Attachment 5 Option 2-6 Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BPWH_Clarification_2.docx | DOCX document | |
| Amendment__2.pdf | ||
| BPWH_Clarifications.docx | DOCX document | |
| Amendment__1.pdf | ||
| Attachment_3-BASE_Foundation_Drawings.pdf | ||
| Attachment_6-Past_Performance_Questionnaire.pdf | ||
| Attachment_1-Wage_Determination.pdf | ||
| Attachment_2-Specifications.pdf | ||
| R0007.pdf | ||
| Attachment_4-Option_1_Building_Erection_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*All work described below is summarized. Full detail can be found on the following drawings.
Option 2 – Site Work
This work includes preparing the project site for the warehouse building and subsequent parking and storage areas, including installation and construction of utilities. Construction shall include
(but is not limited to) major earthwork; entrance road and parking area; water system lateral; full septic system including gravity line, septic tank, and drainfield; and electrical work.
This bid item will include bringing the grades to within one foot of final subgrade elevations within the concrete and foundation footprint. Aggregate purchase and placement for elevations within the top foot of subgrade will be included in the base bid item.
Option 3 – Aggregate Surfacing
This work includes purchase, delivery, and placement of aggregate surfacing within the project site.
Option 4 – Asphalt
This work includes purchase, delivery, and placement of hot mix asphalt on the entrance road.
The same road profile on the following planset shall be used, surface elevations will be adjusted at intersections to meet existing or proposed surrounding grades.
Option 5 – Fencing
This work includes purchase, delivery, and installation of chain link fencing with privacy slats.
Included in this work is construction of (1) 34’ double-swing gate, (1) 12’ single gate, and (2) 4’ man gates.
Option 6 – Fuel Tanks and Concrete
This work includes relocating (1) 500 gallon and (1) 1,000 gallon concrete fuel tanks from
Bridgeport, CA to the project location (approximately 4 miles). Also included is constructing the holding pads for these tanks, along with an adjacent fueling pad.