110_Marion_Demolition_Specifications_.pdf

PDF 21 MB Posted

Attached to
110 Marion Street Demolition - City of Scranton
Solicitation number
2025-ITB-080
Issued by
Lackawanna County, Pennsylvania

About this file

These contract documents prepared by Barry Isett & Associates detail a demolition project for a blighted property located at 110 Marion Street in Scranton, Lackawanna County, Pennsylvania, on behalf of the City of Scranton's Bureau of Code Enforcement. The project involves complete demolition of a two-story structure, including removal of the entire building, foundations, utilities, sidewalks, driveways, fencing, and associated debris. The project is scheduled with a mandatory pre-bid meeting on August 15, 2025, at 2:00 PM, with bid submissions due by 10:00 AM on August 21, 2025. The anticipated Notice of Award is August 21, 2025, with a Notice to Proceed on September 1, 2025, and substantial completion targeted for October 15, 2025.

The project requires comprehensive demolition services including asbestos abatement, utility disconnection, site clearing, and restoration. Contractors must follow federal, state, and local regulations, provide all necessary labor, materials, supervision, and equipment. The project will be executed under a single prime contract, with bidders required to submit documentation including bid forms, bid bonds, contractor qualifications, and compliance with E-Verify employment verification requirements. The site must be restored with 4 inches of screened topsoil and seeded to establish grass coverage, with the contractor responsible for maintaining the site until grass is successfully established.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIMITED ASBESTOS CONTAINING MATERIALS INSPECTION

Throughout:

110 MARION STREET

SCRANTON, PA 18509

Prepared for:

SCRANTON OFFICE OF ECOMONIC AND COMMUNITY DEVELOPMENT

340 NORTH WASHINGTON AVENUE (MUNICIPAL BUILDING),

SCRANTON, PA 18503

Attention:

Mr. Andrew Conners

Prepared by:

QUAD THREE GROUP, INC.

37 NORTH WASHINGTON STREET

WILKES-BARRE, PENNSYLVANIA 18701

PH. (570) 829 - 4200

FAX (570) 829 - 0302

PROJECT # 13030.04.36

AUGUST 2025

TABLE OF CONTENTS

I. EXECUTIVE SUMMARY…………………………………………….1.

II. INTRODUCTION……………………………………………………..1.

III. SURVEY AREA AND DISCUSSION……………………………....2.

IV. MATERIALS SAMPLING AND ANALYTICAL…………………...2.

V. INSPECTION FINDINGS AND RECOMMENDATIONS…………3.

VI. ASBESTOS CONTAINING MATERIALS ABATEMENT………..3.

COST

VII. INSPECTION DISCLAIMER………………………………………..4.

APPENDICES

APPENDIX A ASBESTOS ANALYSIS RESULTS

APPENDIX B SITE PHOTOS

APPENDIX C CERTIFICATIONS

LIMITED ASBESTOS CONTAINING MATERIALS INSPECTION

Prepared for:

Scranton Office of Economic and Community Development 340 North Washington Avenue (Municipal Building), Scranton, PA 18503

I. EXECUTIVE SUMMARY

An Asbestos Containing Materials Inspection was conducted on July 30th, 2025 within the planned demolition site located at 110 Marion Street, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure.

Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc.

conducted the inspection in conjunction with demolition scheduled at the structure.

As part of this asbestos inspection, the quantities and conditions of asbestos containing materials were identified. A total of four (4) multiple layered bulk material samples were collected and analyzed.

Asbestos containing materials (ACM) were not identified on the accessible areas of the structure located at 110 Marion Street, Scranton, Pennsylvania

Materials that were non-suspect or were sampled and through analysis found to not contain asbestos include exterior wall board and shingle siding. Descriptions of all the material samples collected can be found in Appendix A.

The conclusions presented in this report are the result of the coalition, compilation and analysis of samples and other information obtained during the inspection. The results presented in this report represent the conditions present at the time of the inspection. Quad Three Group has no control over conditions or events that occurred following the date of inspection.

II. INTRODUCTION

On July 30 th, 2025, a limited asbestos inspection was performed within 110 Marion Street, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, identify and quantify asbestos containing materials (ACM) as they exist within the structure scheduled for demolition. The survey / inspection process included:

A. Inspecting the area to identify representative “suspected” asbestos-containing materials, types and sampling sites.

B. Collecting representative samples from any suspect material in order to identify all

Asbestos Containing Materials (ACM). Examples of these materials include Pipe insulation, plaster, sheet-rock, floor tiles, linoleum, etc.

C. Sampling was performed by experienced, licensed personnel utilizing semi -destructive sampling techniques in an attempt to locate asbestos containing materials.

1.

D. Laboratory analysis of the materials sampled was performed at an accredited laboratory using the EPA recommended method of polarized light microscopy (PLM) for friable samples.

III. SURVEY AREA DISCUSSION

The property was comprised of a two story structure at 110 Marion Street. Access to the interior of the structure was limited at the time of the inspection due to structural concerns caused by collapsing areas in the rear of the structure, and large amounts of debris blocking safe entrances / exits to the structure. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.

IV. MATERIALS SAMPLING AND ANALYTICAL METHODOLOGY

The building inspection was conducted by an inspector, qualified by experience, education and training in the recognition of suspect asbestos-containing materials (ACM). An initial walk through was conducted to identify suspect asbestos containing materials and to group them into homogeneous sampling areas.

Following the walkthrough, the number of samples required to determine the presence of ACM in the study areas was determined. Sample collection was performed with the intent to identify and locate asbestos containing materials and to group them into homogeneous material categories. This grouping allowed the inspectors to identify like materials within the facility to avoid over sampling or mischaracterization of an asbestos containing material.

The majority of the ACM samples were located utilizing non-destructive techniques. Some areas of ACM may still exist in areas that could not be accessed until complete interior demolition is completed.

Representative samples of each “suspect asbestos containing material” were collected utilizing approved federal and state methods. When samples were collected, the locations were noted. Measurements were taken to determine the approximate quantity of suspect material. The condition of the material was also documented at that time.

All material samples were analyzed via Polarized Light Microscopy (PLM) as per EPA/600R- 93-116, July 1993.

The analytical results and locations for all samples collected can be found in Appendix A.

The samples were analyzed by EMSL Analytical Inc. of Cinnaminson New Jersey. EMSL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP, and has developed and implemented an intra laboratory quality assurance/quality control program to ensure accuracy and consistency of results.

Asbestos is present if the material analyzed is greater than one percent (>1.0%) by weight.

This stipulation is outlined in the EPA Publication EPA 500/5-85-024, Section 2.2.2.2.

2.

V. INSPECTION FINDINGS AND RECOMMENDATIONS

Asbestos containing materials have not been identified on the accessible areas of the structure.

Asbestos containing materials are categorized as containing asbestos concentrations greater than one percent (>1.0%) by weight. Asbestos fiber concentrations less than one percent (<1.0%) by weight are still regulated under OSHA standard 1926.1101.

Below are the results of the building inspection. The results indicate the sample location, sample numbers, material and condition. Some of the materials were homogenized for sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire homogeneous material was classified as asbestos containing in accordance with Environmental Protection Agency Guidelines.

The conditions of the materials are designated as good, damaged or significantly damaged.

The following materials were found to contain more than one percent (>1.0%) asbestos by weight:

ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE

AREAS OF THE STRUCTURE LOCATED AT 110 MARION STREET, SCRANTON, PA.

Analytical results for the materials sampled are located in Appendix A.

Friable materials are materials that can be crushed by applying hand pressure. Non-friable materials are materials that typically cannot be crushed by hand pressure (floor tiles/mastics). If grinding or pulverization were to occur during demolition, non-friable materials can be rendered friable.

Asbestos containing materials (friable and non-friable) located on the interior / exterior of a building, which will be disturbed during renovations / demolition, must be removed and disposed of by a licensed asbestos abatement contractor.

VI. ASBESTOS CONTAINING MATERIAL ABATEMENT COSTS

As part of this report, cost estimates have been provided to help assist the Scranton Office of Economic and Community Development to evaluate the costs associated with a renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should independently verify the quantities of materials when preparing a cost estimate for removal.

The following applies:

ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE

AREAS OF THE STRUCTURE LOCATED AT 110 MARION STREET, SCRANTON, PA.

3.

VII. INSPECTION DISCLAIMER

Data and other information in this report are only valid for the prevailing conditions identified during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.

The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The burden for financial or health consequences for action or lack of action taken by the client or the client's agent is the responsibility of the client.

4.

APPENDIX A

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042515559EMSL Order:

Customer ID: QUAD30

Customer PO:

Project ID:

Attention: Phone:William Sterling (570) 829-4200

Fax:Quad 3 Group, Inc. (570) 829-0302

Received Date:37 N. Washington Street 08/01/2025 9:20 AM

Analysis Date:Wilkes Barre, PA 18701 08/04/2025 - 08/05/2025

Collected Date: 07/30/2025

Project: Scranton Demo / 110 Marion St

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

042515559-0001

None DetectedNon-fibrous (Other)5%Cellulose95%Brown

Fibrous

Homogeneous

Exterior - Wallboard

042515559-0002

None DetectedNon-fibrous (Other)15%Cellulose85%Brown

Fibrous

Homogeneous

Exterior - Wallboard

042515559-0003

None DetectedNon-fibrous (Other)35%Cellulose65%Black

Fibrous

Homogeneous

Exterior - Shingle

Siding

042515559-0004

None DetectedNon-fibrous (Other)35%Cellulose65%Black

Fibrous

Homogeneous

Exterior - Shingle

Siding

Analyst(s)

Alex Francois (2)

Megan Bosch (2)

Samantha Sweeney, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127

Initial report from: 08/05/2025 12:14:22

Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 8/5/2025 12:14 PM

APPENDIX B

PHOTOS

APPENDIX C

mcalvert Pen

SECTION 008600 – PA TAX EXEMPT ENTITIES DISCLOSURE

A. Section 204 of the Tax Reform Code of 1971, see 72 P.S. § 7204(57)(i) and (ii), as amended July 1, 1998, provides a tax exemption for the sale at retail to or use by the United States, the

Commonwealth of Pennsylvania or its instrumentalities or political subdivisions, of tangible personal property or services; and the use by a construction contractor of building machinery and equipment and services thereto that are transferred pursuant to a construction contract for any charitable organization, volunteer fireman's organization, nonprofit educational institution or religious organization for religious purposes, provided that the building machinery and equipment and services thereto are not used in any unrelated trade or business.

In order to permit the contractor to benefit from the foregoing exemption, the tax- exempt entity may be required to cooperate with the construction contractor and provide certain evidence as may be required from time to time by the Pennsylvania Department of Revenue.

B. The contractor is entitled to the aforementioned tax exemption, and the contractor should reflect the tax exemption in all bids, where appropriate.

C. The Contractor is encouraged to use a Pennsylvania Tax Exemption Certificate (Form RE\/-1220) when buying property that qualifies for the tax exemption referenced in Section A above.

D. Access to Accounting Records:

The Contractor shall check all materials, equipment and labor entering into the Work and shall keep such full and detailed accounts as may be necessary for proper financial management under this

Agreement, and the system shall be satisfactory to the Owner. The Owner or its representative shall be afforded access to all the Contractor's records, books, correspondence, instructions, drawings, receipts vouchers, memoranda, and similar data relating to this Contract, and the Contractor shall preserve all such records for a period of three years, or for such longer period as may be required by law, after the final payment (AIA Document A111-1978, Article 12).

E. Contracts with Subcontractors:

The Contractor agrees to include the "Access to Accounting Records" paragraph, in full, in any contracts with subcontractors.

PA TAX EXEMPT ENTITIES DISCLOSURE 008600 - 1

COMMONWEALTH OF PENNSYLVANIA

PUBLIC WORKS EMPLOYMENT VERIFICATION FORM

Date _______________________

Business or Organization Name (Employer)_________________________________________________

Address _____________________________________________________________________________

City _____________________________________ State_____________ Zip Code ________________

Contractor {dzōŎƻƴǘNJŀŎǘƻNJ όŎƘŜŎƪ ƻƴŜύ

Contracting Public Body _______________________________________________________________

Contract/Project No ___________________________________________________________________

Project Description ____________________________________________________________________

Project Location ______________________________________________________________________

As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act

(‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States

Department of Homeland Security. To the best of my/our knowledge, all employees hired post

January 1, 2013 are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature

06 62 00 E-verify Act and Form

On July 5, 2012, Gov. Corbett signed into law the Public Works Employment Verification Act (S.B. 637) which takes effect January 1, 2013.

The Act requires all public works contractors and subcontractors in Pennsylvania to use E-Verify to verify the employment eligibility of new employees and applies to projects with an estimated cost in excess of $25,000 that are funded by the Commonwealth, or its political subdivisions, authorities, or agencies. E-Verify is an internet-based system that compares information from an employee’s Form I-9, Employment Eligibility Verification, to data from the U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility.

(5) "Public work" means construction, reconstruction, demolition, alteration and/or repair work other than maintenance work, done under contract and paid for in whole or in part out of the funds of a public body where the estimated cost of the total project is in excess of twenty-five thousand dollars ($25,000), but shall not include work performed under a rehabilitation or manpower training program.

Under the Act, a contractor must submit a verification form signed under penalty of perjury and acknowledging its compliance with the Act as a precondition of being awarded a public works contract. Subcontractors must submit the form prior to commencing work on the public works project. In addition, contractors must include in their subcontracts information about the requirements of the Act. The Department of General Services (DGS) will create the verification form and is also charged with enforcement of the Act through complaint-based as well as random audits.

A contractor or subcontractor violates the Act by failing either to use E-Verify or to provide the verification form. Sanctions for failure to use E-Verify range from a warning letter (to be posted on the DGS website) for a first violation to a one year debarment for a third and subsequent violation. A willful violation of the Act will result in a 3-year debarment. Civil penalties for failure to use the form or for false statements on the form range from $250 to $1,000 for each violation.

The Act provides significant protection for whistleblowers. If an employee of a contractor or subcontractor is retaliated against for instigating or cooperating in an investigation, the employee can bring suit (which must be brought within 180 days from the date the employee knew of the retaliation) to obtain reinstatement of employment and to collect three times lost wages, along with an award of attorney’s fees and costs.

A contractor or subcontractor who relies in good faith on E-Verify has immunity from sanctions and shall have no liability to any individual who is not hired or is discharged from employment.

Good faith is shown by a federal agency’s written acknowledgment of the use of E-Verify.

Contractors are not liable for violations by subcontractors.

Information on E-Verify can be found:

http://www.uscis.gov/portal/site/uscis and searching for e-verify.

PA DGS regulations can be found:

http://www.pabulletin.com/secure/data/vol42/42-52/2525.html An electronic version of the verification form can be found at:

http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/pub lic_works_employment_verification/1357211 http://www.legis.state.pa.us/cfdocs/legis/PN/Public/btCheck.cfm?txtType=HTM&sessYr=2011&sessInd=0&billBody=S&billTyp=B&billNbr=0637&pn=2347 http://www.uscis.gov/portal/site/uscis/menuitem.eb1d4c2a3e5b9ac89243c6a7543f6d1a/?vgnextoid=75bce2e261405110VgnVCM1000004718190aRCRD&vgnextchannel=75bce2e261405110VgnVCM1000004718190aRCRD&gclid=CLKy7PD5lrECFcXe4Aodnm_Yew http://www.uscis.gov/portal/site/uscis http://www.pabulletin.com/secure/data/vol42/42-52/2525.html http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_works_employment_verification/1357211 http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_works_employment_verification/1357211 tsisock Rectangle cnewton Text Box PA E-Verify Form 009200-1

Division 32 Exterior Improvements

TURF AND GRASSES 329200 - 1

SECTION 329200 - TURF AND GRASSES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes:

1. Seeding for restoring lawn from disturbance of construction activity.

1.2 INFORMATIONAL SUBMITTALS

A. Certification of grass seed.

B. Product certificates.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Seed and other packaged materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and federal laws, as applicable.

PART 2 - PRODUCTS

2.1 SEED

A. Grass seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Rules for Testing Seeds" for purity and germination tolerances.

B. Seed species:

1. Quality: State-certified seed of grass species for solar exposure.

2. Quality: Seed of grass species for solar exposure with not less than 85 percent germination, not less than 95 percent pure seed, and not more than 0.5 percent weed seed.

3. Species as indicated according to seeding schedule on drawings.

2.2 FERTILIZERS

A. Commercial fertilizer: Commercial grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

TURF AND GRASSES 329200 - 2

1. Composition: 1 lb./1,000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

B. Slow-release fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

PART 3 - EXECUTION

3.1 GRASS AREA PREPARATION

A. Reduce elevation of planting soil to allow for soil thickness of sod.

B. Moisten prepared area before planting, if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

C. Before planting, obtain Engineer's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

3.2 SEEDING

A. Sow seed with spreader or seeding machine.

1. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other.

2. Do not use wet seed or seed that is moldy or otherwise damaged.

3. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer.

B. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray.

C. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch.

1. Anchor straw mulch by crimping into soil with suitable mechanical equipment.

3.3 GRASS MAINTENANCE

A. General: Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth grass surface. Provide materials and installation the same as those used in the original installation.

TURF AND GRASSES 329200 - 3

B. Mow grass as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than one-third of grass height. Remove no more than one-third of grass-leaf growth in initial or subsequent mowing.

3.4 SATISFACTORY GRASS

A. Grass installations shall meet the following criteria as determined by engineer:

1. Satisfactory seeded turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any ten sq. ft. and bare spots not exceeding five by five inches.

B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until grass is satisfactory. It shall be the complete responsibility of the contractor to ensure that all areas disturbed by construction and demolition activities are reseeded until grass has been established throughout the areas that were disturbed.

END OF SECTION 329200

000000_Title-Page
000110_TABLE_OF_CONTENTS2
001160_INVITATION_TO_BIDDERS_
003121_PHOTOGRAPHIC_INFO
003126.00_EXISTING_HAZARDOUS_MATERIAL_INFO
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. Existing asbestos reports for individual houses have been prepared by Quad Three Group, Inc. The reports of properties containing asbestos are herein attached for review and information.
003126.13_Asbestos_Reports
Report
APPENDIX A
042515559_001
APPENDIX B
PHOTOS
APPENDIX C
2025 ACM CERT
Q3G Back Page
004113_BID_FORM(STIPULATED_SUM)
004313_BID_BOND_AIA310_Rescan
004597_BID_SUBMISSION
005213_AGREEMENT_BY_OWNER
ARTICLE 4: CONDITION PRECEDENT
ARTICLE 5: NON-DISCRIMINATION CLAUSE
ARTICLE 6: INSURANCE & LIABILITY
ARTICLE 7: PREVAILING WAGES: REGISTRATION WITH THE
DEPARTMENT OF LABOR AND INDUSTRY
CONTRACTOR will be required to register their project with the Department of Labor and Industry to obtain a Prevailing Wage Rate schedule for each awarded project as this project is using grant funds towards construction, demolition, reconstruction, alteration, repair work, renovations, build-out, and/or installation of machinery and equipment in excess of $25,000.00. Registration can be completed by filling out the Prevailing Wage Rates Determination Request Form. Specific questions regarding the applicability of Prevailing Wage Rates should be directed to ra-li-slmr-llc@pa.gov.
CONTRACTOR will also need to provide copies of certified payroll worksheets collected from all contractors and subcontractors conducting work on the approved project and submit to the CITY as part of the reimbursement process.
ARTICLE 8: RECORD KEEPING PROCEDURES
ARTICLE 9: TERMINATION OF CONTRACT
ARTICLE 10: JURISDICITION
ARTICLE 11: INDEPENDENT CONTRACTOR
3. Compliance With Anti-Pollution Regulations
ARTICLE 13: MODIFICATION
ARTICLE 14: SEVERABILITY
ARTICLE 15: NO WAIVER
ARTICLE 16: BINDING EFFECT
ARTICLE 17: NOTICES
(i) In the case of a notice or communication to the CONTRACTOR, is addressed as follows:
Office of Economic and Community Development
of the City of Scranton
Scranton Municipal Building
340 N. Washington Avenue
Scranton, PA 18503
Attn: Executive Director
ARTICLE 18: COUNTERPARTS
ARTICLE 19: HEADINGS
ARTICLE 20: ENTIRE AGREEMENT
006113.13_PERFORMANCE_BOND_AIA312
006113.16_PAYMENT_BOND_AIA312
008600_PA_TAX_EXEMPT_DISCLOSURE
009200_PA_E-VERIFY
011000_SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1.2 PROJECT INFORMATION
A. Project Identification: Demolition Blighted Property – 110 Marion Street
B. Owner: City of Scranton
Bureau of Code Enforcement
340 N. Washington Avenue
Scranton, PA 18503
C. Engineer: Barry Isett & Associates, Inc.
1170 Highway 315, Suite 3
Wilkes-Barre, PA 18702
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of the Project is defined by the Contract Documents and consists of the following:
B. Type of Contract
1.4 PHASED CONSTRUCTION
A. The Work shall be conducted in separate phases.
B. Before commencing Work submit an updated copy of the Contractor's schedule showing the sequence, commencement and completion dates for all of the Work.
1.5 CONSTRUCTION SCHEDULE
A. Schedule
1.6 ACCESS TO SITE
A. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. The contractor shall take all necessary precautions to protect the buildings and surrounding lawns, planting and other property including but not limited to the Owner and privately owned vehicles, equipment and other structures from damage resulting from construction activities under this contract.
1.7 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Existing adjacent building(s) will be occupied during entire construction period. Cooperate with Engineer during construction operations to minimize conflicts. Perform the Work so as not to interfere with adjacent properties day-to-day operations. Maintain existing exits unless otherwise indicated.
1.8 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7 a.m. to 5:30 p.m., Monday through Saturday, except as otherwise indicated or permitted by the authority having jurisdiction.
C. Existing Utility Interruptions: Do not interrupt utilities serving adjacent facilities unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner and adjacent residences.
E. Controlled Substances: Use of tobacco products and other controlled substances on the Project site is not permitted.
1.9 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on the Drawings are described in detail in the Specifications. One or more of the following are used on the Drawings to identify materials and products:

