FY24 Carrizo Cane Topping Operator and Maintenance SOW and Clauses Provisions Amend 2.docx
DOCX document 2 MB Posted
- Solicitation number
- 1124711
About this file
This document is a Solicitation for a federal contract opportunity to provide Carrizo cane topping services along the Rio Grande River in South Texas. The United States Department of Agriculture (USDA) is seeking support to top approximately 200 river miles of Carrizo cane in order to reduce invasive species biomass, increase visibility for the Cattle Fever Tick Eradication Program (CFTEP) and Customs and Border Protection (CBP), and eliminate habitat for cattle fever ticks. The contract will be awarded in four phases, with each phase encompassing approximately 40 linear miles of cane topping. The contractor will be required to provide qualified personnel and equipment to perform the cane topping work, follow safety and environmental protocols, and provide detailed weekly reporting on progress. The total linear miles of cane to be topped under the contract is 160 miles. Proposals are due by May 24, 2024 and will be evaluated based on technical capability, price, past performance, and quality control.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY24 Carrizo Cane Topping Operator and Maintenance SOW and Clauses Provisions Amendment 3.docx | DOCX document | |
| Task Orders FY 24 Carrizo Cane Cost Schedule.xlsx | XLSX spreadsheet | |
| CFTEP Misc Info for the SOW revised May 1 2024.docx | DOCX document | |
| Prioritized Commencement Schedule.docx | DOCX document | |
| Sol_12639524Q0142_Amd_0001.pdf | ||
| Sol_12639524Q0142 tb si.pdf | ||
| FY24 Carrizo Cane Topping Operator and Maintenance SOW 3-22-2024.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .