Density, pcf

Thermal Conductivity, W/m°K

Thermal Resistivity, °K cm/W

BS-1 Bucket Sample 6-10 Moist, very dark brown sand 22.26 124.2 101.6 2.97 34

Notes: W/m°K = Watts per Meter °Kelvin °K cm/W = °Kelvin Centimeter per Watt

Test specimen compacted with moderate effort at as-received moisture content. Material >3/8-inch removed from sample prior to testing (0% of sample). Trimmings moisture content = 22.26%

Thermal Conductivity of Soil by ASTM D5334

Geothermal ABI Clarification.pdf
M1.101 - MECHANICAL FLOOR PLAN - PIPING - AREA A.pdf
521140_MEP_R20
M1.101 - MECHANICAL FLOOR PLAN - PIPING - AREA A
Armed Forces Reserve Center - Addendum Letter ECS 56-1473.pdf
Armed Forces Reserve Center - Addendum Letter ECS 56-1473
Results 101921
REPORT

File details come from the government source that posted it. Updated .