This is a draft Project Schedule (Gantt chart) for the Franklin Commuter Line over East Street Bridge Replacement project, with a Notice to Proceed dated November 10, 2018 and project completion scheduled for June 6, 2019. The schedule encompasses six major phases totaling approximately 209 days of project management oversight. Phase 1 (Project Management) runs November 10, 2018 through June 6, 2019 and includes Notice to Proceed, Task Specific QA Plan, and Task Specific Project Management Plan deliverables. Phase 2 (Analysis of Existing Conditions) spans November 14, 2018 through March 19, 2019, with activities including research and review of available data, field inspection planning and coordination, MBTA right-of-way/safety training, and preliminary environmental assessments. Phase 3 (Topographic and Property Survey) and Phase 4 (Geotechnical Investigation) run concurrently from November 14, 2018 through February 12, 2019, encompassing field surveys, utility clearance coordination, boring and lab testing, and geotechnical reporting.

Phase 5 (Bridge Type Study Report) extends from January 2, 2019 through June 6, 2019 and includes existing substructure evaluation, three superstructure replacement alternatives, construction sequence concepts, roadway evaluation, clearance mitigation alternatives, detour planning, draft report preparation, MBTA review, and finalization. Phase 6 (Value Analysis) runs January 2, 2019 through March 19, 2019 and covers value engineering, constructability review, preliminary quantity take-offs for all alternatives, cost analysis and project estimates, and construction scheduling. The schedule was updated on December 10, 2018 by the Contracting Officer Representative (COR) and includes resource allocations measured in man-hours for each task, with critical path tasks identified. The document references the MBTA Contract No. B92PS24 and Task Order No. 6.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV01

1.00.043414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.043701.043708.043715.043722.043729.043736.0
Time Period
Weekly
Gantt Chart Dates
Beginning Date11/10/18Updated:12/10/18
Today9/15/25By:COR
20182019
(format critical path tasks in red text below)StartEndTaskNovNovNovDecDecDecDecDecJanJanJanJanFebFebFebFebMarMarMarMarMarAprAprAprAprMayMayMayMayJunJunJunJunJunJulJulJulJulAugAugAug
LevelSr. No.TaskResource/MHDateDateDuration (days)101724181522295121926291623291623306132027411182518152229613202731017
1P1Project Management11/10/20186/6/19209
A1.1Notice to Proceed11/10/201811/13/201831.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A1.2Task Specific QA Plan2011/26/201812/14/2018181.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A1.3Task Specific Project Management Plan2011/26/201812/14/2018181.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
0043414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
2P2Analysis of Existing Conditions11/14/20183/19/1912543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.1Research & Review Available Data and Plans2211/14/201801/29/2019762.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.2Plan/Coordinate Field Inspection1211/14/201812/30/2018462.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.3Field Inspection & Summary of Findings4601/03/201901/09/201962.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.4MBTA ROW/Safety Training4812/01/201812/19/2018182.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.5Preliminary Assessment - Environmental Checklist for Design1401/02/201903/19/2019762.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.6Preliminary Assessment - Project Checklist for Environmental1401/02/201903/19/2019762.643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
2P3Topograhic and Property Survey11/14/20182/12/1990343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A3.1Field Work "Surveys"34012/12/201801/15/2019343.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A3.2Survey Drawing Preparation12001/02/201901/29/2019273.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
3P4Geotechnical Investigation11/14/20182/12/1990443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.1Coordination w/ KeolisGZA11/14/201812/18/2018344.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.2Utility Clearance/access coordination with KeolisGZA11/28/201812/18/2018204.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.3Field DrillingGZA01/06/201901/09/201934.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.4Lab TestingGZA01/09/201901/15/201964.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.5Draft geotech ReportGZA01/16/201902/12/2019274.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
5P5Bridge Type Study Report01/2/20196/6/19155543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.1Existing Substructure Evaluation and Assessment4401/30/201902/19/2019205.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.2Superstructure Replacement Alternatives (3 Types)10001/02/201902/19/2019485.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.3Sequence of Construction Concepts4801/23/201902/19/2019275.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.4Exist. Roadway Evaluation and Assessment2401/30/201902/05/201965.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.5Roadway Clearance Mitigation Alternatives (Hor./Vert. 2 Alternates)10602/06/201903/05/2019275.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.6Preparation of Conceptual Detour Plan2203/06/201903/12/201965.643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.7Evaluation and Prepare Draft Report8802/20/201903/19/2019275.743414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
QA Review803/26/201904/01/2019643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
QA Updates2404/02/201904/08/2019643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
5.8Submit Type Study Report004/09/201904/09/2019043414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.9MBTA ReviewMBTA04/10/201905/08/2019285.943414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.1Finalize Report Upon MBTA Review2405/09/201906/06/2019285.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
P6Value Analysis01/2/20193/19/1976643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.1Value Engineering4401/02/201902/19/2019486.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.2Constructability5201/30/201902/20/2019216.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.3Preliminary Quantity Take-Off (All Alternates)5802/20/201903/05/2019136.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.4Cost Analysis / Project Estimates (All Alternates)6603/06/201903/19/2019136.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.5Project Schedule4003/06/201903/19/2019136.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0

&D &T MBTA Contract No. B92PS24 - Task Order No. 6 Franklin Commuter Line over East Street Bridge Replacement Work Flow Management &P of &N

&F

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .