Attachment 6 - BSL2 container elctricity load.png

PNG image 423 KB Posted

Attached to
Electrical service installation for containerized laboratory, USDA-ARS DKI Pacific Basin Agricultural Research Center, HI
Solicitation number
1174390
Issued by

About this file

MDP Panel Schedule Summary

This document is an electrical panel schedule for a Mechanical Room located in a facility with 208/120V voltage supply and 225A main amps. The schedule designates 63 individual circuits across three phases (A, B, and C) distributed throughout the panel, with total connected load of 47.612 kVA, connected current of 132.16A, demand load of 42.750 kVA, and demand current of 132.54A.

The panel serves multiple building systems and functions including HVAC equipment, lighting, receptacles, fire/burglar panel, data racks, BMS, emergency lighting, water heater, and various auxiliary systems. Circuit breaker specifications range from 1-amp to 50-amp capacity, with load types categorized as Lighting (L), Receptacles (R), HVAC (H), Equipment (E), Motors (M), and Water Heater (W). Individual circuits are configured with specific amperage ratings and load calculations shown in kVA columns. The document includes detailed notes identifying GFI breaker designations and provides panel totals by load type, with demand factors applied to calculate actual demand loads based on standard electrical code requirements. The voltage limitation is noted as 208V minimum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .