Highridge Business Park Project
Solicitation number
Not on record
Issued by
Somerset County, Pennsylvania

About this file

This is a Bid Tabulation Report Pricing Section for the Highridge Business Park Project administered by the Schuylkill Economic Development Corporation (SEDCO) in Foster Township, Schuylkill County, Pennsylvania. The sealed Request for Proposals was due electronically via PennBid by Noon on September 7, 2026. The project scope includes site clearing, grubbing, grading, storm pipe installation, precast storm structures, seeding, mulching, erosion and sediment controls, stone paving, finish paving, and water and sewer extensions. The work is organized into 17 line items spanning general conditions and erosion controls, site preparation, grading, paving operations, drainage infrastructure, utilities, and landscaping. The successful bidder will be required to provide Performance and Payment Bonds each equal to 100 percent of the Contract Price with a corporate Surety approved by the owner. Pennsylvania Prevailing Wage Rates apply to all workers on the project.

Six contractors submitted bids for the project: Ankiewicz Enterprises Inc., Heim Construction Co. Inc., Iron Eagle Excavating, Kinsley Construction, York Miller Soil Solutions LLC, and Schlouch Incorporated. Total bid prices ranged from $3,265,800.00 (Kinsley Construction, the lowest bid) to $3,971,504.91 (Iron Eagle Excavating). Ankiewicz Enterprises Inc. submitted a total bid of $3,365,202.00, while Heim Construction Co. Inc., York Miller Soil Solutions LLC, and Schlouch Incorporated submitted bids of $3,830,170.94, $3,665,361.00, and $3,620,895.00 respectively. Line item pricing varied significantly among bidders, with notable discrepancies in certain items such as Item 1-9 (Storm Structures), 1-10 (C.O. Manholes), 1-11 (Headwall), and 1-12 (V Notch Weir), where two bidders submitted nominal $1.00 pricing. The project carries prevailing wage requirements and requires contractors to demonstrate nondiscrimination in employment practices and utilization of project area businesses to the greatest extent feasible.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

Ankiewicz Enterprises IncHeim Construction Co. Inc.Iron Eagle ExcavatingKinsley Construction Site YorkMiller Soil Solutions, LLC.Schlouch Incorporated
Total Cost$3,365,202.00$3,830,170.94$3,971,504.91$3,265,800.00$3,665,361.00$3,620,895.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$3,365,202.00$3,830,170.94$3,971,504.91$3,265,800.00$3,665,361.00$3,620,895.00
#1-1GENERAL CONDITIONS & E&S CONTROLSLS1$287,681.00$287,681.00$450,000.00$450,000.00$190,845.79$190,845.79$318,600.00$318,600.00$322,415.00$322,415.00$239,750.00$239,750.00
#1-2GRUB AND GRIND STUMPSLS1$176,000.00$176,000.00$125,998.47$125,998.47$59,000.00$59,000.00$123,700.00$123,700.00$90,245.00$90,245.00$183,015.00$183,015.00
#1-3STRIP AND REPLACE TOPSOILLS1$152,000.00$152,000.00$68,871.34$68,871.34$129,105.35$129,105.35$129,000.00$129,000.00$302,664.50$302,664.50$284,200.00$284,200.00
#1-4CUT / FILL TO GRADE BUILDING 12" BELOW FINISH FLOOR 6" TOPSOILLS1$588,000.00$588,000.00$1,453,959.56$1,453,959.56$1,326,171.09$1,326,171.09$1,147,200.00$1,147,200.00$1,852,166.50$1,852,166.50$1,114,000.00$1,114,000.00
#1-5TRUCK PAVING TRUCK COURT BASE AND DRIVEWAY AND COURSE ONLY AND DRIVEWAYLS1$479,687.00$479,687.00$435,555.08$435,555.08$439,026.31$439,026.31$448,300.00$448,300.00$150,000.00$150,000.00$505,860.00$505,860.00
#1-6CAR LOT AND DRIVEWAY PAVING BASE AND FINISH INCLUDING STRIPPINGLS1$260,550.00$260,550.00$267,008.75$267,008.75$234,113.38$234,113.38$224,300.00$224,300.00$85,000.00$85,000.00$296,615.00$296,615.00
#1-7CONCRETE CURBLS1$30,303.00$30,303.00$13,632.28$13,632.28$17,941.26$17,941.26$17,800.00$17,800.00$8,500.00$8,500.00$17,720.00$17,720.00
#1-8INFILTRATION BEDS AND TRENCHLS1$407,387.00$407,387.00$490,498.68$490,498.68$841,091.94$841,091.94$337,800.00$337,800.00$381,998.00$381,998.00$412,735.00$412,735.00
#1-9STORM STRUCTURESLS1$78,000.00$78,000.00$36,895.10$36,895.10$50,812.60$50,812.60$35,500.00$35,500.00$1.00$1.00$48,980.00$48,980.00
#1-10C.O. MANHOLESLS1$51,500.00$51,500.00$4,437.35$4,437.35$30,200.02$30,200.02$23,100.00$23,100.00$1.00$1.00$31,525.00$31,525.00
#1-11HEADWALLLS1$66,500.00$66,500.00$40,445.60$40,445.60$35,006.76$35,006.76$27,900.00$27,900.00$1.00$1.00$27,310.00$27,310.00
#1-12V NOTCH WEIRLS1$15,856.00$15,856.00$3,750.00$3,750.00$14,431.66$14,431.66$8,200.00$8,200.00$1.00$1.00$6,435.00$6,435.00
#1-13STORM PIPELS1$408,491.00$408,491.00$122,501.14$122,501.14$296,510.80$296,510.80$155,000.00$155,000.00$288,572.00$288,572.00$159,770.00$159,770.00
#1-14SANITARY 8" SPR 35 – SECTION M-MLS1$83,300.00$83,300.00$69,658.79$69,658.79$166,970.48$166,970.48$59,600.00$59,600.00$69,885.00$69,885.00$45,890.00$45,890.00
#1-15WATER LINE 12" DIP CLASS 52 FITTINGS, VALVES, THRUST BLOCKS ETC.LS1$69,967.00$69,967.00$108,159.22$108,159.22$79,722.47$79,722.47$138,000.00$138,000.00$83,910.00$83,910.00$104,425.00$104,425.00
#1-16GUIDE RAILLS1$46,580.00$46,580.00$39,432.75$39,432.75$37,555.00$37,555.00$39,800.00$39,800.00$30,000.00$30,000.00$43,880.00$43,880.00
#1-17FINE GRADE AND SEEDLS1$163,400.00$163,400.00$99,366.83$99,366.83$23,000.00$23,000.00$32,000.00$32,000.00$1.00$1.00$98,785.00$98,785.00