11.10.2026 Sign-In.pdf
PDF 2 MB Posted
- Solicitation number
- S-KL0010-00018310
- Issued by
- Clackamas County, Oregon
About this file
This is a sign-in sheet for a mandatory pre-proposal conference held by the City of Lake Oswego, Oregon on November 10, 2026, related to the solicitation for architectural design services for a new library building. The conference was required attendance for all prospective consultants interested in submitting proposals for the project. Proposals are due by 4:30 p.m. PST on November 20, 2026. The City will award a single contract with an initial one-year term and options to renew for six additional one-year terms, with anticipated contract kickoff on February 3, 2027. The scope of work encompasses comprehensive architectural and engineering design services across multiple disciplines including structural, civil, mechanical, electrical, plumbing, and acoustic engineering, along with sustainability consulting, landscape design, and community engagement services. The project is divided into two phases: Phase 1 (February 2027 through July 2028) covers site selection, feasibility studies, and conceptual design to support a May 2029 bond measure, while Phase 2 (June 2029 through December 2032) covers schematic design through construction administration.
Evaluation will occur between November 23 and December 7, 2026, with shortlisted firms submitting detailed pricing proposals by December 18, 2026, followed by interviews on December 17, 2026. The City prioritizes firms holding COBID certification or utilizing COBID-certified subcontractors and suppliers, which carries 10 evaluation points rather than functioning as a set-aside. Required insurance coverage includes $2,000,000 per occurrence and $3,000,000 aggregate general liability, $2,000,000 automobile liability, and $2,000,000 professional liability, with the City named as additional insured. The project is financed through urban renewal funding and a planned bond measure. Evaluation criteria include firm qualifications (30 points), project team qualifications and references (40 points), project approach (20 points), COBID certification or subcontractor utilization (10 points), interview performance (100 points), and price proposal (15 points). The City retains the right to terminate for convenience with 10 days' notice or for cause with 5 business days to cure material breaches.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .