12010918R0003_A02_SF30.pdf
PDF 83 KB Posted
- Attached to
- Dangerous River Boat Launch Federal contract opportunity
- Solicitation number
- 12010918R0003
About this file
12010918R0003, Amendment 02, Standard Form 30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12010918R0003_A05.pdf | ||
| 12010918R0003_A04.pdf | ||
| DangerousRiverHydrologyResourceReport.pdf | ||
| StateofAKDeparNaturalResourcesConcreteBoatRampDrawingW-1.pdf | ||
| 12010918R0003_A03_SF30.pdf | ||
| 12010918R0003_PrePropMeetingAgendaNotes_fnl.pdf | ||
| 12010918R0003_A02_SF30Atch02_SpecSection014100.pdf | ||
| NatlCoreAK_TNF_BMP_Crosswalk.pdf | ||
| FSH2509_22_2006b_BMPsR10.pdf | ||
| USDAFS_WaterQualityMgmt_BMPs_April2012.pdf | ||
| 12010918R0003_A02_SF30Atch01Photographs.pdf | ||
| 12010918R0003_SF1442.pdf | ||
| AK1_09Feb2018_Mod2.docx | DOCX document | |
| BioPreferred_Product_Categories.pdf | ||
| EPA_CPG_LandscapingProducts.pdf | ||
| Dangerous_River_Project_Drawings_071517.pdf | ||
| 12010918R0003_DangerousRiverBoatLaunch_RFP.pdf | ||
| Project_Specifications_Combined-July2017.pdf | ||
| EPA_CPG_ConstructionProducts.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12010918R0003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ANCHORAGE AK 99501
161 EAST 1ST AVENUE DOOR 8
CHUGACH NF-SUPERVISORS OFFICE
USDA FOREST SERVICE
03/16/20180002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/23/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Dangerous River Boat Launch Ramp.
Amendment 02 issued for the following reasons:
1. Publish agenda and notes from pre-proposal meeting held on 07 March 2018. Conference call notes include a CloudVault link that includes vides of the project area.
2. Make change to Section F, FAR 52.211-10 Commencement, Prosecution and Completion of work. Replace the wording for item (c) in its entirety with: Complete the entire work ready for use not later than 01 Aug 2019. The time stated for completion shall include final cleanup of the premises.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARI MEINERS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 17
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12010918R0003/0002
3. Make change to Section H, Landscape
Preservation. Replace the dates in item (f) with
01 June - 15 July.
4. Clarification to Section H, Required
Permitting. NPDES Storm-water Permit is not required for this project. Contractors should take note of the three (3) best management practice documents incorporated under this amendment (reference 6 below).
5. Share photographs of the project area.
6. Add three (3) best management practices references to Project Specifications Section
014100 - Regulatory Requirements, Part 1.2, A-Reference Specification. Three (3) documents included with this amendment.
Period of Performance: 04/06/2018 to 08/01/2019
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it.