08 HRC QALI.pdf
PDF 203 KB Posted
- Solicitation number
- FA821322R3022
About this file
This document outlines quality assurance requirements for harness release cartridges, drogue gun cartridges, and gyro spin generators. The solicitation is open only to Rockwell Collins, Inc. and Chemring Engergetic Devices and seeks final delivery by an unspecified date. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the contracting agency. Inspection points are defined for mandatory stamping and witnessing of documentation, with DCMA reserving the right to impose additional checks as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09 Gyro QALI.pdf | ||
| 12 JFQR.pdf | ||
| 06 SOW Packaging.pdf | ||
| 11 Rework and Repair of Nonconfirming Material.pdf | ||
| 15 CDRLS.pdf | ||
| 07 SPI.pdf | ||
| 05 CADPAD Item Marking Instructions.pdf | ||
| 13 Item Description.pdf | ||
| 01 FA821322R3022_Solicitation.pdf | ||
| 03 REPSHIP.pdf | ||
| 04 SOW Ammo Data Card.pdf | ||
| 14 EDL.pdf | ||
| 10 Drogue QALI.pdf | ||
| 02 Air Munition Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
No.
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
The contractor s
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
File details come from the government source that posted it. Updated .