Attachment15_Performance Work Statement.docx
DOCX document 107 KB Posted
- Solicitation number
- 1168154
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Performance Work Statement (PWS) for the Harris South Project Environmental Impact Statement support contract with the U.S. Forest Service, Tongass National Forest, with an anticipated start date of October 1, 2026, and performance period extending to October 30, 2028. The contractor must complete an initial Environmental Impact Statement (EIS), conduct public review and comment analysis, prepare a final EIS, and produce a draft Record of Decision (ROD). Base contract deliverables include project management and coordination (kick-off meetings, project schedules, quality control plans, bi-weekly coordination calls, monthly progress reports), planning record development and maintenance, geospatial data management, subsistence analysis and hearing support, public comment content analysis and response tracking, biological assessment and Essential Fish Habitat documentation, silvicultural prescription information compilation, and comprehensive technical writing and editing services for all project documents. An optional task involves supporting the objection review process and producing final ROD and project record documentation post-objection period.
The contractor must demonstrate expertise in NEPA regulations, Forest Service directives, the Endangered Species Act, Magnuson-Stevens Fishery Conservation and Management Act, and Alaska's subsistence requirements under ANILCA. Key personnel include a Project Manager and Interdisciplinary Team Leader who cannot be replaced without Forest Service approval. The contractor is responsible for all labor, equipment, materials, and coordination while the Forest Service provides inventory data, GIS support, Interdisciplinary Review Team participation, document review and approval, and leads final decision-making, tribal consultation, and ESA/MSA consultations. All deliverables must comply with Section 508 accessibility standards and be provided in Microsoft Word and Adobe PDF formats. The contractor must maintain an electronic planning record in the Forest Service's Pinyon/Box system, manage all geospatial data according to Forest Service standards and FGDC requirements, and safeguard all sensitive and government information with strict confidentiality protocols. The Forest Service retains all intellectual property rights, and no publications or marketing use of project materials is permitted during or after contract performance.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name Name of Project
Tongass National Forest │ Month Year Performance Work Statement Tongass National Forest Harris South Project i Contents
| Project Title | 1 |
| General Information | 1 |
| 1.0 Background and Purpose | 1 |
| 2.0 Acronyms, Abbreviations, and Definitions | 1 |
| Contractor Requirements | 2 |
| 3.0 Technical Requirements/ Tasks | 3 |
| 4.0 Deliverables / Schedule | 15 |
| 5.0 Government Furnished | 19 |
| 6.0 Travel | 20 |
| 7.0 Contractor’s Key Personnel | 20 |
| 8.0 Security Requirements | 21 |
| 9.0 Data Rights | 22 |
| 10.0 Section 508 - Electronic and Information Technology Standards | 23 |
| 11.0 Performance Requirement Measures | 24 |
| Attachments | 25 |
Name of Project Name of Project Environmental Assessment i ii Tongass National Forest Project Title Harris South Project Environmental Impact Statement Support General Information
1.0 Background and Purpose
The Forest Service is building efficiency by utilizing and developing tools and strategies to implement requirements of the National Environmental Policy Act to continue to improve our processes to complete our work. This work supports streamlining project development and environmental compliance to implement active land management, as required per National Forest Management Act.
The Harris South Project is proposed to harvest old-growth and young-growth timber to move the project area toward desired conditions outlined in the Forest Plan through area-specific goals and objectives and address the need to provide a sustainable level of forest products to contribute to the economic sustainability of the region.
This Performance Work Statement requests (base items):
Completion of one objective, scientifically accurate and legally defensible initial Environmental Impact Statement for the proposed Harris South Project Content Analysis after requesting public review and comment on initial EIS document.
Completion of Final Environmental Impact Statement for the proposed Harris South Project Complete Draft Record of Decision.
Option:
Support Objection Process Final Environmental Impact Statement (post-objection process to address any objection review instructions) and Record of Decision Final Project Record The Harris South Project is on the Tongass National Forest. The period of performance is tentative to start in fall of 2026.
2.0 Acronyms, Abbreviations, and Definitions
USDA – United States Department of Agriculture CARA – Comment Analysis and Response Application eMNEPA – Electronic Management of National Environmental Policy Act Essential Fish Habitat (EFH) – EFH Assessment is a written assessment of the effects of a proposed Federal action on EFH (50 CFR 600.920(e)). Essential fish habitat includes all waters and substrate necessary for fish spawning, breeding, feeding, or growth to maturity.
FS – Forest Service Forest Service CO – Agency Contracting Officer Forest Service COR – Agency Contracting Officer Representative: Assigned Tongass National Forest staff that will coordinate between the Forest Service CO, PM, technical experts as well as the Contractor Project Manager.
Forest Service Joint Review Team – Assigned Tongass Forest subject matter experts that provide timely and thorough interdisciplinary review of National Environmental Policy Act (NEPA) documents prepared for the Forest.
Forest Service PM – Agency Project Manager: Assigned staff representative from the Tongass National Forest that will serve as the main point of contact and technical expert for all tasks associated with this performance work statement (PWS) IDT – Interdisciplinary Team: team of multiple resource and subject matter experts that work together to develop and plan projects, project planning documents, and other multi-resource efforts.
SME – Subject matter expert FP – Forest Land Management Plan Pinyon/Box – Agency’s cloud-based file management system to be used for collaboration and providing deliverables to the Forest Service CO, COR, PM, and technical experts.
EIS – Environmental Impact Statement MSA - Magnuson-Stevens Fishery Conservation and Management Act NEPA – National Environmental Policy Act Project – The planning effort Project GIS Database – ArcGIS geodatabase housing all spatial information and supporting metadata PWS - Performance Work Statement ROD – Record of Decision Contractor Requirements The Contractor will be responsible for all, and not limited to, the following:
a. The Contractor will meet with the Forest Service PM, COR, and other Forest Service personnel on a regular basis. The Contractor will facilitate the meetings and produce draft meeting notes for Forest Service approval. It is assumed that the Contractor will include meetings and coordination in the Project schedule.
b. The Contractor will have demonstrated project management experience, and the ability to meet expedited timelines for completion of Environmental Impact Statement NEPA documents and supporting tasks outlined in the Tasks and Deliverables/Schedule in this PWS.
c. The Contractor will collaborate with the assigned Forest Service PM and COR to identify specific resource skills that the Contractor will provide to comprise an IDT and identify anticipated IDT workload requirements relative to the project schedule.
d. The Contractor will maintain communications with the Forest Service and provide written progress reports and hold meetings with the agency in an agreed-upon frequency.
e. The Contractor will follow Forest Service-specific (where available and defined) geospatial and tabular data management practices.
f. The Contractor will prepare all documents and conduct all processes consistent with applicable laws, regulations, and policies including the National Forest Management Act, Department of Agriculture NEPA Regulations (Interim or final as available at time of contract award), the Administrative Procedures Act, Tongass Forest Plan, and current Forest Service regulations and policy.
g. The Contractor will prepare and submit monthly invoices through the Invoice Processing Platform (IPP).
h. The Contractor will furnish all labor, equipment, supervision, transportation, travel, materials, supplies, and incidentals, except those indicated as government-furnished, to perform all work necessary for completion of this PWS, and deliverables in accordance with the requirements of the contract.
3.0 Technical Requirements/ Tasks
3.1 Task 1: Project Kick-off, Project Management, and Coordination (Applies to Base item)
3.1.1 Post Award Conference Call and Project Kick-off Meeting(s) The Contractor and the Forest Service will participate in a post-award conference call scheduled within ten (10) business days from award at a minimum, attendees will be the Contractor’s Project Manager, the Forest Service CO, PMs, and COR designated for the Contract Award. This kick-off meeting will, at a minimum:
Introduce the Contractor and supporting Forest Service staff.
Define the roles and responsibilities (Government/Contractor).
Discuss contract administration, tasks, deliverables, schedule, and PWS requirements.
Answer any technical questions regarding the contract.
The Contractor and the Forest Service will participate in a project kick-off meeting within ten (10) business days after the post-award conference call at a date and time mutually agreed upon by the Contractor’s Project Manager, the Forest Service CO, PM, and COR. This meeting may be held in conjunction with the post award conference call or held separately, as agreed upon by the Contractor and Forest Service. The level of attendance will be discussed and mutually agreed upon in advance. The agenda will be created by the Contractor in consultation with the Forest Service PM and will include:
Introduce the Contractor and supporting Forest Service staff.
Define the roles and responsibilities for key parties.
Review project schedule and begin developing comprehensive project schedule based on key milestones.
Review the purpose of and need for the project, background, scope, and objectives of the project.
Discuss the existing data and data needs for the EIS, including developing a strategy for resource analysis by utilizing and maintaining the Project GIS database throughout the EIS process.
Discuss the current Environmental Impact Statement outline and content.
Discuss how the planning record will be kept and submitted.
Review and discuss the Quality Control Plan. The definition of successful delivery of a product should be agreed to by Forest Service PM, COR, and the Contractor.
The Contractor will record and submit meeting notes to all attendees and ensure these notes and all supporting documentation is included in the Planning Record as necessary. (Deliverable 3.1.1)
3.1.2 Project Management Plan and Project Schedule
The Contractor will develop a Project Management Plan and Project schedule and submit these documents to the Forest Service PM and COR. The schedule will establish due dates for Forest Service provision of materials, data, and other information necessary for the Contractor’s completion of deliverables. The schedule will also include regular meetings (see 3.1.4) to ensure that effective and timely communication is occurring. The Contractor, Forest Service PM, and COR may adjust the frequency of these meetings as necessary throughout the project. (Deliverable 3.1.2)
3.1.3 Quality Control Plan
The Contractor will develop a Quality Control Plan (QCP) to maintain an effective quality control program to ensure services are performed in accordance with the contract and this PWS. (Deliverable 3.1.3)
3.1.3.1 The Contractor will develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
3.1.3.2 The plan will specifically address the Contractor’s strategy to provide quality workmanship, continual process improvement and correction of deficiencies as required. The Contractor’s QCP is the means by which they assure themselves their work complies with the requirement of the contract.
3.1.3.3 The Contractor’s complete quality control plan must include, at a minimum, the following: Name of a quality control manager and an alternate(s) who is responsible for the quality performance of this contract. It is the quality control manager’s responsibility to inform the Contractor’s PM regarding significant data/information deficiencies and the Contractor’s PM will inform the Forest Service PM, COR, and CO.
3.1.3.4 The quality control program will consist of the plans, procedures, monitoring, and inspection to ensure the work of the PWS is compliant with the data standards in the PWS.
3.1.3.5 The initial QCP will be submitted within seven (7) business days of contract award. As necessary the initial QCP will be discussed during the initial regular coordination call and if revisions are necessary, the Contractor will then have ten (10) business days to revise and submit the final QCP.
3.1.3.6 Any modifications to the program during the period of performance will be provided to the Forest Service PM, COR, and CO for review no later than ten (10) business days prior to effective date of the change. The QCP will be subject to the Forest Service’s review and approval.
3.1.3.7 The Forest Service CO may notify the Contractor of required modifications to the plan during the period of performance. The Contractor will coordinate suggested modifications and obtain acceptance of the plan by the Forest Service CO.
3.1.3.8 The Forest Service may find the QCP “unacceptable” whenever the Contractor's procedures do not accomplish quality control objective(s). The Contractor will revise the QCP within fifteen (15) business days from receipt of notice that QCP is found “unacceptable”.
3.1.4 Regular Coordination Meetings
The Contractor will hold web-based bi-weekly coordination meetings with the Forest Service PM and COR. The frequency of these meetings may change as the project proceeds and any changes will be mutually agreed upon. The Contractor will facilitate the calls, record meeting notes, and may be asked to create meeting materials or other associated tasks. (Deliverable 3.1.4)
3.1.5 Monthly Progress Reports
To support communication between the Contractor and the agency, the Contractor will provide a monthly report documenting tasks and issues identified during the month and upcoming month submitted to the Forest Service PM and COR. Report submission will coincide with monthly invoices. Report will include project schedule, action items, and other critical project management status information. (Deliverable 3.1.5)
3.2 Task 2: Planning Record (Applies to Base item and Option if exercised)
3.2.1 Planning Record specific to the EIS and Document Management
3.2.1.1 The Contractor will create, maintain, and index an official electronic record to ensure documentation supporting the tasks associated with this PWS can be integrated into the broader Planning Record for the project. This electronic record will include copies of all materials created, reviewed, used, or cited to support this project, including personal communications, electronic messages, and other non-published materials. The official record must be in electronic format housed in the Forest Service official Pinyon (Box), with copies of all relevant documents scanned and converted to PDF. The Planning Record will be kept current on a monthly basis or after each key milestone, whichever is more frequent. The official record will include a Planning Record Index in a Microsoft Excel spreadsheet format that includes but is not limited to: Date (YYYYMMDD), File name, Number of pages, Author/Creator, and a brief description of the file topic/content. An example is included as an attachment. (Deliverable 3.2.1.1)
3.2.1.2 The Contractor will label and identify documents with appropriate file naming conventions as outlined in the provided Tongass National Forest Planning Record Protocol.
3.2.1.3 The Contractor must safeguard all information, including that which is received from, given access to, independently researched/gathered, or produced for the Government. Any data provided in support of the NEPA analysis by the non-Federal Party which they feel is confidential must be marked as such. The Contractor will clearly identify any materials that may include privileged information. See the section below, as well as Section 8.0 Security Requirements and Section 9.0 Data Rights for additional information.
3.2.1.4 The Planning Record may be audited by the Forest Service PM or COR at any time.
3.2.1.5 See Planning Record Index template and the Tongass National Forest Planning Record Protocol (current version) for additional guidance and requirements.
3.2.2 Record and Product Rights
3.2.2.1 All records acquired or generated by the Contractor in its performance of each task will be the property of the Government and will be delivered to the Government or otherwise disposed of by the Contractor either as the CO may from time to time direct during the process of the work, or in any event, as the CO will direct upon task completion or termination of the contract.
3.2.2.2 Forest Service retains all intellectual property rights. Publishing any product (either interim findings or final product) is solely at the discretion of the Government.
3.2.2.3 See Section 9.0 Data Rights for additional information.
3.3 Task 3: Data Management (Applies to Base item)
3.3.1 Government Furnished Property and Security
The Government will provide the following Government Furnished Property (GFP) for the Contract GIS Specialist:
· An FS imaged laptop and docking station.
· USDA-issued LincPass for access to federal facilities and computer systems. As required by the Homeland Security Presidential Directive (HSPD) 12 “Policy for a Common Identification Standard for Federal Employees and Contractors” to perform a National Agency Check with Inquiries (NACI) for contractor personnel. The NACI is a brief form of background investigation that is conducted through the Office of Personnel Management. This investigation will be conducted for contractor staff assigned to this contract. Contractor staff shall provide two (2) forms of acceptable identification, a current photograph, and be finger-printed. A current and successful clearance is required for a contractor employee to work under this contract. For tasks dependent on access to the FS Network contract personnel shall be required to have FS network access. Contractors shall follow the “Person Model” process to obtain a Personal Identity Verification (PIV) known as LincPass. Allowance of approximately six (6) weeks should be anticipated for activation of a LincPass.
All contractor personnel shall complete initial and annual information security awareness training to maintain their access to FS systems.
Upon termination of employment, the contractor shall take immediate possession of the terminated personnel’s LincPass and close or restrict access to all USDA or FS accounts. The LincPass of terminated or separated personnel shall be returned to the Government within three (3) business days.
