12-IFB 26-1-23900R1 Vol.5B Plans V2.pdf

PDF 5 MB Posted

Attached to
MCT Building #3 Bus Lift Replacement (REBID)
Solicitation number
26-1-23900R1
Issued by
Madison County, Illinois

About this file

This document is a comprehensive set of architectural and engineering design plans for the MCT Building 3 Lift Replacement project located at 1 Transit Way in Pontoon Beach, Illinois. The project involves removing and replacing two existing heavy-duty rotary vehicle lifts in a service bay area, with detailed specifications for demolition, new installation, electrical work, and pit modifications. The project is being undertaken by MCT (Madison County Transit) and designed by AAIC (Architecture and Construction) with WRF Engineers as a consulting firm. The project is scheduled for bid on 9/30/2025, with an expiration date of 11/30/2026.

The design plans include extensive technical details for the lift replacement, including specific requirements for concrete work, electrical connections, pneumatic line installations, and precise measurements for the new lift pits and control consoles. The project involves removing existing hydraulic systems, electrical connections, and concrete surfaces, and installing new lifts with accompanying infrastructure. The electrical plans specify using the existing Siemens 120/208V, three-phase, 250A electrical panel, with modifications including installing a new 40A/3P circuit breaker and providing new electrical and pneumatic connections for the lift console. The total project encompasses comprehensive demolition, electrical, and structural work within the service bay area of Building 3.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COPYRIGHT 2025 by AAIC, INC.

A

PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2026

DATE:

H A

L F

/2

/4

/4

/2

/1

/8

G

R A

P H

IC

S

C A

L E

F

IG

U R

E S

SIGNED:

D R

A W

IN

G

R E

V

IS

IO

N

S

B

C

D

E

F

G

H

GENERAL CONTRACTOR

GYPSUM BOARD

FIRE EXTINGUISHER

& WALL BRACKET

FIRE EXTINGUISHER

EXPOSE (ED), EXPANSION

ELECTRIC WATER COOLER

ENGINEER (ING) (ED)

ELEVATION, ELEVATOR

ELECTRIC, ELECTRICAL

EXPANSION JOINT

DOWN SPOUTDS.

DW. DRYWALL

DEMO.

DET./DTL.

DIA.

D.L.

DR.

DIM.

C.T.

C.Y.

CAR.

DEMOLITION

DETAIL

DIAMETER

DIMENSION

DEAD LOAD

DOOR

CARPET

CERAMIC TILE

CUBIC YARD

D HDWD.

HDW. (R)

GYP.

H.B.

H.M.

H.D.

H.C.

GLS.

G.C.

HOSE BIB

HOLLOW METAL

HARDWOOD

HARDWARE

HIGH DENSITY

HOLLOW CORE

HANDICAPPED,

GYPSUM

GLASS

H

CONCRETE MASONRY UNIT

CONTINUOUS, CONTINUED

BUILDING EXPANSION JOINT

CONC.

CONF.

CONST.

CONT.

CORR.

CLG.

COL.

C.M.U.

C.F.

C.J.

CAB.

CEILING

CONCRETE

CONFERENCE

CONSTRUCTION

COLUMN

CORRIDOR

CABINET

CUBIC FEET

CONTROL JOINT

C

BK./BRK.

BLDG.

BLKG.

ASPH.

BM.

BOT.

BRG.

BO.

BD.

BEJ

BUILDING

BLOCKING

BY OWNER

BOTTOM

BEARING

BEAM

BOARD

BRICK

ASPHALT

B

FINISHFIN.

G.B./GYP. BD.

GALV.

FLEX.

FLUOR.

FLASH.

FL./FLR.

GAL.

GA.

FUR.

F.V.

FTG.

GALVANIZED

GALLON

GAUGE

G

FIELD VERIFY

FURRED (ING)

FOOTING

FLEXIBLE

FLUORESCENT

FLASHING

FLOOR (ING)

FRG

F.E.C.

FDN./FNDN.

EXIST., EX.

F.F.

F.E.

EXT.

EXP.

FIBERGLASS MAT REINF. GYP. BD.

FINISH FLOOR

EXTINGUISHER

CABINET & FIRE

FOUNDATION

EXTERIOR

EXISTING

F

AIR CONDITION (ING)

ARCHITECT (URE) (URAL)

ABOVE FINISH FLOOR

ADJACENT, ADJUSTABLE

ADDENDUM, ADDITIONAL

ACOUSTICAL CEILING TILE SYS.

ARCH.

APPROX.

ANOD.

A.L./ALUM.

ADJ.

ALT.

A.F.F.

A.B.

A.C.T.

ADD.

A/C

APPROXIMATE

ANODIZED

ALTERNATE

ALUMINUM

ANCHOR BOLT

A

E.W.C.

EQUIP.

ENGR.

ELEV./EL.

ELEC. ELECT.

EQ.

E.P.

E.

E.F.

E.J.

EA.

EQUIPMENT

EQUAL

ELECTRIC PANEL

EXHAUST FAN

EACH

EAST

E

W

STAINLESS STEEL

SPECIAL COATING

SANITARY NAPKIN DISPENSER

SEALANT JOINT W/ BACKER ROD.

SUSPEND, SUSPENDED

STRUCTURE, STRUCTURAL

OVERHEAD DOOR (SECTIONAL)

OUTSIDE FACE OF WALL

OVERFLOW DRAIN

OUTSIDE DIAMETER,

NOT IN CONTRACT

O

OPP.

OPNG.

OHD.

O.F.O.W.

OH.

OFF.

O.D.

O.C.

OPPOSITE

OPENING

OVERHEAD

OFFICE

ON CENTER

N.T.S.

NOM.

N.I.C.

NAT.

MTL./MET.

MTG.

MTD.

NORTH

NOT TO SCALE

NOMINAL SIZE

NATURAL

METAL

MEETING

MOUNT (ED)

N

STD.

STL.

STRUCT.

SUSP.

SYS.

STEEL

SYSTEM

STANDARD

S.C.

SHTG.

SIM.

S.N.D.

S.S.

SPC.

SQ.

