- Buildiing 50 Elevator Installation at the Jefferson Labs Campus Federal contract opportunity
- Solicitation number
- 11-223-SOL-00030
About this file
Attachment J-1 drawing A-2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment 4.pdf | ||
| amendment 3.pdf | ||
| amendment 2.pdf | ||
| site visit list of attendees.pdf | ||
| amendment 1.pdf | ||
| G 1.pdf | ||
| E 1.pdf | ||
| A 1-.pdf | ||
| Project Manual.pdf | ||
| 11-223-SOL-00030.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
9' 6"
ELEV.
NO. 2
CX
A.2 E4
TYP.
EXIST.
ELEV.
NO. 1
C
X
ELEV.
NO. 2
A.2 E4
TYP.
EXIST.
ELEV.
NO. 1
C
X
ELEV.
NO.2
TYP.
EXIST.
ELEV.
NO. 1
CX
ELEV.
NO. 23'
6"
8'
" V
IF
6' - 8 1/2" VIF 3 1/2"
A.2 E4
TYP.
proposed elevator existing elevator
D X C
ELEV. PIT
ELEV. 270'-0"
EXIST.ELEVATOR PIT LADDER
LINE OF CURVED SIDES OF
EXIST. PARTITION BEYOND
1'-4" NTS 8'-8 1/2" NTS
FIRST FLOOR
ELEV. 274'-0"
(T
YP
E
LE
V.
D O
O R
7'
2"
MEZZANINE FLOOR
ELEV. 284'-0"
SECOND FLOOR
ELEV. 294'-7 1/2"
FIFTH FLOOR
ELEV. 347'-1 1/2"
SIXTH FLOOR
ELEV. 361'-2 1/4"
SEVENTH FLOOR
ELEV. 375'-3"
MACHINE ROOM
ELEV. 394'-0"
EX
IS
TI
N
G E
LE
VA
TO
R
S H
AF
T
A.2 H2
TYP.
A.2 E2
TYP.
GENERAL CONTRACTOR TO REMOVE AND
REPLACE PIT SLAB TO ACCOMODATE
SELECTED ELEVATOR MANUFACTURERS
DEPTH RECOMMENDATIONS, ENSURE
THAT PIT FLOOR SLOPES TO DRAIN,
PROVIDE WATERPROOFING OVER FLOOR
AND WALLS TO FIRST FLOOR ELEVATION.
SILL ANGLE
SLAB EDGE
METAL FASCIA PLATE
BY ELEV. MFR.
METAL JAMB
BEYOND
PATCH FLOOR W/
VCT PROVIDED BY OWNER
SILL ASSEMBLY
BY ELEV. MFR.
EXIST. 2 HOUR
CONSTRUCTION
SHAFT SIDE
FILLER
7/
8"
/1
6"
5" MIN.
EXIST.CONSTRUCTION
DUST COVER
METAL FASCIA PLATE
BY ELEV. MFR.
METAL ELEV.
ENTRANCE HEAD
METAL JAMBS BEYOND
HOISTWAY DOOR
EXIST. LINTEL
PATCH GWB ON MTL.
FURRING
DISTRUBED BY
DEMOLITION
SHAFT SIDE
7' -0
" A .F
.F
1'
0"2"
4 1/4"7/8"
EXIST. 2 HOUR
CONSTRUCTION
HOISTWAY DOOR
FULL WIDTH
METAL SILL
PATCH PROFILE OF
ADJACENT ELEV. METAL
JAMB. VARIES AT EACH
FLOOR.
LINE 0F
FRAME ABOVE
SHAFT SIDE
EXISTING GWB ON METAL
FRAMING.
CONFIGURATION VARIES
AT EACH FLOOR
C
LE
AR
F
R
AM
E O
PE
N
IN
G
1'
0" 2" 1'
0" 2"
4 1/4"7/8"
1'
/3 2"
2"
PROVIDE GWB RETURN
AT JAMB AND FURRDOWN,
PAINT TO MATCH EXISTING
EXIST.2 HOUR
CONSTRUCTION
EXIST.2 HOUR
CONSTRUCTION
E D X C
ELEVATOR MACHINE ROOM
EXISTING REMOVABLE
ENCLOSURE FOR ELEV. NO. 2
MACH. INSTALL
LINE OF EXIST. ELEV.
SHAFT BELOW (TYP.)
A.C. UNIT
COORD. SHEAVE HOLE
LOCATION W/ ELEV. MFR.
EXISTING A.C. UNIT
Tape Visqueen to Floor
2 X 4 Studs on 24" O.C.
W/ 1/2" Plywood
3 1/2" Sound Batt. Insulation
Visqueen Tape at all Joints
Tape Visqueen to Deck Deck
Side of Demo. Work
Ap pr ox . 2
0'
0"
JEFFERSON LABORATORIES OF THE FDA
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO.
SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
DRAWING NO.
SHEET
As indicated
8/2/2010 1:09:30
PM
ALHJULY 26, 2010
ELEVATOR PLANS & DETAILS
BUILDING 50 - ELEVATOR ADDITION
A.2
GC,BS
2.3684.10
1/4" = 1'-0"
A2 SEVENTH FLOOR PLAN
1/4" = 1'-0"
A4 FIFTH & SIXTH FLOOR PLAN
1/4" = 1'-0"
A5
SECOND, THIRD, &
FOURTH FLOOR PLAN
1/4" = 1'-0"
A7 FIRST FLOOR PLAN
1/4" = 1'-0"
A1 ELEVATOR SECTION
1/4" = 1'-0"
E2 ELEVATOR SILL DETAIL
NOT TO SCALE
1/4" = 1'-0"
H2 ELEVATOR LINTEL DETAIL
NOT TO SCALE
1/4" = 1'-0"
E4 ELEVATOR JAMB DETAIL
NOT TO SCALE 1/4" = 1'-0"
E6 ELEV. MACHINE RM.
NOTE:
PROVIDE ELEVATOR STOPS AT
FLOOR 1, 2, 3, 4, 5, 6, AND 7
Floor Plan General Notes A All construction shall be in accordance with the requirements of the applicable codes, engineering shall conform with all applucable municipal, state and federal regulationd having jurisdiction including accessibility standards and requirements of "Americans with Disabilities Act."
B Each trade is advised that information pertinent to its work may occur in variuos sections of the contract documents. Refer to every sheet of drawings for notes and symbols. Notes shall be reviewed and applied to related building components regardless of their locations in the drawings and specifications.
C Unless noted otherwise, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions
D The contractor shall furnish and install all blocking, stiffeners, bracing, backing plated and supporting brackets required for the proper installation of all building components as recommended by the manufacturer and required by code. In walls, provide blocking attached to studs as backing supports for wall-mounted items.
E All dissimilar metals shall be effectively isolated from each other to avoid molecular breakdown.
G Finish floor elevations are to the top of concrete, unless noted otherwise.
H New construction at hoistway wall is to be 2 hour construction.
Floor Plan Key Notes 1 Dust partition, verify exact location with contracting officer.
3/4" = 1'-0"
J7 DUST PARTITION
aharness Gene (7.26.2010)
File details come from the government source that posted it. Updated .