The contractor shall establish, maintain, and implement a property management and control program in accordance with FAR Part 45 and the GFP clauses in the contract including, maintaining a current list of the GFP in their possession and allow the Government access to any GFP reports during the performance of the contract. GFP used in the conduct of this contract is under the control and accountability of the contractor. Contractor personnel are responsible for protecting, preserving, maintaining, and repairing any GFP in their possession according to the contract and their property control procedure. The contractor shall be liable for any and all loss or damage of GFP until transfer of property back to the Government occurs.
3.3.1 Data
While the agency anticipates supplying all data necessary for analysis in the EIS, the Forest Service requires that all data modifications and analyses collected under this contract be submitted to the Forest Service PM and COR as part of the Planning Record supporting this project (see 3.2 Task 2: Planning Record). Data must be in the form of individual data points used in the analysis, not just summaries like means; metadata must be included that comprehensively explain all variables, conditions, etc., such that the results can be understood and replicated by others.
3.3.2 The Contractor may be required to provide a wide range of data management services to include:
a. Provide all GIS data, analysis, maps using ArcGIS Pro, and graphics, in electronic format, using accepted and compatible software formats. ArcGIS must be a version acceptable to the Forest Service at the time of this PWS.
b. Prepare a “Data Management” section in the analysis document(s) or a standalone document for the Planning Record that includes a list of all data used in the EIS analysis process, and the backup metadata, regardless of the source of the data. EIS may either contain or reference this standalone document and identify where to find the metadata and data. Most of the data to be used in the preparation of these NEPA documents will be provided by the Forest Service in GIS or other form.
c. The EIS will be prepared with the Forest Service guidance and requirements regarding data management. All GIS data supplied and developed by the Forest Service and used in the EIS, or developed by the Contractor, will meet the Forest Service’s accuracy standards for geographic data. See attached Tongass Managing GIS Project Record.
d. Any Contractor-supplied geospatial deliverables will comply with applicable national, and federal geographic information standards, particularly those determined by the Federal Geographic Data Committee (FGDC) supporting the National Spatial Data Infrastructure (NSDI). Any geospatial data provided will be complete and will include a spatial component, attribute information and metadata. The data will be used for the EIS and will comply with applicable FGDC content standards. Accuracy statements reported by the Contractor will be completely and thoroughly substantiated by Metadata. The National Standard for Spatial Data Accuracy provides guidelines in Section 3.2.3, Accuracy Reporting, for reporting positional accuracy in Metadata.
e. Metadata received from the Contractor will be delivered in the same package as the geospatial data and must be capable of being imported and processed by ArcGIS. The Forest Service will determine acceptable formats and will provide a metadata template and examples as part of the data package to support completing the EIS. All required information must be included. Metadata received from the Contractor will, at the Forest Service’s discretion, be subject to inspection prior to acceptance.
f. The Forest Service PM will notify the Contractor of any rejected metadata within five (5) business days of Forest Service review.
g. Any metadata rejected by the Forest Service PM will be returned to the Contractor for correction and returned to the Forest Service PM within a specified number of days from the rejection notification date, as determined by Forest Service COR for each item.
3.4 Task 4: Environmental Impact Statement (EIS) and Draft Record of Decision (Applies to Base item) The format for all documents will be approved by the Forest Service PM.
3.4.1 Environmental Impact Statement
3.4.1.1 The Contractor will be responsible for writing, preparing, and editing any and all initial EIS documents and reports, or portions of documents and reports, and provide NEPA-related services as required. The Contractor will edit all documents to read like one voice, reduce redundancy and use the active voice (not passive). See Section 3.8 Task: Writing and Editing Functions for more information on document development guidance and Section 10.0 Section 508 - Electronic and Information Technology Standards.
3.4.1.2 The Contractor will coordinate an interdisciplinary team (including subsistence specialist) to develop the EIS and all supporting documents and analysis, as well as the alternatives to be analyzed in the initial and complete EIS.
3.4.1.3 The Contractor will write the initial EIS using guidance provided in the interim or final USDA NEPA Regulations applicable at the time of contract award. This includes complying with any page limits, as defined by applicable USDA NEPA regulations. Minimum elements required at the time of writing this PWS are listed below. Elements (a.) through (g.) can be independently completed by the contractor as part of this task based on information provided by the Forest Service and in coordination with the Forest Service PM and Responsible Official. Element (h.) will be developed by the agency and provided to the contractor to include in the initial EIS.
a. Cover
b. Purpose and need for the proposal
c. Proposed action and alternatives
d. Potentially affected environment
e. Environmental impacts
f. Environmental review and consultation requirements, to include a list of agencies and persons consulted
g. Appendices (Travel Analysis, etc.)
h. Certifying statements for page limit and deadline.
The Forest Service retains all responsibility for approval of documents prepared by the Contractor. The Forest Service will review each section (a. through h. above) as it is developed and provide edits/comments to the Contractor within 3 weeks of receiving the section or document. The draft document will be provided in Microsoft Word format to allow for track changes and comments from reviewers. The Contractor will address all comments and edits within 2 weeks of receiving Forest Service input on the initial drafts.
The Contractor will coordinate an IDT to complete analysis documentation and finalize reports to compliment the development of the EIS. This includes finalizing relevant data, methodologies, references, and other documentation that support the conclusions from their analysis. Alternatively, the analysis can be integrated directly into the EIS or in a stand-alone supporting document, unless required for separate consultation with other agencies such as the Biological Assessment.
The current Tongass Forest Plan requires unit and road cards to be completed and appended to the EIS. Unit cards serve as the final documentation of the application of BMPs, Forest Plan standards and guidelines and mitigation measures. A map representation of the proposed action for each alternative accompanies each unit card. Road cards provide road management objectives for proposed new and proposed changes to existing NFS roads within the Harris South Project area. A map representation of the proposed action for each alternative accompanies each road card. See Unit and Road Card examples for guidance. A travel analysis is required by Forest Service Manual 7700 Travel Management Chapter 10, section 7712. A travel analysis informs decisions relating to administration of the forest transportation system and helps to identify proposals for changes in travel management direction (see Forest Service Handbook 7709.55 Travel Planning Handbook Chapter 20 Travel Analysis.
Concurrent development of multiple documents may require collaboratively editing files through Pinyon (Box) file sharing. This could also include Contractor staff working side by side with Forest Service staff virtually in Microsoft Teams meetings.
Two agency review periods are anticipated to complete the initial EIS. Each review period will be 3-4 weeks after the initial EIS document and supporting Planning Record are accepted by the Forest Service PM. The initial EIS will be reviewed by the Forest Service Joint Review Team and other agency staff as appropriate. After each review, the Contractor will be required to address all comments made and update the document to resolve any corrections needed as directed by the Forest Service PM or COR. The completed initial EIS and supporting documentation (including unit and road cards) will be provided to the Forest Service in both Adobe PDF and MS Word formats. (Deliverable 3.4.1)
3.4.2 Subsistence Analysis and Subsistence Hearing
Subsistence is a broad term applied to many natural resource uses by rural Alaskans. In the 1980 Alaska National Interest Lands Conservation Act (ANILCA), subsistence is defined as: "The customary and traditional uses by rural Alaska residents of wild renewable resources for direct personal or family consumption as food, shelter, fuel, clothing, tools, or transportation; for the making and selling of handicraft articles out of nonedible byproducts of fish and wildlife resources taken for personal or family consumption; for barter, or sharing for personal or family consumption; and for customary trade" (ANILCA Sec. 803). It should be noted that for Alaskans, subsistence does not usually include the connotation of marginal survival that it usually has in the English language. For many rural Alaskans, subsistence is a way of life that embodies deep cultural and traditional meaning. Rural residents have opportunities to participate in subsistence activities and to harvest subsistence resources in accordance with the direction in the Alaska National Interest Lands Conservation Act of 1980 (ANILCA). The Prince of Wales-Hyder Census Area is designated as rural by the Federal Subsistence Board and residents may harvest fish and wildlife for subsistence uses on Federal public lands in Alaska.
As part of the EIS analysis, the Contractor will coordinate an IDT to complete a subsistence analysis as required by ANILCA 810 to determine effects on subsistence uses. Based on the determinations from that evaluation, notice and hearings may be required by ANILCA 810 and 811. If required, the Contractor will draft, prepare, or assist with providing, as requested by the Forest Service, notice to the public and applicable State agencies, Subsistence Regional Advisory Councils, and local fish and game advisory committees and Alaska Department of Fish and Game (for wildlife and fisheries subsistence. If required, the Contractor will draft materials and assist the Forest Service as requested in providing a public hearing in the vicinity of the area involved. (Deliverable 3.4.2) 3.4.3: Content Analysis of Public Comments on the initial EIS At the conclusion of the public notice and comment period for the initial EIS, the Contractor will be responsible for content analysis, comment coding, and establishing a response tracking spreadsheet or similar document. In addition to compiling public comments through eMNEPA tools (i.e. CARA), and/or the most updated software used by the Forest Service, the agency will receive written and electronic mail comments and will provide them to the Contractor to include in their content analysis, comment coding, and response tracking database.
3.4.3.1 The Contractor will develop a response tracking spreadsheet or similar document that must include the names and addresses of the individual or entity, the comments and/or issues presented, and the venue each comment was raised in, for example, subsistence hearing, public meeting, mailing, or internet submission through electronic mail, or other platform used.
The Forest Service eMNEPA tool CARA, or the most updated software used by the agency, may be used to support content analysis of all public comments received. The Contractor will categorize comments based on the example comment coding structure and rule set provided by the Forest Service. (Deliverable 3.4.3.1)
3.4.3.2 After the comments are categorized and coded, the Forest Service will determine how to address substantive issues or recommendations. The Forest Service will complete their review within 21 calendar days of delivery of the tracking spreadsheet. Agency action determinations may include: (i) Modifying alternatives, including the proposed action; (ii) Developing and evaluating alternatives not previously given serious consideration by the agency; (iii) Supplementing, improving, or modifying analyses; (iv) Consideration of science or literature not previously considered, if the commenter clearly identifies cause-and-effect issues relating the literature to the environmental analysis; (v) Making factual corrections, or the agency may determine (vi) no action needed, supported by a brief rationale for taking no action. The Contractor will produce a Comment Summary Report based on the categorization of comments received and agency actions. (Deliverable 3.4.3.2)
3.4.3.3 Once agency action determination is complete, the Contractor will organize and facilitate Concern Resolution workshops (Virtual) with Forest Service Joint Review Team (JRT) and Contractor IDT to resolve public comments that require further discussion/decision making to support finalizing the Comment Analysis Report. Up to four (4) workshops may be necessary to coordinate with the Forest Service PM, Responsible Official, Forest Service JRT and Contractor IDT. (Deliverable 3.4.3.3)
3.4.3.4 The Contractor will update the appropriate sections of the initial EIS (3.4.1: Environmental Impact Statement) or Planning Record (3.2 Task 2: Planning Record) based on agency action determinations and prepare a draft Comment Analysis Report to include as an appendix in the complete EIS as required under the USDA Interim or Final NEPA Regulations. (Deliverable 3.4.3.4)
3.4.4 Revise Environmental Impact Statement
After the notice and comment period for the initial EIS, the Contractor is required to revise the initial EIS to produce a complete EIS document. The EIS updates will include making any changes based on substantive issues or recommendations as determined by the Forest Service. These changes may include: (i) Modifying alternatives, including the proposed action; (ii) Developing and evaluating alternatives not previously given serious consideration by the agency; (iii) Supplementing, improving, or modifying analyses; (iv) Consideration of science or literature not previously considered, if the commenter clearly identifies cause-and-effect issues relating the literature to the environmental analysis; (v) Making factual corrections.
The complete EIS will include all elements developed for initial EIS (see 3.4.1.3 above), as well as an Executive Summary, complete list of cited references, a fully developed summary of public involvement, consultation, and coordination efforts.
It is anticipated that a revised Forest Plan Record of Decision will be signed by February of 2028. If the revised Forest Plan NEPA is completed according to its timeline then the complete EIS must be made consistent with the revised Forest Plan. A copy of the final revised Forest Plan will be supplied once its Final Record of Decision is signed.
Two agency review periods are anticipated for the complete EIS. Each review period will be 3-4 weeks after the complete EIS document and supporting Planning Record are accepted by the Forest Service PM. The complete EIS will be reviewed by the Forest Service JRT and other agency staff as appropriate. After each review, the Contractor will be required to address all comments made and update the document to resolve any corrections needed as directed by the Forest Service PM or COR. The complete EIS and supporting documentation will be provided to the Forest Service in both Adobe PDF and MS Word formats. (Deliverable 3.4.4)
3.4.5 Draft Record of Decision
In cooperation with the Forest Service PM and Responsible Official, the Contractor will develop a draft Record of Decision (ROD) that includes the minimum elements outlined below. Adjustments to the outline and content can be made as agreed upon through coordination with Forest Service PM and COR. The Forest Service retains all responsibility for approval of documents prepared by the Contractor.
The ROD will include:
a. Incorporate by reference the environmental impact statement and note any other documentation related to it, such as documentation contained in the planning record. The record of decision need not repeat any of the discussion in the environmental impact statement.
b. Certify that the responsible official has considered all the substantive alternatives, information, and analyses submitted by State, Tribal, and local governments and public commenters for consideration in developing the environmental impact statement.
c. State the decision, that is, the alternative selected.
d. Provide an explanation on how the responsible official considered significance, relative to the alternatives described in the environmental impact statement.
e. Identify and discuss all such factors, including any essential considerations of national policy, that the responsible official balanced in making the decision and state how those considerations informed the decision. The discussion may include preferences among alternatives based on other relevant factors, such as environmentally preferable, economic and technical feasibility considerations, and statutory requirements.
f. State any means identified to mitigate adverse environmental effects of the proposed action or selected alternative. The Contractor will summarize, where applicable, a monitoring and enforcement program for any enforceable mitigation requirements or commitments.
g. A statement regarding when implementation of the action is anticipated to begin.
h. Include the date issued and the signature of the Responsible Official.
One agency review period is anticipated to complete the draft ROD. The review period will be 3-4 weeks after the draft ROD is accepted by the Forest Service PM. The draft ROD will be reviewed by the Forest Service JRT and other agency staff as appropriate. After the review, the Contractor will be required to address all comments made and update the document to resolve any corrections needed as directed by the Forest Service PM or COR. The completed draft ROD and supporting documentation will be provided to the Forest Service in both Adobe PDF and MS Word formats. (Deliverable 3.4.5)
3.5 Task 5: Biological Assessment and Essential Fish Habitat (Applies to Base item) The project will require production of a Biological Assessment and Essential Fish Habitat and supporting documentation to make a determination of effects relative to proposed activities.
3.5.1 Biological Assessment and Essential Fish Habitat Requirements The Contractor will be required to prepare a Biological Assessment (BA) for the Harris South Project that may potentially impact threatened or endangered species.
The BA will include any listed, proposed, or candidate species, or designated or proposed critical habitat potentially impacted by the Harris South Project.
Current regulation 50 CFR 402.14(c) identifies the required elements of a Biological Assessment, briefly summarized below:
a. description of the proposed action
b. description or map of the action area
c. description of any listed, proposed or candidate species, or designated or proposed critical habitat that may be affected
d. analysis of effects of the action, including cumulative effects
e. effects determinations See attached USFWS Template for Biological Assessments, dated February 21, 2025 (or most recent available version accepted by USFWS) for guidance and as an example format.
The Contractor will be required to prepare an Essential Fish Habitat (EFH) assessment as required by the Magnuson-Stevens Fishery Conservation and Management Act (MSA). The assessment will determine any activities that could affect the essential fish habitat of federally managed fish species identified in a fishery management plan by the North Pacific Fishery Management Council. Federal agencies must provide NMFS with an EFH assessment for any action that may adversely affect EFH. An EFH assessment must contain:
a. Description of the proposed action.
b. An analysis of the adverse effects of the action on EFH and managed species.
c. The Federal agency's conclusions and determination regarding the effects of the action on EFH.
d. Proposed mitigation, if applicable.
If appropriate, the EFH assessment should also include the items listed at 50 CFR 600.920(e)(4). The level of detail in an EFH assessment should be commensurate with the potential impacts to EFH. See attached NOAA Fact Sheet 2025 for EFH for guidance.
3.5.2 BA and EFH data management and Planning Record
As included under Section 3.3 Task 3: Data Management, supporting data collected or developed to support the determinations of effects under the ESA and MSA and general NEPA effects disclosure must be included in the Planning Record.
3.5.3 Biological Assessment and Essential Fish Habitat
The Contractor will prepare a BA and EFH for Forest Service review, in consultation with the Forest Service PM. The Contractor can anticipate coordination meetings with the Forest Service to support this task. The meetings will be to convey and discuss concepts, conservation measures, and effects determination. (Deliverable 3.5.3) One agency review period is anticipated to complete the BA and EFH. The review period will be 3-4 weeks after the draft BA and EFH are accepted by the Forest Service PM. The draft BA and EFH will be reviewed by the Forest Service JRT and other agency staff as appropriate. After the review, the Contractor will be required to address all comments made and update the documents to resolve any corrections needed as directed by the Forest Service PM or COR. The completed BA and EFH and supporting documentation will be provided to the Forest Service in both Adobe PDF and MS Word formats to include in the Planning Record.
3.5.4 Contractor Resource Specialist(s)
The BA and EFH will be prepared by a competent, qualified, professional biologist(s) and requiring at least a bachelor’s degree in biological sciences or closely related degree, and experience to perform the task independently. The Contractor will provide the final BA and EFH to the Forest Service for any needed consultation with the U.S. Fish and Wildlife Service (USFWS) and the National Marine Fisheries Service (NMFS/NOAA Fisheries).
3.5.5 Approval Authority
The Forest Service retains approval authority and the ability to reverse determination for any BA and EFH.
3.6 Task 6 Silvicultural Prescriptions (Applies to Base item) The silvicultural diagnosis and prescriptions for all proposed harvest units for the Selected Alternative are required to be completed and signed by an Alaska Region Certified Silviculturist by the time of Decision for the project.
3.6.1 Silvicultural Diagnosis and Prescription
For the Certified Silviculturist to complete the above requirement, each unit requires information within the following categories:
a. general information
b. site description
c. stand characteristics
d. soil considerations
e. overstory characteristics
f. understory characteristics
g. wind disturbance patterns
h. management concerns and project specific constraints, and
i. silviculture objectives.
See attached spreadsheet “Harris South Unit Rx Information” for the full list of items required in each category for each unit. The Contractor will ascertain this specified list of unit-specific information from provided field data, inventoried data, activity tracking data, aerial photos, and Tongass National Forest geospatial data. The Contractor will provide Forest Service personnel with the “Harris South Unit Rx Information” spreadsheet with all required information populated for each unit included in the Selected Alternative. (Deliverable 3.6.1)
3.6.2 Silviculture Data Management and Planning Record
If provided data sources are processed, manipulated, or require calculations to populate Harris South Unit Rx Information spreadsheet fields, these will be documented and included in the Planning Record.
3.6.3 Final Silvicultural Prescriptions (Applies to Option if exercised) The Forest Service will provide completed final prescriptions, signed by a Certified Silviculturist, to be included within the planning record no later than the time the Final Record of Decision is to be signed by the Responsible Official.
3.7 Task 7: Writer and Editor Functions (Applies to Base item and Option if exercised)
3.7.1 Document Development
As described throughout this PWS, technical writer and editor functions will be required for all documents produced under this PWS including: the initial EIS and complete EIS documents, all analysis reports, biological assessment, draft ROD, data/metadata documentation, and all documentation supporting this project to ensure completeness of documentation for the Planning Record.
3.7.2 Printing Requirements
The Forest Service will approve the document template in accordance with the Government Printing Office (GPO) printing requirements. Title 44, U.S.C. 501 mandates that all printing and binding be accomplished through the GPO, unless a waiver is granted. All documents will be professional in appearance; edited for correct grammar and readability by the general public; free from professional or agency jargon, while maintaining a scientific base; minimize acronyms, include appropriate and clear maps and other graphics, and clearly depict management quotes, as referenced in the DOI’s Federal Plain Language Guidelines at www.doi/gov/plainlanguage.
3.7.3 Templates and Guidance
All documents will incorporate the Tongass Master Style Template to ensure consistent formatting. See Attachments and Section 10.0 Section 508 – Electronic and Information Technology Standards for additional resources in document development and writer and editor guidance.
3.8 Task 8: Support Objection Process and Final Record of Decision (Option) Please note that this task is an option outside of the base contract. If this option is not exercised by the contractor, the Forest Service will be responsible for completing this task.
3.8.1 At the conclusion of the Objection Period governed by 36 CFR 218, the contractor will prepare project worksheets/crosswalk to provide the Objection Review Team information on where to find in the EIS, ROD, or Project Record where supporting documentation or analysis is located. (Deliverable 3.8.1)
3.8.2 Contractor will update the EIS and ROD to address concerns or instructions from the Objection Review team. The Final EIS and ROD with supporting documentation will be provided to the Forest Service in both Adobe PDF and MS Word formats. (Deliverable 3.8.2)
3.8.3 Contractor will add final documentation to complete the Project Record; including final silvicultural prescriptions. (Deliverable 3.8.3)
4.0 Deliverables / Schedule
4.1 Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 3.1.1 |
| Post Award Conference Call and Project Kick-off Meeting |
| The Post Award Conference Call and Project Kick Off Meeting may be held jointly or separately and will, at a minimum, introduce all parties, define roles and responsibilities (Government/Contractor), discuss contract administration, discuss the PWS requirements, and answer any technical questions. Also, meeting notes will be recorded by the Contractor as included in Item No. 3.1.4. |
| No later than 10 business days after contract award |
| 3.1.2 |
| Project Management Plan and Project Schedule |
| The schedule identifies key milestones and relevant requirements to the development of a schedule to meet the completion date goal. The Project Schedule will establish due dates for FS provision of materials, data, and other information necessary for Contractor completion of deliverables. The schedule will also include regular coordination meetings scheduled bi-weekly (or as agreed upon) to ensure that effective and timely communication is occurring (see 3.1.4). |
| No later than 5 business days after the Kick-off Meeting |
| 3.1.3 |
| Quality Control Plan |
| The Contractor will develop a Quality Control Plan (QCP) to maintain an effective quality control program to ensure services are performed in accordance with the contract and this PWS. |
| No later than 5 business days after contract award |
| 3.1.4 |
| Regular Coordination Meetings, Facilitation, and Meeting Notes |
| The Contractor will hold bi-weekly progress calls with the Forest Service PM and COR. Frequency may be adjusted to meet the needs of the Contractor and agency, as mutually agreed upon. The Contractor will provide meeting notes that will include all attendees, topics discussed, decisions made, and any action items/responsible individual necessary to support progress towards completing milestones and the project. |
| Begins within 10 business days of contract award and continues throughout period of performance. Notes will be provided to all attendees within 5 business days after each meeting |
| 3.1.5 |
| Monthly Progress Reports |
| Monthly report documenting tasks and issues identified during the month and upcoming month submitted to the Forest Service PM and COR. Report will include project schedule, action items, and other critical project management status information. |
| By the 5th day of each month (or the following Monday if the 5th falls on a weekend) and continues throughout period of performance. |
| 3.2.1.1 |
| Planning Record |
| A complete electronic version of the Planning Record that would include all records in a searchable database, to include a document index and PDF copies of all records. See 3.2 Task 2: Planning Record. Additional details about items included in the Planning Record are described in: 3.3 Task 3: Data Management, and 3.4.3: Content Analysis of Public Comments on the initial EIS. |
| Updated at least monthly or more frequently as agreed upon in the Project Schedule. To be complete 2 weeks before the end of the performance period to allow for review from the Forest Service PM and COR. |
| 3.4.1 |
| Initial EIS |
| Includes EIS Elements a. through g. as described in 3.4 Task 4: Environmental Impact Statement. The Contractor develops elements b. through d. with information provided by the agency from internal and external scoping (as available), the assessment, and through IDT Meetings and coordination with the Responsible Official. These sections will include Alternatives to analyze in detail and significant issues. Disclosure of Alternatives not analyzed in detail and non-significant issues can be incorporated into these sections as appropriate. The Contractor develops elements e. and f. to disclose the Environmental impacts and document the Environmental review and consultation requirements, including the list of agencies and persons consulted. After reviewed/approved, the initial EIS will be electronically delivered, and ready for publication by the agency. It will be free from editorial remarks, comments, and other typographical efforts and Section 508 compliant. |
| October 2027 (target to accept Contractor developed initial EIS) |
| 3.4.2 |
| Subsistence Analysis and Subsistence Hearing |
| Complete a subsistence analysis as required by ANILCA 810 to determine effects on subsistence uses. Based on that evaluation, complete ANICLA 810 subsistence hearing in compliance with Tongass Forest Plan and add testimony to Planning Record. |
| Subsistence Analysis should be used in the initial EIS development. Subsistence hearing should be held during the initial EIS public comment period. |
| 3.4.3.1 |
| Response Tracking Database |
| The Contractor will develop a response tracking spreadsheet or similar database to conduct content analysis, categorization, and identify substantive issues or comments to be addressed. The Forest Service PM and IDT will review and identify comments that present substantive issues or provide information to consider updating the proposed action, alternatives, or environmental impact statement. |
| Tracking spreadsheet delivered 4 weeks after the end of the Notice and Comment Period (December 2027 target for the end of the initial EIS comment period). |
| 3.4.3.2 |
| Comment Summary Report |
| The Contractor will produce a Comment Summary Report based on the categorization of comments received during all outreach opportunities and agency actions. |
| Draft summary report within 4 weeks of receiving the agency’s review and action determinations. |
| 3.4.3.3 |
| Internal/Agency Concern Resolution Workshops |