SPKLR.

SECT.

SJ.

S.F.

SPRINKLER

SQUARE

SIMILAR

SQUARE FEET

SECTION

SHEATHING

SOLID CORE

WELDED WIRE FABRIC

WD.

WDW.

W.C.

W.W.F.

WT.

W.

W/

WEIGHT

WEST

WITH

WOOD

WINDOW

WATER CLOSET

ROUGH OPENING

RETURN TO OWNER

REINFORCE (ED) (ING)

POLYVINYL CHLORIDE

PAPER TOWEL DISPENSER

PULL STATION (FIRE ALARM)

POUNDS / SQUARE INCH

POUNDS / SQUARE FOOT

PAINT(ED), PRESSURE TREATED

PLASTIC LAMINATE

PLASTIC/PLASTER

PAVED, PAVEMENT

MASONRY OPENING

MISCELLANEOUS

MANUFACTURE (ER) (ED)

LT. LIGHT

MISC.

MFR.

MEZZ.

MECH.

MAX.

MATL./MAT.

MAS.

M.S.

M.O.

MIN.

MOP SINK

MINIMUM

MEZZANINE

MECHANICAL

MAXIMUM

MATERIAL

MASONRY

M

LAV.

LAM.

KITCH.

L.F.

L.L.

LB.

JT.

LIVE LOAD

LINEAL FEET

POUND

LAVATORY

LAMINATED

L

KITCHEN

JOINT

K

REINF.

R.T.O.

R.O.

RM.

REV.

RESIL.

REQ.

S. SOUTH

S

REVISION

ROOM

RESILIENT

REQUIRE (ED)

PVMT.

PVC.

P.T.D

R

RADIUS

PAVEMENT

INSULATION, INSULATED

INSIDE DIAMETER

JAN.

INCAND.

INSUL.

JST.

JCT.

JB.

I.D.

INT.

JOIST

JUNCTION

JUNCTION BOX

JANITOR

J

INCANDESCENT

INTERIOR

I

P.S.I.

P.S.F.

P./PT.

PNL.

P. LAM.

PLAS.

PLYWD.

PLMB.

PAV.

PS

P.T.

PL.

PAINT (ED)

PANEL

PLYWOOD

PLUMB(ING)

PLATE

P

TYPICALTYP.

VINYL WALL COVERING

VENEER PLASTER

VAPOR BARRIER, VINYL BASE

VINYL COMPOSITION TILE

VENTILATOR, VENTILATION

V.B.

V.C.T.

VERT.

VEST.

VENT.

V.T.B.

V.T.

V.W.C.

V.P.

V.

VINYL TILE BASE

VINYL TILE

VINYL

VESTIBULE

VERTICAL

UNF.

UTIL.

UR.

TV.

URINAL

UTILITY, UTILITIES

V

TELEVISION

UNFINISHED

U

TOP OF CONCRETE

TEMPORARY, TEMPERED,

TERR.

TEMP.

TEL.

T.O.C.

THRESH.

T.O.

T.O.S.

TOIL./TLT. TOILET

TOP OF

THRESHOLD

TOP OF STEEL

TERRAZZO

TELEPHONE

TEMPERATURE

T

AIR CONDITIONING

HEATING/VENTILATING/

HEATING & VENTILATING

HT., HTG. HEIGHT

H.V.A.C.

H.&V.

HORIZ. HORIZONTAL

DG. FIBERGLASS MAT FACED GYP. BD.

WSC. WOOD SOLID CORE

BF. BI-FOLD

CPT. CARPET TILE

E.O.S. EDGE OF SLAB

N.

E (CONT.)

R.

R (CONT.)

DRAWING SYMBOLS

AAIC, INCORPORATED PROJECT NO.:

PROJECT DATA

FOR: BY:

CONSULTANTS PROJECT LOCATION

DRAWING INDEXARCHITECTURAL ABBREVIATIONS

GR

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

A1.0

A1.0

INTERIOR ELEVATION TAG

WALL SECTION

ROOM TAG

DOOR TAG

REVISION TAG

KEYNOTE TAGDETAIL SECTION

ROOM NAME

BUILDING ELEVATION TAG

A1.0

A1.0

A1.0

PLAN/DETAIL CALLOUT

WINDOW TAG

PARTITION TAG

CEILING HEIGHT TAG9'-0"COLUMN GRIDA

AREVISION CLOUD

A1

R E

M A

R K

S

D A

T E

N

O

9/30/2025

NC/JC

ISSUED FOR BID

26-1-23900

G000

M C

T B ld g

Li ft R ep la ce m en t

T

R A

N S

IT

W

A Y

, P O

N T

O O

N B

E A

C H

, I L

P R

O

JE

C T

C O

V E

R S

H E

E T

MCT Bldg 3 Lift Replacement

26-1-23900

1 TRANSIT WAY, PONTOON BEACH, IL 62040

MCT PROJECT NUMBER: 26-1-23900R1

BUILDING 3 - 1 TRANSIT WAY, PONTOON BEACH, IL 62040

1. CONTRACTOR SHALL COORDINATE REMOVAL,

HAULING, AND LEGAL DISPOSAL OF ALL WASTE

MATERIALS.

2. EXISTING ITEMS DISTURBED OUTSIDE THE

DESIGNATED DEMOLITION AREAS ARE TO BE

REPLACED WITH EQUAL OR BETTER CONSTRUCTION AT

THE EXPENSE OF THE CONTRACTOR. EVERY EFFORT

SHALL BE MADE TO MINIMIZE SUCH DISTURBANCES.

3. THE EXISTING UTILITIES ARE SHOWN FROM THE BEST

AVAILABLE RECORDS AND SHALL BE VERIFIED BY THE

CONTRACTOR TO THEIR OWN SATISFACTION BEFORE

AND DURING DEMOLITION. THE A/E NOR THE OWNER

WARRANTS OR GUARANTEES THE COMPLETENESS OR

THE CORRECTNESS OF THE INFORMATION PROVIDED.

4. OWNER SHALL REMOVE ALL FURNITURE AND

MOVEABLE EQUIPMENT PRIOR TO THE START OF

WORK.

5. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS

AND CONDITIONS AND MAKE MINOR ADJUSTMENTS AS

NECESSARY. NOTIFY A/E OF ANY DISCREPANCIES

WHICH MAY AFFECT THE OUTCOME OF THE WORK.

6. DIMENSIONS SHOWN ARE FROM FACE OF FINISH TO

FACE OF FINISH UNLESS OTHERWISE NOTED.

7. ALL EXISTING FINISHES INDICATED TO REMAIN BUT

DISTURBED DURING CONSTRUCTION SHALL BE

RESTORED TO A CONDITION AT LEAST EQUAL IN

MATERIAL AND APPEARANCE TO THAT WHICH EXISTED

PRIOR TO CONSTRUCTION.

8. UPON COMPLETION OF CONSTRUCTION ACTIVITIES

CONTRACTOR SHALL CLEAN ALL WORK AREAS SO

THAT THEY ARE FREE OF ALL CONSTRUCTION DIRT

AND DEBRIS.

9. PROTECT EXISTING UTILITIES DURING

CONSTRUCTION.

10. CONTRACTOR SHALL COORDINATE ALL WORK WITH

THE OWNER, A/E AND OTHER TRADES THROUGHOUT

THE PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR THE

PROTECTION AND CONDITION OF ALL TEMPORARY

UTILITIES THROUGHOUT THE COURSE OF THE

PROJECT. DAMAGES CAUSED BY THE FAILURE OF

UTILITIES ARE SOLELY THE RESPONSIBILITY OF THE

CONTRACTOR.

GENERAL NOTES:

APPLICABLE TO ALL SHEETS

GENERAL

G000 PROJECT COVER SHEET

ARCHITECTURE

AD100 DEMOLITION PLAN

AD200 LIFT PIT DEMO SECTIONS

A100 NEW WORK PLAN

A101 LIFT PIT AND CONSOLE PLANS

A200 LIFT PIT SECTIONS AND DETAILS

ELECTRICAL

ED100 ELECTRICAL DEMOLITION PLAN

E100 ELECTRICAL PLAN

IFB 9/30/25

9/30/2025

UP

DN DN

D D

C C

B B

A A

D1

D1

D6

D2

D3

D4

D7

OFFICE

DRIVE-THRU BAY

F.D.

F.D.

2' -1

1/

8" 9'

-6

PANEL P3

F.D.

3'-4" 14'-5 3/4"

CL

CL

CL

CL

D1

D4

D2

'-7

/4

'-7

'-0

/4

7'-0" 7'-0"

20'-0" 20'-0" 20'-0" 20'-0" 20'-0"

7'-0" 7'-0"

SHOP AREA

SERVICE

BAY

LIFT #2

LIFT #1

SERVICE PIT

BAY

SERVICE

BAY

12'-4 1/2" 5'-5 1/4"

2'-2"

AD200

6'-4"

'-2

AD200

AD200

AD200

17'-9 3/4"

D6

1' -8

D2

1' -8

D6D6

AD200

9' -0

7'-6 1/2"

F.D.

'-6

E X

IS

T

. C E

N T

E R

O F

W H

E E

L

'-4

AREA NOT IN SCOPE

LIMITS OF DEMOLITION

COPYRIGHT 2025 by AAIC, INC.

A

PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2026

DATE:

H A

L F

/2

/4

/4

/2

/1

/8

G

R A

P H

IC

S

C A

L E

F

IG

U R

E S

SIGNED:

D R

A W

IN

G

R E

V

IS

IO

N

S

KEYED NOTES:

B

C

D

E

F

G

H

GR

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

R E

M A

R K

S

D A

T E

N

O

9/30/2025

NC/JC

ISSUED FOR BID

26-1-23900

AD100

M C

T B ld g

Li ft R ep la ce m en t

T

R A

N S

IT

W

A Y

, P O

N T

O O

N B

E A

C H

, I L

D E

M O

LI

T

IO

N

P

LA

N

3/16" = 1'-0"

GROUND FLOOR DEMOLITION PLAN - BUILDING 3

DEMOLITION PLAN KEY

D1 CONTRACTOR SHALL DISCONNECT, EXCAVATE,

AND REMOVE HEAVY DUTY ROTARY LIFTS,

HYDRAULICS, COMPONENTS, AND CONTROLS.

DRAIN HYDRAULIC SYSTEM AND PROPERLY

DISPOSE OF FLUID. SALVAGE LIFT AND RELATED

COMPONENTS AND PRIOR TO DISPOSAL CHECK

WITH MCT MAINTENANCE STAFF TO VERIFY IF

THEY WISH TO RETAIN ANY OLD EQUIPMENT OR

COMPONENTRY.

D2 SAW-CUT EXISTING CONCRETE IN A STRAIGHT

AND WORKMAN LIKE MANNER AND REMOVE

INDICATED PORTION OF EXISTING CONCRETE

SLAB. CONCRETE AND DEBRIS SHALL BE

PROPERLY DISPOSED OF. EXCAVATE SOIL

UNDER CONCRETE SLAB TO A DEPTH OF 3'-6"

FOR NEW FOOTING.

D3 REMOVE EXISTING ABOVE GROUND POWER

UNIT AND CONTROLS. PROPERLY DISPOSE.

D4 REMOVE EXISTING CHASE FOR EXISTING

HYDRAULIC AND AIR LINES.

D6 REMOVE EXISTING WHEEL BASE AND ALL

ASSOCIATED COMPONENTS.

D7 OWNER TO CAP EXISTING HYDRAULIC AND AIR

LINES.

1. BOTH LIFT SYSTEMS ARE TO BE REMOVED

AND REPLACED AT THE SAME TIME.

2. DRAIN AND PROPERLY DISPOSE OF

HYDRAULIC FLUID IN EXISTING LIFT.

3. DISCONNECT ELECTRICAL SOURCE FOR

LIFTS AT THE BREAKER.

4. CAP OFF SANITARY SEWER AND DRAIN LINES

IN THE CONSTRUCTION ZONE.

5. PROTECT ALL BUILDING FINISHES AND

EQUIPMENT DURING THE DEMOLITION PHASE

OF THE WORK.

6. PROVIDE CURTAINS TO CONTAIN DUST

DURING DEMOLITION.

7. REMOVE DEBRIS FROM THE AREA AND

STOCK PILE IN THE DESIGNATED AREA. THE

WORK AREA SHALL REMAIN FREE FROM

DEBRIS AT ALL TIMES.

8. CONTRACTOR'S WORKERS AND EQUIPMENT

SHALL BE CONFINED TO WORK AREAS ONLY.

GENERAL NOTES

D1

D6

AD2001'-8"

1'-8"

SLOPE

D1

D1

AD200

D2D2

D5

5" 3'

-5

10"

D5

10"1'-8"

4'-7 1/4"

A

D1

D2 D2

AD200

D4 D2

D5

SLOPE

29'-7"

D5

D6

2' -3

4"

9'-0"

9'-6"

E X

IS

T

IN

G

F .D

35'-6"

E X

IS

T

IN

G

F .D

E X

IS

T

IN

G

O

V E

R H

E A

D D

O O

R

AD200

5" 3'

-2 " 2' -7

AD200

D1

1'-8"

3'-4"

1' -1

0"

2' -3

10" 10" 5"

D4

D2

COPYRIGHT 2025 by AAIC, INC.

A

PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2026

DATE:

H A

L F

/2

/4

/4

/2

/1

/8

G

R A

P H

IC

S

C A

L E

F

IG

U R

E S

SIGNED:

D R

A W

IN

G

R E

V

IS

IO

N

S

KEYED NOTES:

B

C

D

E

F

G

H

GR

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

R E

M A

R K

S

D A

T E

N

O

9/30/2025

NC/JC

ISSUED FOR BID

26-1-23900

AD200

M C

T B ld g

Li ft R ep la ce m en t

T

R A

N S

IT

W

A Y

, P O

N T

O O

N B

E A

C H

, I L

LI

F

T P

IT

D

E M

O S

E C

T

IO

N S

D1 CONTRACTOR SHALL DISCONNECT, EXCAVATE,

AND REMOVE HEAVY DUTY ROTARY LIFTS,

HYDRAULICS, COMPONENTS, AND CONTROLS.

DRAIN HYDRAULIC SYSTEM AND PROPERLY

DISPOSE OF FLUID. SALVAGE LIFT AND RELATED

COMPONENTS AND PRIOR TO DISPOSAL CHECK

WITH MCT MAINTENANCE STAFF TO VERIFY IF

THEY WISH TO RETAIN ANY OLD EQUIPMENT OR

COMPONENTRY.

D2 SAW-CUT EXISTING CONCRETE IN A STRAIGHT

AND WORKMAN LIKE MANNER AND REMOVE

INDICATED PORTION OF EXISTING CONCRETE

SLAB. CONCRETE AND DEBRIS SHALL BE

PROPERLY DISPOSED OF. EXCAVATE SOIL

UNDER CONCRETE SLAB TO A DEPTH OF 3'-6"

FOR NEW FOOTING.

D4 REMOVE EXISTING CHASE FOR EXISTING

HYDRAULIC AND AIR LINES.

D5 REMOVE ALL EXISTING CONCRETE, REBAR, AND

OTHER COMPONENTS ASSOCIATED WITH

EXISTING LIFT.

D6 REMOVE EXISTING WHEEL BASE AND ALL

ASSOCIATED COMPONENTS.

1/2" = 1'-0"

LIFT PIT #2 DEMO SECTION

1/2" = 1'-0"

LIFT PIT #1 DEMO SECTION

1/2" = 1'-0"

LIFT PIT #1 DEMO SECTION

1/2" = 1'-0"

LIFT PIT #2 DEMO SECTION

1" = 1'-0"

LIFT PIT #1 CHASE DEMO SECTION

OFFICE

DRIVE-THRU BAY

D D

C C

B B

A A

A2

A1

A3

A4

A6

A8

A9

A1

F.D. F.D.

F.D.

CL

CL

CL

CL

3' -1

PANEL P3

A200

7'-9 3/16" 10'-0 9/16"

'-7

17'-9 3/4"

14'-5 3/4"

'-1

/4

9'

-6

2' -0

1'

-6

'-2

3'

-1

7'-0" 7'-0"7'-0" 7'-0"

12'-4 1/2" 5'-5 1/4"

20'-0" 20'-0" 20'-0" 20'-0" 20'-0"

A101

3'-6" 7'-6 1/2"

'-6

5'

-4

1' -8

1'

-2

3'-8" 1'-8" 3'-8"

9'-0"

'-1

0"

9'-4 1/2"

1'-0 1/2" 1'-3" 5'-5 11/16" 2'-6 1/4" 4'-2" 2'-6 1/4" 10 1/16"

A1

A1

LIFT #2

SERVICE

BAY

LIFT #1

SERVICE PIT

BAY

SERVICE

BAY

SHOP AREA

1-41

A6

A8A1

A12

3'-1"

1' -9

9'

-6

F.D.

9' -0

'-6

'-1

N E

W C

E N

T E

R O

F W

H E

E L

B A

S E

'-0

AREA NOT IN SCOPE

LIMITS OF DEMOLITION

COPYRIGHT 2025 by AAIC, INC.

A

PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2026

DATE:

H A

L F

/2

/4

/4

/2

/1

/8

G

R A

P H

IC

S

C A

L E

F

IG

U R

E S

SIGNED:

D R

A W

IN

G

R E

V

IS

IO

N

S

KEYED NOTES:

B

C

D

E

F

G

H

GR

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

R E

M A

R K

S

D A

T E

N

O

9/30/2025

NC/JC

ISSUED FOR BID

26-1-23900

A100

M C

T B ld g

Li ft R ep la ce m en t

T

R A

N S

IT

W

A Y

, P O

N T

O O

N B

E A

C H

, I L

N E

W W

O R

K P

LA

N

3/16" = 1'-0"

GROUND FLOOR DIMENSION PLAN - BUILDING 3

PLAN KEY

A1 FINISH CONCRETE FLOOR TO MATCH ALL

CURRENT SLOPES, PITCHES, AND FINISH

(POLISHED AND SEALED). TIE IN NEW VAPOR

BARRIER WITH EXISTING UNDER THE

CONCRETE. CONCRETE SHALL HAVE NO

EXPANSION JOINTS, UNLESS NEW CONCRETE

IS BUTTED UP TO AN EXISTING EXPANSION

JOINT; REPLACE POURED NEOPRENE

SEALANT. CONCRETE IS TO BE 5" THICK WITH

#4 REBAR EACH WAY AT LIFT #1; LIFT 2 INFILL

PER 6/A200

A2 FIXED CASSETTE TO BE INSTALLED AT NO

MORE THAN 1/8" ABOVE FINISH FLOOR.

A3 MOVABLE CASSETTE TO BE INSTALLED AT NO

MORE THAN 1/8" ABOVE FINISH FLOOR.

A4 12" THICK FOOTING WITH #5 REBAR AT 14" O.C.

EACH WAY.

A6 4" PVC CONDUIT CHASE FOR HYDRAULIC AND

AIR LINES. INSTALL PER LIFT

MANUFACTURER'S STANDARDS.

A8 3/4" RIGID METAL CONDUIT FOR AUTOMATIC

WHEEL BASE POSITIONING POTENTIOMETER

CABLE. INSTALL PER LIFT MANUFACTURER'S

STANDARDS.

A9 LIFT CONTROL CONSOLE. PROVIDE CONCRETE

HOUSEKEEPING PAD 4" THICK ABOVE

EXISTING FINSH CONCRETE FLOOR.

A12 1/4" STEEL COVER PLATE 48" MAX LENGTH.

(OPTION: ENCASE SCISSOR LIFT CONDUIT TO

ALLOW INSTALLATION OF SCISSOR LIFT

HYDRAULIC AND AIR LINES IN LIEU OF CHASE

WITH STEEL COVER.)

A200

A200

A200

ELECTRICAL LINE-SIDE

SUPPLY TO CONTROL

CONSOLE INCLUDING 3

PHASE, 208/230/460/575

VOLT, 40/40/20/20 AMP

PNEUMATIC LINE-SIDE SUPPLY 90

PSI, 5 CFM, TO INCLUDE FILTER,

REGULATOR & LUBRICATOR

3' -1

9'-2 1/2"

CONCRETE BLOCK-OUT

SERVICE OPENING

6" H X 16" W X 4" D

EMBEDDED FRAME: NOSING

ANGLE - L3" X 3" X 1/4" WITH

FORM BAR - 3/8" X 1 1/4"

1'-0 1/2"

4'-2" WALL TO WALL

'-6

IN

S

ID

E W

A

LL

T O

IN

S

ID

E

W A

LL

9'-6 1/2"

'-0

M

A X

. W H

E E

LB

A

S E

1' -6

9' -0

M

IN

. W

.B

'-0

C

E N

T E

R

'-0

T

R A

V E

L R

A N

G E

FRONT OF VEHICLE

REAR OF VEHICLE

COVERS:

1 @ 23.50" 1 @ 8.75"

TWO (2) BRIDGE

BRACKETS

WALL BRACKET

WHEEL DISH AND

NOSING ANGLE

CENTERLINE OF

STATIONARY

LIFTING UNIT

CL

C L

A4 A1

A1

A1

A3

A2

A8

A6

A9

LIFT #1

F.D.

A4

A12

A12

3'-1"

'-1

3/

4"

CL

F.D.

EXISTING U.G. DRAIN

9' -6

'-0

" 11 '-6

1'-7 1/2"

CONTROL CONSOLE

RIGID METAL CONDUIT FOR

ELECTRIC LINE SIDE SUPPLY,

INCLUDE SEAL-OFF.

3/4" RIGID METAL CONDUIT,

CONTINUOUS PIPE 18"

ABOVE FINISHED FLOOR,

INCLUDE SEAL-OFF.

CONDUIT CHASE OR PIPE FOR

COMPRESSED AIR SUPPLY.

4" SCH. 40 PVC CHASE,

TRIM TO 3" ABOVE

FINISHED FLOOR.

3'-1"

3' -1

NEW 4" CONCRETE

EQUIPMENT PAD.

F R

O N

T

ALIGN WITH EXISTING COLUMN

SLOPED FLOOR

REAR OF VEHICLE

FRONT OF VEHICLE

HATCHED AREAS TO BE

FLAT & LEVEL

3' -0

A200

A200

A4

A4

2' x 2' PUMP PIT

SUMP PUMP PROVIDED

BY OWNER

FRONT

RIGID METAL CONDUIT FOR ELECTRIC

LINE SIDE SUPPLY. INCLUDE SEAL-OFF

TO MEET LOCAL REQUIREMENTS.

CONDUIT CHASE OR PIPE FOR

COMPRESSED AIR SUPPLY.

3/4" RIGID METAL CONDUIT,

CONTINUOUS PIPE 18" ABOVE

FINISHED FLOOR, INCLUDE SEAL-OFF

TO MEET LOCAL REQUIREMENTS.

4" SCH. 40 PVC CHASE, TRIM TO 3"

ABOVE FINISHED FLOOR.

WALL TO WALL

4'-2"

9'-6 1/2"

'-6

IN

S

ID

E W

A

LL

T O

IN

S

ID

E

W A

LL

3' -6

SUMP PUMP PIT

2'X2'X2' TYP.

4' -0

5'

-0

9' -0

2'

-4

CONCRETE BLOCK-OUT SERVICE

OPENING 6" H X 16" W X 4" D

(SEE DETAIL 5/A200)

REAR OF VEHICLE

FRONT OF VEHICLE

EMBEDDED FRAME: NOSING

ANGLE - L3" X 3" X 1/4" WITH

FORM BAR - 3/8" X 1 1/4"

CONCRETE WALL BELOW

CONCRETE FOOTING BELOW

3/4" RIGID

METAL CONDUIT

4" SCH 40

PVC CHASE

CL

CL

CONC. BLOCK-OUT

(SEE DETAIL 4/A200)

COPYRIGHT 2025 by AAIC, INC.

A

PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2026

DATE:

H A

L F

/2

/4

/4

/2

/1

/8

G

R A

P H

IC

S

C A

L E

F

IG

U R

E S

SIGNED:

D R

A W

IN

G

R E

V

IS

IO

N

S

KEYED NOTES:

B

C

D

E

F

G

H

GR

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

R E

M A

R K

S

D A

T E

N

O

9/30/2025

NC/JC

ISSUED FOR BID

26-1-23900

A101

M C

T B ld g

Li ft R ep la ce m en t

T

R A

N S

IT

W

A Y

, P O

N T

O O

N B

E A

C H

, I L

N E

W L

IF

T

P

IT

A N

D C

O N

S O

LE

P

LA

N

S

3/8" = 1'-0"

NEW LIFT CONTROL CONSOLE AND LIFT- ENLARGED PLAN

3/4" = 1'-0"

NEW LIFT CONTROL CONSOLE

3/8" = 1'-0"

NEW LIFT BASE PLAN

A1 FINISH CONCRETE FLOOR TO MATCH ALL

CURRENT SLOPES, PITCHES, AND FINISH

(POLISHED AND SEALED). TIE IN NEW VAPOR

BARRIER WITH EXISTING UNDER THE

CONCRETE. CONCRETE SHALL HAVE NO

EXPANSION JOINTS, UNLESS NEW CONCRETE

IS BUTTED UP TO AN EXISTING EXPANSION

JOINT; REPLACE POURED NEOPRENE SEALANT.

CONCRETE IS TO BE 5" THICK WITH #4 REBAR

EACH WAY AT LIFT #1; LIFT 2 INFILL PER 6/A200

A2 FIXED CASSETTE TO BE INSTALLED AT NO

MORE THAN 1/8" ABOVE FINISH FLOOR.

A3 MOVABLE CASSETTE TO BE INSTALLED AT NO

MORE THAN 1/8" ABOVE FINISH FLOOR.

A4 12" THICK FOOTING WITH #5 REBAR AT 14" O.C.

EACH WAY.

A6 4" PVC CONDUIT CHASE FOR HYDRAULIC AND

AIR LINES. INSTALL PER LIFT MANUFACTURER'S

STANDARDS.

A8 3/4" RIGID METAL CONDUIT FOR AUTOMATIC

WHEEL BASE POSITIONING POTENTIOMETER

CABLE. INSTALL PER LIFT MANUFACTURER'S

STANDARDS.

A9 LIFT CONTROL CONSOLE. PROVIDE CONCRETE

HOUSEKEEPING PAD 4" THICK ABOVE EXISTING

FINSH CONCRETE FLOOR.

A12 1/4" STEEL COVER PLATE 48" MAX LENGTH.

(OPTION: ENCASE SCISSOR LIFT CONDUIT TO

ALLOW INSTALLATION OF SCISSOR LIFT

HYDRAULIC AND AIR LINES IN LIEU OF CHASE

WITH STEEL COVER.)

1/2" = 1'-0"

ISOMETRIC VIEW OF CONDUITS AT CONTROL CONSOLE

3/8" = 1'-0"

NEW LIFT PIT AND CONDUIT PLAN

4'-2"

A4

A10

A1 A1

A10

A3

SLOPE SLOPE

SLOPESLOPE

A200

2' -1

0" 1'

-0

1'-8"

3'-4 5/16"

6" 6" 3' -1

0"10"

6" 6"

A11

A11

A14

A

5" 2'

-5

1' -0

A10

A3 A2

A1

A1

A10

A4

A5

A1

3' -5

3'-1" 26'-5 15/16"

SLOPE

11'-4"

A11

A11

A14

A14

9'-6"

E X

IS

T

IN

G

F .D

E X

IS

T

IN

G

F .D

35'-0"

NEW CENTER OF WHEEL BASE

13'-0"

6"

SLOPE

A200

2' -0

2'-0" 3'-6"

SLOPESLOPE

A200

1'-4 7/8"

CONCRETE AT WHEEL SPOTTING

DISH. FINISH CONCRETE TO 3' - 0"

RADIUS AND 1" DEPTH.R

A13

A10

A1

5"

1'-8"

7' -5

A111'-3"

1' -3

1'

-0

A4

A6 A8

2'-11"

10" 10"

3'-4"

SLOPE

A12

A11

SET THE ELEVATION OF THE FORM BAR LEVEL AND 3/8" ABOVE

FINISHED FLOOR. SLOPE CONCRETE AWAY FROM FORM BAR

DOWN TO F.F. ELEVATION. THE NOSING ANGLE BELOW THE

FORM BAR WILL BE AT FINISHED FLOOR ELEVATION.

A13 SLOPE

A13

A7

A14 4"

3/4" RIGID METAL CONDUIT

WITH COUPLING AND CHASE

NIPPLE, 4" BELOW PVC

4" SCH 40 PVC CHASE

INVERT 20" BELOW F.F.

1' -0

A10

2'-0"

A11

A13

A14

1' -8

2"

1' -8

5"

4" SCH 40 PVC CHASE

INVERT 20" BELOW F.F.

3/4" RIGID METAL CONDUIT

WITH COUPLING & CHASE

NIPPLE, 5" FROM PVC

A13

A11

A10

A4

SET THE ELEVATION OF THE FORM BAR LEVEL AND 3/8" ABOVE

FINISHED FLOOR. SLOPE CONCRETE AWAY FROM FORM BAR

DOWN TO F.F. ELEVATION. THE NOSING ANGLE BELOW THE

FORM BAR WILL BE AT FINISHED FLOOR ELEVATION.

SLOPE FINISHED FLOOR3/

8"

F.F.

A13

4' -2

4"

LIFT CONTROL CONSOLE

FRONT

ELECTRICAL LINE SIDE SUPPLY TO

CONTROL CONSOLE INCLUDING 3

PHASE, 208/230/460/575 VOLT

40/40/20/20 AMP

CONDUIT

DISCONNECT, CONDUIT,

AND CONDUCTORS

CONNECT NEW ELECTRICAL AND

COMPRESSED AIR TO CONTROL

CONSOLE AS REQUIRED

FILTER/REGULATOR/LUIBRICATOR MOUNT

SECURELY TO WALL, IN ACCESSIBLE LOCATION

SHUT-OFF VALVE

COMPRESSED AIR PIPING

PNEUMATIC LINE SIDE SUPPLY 90 PSI, 5 CFM

4" SCH. 40 PVC CHASE, TRIM

TO 3" ABOVE FINISHED FLOOR.

NEW 4" CONCRETE

EQUIPMENT PAD

SLAB ON GRADE.

EXISTING CONCRETE

SLAB.

3/4" Ø x 1'-4" SMOOTH

DOWEL BARS @ 12" O.C.

DRILL INTO EXISTING.

UNBONDED

5"

COPYRIGHT 2025 by AAIC, INC.

A

PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2026

DATE:

H A

L F

/2

/4

/4

/2

/1

/8

G

R A

P H

IC

S

C A

L E

F

IG

U R

E S

SIGNED:

D R

A W

IN

G

R E

V

IS

IO

N

S

KEYED NOTES:

B

C

D

E

F

G

H

GR

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

R E

M A

R K

S

D A

T E

N

O

9/30/2025

NC/JC

ISSUED FOR BID

26-1-23900

A200

M C

T B ld g

Li ft R ep la ce m en t

T

R A

N S

IT

W

A Y

, P O

N T

O O

N B

E A

C H

, I L

N E

W L

IF

T

P

IT

S E

C T

IO

N

S A

N D

D E

T A

IL

S

1/2" = 1'-0"

NEW LIFT #1 PIT - SECTION

1/2" = 1'-0"

NEW LIFT PIT #1 - SECTION

1 1/2" = 1'-0"

SECTION AT NEW WHEEL SPOTTING DISH

A1 FINISH CONCRETE FLOOR TO MATCH ALL

CURRENT SLOPES, PITCHES, AND FINISH

(POLISHED AND SEALED). TIE IN NEW VAPOR

BARRIER WITH EXISTING UNDER THE

CONCRETE. CONCRETE SHALL HAVE NO

EXPANSION JOINTS, UNLESS NEW CONCRETE

IS BUTTED UP TO AN EXISTING EXPANSION

JOINT; REPLACE POURED NEOPRENE

SEALANT. CONCRETE IS TO BE 5" THICK WITH

#4 REBAR EACH WAY AT LIFT #1; LIFT 2 INFILL

PER 6/A200

A2 FIXED CASSETTE TO BE INSTALLED AT NO

MORE THAN 1/8" ABOVE FINISH FLOOR.

A3 MOVABLE CASSETTE TO BE INSTALLED AT NO

MORE THAN 1/8" ABOVE FINISH FLOOR.

A4 12" THICK FOOTING WITH #5 REBAR AT 14" O.C.

EACH WAY.

A5 PNEUMATIC SUMP PUMP. CASSETTES ARE

SLOPED INTERNALLY TO PUMP. SUMP PUMP

WILL BE DISCHARGED INTO EXISTING OIL

WATER SEPARATOR. CONTRACTOR IS

RESPONSIBLE FOR LOCATING AND

IDENTIFYING EXISTING PIPING FOR OIL/WATER

SEPARATOR AND CONNECTING NEW SUMP

PUMPS TO EXISTING OIL/ WATER SEPARATOR

LINE.

A6 4" PVC CONDUIT CHASE FOR HYDRAULIC AND

AIR LINES. INSTALL PER LIFT

MANUFACTURER'S STANDARDS.

A7 3/4" RIGID METAL CONDUIT FOR LIQUID

DETECTION SENSOR. INSTALL PER LIFT

MANUFACTURER'S STANDARDS.

A8 3/4" RIGID METAL CONDUIT FOR AUTOMATIC

WHEEL BASE POSITIONING POTENTIOMETER

CABLE. INSTALL PER LIFT MANUFACTURER'S

STANDARDS.

A10 COMPACTED BACKFILL. USE CLEAN CA-6 FOR

FILL MATERIAL.

A11 NEW VAPOR BARRIER.

A12 1/4" STEEL COVER PLATE 48" MAX LENGTH.

(OPTION: ENCASE SCISSOR LIFT CONDUIT TO

ALLOW INSTALLATION OF SCISSOR LIFT

HYDRAULIC AND AIR LINES IN LIEU OF CHASE

WITH STEEL COVER.)

A13 3" x 3" NOSING ANGLE FRAME.

A14 NEW WATER STOP.

1/2" = 1'-0"

LIFT PIT #2 INFILL - SECTION

1" = 1'-0"

NEW LIFT PIT HYDRAULIC AND AIR CHASE

1" = 1'-0"

NEW REAR OF PIT CHASE CONNECTIONS

1" = 1'-0"

NEW CONCRETE BLOCK-OUT SERVICE DETAIL

1" = 1'-0"

NEW NOSING ANGLE DETAIL1/2" = 1'-0"

AIR AND ELECTRICAL SERVICES AT CONSOLE

1 1/2" = 1'-0"

NEW TO EXISTING SLAB DETAIL - TYPICAL

/0 5/

A D

D E

N D

U M

OFFICE

DRIVE-THRU BAY

SHOP AREA

SERVICE

BAY

LIFT #2

LIFT #1

SERVICE PIT

BAY

SERVICE

BAY

COPYRIGHT 2025 by AAIC, INC.

A

AAIC PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2025

DATE:

3"

HA

LF

1/

2" 3/

4" 1/

4" 1/

2" 1/

1/ 8"

15 30

60 12

30 60

G

RA

PH

IC

S

CA

LE

FI

G

UR

ES

SIGNED: 6/27/2025

DR

AW

IN

G

RE

VI

SI

O

NS

B

C

D

E

F

G

H

0'

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

26-1-23900

MC

T

Bl dg

Lif t R ep lac em en t

1 T

RA

NS

IT

LN

, P

ON

TO

ON

B

EA

CH

, IL

N O

D

AT

E:

R

EM

AR

KS

P: 618.659.8709 F: 618.656.8353

112 N. KANSAS STREET

EDWARDSVILLE, IL 62025

R25-055

ED100

EL

EC

TR

IC

AL

D

EM

OL

IT

IO

N

PL

AN

3/16" = 1'-0"

ELECTRICAL DEMOLITION PLAN

CDB MAR

X

1. EXISTING SIEMENS 120/208V, THREE PHASE, 250A ELECTRICAL PANEL "P3"

SHALL REMAIN. REMOVE THREE EXISTING SPARE 20A/1P CIRCUIT

BREAKERS WITHIN PANEL AND INSTALL A NEW 40A/3P CIRCUIT BREAKER

TO FEED NEW LIFT.

2. DISCONNECT AND REMOVE EXISTING ELECTRICAL CONNECTIONS AND ALL

RELATED MISC. ELECTRICAL DEVICES/WIRING FOR EXISTING LIFT.

3. REMOVE EXISTING ELECTRICAL DISCONNECT SWITCHREMOVE

CONDUIT/WIRING BACK TO THE EXISTING ELECTRICAL PANEL.

4. DISCONNECT AND REMOVE EXISTING PNEUMATIC CONNECTIONS,

FILTER/REGULATOR/LUBRICATOR AND ALL RELATED PIPING FOR EXISTING

LIFT. PERMANENTLY CAP PIPING AT JOIST SPACE.

5. DISCONNECT AND REMOVE EXISTING PNEUMATIC CONNECTIONS,

FILTER/REGULATOR/LUBRICATOR AND ALL RELATED PIPING FOR EXISTING

LIFT. REMOVE PIPING TO JOIST SPACE AND EXTEND TO NEW LIFT

CONSOLE LOCATION AS INDICATED.

ISSUED FOR BID

OFFICE

SHOP AREA

DRIVE-THRU BAY

COPYRIGHT 2025 by AAIC, INC.

A

AAIC PROJECT NUMBER:

SHEET NUMBER:

PROJECT PHASE:

DRAWN: CHECK:

EXPIRES: 11/30/2025

DATE:

3"

HA

LF

1/

2" 3/

4" 1/

4" 1/

2" 1/

1/ 8"

15 30

60 12

30 60

G

RA

PH

IC

S

CA

LE

FI

G

UR

ES

SIGNED: 6/27/2025

DR

AW

IN

G

RE

VI

SI

O

NS

B

C

D

E

F

G

H

0'

CONSULTANTS:

15 E Washington St | Belleville, IL 62220

ph. 618.345.1270

26-1-23900

MC

T

Bl dg

Lif t R ep lac em en t

1 T

RA

NS

IT

LN

, P

ON

TO

ON

B

EA

CH

, IL

N O

D

AT

E:

R

EM

AR

KS

P: 618.659.8709 F: 618.656.8353

112 N. KANSAS STREET

EDWARDSVILLE, IL 62025

R25-055

E100

EL

EC

TR

IC

AL

P

LA

N

3/16" = 1'-0"

ELECTRICAL PLAN

CDB MAR

1. PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE 2020 EDITION OF

THE NATIONAL ELECTRIC CODE.

2. PROVIDE A NEW TYPED CIRCUIT DIRECTORY FOR PANELBOARD P3.

3. PROVIDE PLASTIC ENGRAVED LABEL ON NEW DISCONNECT SWITCH.

INDICATE PANEL AND CIRCUIT NUMBER

X

1. EXISTING SIEMENS 120/208V, THREE PHASE, 250A ELECTRICAL PANEL "P3" SHALL REMAIN. REMOVE THREE

EXISTING SPARE 20A/1P CIRCUIT BREAKERS WITHIN PANEL AND INSTALL A NEW 40A/3P CIRCUIT BREAKER

TO FEED NEW LIFT.

2. PROVIDE ELECTRICAL AND PNEUMATIC CONNECTIONS FOR NEW LIFT CONSOLE. SEE DETAIL 7/A200.

PROVIDE CONDUIT SEAL-OFF AT CONDUIT ENTRIES INTO CONSOLE. SEE DETAIL 1/A101.

3. PROVIDE A 60A/3P DISCONNECT SWITCH AND ELECTRICAL CONNECTIONS FOR LIFT. ROUTE 4-#8 AWG & #10 AWG GND IN A 3/4" RIGID STEEL CONDUIT TO EXISTING ELECTRICAL PANEL "P3". CONNECT TO THE NEW

40A/3P CIRCUIT BREAKER.

4. PROVIDE NEW PNEUMATIC FILTER/REGULATOR/LUBRICATOR. EXTEND 3/4" TYPE "K" COPPER FROM THE

EXISTING LIFT FILTER/REGULATOR LOCATION AS REQUIRED. CONNECT NEW PIPING FROM

FILTER/REGULATOR/LUBRICATOR TO CONSOLE IN ACCORDANCE WITH LIFT MANUFACTURERS

INSTRUCTIONS

ACCORDANCE WITH LIFT MANUFACTURERS INSTRUCTIONS. PROVIDE CONDUIT SEAL-OFF AT CONDUIT

ENTRY INTO CONSOLE. SEE DETAIL 1/A101.

6. INSTALL A 4" PVC CONDUIT CHASE FOR HYDRAULIC AND AIR LINES ACCORDANCE WITH LIFT

MANUFACTURERS INSTRUCTION

ACCORDANCE WITH LIFT

MANUFACTURERS INSTRUCTIONS. PROVIDE CONDUIT SEAL-OFF AT CONDUIT ENTRY INTO CONSOLE. SEE

DETAIL 1/A101.

ISSUED FOR BID

Sheets
A100 - NEW WORK PLAN
A101 - NEW LIFT PIT AND CONSOLE PLANS
AD100 - DEMOLITION PLAN
AD200 - LIFT PIT DEMO SECTIONS
G000 - PROJECT COVER SHEET
A200 - NEW LIFT PIT SECTIONS AND DETAILS

File details come from the government source that posted it. Updated .