This is a bid drawing document for a technology upgrade and additions project at Thomas M. Ryan Intermediate School, operated by Gull Lake Community Schools in Richland, Michigan. The project encompasses comprehensive infrastructure upgrades including cabling, audio/video systems, and security installations throughout the facility. The drawing set, issued for bid on December 9, 2019, consists of 31 detailed technical drawings organized into six main categories: cabling legends and details (TC101-TC103), first floor cabling plans for six building units (TC201A-TC201F), audio/video legends and connectivity diagrams (TC301-TC306), first floor audio/video plans for six units (TC401A-TC401F), security legends and equipment details (TC501-TC504), and first floor security plans for six units (TC601A-TC601F). The drawings specify installation requirements across multiple building zones, including classrooms, administrative areas, gymnasiums, cafeterias, and specialized spaces such as the media center and STEM lab.
The technical specifications outlined in the drawings include requirements for communications contractors to install necessary pass-throughs for cable routing, firestop all penetrations to meet applicable codes, and support all cables above drop ceilings using J-hooks spaced no less than every five feet. The facility design incorporates multiple communication rooms including one main distribution frame (MDF) and seven intermediate distribution frames (IDF-B through IDF-G) to support the technology infrastructure. Cabling plans designate specific routing paths from each building unit to its designated communication room, and equipment schedules provide manufacturer specifications and part numbers for communication equipment, audio/video cables, classroom equipment, speakers, IP clocks, and cable components. The project was designed by Commtech Design, located in Rockford, Michigan, and represents a complete modernization of the school's technology infrastructure to support contemporary educational technology requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GULL LAKE COMMUNITY SCHOOLS
RICHLAND, MI
TECHNOLOGY UPGRADE & ADDITIONS
DRAWING LIST:
TC101 CABLING LEGENDS, SCHEDULES & DETAILS
TC102 CABLING CONNECTIVITY DETAILS
TC103 CABLING RACK LAYOUTS AND FIBER BACKBONE DETAILS
TC201A FIRST FLOOR CABLING PLAN - UNIT 100
TC201B FIRST FLOOR CABLING PLAN - UNIT 200
TC201C FIRST FLOOR CABLING PLAN - UNIT 300
TC201D FIRST FLOOR CABLING PLAN - UNIT 400
TC201E FIRST FLOOR CABLING PLAN - UNIT 500
TC201F FIRST FLOOR CABLING PLAN - UNIT 600
TC301 AUDIO/VIDEO LEGENDS, SCHEDULES & DETAILS
TC302 AUDIO/VIDEO CLASSROOM CONNECTIVITY DIAGRAM
TC303 AUDIO/VIDEO CLASSROOM CONNECTIVITY DIAGRAM
TC304 AUDIO/VIDEO CLASSROOM CONNECTIVITY DIAGRAM
TC305 AUDIO/VIDEO CLASSROOM CONNECTIVITY DIAGRAM
TC306 AUDIO/VIDEO CLASSROOM CONNECTIVITY DIAGRAM
TC401A FIRST FLOOR AUDIO/VIDEO PLAN - UNIT 100
TC401B FIRST FLOOR AUDIO/VIDEO PLAN - UNIT 200
TC401C FIRST FLOOR AUDIO/VIDEO PLAN - UNIT 300
TC401D FIRST FLOOR AUDIO/VIDEO PLAN - UNIT 400
TC401E FIRST FLOOR AUDIO/VIDEO PLAN - UNIT 500
TC401F FIRST FLOOR AUDIO/VIDEO PLAN - UNIT 600
TC501 SECURITY LEGENDS, SCHEDULES & DETAILS
TC502 SECURITY EQUIPMENT DETAILS
TC503 SECURITY EQUIPMENT DETAILS
TC504 SECURITY CAMERA ONE-LINE DIAGRAMS
TC601A FIRST FLOOR SECURITY PLAN - UNIT 100
TC601B FIRST FLOOR SECURITY PLAN - UNIT 200
TC601C FIRST FLOOR SECURITY PLAN - UNIT 300
TC601D FIRST FLOOR SECURITY PLAN - UNIT 400
TC601E FIRST FLOOR SECURITY PLAN - UNIT 500
TC601F FIRST FLOOR SECURITY PLAN - UNIT 600
THOMAS M. RYAN INTERMEDIATE SCHOOL:
9562 M-89
RICHLAND, MI 49083
PH: 269.548.3700
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
A N
I
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
COVER
ABBREVIATIONS
ABBREV. DESCRIPTION ABBREV. DESCRIPTION
COMMUNICATION EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
COMMUNICATION SYMBOL LEGEND
SYMBOL DESCRIPTION
IP CLOCK EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
CABLE SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
TC101
TYPICAL FACEPLATE LABELING
TC101
TYPICAL CABLE LABELING
AT FACEPLATE & PATCH PANEL
TC101
COMMUNICATIONS GROUNDING DETAIL
TC101
CAMERA OR WIRELESS PANEL LABELING
TC101
CAT-6 DATA PANEL LABELING
N
TC101
CONNECTIVITY CODE
MOHAWK NOTE
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC101
CABLING LEGENDS,
SCHEDULES & DETAILS
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE11
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE12
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
TC102
CONNECTIVITY CODE
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC102
CABLING
CONNECTIVITY DETAILS
TC103
FIBER OPTIC CABLE
LABELING
TC103
RYAN INTERMEDIATE BUILDING FIBER
BACKBONE CONNECTIVITY
TC103
RYAN INTERMEDIATE
COMM ROOM MDF RACK LAYOUTS
TC103
RYAN INTERMEDIATE
COMM ROOM IDF-B RACK LAYOUTS
TC103
RYAN INTERMEDIATE
COMM ROOM IDF-C RACK LAYOUTS
TC103
RYAN INTERMEDIATE
COMM ROOM IDF-D RACK LAYOUTS
TC103
RYAN INTERMEDIATE
COMM ROOM IDF-E RACK LAYOUTS
TC103
RYAN INTERMEDIATE
COMM ROOM IDF-F RACK LAYOUTS7
TC103
RYAN INTERMEDIATE
COMM ROOM IDF-G RACK LAYOUTS
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC103
CABLING RACK LAYOUTS
AND FIBER BACKBONE
DETAILS
COMM
ROOMIDF-B
EXISTING WALL
MOUNTED RACK
ALL CABLES THIS DRAWING
SHALL ROUTE TO COMM
ROOM IDF-B
STORAGE
VESTIBULE
CORRIDOR
ADMINISTRATION
OFFICE
OFFICE
HALL
CONFERENCE
115 IDF-B
WORK / MAIL
HEALTH
T
CORRIDOR
VESTIBULE
MUSIC
J.C.
PRACTICE
CLASSROOM
CLASSROOM
STORAGE
KILN
GENERAL CABLING NOTES
1. COMMUNICATIONS CONTRACTOR SHALL
INSTALL ANY PASS-THRU'S REQUIRED FOR
ROUTING CABLES AROUND THE BUILDING.
FIRESTOP ALL PASS-THRU'S TO MEET
APPLICABLE CODES.
2. CONTRACTOR SHALL COMPLETE A WALK-THRU
OF THE SITE DURING CONSTRUCTION AND
SHALL VERIFY ALL CONDUITS AND PASS THRU'S
ARE INSTALLED FOR CABLES.
3. ALL CABLES SHALL BE SUPPORTED ABOVE THE
DROP CEILING BY J-HOOKS. HOOKS SHALL BE
LOCATED NO LESS THAN EVERY 5 FEET.
C o m m te c h
DD DD
ee ee ss ss ii ii gg gg nn nn B
E L
D
IN
G R
D
N E
S
T E
R O
C K
F O
R D
M
IC
H
IG
A
N
W W
W .C
O M
M T
E C
H D
E S
IG
N
.C O
M
Mark Revision Description
These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission. -Commtech Design
Date
Project
Sheet
R Y
A N
I N
T E
R M
E D
IA
T
E G
U L
L L
A K
E C
O M
M U
N
IT
Y S
C H
O O
L S
T E
C H
N O
L O
G Y
U P
G R
A D
E
A D
D
IT
IO
N
S
1297_01
TC201A
FIRST FLOOR CABLING
PLAN - UNIT 100TC201A
FIRST FLOOR CABLING PLAN - UNIT 100
1/8" = 1'-0"
400500
KEY PLAN
ISSUED FOR BID
12/09/19
12/09/2019
ROOM IDF-D
ALL CABLES THIS DRAWING
SHALL ROUTE TO COMM
ROOM IDF-D
CAFETERIA
KITCHEN
STORAGE
CORRIDOR
IDF-D
WOMEN
MEN
GYMNASIUM
STORAGE
CORRIDOR
CLASSROOM
LOUNGE
CORRIDOR
S.E.
