11 Rework and Repair of Nonconfirming Material.pdf

PDF 50 KB Posted

Attached to
Harness Release Cartridge, Drogue Gun Cartridge and Gyro Spin Gen
Solicitation number
FA821322R3022
Issued by

About this file

This document outlines rework and repair procedures for nonconforming materials under a federal contract. The contractor must document rework procedures and submit them to the Government Quality Assurance Representative for review prior to implementation. Repair procedures require submission on a Request for Deviation/Waiver form to the Contracting Officer for written approval. For any rework or repair submission, the contractor must include a description of the nonconformance cause and corrective actions to prevent recurrence. The procedure must also include reinspection provisions taking precedence over technical requirements and providing assurance that reworked or repaired items meet specifications. These rework and repair flow-down requirements apply to all contractors, suppliers, vendors and subcontractors.

The related federal contract solicitation seeks Harness Release Cartridges, Drogue Gun Cartridges and Gyro Spin Generators. This competitive action is restricted to qualified vendors Rockwell Collins, Inc. and Chemring Engergetic Devices. Interested parties should review the attached documents for additional details. The soliciting agency is the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base.

View the file

Other files

File Type Posted
09 Gyro QALI.pdf PDF
12 JFQR.pdf PDF
06 SOW Packaging.pdf PDF
15 CDRLS.pdf PDF
07 SPI.pdf PDF
05 CADPAD Item Marking Instructions.pdf PDF
13 Item Description.pdf PDF
01 FA821322R3022_Solicitation.pdf PDF
08 HRC QALI.pdf PDF
03 REPSHIP.pdf PDF
04 SOW Ammo Data Card.pdf PDF
14 EDL.pdf PDF
10 Drogue QALI.pdf PDF
02 Air Munition Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

File details come from the government source that posted it. Updated .