PART 2 - EXECUTION (Not Used)

011100_SUMMARY_OF_WORK_
PART 1 - GENERAL
1.1 SUMMARY OF WORK
A. The following defines the scope of work required for the Blight Property Demolition project.
B. The Contractor shall notify PA One Call at 800-242-1776 or at www.paonecall.org at least (3) days prior to start of any demolition or excavation.
C. The contractor shall notify DEP Air quality Department, as necessary, of their “Intent to Demolish” a specific structure.
D. All debris shall be removed from each individual demolition site as the work progresses and disposed of consistent with federal, state and local regulations. Each site shall be free from all debris upon completion of the work. Receipts of Disposal shall be provided to the County.
E. Prior to work startup the Contractor is required to investigate the property and if necessary, completely exterminate the site to prevent rodents and insects to disperse into the neighborhood. The costs for rodent, insect, pest or vermin control shall be the responsibility of the Contractor and shall be included in the total cost of the bid.
F. Asbestos containing materials must be abated prior to demolition and will be part of the contract. Refer to Section 003126.13 Assessment Report.
G. Before beginning demolition, the Contractor must ensure that all utility services (such as water, gas, power, and telephone) are disconnected and secured. If not already done, the Contractor will handle the disconnection and securing of these services in compliance with the relevant utility regulations and the International Building Code (Current Edition), Section 3303.2. Additionally, all water, storm, and sanitary drains from the structure must be capped and protectively covered, including service laterals. The Contractor will bear all costs associated with this incidental work, including any fees charged by utility companies or other agencies.
H. Septic Systems: Tanks must be pumped out, and all associated piping must be removed and disposed of properly. Tanks should either be removed and disposed of correctly or abandoned in place by punching holes in the tank bottom and filling it with clean fill.
I. On-lot Water Wells: Wells that need to be abandoned, the pump must be removed, and the shaft filled with clean stone and permanently capped 12 inches below the finished grade. The well abandonment procedures specified in AWWA’s Standard A100 for Water Wells and DEP’s Groundwater Monitoring Guidance Manual (DEP ID: 383-3000-001), available on DEP’s website, should be followed. An abandonment plan must be submitted to and approved by the owner before proceeding with the well abandonment.
J. Dust Control: Surfaces and debris shall be thoroughly moistened to prevent excessive dust during demolition and transportation activities. The Contractor is responsible for securing a water source. Use of public fire hydrants must be authorized by the Authorities Having Jurisdiction. The Contractor will be responsible to furnish hoses, backflow prevention and/or other equipment necessary to operate and transport the water to the work site.
K. Fencing/Barricades: Contractor shall erect fencing not less than 4 feet in height, and other suitable barriers, as directed authorities having jurisdiction and shall be maintained by the Contractor around the perimeter of the work site. Contractor shall furnish, erect and maintain signage which warns against unlawful entry into the project site.
L. Contractor shall make all efforts to protect existing public sidewalks from damage. The Contractor shall be responsible for the replacement at no additional cost.

1.2 SCOPE OF WORK

PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
012600_CONTRACT_MODIFICATION_PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for handling and processing Contract modifications.
1.2 MINOR CHANGES IN THE WORK
A. Engineer will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.
1.3 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Engineer will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
B. Contractor-Initiated Work Change Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Engineer.
1.4 ADMINISTRATIVE CHANGE ORDERS
A. Allowance Adjustment: See Section 012100 "Allowances" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect actual costs of allowances.
B. Unit-Price Adjustment: See Section 012200 "Unit Prices" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured scope of unit-price work.
1.5 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Work Changes Proposal Request, Engineer will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.
1.6 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: Engineer may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
012900_PAYMENT_PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.
1.2 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.
1.3 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.
B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.
1.4 APPLICATIONS FOR PAYMENT
A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by Engineer and paid for by Owner.
B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction work covered by each Application for Payment is the period indicated in the Agreement.
C. Payment Application Times: Submit Application for Payment to Engineer by the tenth of the month. The period covered by each Application for Payment is one month, ending on the last day of the month.
D. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for Applications for Payment.
E. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Engineer will return incomplete applications without action.
F. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed. Differentiate between items stored on-site and items stored off-site.
G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
H. Application for Payment at Substantial Completion: After Engineer issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.
I. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
013100_PROJECT_COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1.2 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
1.3 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors, including utility companies to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1.4 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
C. Engineer’s Action: Engineer will review each RFI, determine action required, and respond. Allow seven working days for Engineer's response for each RFI. RFIs received by Engineer after 1:00 p.m. will be considered as received the following working day.
1.5 PROJECT MEETINGS
A. General: Engineer will schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
B. Preconstruction Conference: Engineer will schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Engineer.
C. Progress Meetings: Conduct progress meetings at weekly intervals.
D. Attendees: In addition to representatives of Owner, Utility Companies and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
E. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
F. Minutes: Engineer will record and distribute the meeting minutes to each party present and to parties requiring information.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
015000_TEMPORARY_FACILITIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
1.2 USE CHARGES
A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Owner's construction forces, Engineer, testing agencies, and authorities having jurisdiction.
1.3 QUALITY ASSURANCE
A. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
B. Accessible Temporary Egress: Comply with the requirements of Authorities having jurisdiction.
1.4 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Engage installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
3.2 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
B. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.
C. Telephone Service:
3.3 SUPPORT FACILITIES INSTALLATION
A. Traffic Controls: Comply with requirements of authorities having jurisdiction.
B. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain Project site, excavations, and construction free of water.
C. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with Division 01 Section "Execution" for progress cleaning requirements.
D. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.
3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Barricades, Warning Signs, and Lights: Comply with requirements of owner’s authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.
C. Temporary Egress: Maintain temporary egress from existing occupied facilities and as required by authorities having jurisdiction.
D. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weather tight enclosure for exterior of building to remain.
3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.
D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.
017300_EXECUTION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:
1.2 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Comply with requirements specified in other Sections.
B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: Contractor shall be responsible for the verification of all existing conditions prior to the start of construction.
B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
3.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of the Contractor, submit a request for information to Engineer according to requirements in Division 01 Section "Project Management and Coordination."
3.3 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings. If discrepancies are discovered, notify Engineer promptly.
B. General:
3.4 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.
D. Conduct demolition operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
F. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.
G. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

This is the start of the file's text. The full file is on GovTribe.