S.E.
CORRIDOR
EXISTING WALL
MOUNTED
RACK
GENERAL CABLING NOTES
1. COMMUNICATIONS CONTRACTOR SHALL
INSTALL ANY PASS-THRU'S REQUIRED FOR
ROUTING CABLES AROUND THE BUILDING.
FIRESTOP ALL PASS-THRU'S TO MEET
APPLICABLE CODES.
2. CONTRACTOR SHALL COMPLETE A WALK-THRU
OF THE SITE DURING CONSTRUCTION AND
SHALL VERIFY ALL CONDUITS AND PASS THRU'S
ARE INSTALLED FOR CABLES.
3. ALL CABLES SHALL BE SUPPORTED ABOVE THE
DROP CEILING BY J-HOOKS. HOOKS SHALL BE
LOCATED NO LESS THAN EVERY 5 FEET.
C o m m te c h
DD DD
ee ee ss ss ii ii gg gg nn nn B
E L
D
IN
G R
D
N E
S
T E
R O
C K
F O
R D
M
IC
H
IG
A
N
W W
W .C
O M
M T
E C
H D
E S
IG
N
.C O
M
Mark Revision Description
These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission. -Commtech Design
Date
Project
Sheet
R Y
A N
I N
T E
R M
E D
IA
T
E G
U L
L L
A K
E C
O M
M U
N
IT
Y S
C H
O O
L S
T E
C H
N O
L O
G Y
U P
G R
A D
E
A D
D
IT
IO
N
S
1297_01
TC201B
FIRST FLOOR CABLING
PLAN - UNIT 200TC201B
FIRST FLOOR CABLING PLAN - UNIT 200
1/8" = 1'-0"
400500
KEY PLAN
ISSUED FOR BID
R E
F
ALL CABLES THIS DRAWING
SHALL ROUTE TO COMM
ROOM IDF-D
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
MUD ROOM
CLASSROOM
COMMONS
VESTIBULE
STORAGE
STAFF ROOM
RESOURCE
CORRIDOR
GENERAL CABLING NOTES
1. COMMUNICATIONS CONTRACTOR SHALL
INSTALL ANY PASS-THRU'S REQUIRED FOR
ROUTING CABLES AROUND THE BUILDING.
FIRESTOP ALL PASS-THRU'S TO MEET
APPLICABLE CODES.
2. CONTRACTOR SHALL COMPLETE A WALK-THRU
OF THE SITE DURING CONSTRUCTION AND
SHALL VERIFY ALL CONDUITS AND PASS THRU'S
ARE INSTALLED FOR CABLES.
3. ALL CABLES SHALL BE SUPPORTED ABOVE THE
DROP CEILING BY J-HOOKS. HOOKS SHALL BE
LOCATED NO LESS THAN EVERY 5 FEET.
C o m m te c h
DD DD
ee ee ss ss ii ii gg gg nn nn B
E L
D
IN
G R
D
N E
S
T E
R O
C K
F O
R D
M
IC
H
IG
A
N
W W
W .C
O M
M T
E C
H D
E S
IG
N
.C O
M
Mark Revision Description
These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission. -Commtech Design
Date
Project
Sheet
R Y
A N
I N
T E
R M
E D
IA
T
E G
U L
L L
A K
E C
O M
M U
N
IT
Y S
C H
O O
L S
T E
C H
N O
L O
G Y
U P
G R
A D
E
A D
D
IT
IO
N
S
1297_01
TC201C
FIRST FLOOR CABLING
PLAN - UNIT 300TC201C
FIRST FLOOR CABLING PLAN - UNIT 300
1/8" = 1'-0"
400500
KEY PLAN
ISSUED FOR BID
F
COMM
ROOM IDF-E
NEW WALL
MOUNTED CABINET
WALLFIELD "A"
SEE TC302/1
SEE TC302/1
ALL CABLES THIS DRAWING
SHALL ROUTE TO COMM
ROOM IDF-E
MEN
WOMEN
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
STAFF ROOM
RESOURCE
STORAGE
COMMONS
VESTIBULE
CLASSROOM
CLASSROOM
MUD ROOM
GENERAL CABLING NOTES
1. COMMUNICATIONS CONTRACTOR SHALL
INSTALL ANY PASS-THRU'S REQUIRED FOR
ROUTING CABLES AROUND THE BUILDING.
FIRESTOP ALL PASS-THRU'S TO MEET
APPLICABLE CODES.
2. CONTRACTOR SHALL COMPLETE A WALK-THRU
OF THE SITE DURING CONSTRUCTION AND
SHALL VERIFY ALL CONDUITS AND PASS THRU'S
ARE INSTALLED FOR CABLES.
3. ALL CABLES SHALL BE SUPPORTED ABOVE THE
DROP CEILING BY J-HOOKS. HOOKS SHALL BE
LOCATED NO LESS THAN EVERY 5 FEET.
C o m m te c h
DD DD
ee ee ss ss ii ii gg gg nn nn B
E L
D
IN
G R
D
N E
S
T E
R O
C K
F O
R D
M
IC
H
IG
A
N
W W
W .C
O M
M T
E C
H D
E S
IG
N
.C O
M
Mark Revision Description
These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission. -Commtech Design
Date
Project
Sheet
R Y
A N
I N
T E
R M
E D
IA
T
E G
U L
L L
A K
E C
O M
M U
N
IT
Y S
C H
O O
L S
T E
C H
N O
L O
G Y
U P
G R
A D
E
A D
D
IT
IO
N
S
1297_01
TC201D
FIRST FLOOR CABLING
PLAN - UNIT 400TC201D
FIRST FLOOR CABLING PLAN - UNIT 400
1/8" = 1'-0"
400500
KEY PLAN
ISSUED FOR BID
W/D
ROOM MDF
COMM
ROOM IDF-C
2 EXISTING
WALL RACKS
COMM
ROOM IDF-FNEW WALL
MOUNTED CABINET
WALLFIELD "A"
EXISTING AUDIO
CABINET
ALL CABLES THIS SIDE OF
THE LINE SHALL ROUTE TO
COMM ROOM IDF-F
ALL CABLES THIS SIDE OF
THE LINE SHALL ROUTE TO
COMM ROOM IDF-C
ALL CABLES THIS SIDE OF
THE LINE SHALL ROUTE TO
COMM ROOM IDF-C
ALL CABLES THIS SIDE
OF THE LINE SHALL
ROUTE TO COMM
ROOM MDF
MEDIA CENTER
TITLE 1
CORRIDOR
TITLE 1
J.C. IDF-C
A/V MDF
OFFICE
OFFICE
CORRIDOR
S.E.
CLASSROOM
VESTIBULE
TITLE 1
VESTIBULE
STORAGE
STEAM
COMMONS
STORAGE
TITLE 1
EXISTING RACK
ABOVE DOOR
GENERAL CABLING NOTES
1. COMMUNICATIONS CONTRACTOR SHALL
INSTALL ANY PASS-THRU'S REQUIRED FOR
ROUTING CABLES AROUND THE BUILDING.
FIRESTOP ALL PASS-THRU'S TO MEET
APPLICABLE CODES.
2. CONTRACTOR SHALL COMPLETE A WALK-THRU
OF THE SITE DURING CONSTRUCTION AND
SHALL VERIFY ALL CONDUITS AND PASS THRU'S
ARE INSTALLED FOR CABLES.
3. ALL CABLES SHALL BE SUPPORTED ABOVE THE
DROP CEILING BY J-HOOKS. HOOKS SHALL BE
LOCATED NO LESS THAN EVERY 5 FEET.
C o m m te c h
DD DD
ee ee ss ss ii ii gg gg nn nn B
E L
D
IN
G R
D
N E
S
T E
R O
C K
F O
R D
M
IC
H
IG
A
N
W W
W .C
O M
M T
E C
H D
E S
IG
N
.C O
M
Mark Revision Description
These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission. -Commtech Design
Date
Project
Sheet
R Y
A N
I N
T E
R M
E D
IA
T
E G
U L
L L
A K
E C
O M
M U
N
IT
Y S
C H
O O
L S
T E
C H
N O
L O
G Y
U P
G R
A D
E
A D
D
IT
IO
N
S
1297_01
TC201E
FIRST FLOOR CABLING
PLAN - UNIT 500
TC201E
FIRST FLOOR CABLING PLAN - UNIT 500
1/8" = 1'-0"
400500
KEY PLAN
ISSUED FOR BID
F
GENERAL CABLING NOTES
1. COMMUNICATIONS CONTRACTOR SHALL
INSTALL ANY PASS-THRU'S REQUIRED FOR
ROUTING CABLES AROUND THE BUILDING.
FIRESTOP ALL PASS-THRU'S TO MEET
APPLICABLE CODES.
2. CONTRACTOR SHALL COMPLETE A WALK-THRU
OF THE SITE DURING CONSTRUCTION AND
SHALL VERIFY ALL CONDUITS AND PASS THRU'S
ARE INSTALLED FOR CABLES.
3. ALL CABLES SHALL BE SUPPORTED ABOVE THE
DROP CEILING BY J-HOOKS. HOOKS SHALL BE
LOCATED NO LESS THAN EVERY 5 FEET.
COMM
ROOMIDF-G
NEW WALL
MOUNTED CABINET
WALLFIELD "A"
ALL CABLES THIS SIDE
OF THE LINE SHALL
ROUTE TO COMM
ROOM MDF
ALL CABLES THIS SIDE
OF THE LINE SHALL
ROUTE TO COMM
ROOM IDF-F
ALL CABLES THIS SIDE
OF THE LINE SHALL
ROUTE TO COMM
ROOM MDF
ALL CABLES THIS SIDE
OF THE LINE SHALL
ROUTE TO COMM
ROOM IDF-F
COMMONS
VESTIBULE
RESOURCE
STAFF ROOM
MUD ROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
WOMEN
MEN
ART
C o m m te c h
DD DD
ee ee ss ss ii ii gg gg nn nn B
E L
D
IN
G R
D
N E
S
T E
R O
C K
F O
R D
M
IC
H
IG
A
N
W W
W .C
O M
M T
E C
H D
E S
IG
N
.C O
M
Mark Revision Description
These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission. -Commtech Design
Date
Project
Sheet
R Y
A N
I N
T E
R M
E D
IA
T
E G
U L
L L
A K
E C
O M
M U
N
IT
Y S
C H
O O
L S
T E
C H
N O
L O
G Y
U P
G R
A D
E
A D
D
IT
IO
N
S
1297_01
TC201F
FIRST FLOOR CABLING
PLAN - UNIT 600TC201F
FIRST FLOOR CABLING PLAN - UNIT 600
1/8" = 1'-0"
400500
KEY PLAN
ISSUED FOR BID
ABBREVIATIONS
ABBREV. DESCRIPTION ABBREV. DESCRIPTION
AUDIO/VIDEO CABLE SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
CLASSROOM EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
SPEAKER SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
COMMUNICATION SYMBOL LEGEND
SYMBOL DESCRIPTION
TC301
TYPICAL CABLE LABELING
FOR AUDIO CABLES
TC301
AUDIO PAGING & BELL SYSTEM
CONNECTIVITY SCHEMATIC
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC301
A/V LEGENDS,
SCHEDULES & DETAILS
TC302
CLASSROOM AV CONNECTIVITY
NEW CLASSROOM
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC302
A/V CLASSROOM
CONNECTIVITY DIAGRAM
TC303
CLASSROOM AV CONNECTIVITY
EXISTING SPEAKERS
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC303
TC304
MEDIA CENTER AV CONNECTIVITY
EXISTING SPEAKERS
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC304
TC305
STEM LAB AV CONNECTIVITY
DIAGRAM
RI
CH
LA
N
D, M
IC
H
IG
AN
R Y
T E
R M
E D
I A
T E
GU
LL
L
AK
E
CO
M M
UN
IT
Y
SC
H
OO
LS
TE
CH
N
OL
OG
Y
UP
GR
AD
E
A
DD
IT
IO
N S
C o m m t e c h
TC305
File details come from the government source that posted it. Updated .