Humboldt-Toiyabe NF-Bridgeport Warehouse Construction
Solicitation number
12026118R0007
Issued by

About this file

Attachment 5 Option 2-6 Drawings

View the file

Other files

File Type Posted
BPWH_Clarification_2.docx DOCX document
Amendment__2.pdf PDF
BPWH_Clarifications.docx DOCX document
Amendment__1.pdf PDF
Attachment_3-BASE_Foundation_Drawings.pdf PDF
Attachment_6-Past_Performance_Questionnaire.pdf PDF
Attachment_1-Wage_Determination.pdf PDF
Attachment_2-Specifications.pdf PDF
R0007.pdf PDF
Attachment_4-Option_1_Building_Erection_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

*All work described below is summarized. Full detail can be found on the following drawings.

Option 2 – Site Work

This work includes preparing the project site for the warehouse building and subsequent parking and storage areas, including installation and construction of utilities. Construction shall include

(but is not limited to) major earthwork; entrance road and parking area; water system lateral; full septic system including gravity line, septic tank, and drainfield; and electrical work.

This bid item will include bringing the grades to within one foot of final subgrade elevations within the concrete and foundation footprint. Aggregate purchase and placement for elevations within the top foot of subgrade will be included in the base bid item.

Option 3 – Aggregate Surfacing

This work includes purchase, delivery, and placement of aggregate surfacing within the project site.

Option 4 – Asphalt

This work includes purchase, delivery, and placement of hot mix asphalt on the entrance road.

The same road profile on the following planset shall be used, surface elevations will be adjusted at intersections to meet existing or proposed surrounding grades.

Option 5 – Fencing

This work includes purchase, delivery, and installation of chain link fencing with privacy slats.

Included in this work is construction of (1) 34’ double-swing gate, (1) 12’ single gate, and (2) 4’ man gates.

Option 6 – Fuel Tanks and Concrete

This work includes relocating (1) 500 gallon and (1) 1,000 gallon concrete fuel tanks from

Bridgeport, CA to the project location (approximately 4 miles). Also included is constructing the holding pads for these tanks, along with an adjacent fueling pad.

Attachment #5-Solicitation No.: 12026118R0007