10 Drogue QALI.pdf
PDF 205 KB Posted
- Solicitation number
- FA821322R3022
About this file
This document outlines quality assurance requirements for harness release cartridges, drogue gun cartridges, and gyro spin generators. The solicitation is restricted to Rockwell Collins, Inc. and Chemring Engergetic Devices and requests final delivery by an unspecified date. The contractor must comply with mandatory stamping and signature requirements on documentation and allow government inspection at verification points unless noted otherwise.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09 Gyro QALI.pdf | ||
| 12 JFQR.pdf | ||
| 06 SOW Packaging.pdf | ||
| 11 Rework and Repair of Nonconfirming Material.pdf | ||
| 15 CDRLS.pdf | ||
| 07 SPI.pdf | ||
| 05 CADPAD Item Marking Instructions.pdf | ||
| 13 Item Description.pdf | ||
| 01 FA821322R3022_Solicitation.pdf | ||
| 08 HRC QALI.pdf | ||
| 03 REPSHIP.pdf | ||
| 04 SOW Ammo Data Card.pdf | ||
| 14 EDL.pdf | ||
| 02 Air Munition Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
No.
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
The contractor s
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
File details come from the government source that posted it. Updated .