Amendment2.pdf

PDF 106 KB Posted

Attached to
Lamoille Canyon Pavement Project on the Humboldt-Toiyabe National Forest
Solicitation number
1202NV20R0003
Issued by

About this file

This document is an amendment to a federal solicitation for pavement preservation services on the Lamoille Canyon route within the Humboldt-Toiyabe National Forest. The amendment extends the response deadline to June 16th at 1:00pm and provides clarification on requirements. Pavement milling will be 6 inches deep along 2,000 linear feet of road in two sections and an upper parking area, to be paid as a lump sum. Striping will consist of double coat paint along approximately 63,360 linear feet of road. The period of performance is July 1, 2020 to July 1, 2021. The solicitation is seeking bids for asphalt pavement preservation work by the USDA Forest Service.

View the file

Other files

File Type Posted
Amendment3.pdf PDF
Amendment1.pdf PDF
1202NV20R0003.pdf PDF
1202NV20R0003.pdf PDF
Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1202NV20R0003

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

02NV

IDAHO FALLS ID 83401

1405 HOLLIPARK DRIVE

IDAWY ACQUISTITION SERVICE CENTER

USDA FS

06/08/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/08/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Lamoille Canyon Pavement Preservation

The purpose of this amendment is to extend the solicitation closing date and answer questions.

The solicitation closing date is extended to June 16 at 1 pm MS.

The questions and answers are as follows:

Q: What is the depth of asphalt pavement milling required?

A: 6 inches depth

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

AMELIA R. VELASCO

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

TEL: EMAIL: 208-529-1020 ext: 5848 amelia.velasco@usda.gov

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1202NV20R0003/0002

Q: What is the unit of measure for bid item

413.02 Asphalt Pavement Milling - 2 EA 2000 LF

Road Sections?

A: Optional Item C: Pavement Milling - Road Sections and Upper Parking Area Pay Item 413.02 states the unit of measure. Pay Item 413.01 does not specify unit of measure. This item shall be paid for as a lump sum quantity and the work shall be done on 4000 feet of road 25 feet wide.

Q: Is the striping single coat or double coat?A:

According to FP 14 Section 634 two coats of paint is required

Q: Does each line of the Double Yellow Stripe get paid for separately?

A: Yes, each line gets paid separately. 6 miles of road at 5240 feet/mile times 2 stripes is 63,360 linear feet.

All other terms and conditions remain the same.

Period of Performance: 07/01/2020 to 07/01/2021

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .