Attachment12_Harris South Unit Rx Information.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Harris South Project Environmental Impact Statement
Solicitation number
1168154
Issued by

About this file

This file is a data collection template for the Harris South Project, a timber harvest initiative on the Tongass National Forest in Alaska. The spreadsheet template establishes standardized requirements for documenting comprehensive information about individual timber harvest units within the selected alternative, organized with general information fields across columns for each unit.

The template mandates collection of detailed forestry and environmental data across multiple categories: general unit characteristics including acreage, watershed identification, yarding systems, and access routes; site descriptions documenting slope conditions, stream buffers, and terrain features; stand characteristics including volume strata, structure type, capable growing area percentages, and plant association groups; soil considerations addressing drainage, productivity, and mass movement potential; overstory and understory composition with species dominance and damage assessments; wind disturbance patterns; and management constraints spanning legacy forest structure requirements, karst features, soil stability, wildlife protections, fisheries impacts, scenic integrity, heritage resource exclusions, and beach/estuary management. The template specifies that source information will be derived from reconnaissance field notes, GIS layers, project design documentation, and inventory data, with this deliverable (3.6.1) to be completed at contract start. The prescribed information directly supports the Harris South Project's objectives of moving the project area toward desired conditions through sustainable old-growth and young-growth timber harvesting while addressing regional economic sustainability goals outlined in the Forest Plan.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Tongass National Forest, Harris South ProjectNote: sources for these fields will be defined clearly and provided at start of contract
Deliverable 3.6.1, Spreadsheet "Harris South Unit Rx Information"
Required Items Below and Units Across for Selected Alternative onlySource information for contractor (includes recon/field notes, GIS layers, project design, and inventory data)Unit X … all in one spreadsheet going across, one column for each unit
GENERAL INFORMATION
Old growth (OG) unit or young growth (YG) unit?
Harris South Subdivision (A, B, C, or D)
OG unit - FACTS ID Number(s) - extend to include full Unique ID if available
YG unit - FACTS ID Number(s) - original stand harvested
YG unit - FPS ID Number(s) - 4 or 5 digit unique ID
Total Unit Acres (to the tenth acre)
Unit Acres that are suitable, available, and planned for timber harvest
Watershed name(s) (HUC14)
Land Use Designation(s) (acres of each if split)
Yarding System: shovel, cable, helicopter (acres of each if multiple)
Average Elevation (average in feet from FPS) plus a rough/rounded range (hundreds of feet)
Aspect (average direction in degrees from FPS, can also use GIS to describe in words from contour lines)
How is the unit accessed for logging? Open NFS road number, new NFS road number, reconstructed road, and/or temporary road construction (list all that apply)
SITE DESCRIPTION
Slopes over 72%? Yes/No; describe if yes (unsuitable determination, extent, location - rough)
Unsuitable slope exclusions? Yes/No, describe if yes.
TTRA Stream Buffers? Yes/No, describe roughly if yes (in words, such as "X Creek is along the southern boundary", or "there are several Class II streams within the unit").
Non-commercial timber inclusions? Yes/No, describe if yes, primarily for non-commercial portions of old growth stands. For young growth, can include unproductive areas, muskeg, lakes, quarries - look at aerial photo and use these notes from the field to key in on features to describe with rough acre size.
Rock outcrops or blind leads in unit? Yes/No, describe if yes. This gets at terrain features, especially if pertinent to cable. If able to discern anything from contour lines or lidar, use that, and/or notes from field observations.
Adjacent harvest? Yes/No, describe if yes. When did the adjacent stand originate, and will it affect the need to address potential opening size issues with this planned harvest?
VCU - what one(s), and is it a Legacy VCU (where the Legacy Forest Structure Standard in the Forest Plan applies), Yes/No? If the unit is split between legacy and non-legacy VCUs, list acres in each.
STAND CHARACTERISTICS
Stand Volume Strata: this is 2026 merch net MBF/acre from FPS runs. High = 30+, Medium = 20-30, Low = 9-20, Other = less than 9.
Stand Structure (old growth, two aged, even-aged, brushy, stem exclusion, understory reinitiation, uneven-aged), if known.
Stand Year of Origin (YG only)
Capable Growing Area: this is a % value, look at aerial photo or any features in recon notes to determine non-forested areas, unproductive areas, muskeg, lakes, quarries. Estimate %; often at least 95% is capable.
Previous Stand Activities: describe any past treatments that have occurred in the stand such as precommercial thinning. Also look at canopy height lidar map to see if you notice any other disturbances from treatments like gaps or rock quarry or other anomolies.
Plant Association Group: select "Not Surveyed" if unavailable; series and group if available.
SOIL CONSIDERATIONS
Soil Drainage (well/moderate/poorly)
Productivity (high/moderate/low)
Mass Movement Potential (low/moderate/high)
Suspension Requirements: full or partial? If full, describe why.
OVERSTORY CHARACTERISTICS
Overstory tree species listed in order of dominance
Average Merch Trees per Acre (2026, FPS)
Average Merch Basal Area (2026, FPS)
Average Merch Quadratic Mean Diameter (2026, FPS)
Estimated Net MBF/acre (Merch) (2026, FPS)
Overstory growth: static, declining, or increasing?
Tree Damage Noted: Yes/No; if yes, list and describe: mistletoe, fluting, insects, cedar decline, wind hazard, physical defect, stem decay, disease, catastrophic, other.
UNDERSTORY CHARACTERISTICS (advanced regeneration)
Understory: two most dominant tree species in order
General Understory: heavy typical old growth, light typical old growth, moderate typical old growth, atypical light, atypical heavy, open - if able to be determined from notes
Advanced Regeneration Amount: heavy, moderate, low
Understory Growth: increasing, static, declining
Damage noted (understory)? Yes/No?, if yes, list and describe if noted.
WIND DISTURBANCE PATTERNS
Overall Windthrow Risk: low, moderate, high
Windthrow Dominant Direction: this is the direction where the wind came from; can average, describe in a cardinal direction
Wind Exposure: describe in terms of intensity and direction, based on terrain (aspect, slope), other openings, edge dynamics, and influence from terrain features (funneling, intensifying, etc.).
MANAGEMENT CONCERNS, PROJECT SPECIFIC CONSTRAINTS, AND SILVICULTURE OBJECTIVES
Legacy VCU: is legacy forest structure required, and has it been designated? Describe with acreage and placement (overlapping with other resource constraints, interior, to the edges). Note that young growth timber harvest does not require legacy designation.
Karst: describe any constraints that are present in or excluded from the unit, such as high vulnerability karst buffers, caves, or special interest areas.
Soils: describe any constraints, requirements, or pertinent conditions that are present in or excluded from the unit, including slopes over 35% (= cable instead of shovel), slopes over 72% (unsuitable), unstable soils, landslides (historical or new) present, if wetlands or hydric soils are impacted, if the unit has any riparian soils RMA, and if detrimental soil disturbance threshold of 15% needs to be managed for.
Timber/Silviculture: any additional management concerns that are specific to the stand/unit (experimental sites, power lines, private land adjacent, etc.).
Wildlife: describe any constraints present in or excluded from the unit such as nest buffers, dens, or timing restrictions for operations.
Botany: describe any restrictions or requirements pertaining to plants or habitat that may be present in or excluded from the unit.
Invasives: describe any requirements or concerns relating to invasive plant populations that affect implementation.
Fisheries/Hydro: describe streams, TTRA buffers, RMAs, and road-stream crossings present within or excluded from the unit, along with any other constraints or concerns; description should be much more general that would be included on the unit card.
Scenery: describe any constraints or concerns that apply to management of the unit, such as opening size restrictions or what is 'seen' from certain vantages as applied from Forest Plan Standards and Guidelines.
Heritage: all sites should be excluded from units and aren't generally discussed further from a unit level; if there is something to note though about heritage resources/requirements, describe it.
Beach/Estuary: is beach and estuary fringe present in the unit, and are there plans to manage any of that part of the unit, and with what constraints?
Other: any other management concern or project specific constraint for this unit not listed above.
Selected Alternative prescription(s): even-aged management, two-aged management, uneven-aged management, and/or intermediate treatment? If multiple, describe the reason and give acres of the split.
Associated Future Activities through stand rotation (what treatments/actions, number of years out post-harvest, harvest = year 0)

File details come from the government source that posted it. Updated .