This document is Addendum #1 to the Request for Proposals issued by Hood River County, Oregon for the Mt. Hood Town Hall Solar Plus Storage Energy System Construction project. The addendum addresses questions raised during the solicitation process and provides clarification on the project scope. The project requires design-build services for a comprehensive microgrid system including a minimum 55 kW solar photovoltaic system, a 60 kW/307.2 kWh battery energy storage system, and integrated microgrid controls. The voluntary site visit occurred on November 12, 2025, with a questions deadline of November 14, 2025, at 5 p.m. PST. Proposal submissions are due December 11, 2025, by 5 p.m. PST, with contract award anticipated for January 20, 2026. Construction must begin before August 2, 2026, and be completed by August 2, 2027. The re-bid was conducted to ensure equitable, transparent, and compliant procurement processes, with a revised scope of work providing more detailed specifications regarding preferred structure and location, available on page seven of the full RFP solicitation package.
The project budget ranges from $825,000 to $885,000, funded through Hood River County and a grant from the Oregon Department of Energy. All contractors and subcontractors must be registered with the Oregon Construction Contractors Board and file a $30,000 public works bond before commencing work. Proposers must comply with Oregon prevailing wage requirements under ORS 279C using October 5, 2025 BOLI Prevailing Wage Rates, demonstrate an employee drug-testing program, and maintain insurance coverage of $2,000,000 commercial general liability and $2,000,000 professional liability. Performance and payment bonds equal to 100% of the contract value are required. Evaluation criteria include proposal completeness (pass/fail), understanding of scope and approach (30 points), experience with similar projects (25 points), cost competitiveness (10 points), equipment proposed (20 points), and staff qualifications (15 points). Upon completion, Hood River County will own the microgrid, with long-term operation and maintenance provided by the Mt. Hood Towne Hall Association, a nonprofit organization. Part number lists were not available at the addendum stage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-81 Notice of intent to Award.pdf | ||
| MHTH Addendum 2 11252025.pdf | ||
| MHTH Solar Plus Solar Microgrid Project_RFP 2_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1 Mt. Hood Town Hall Solar + Storage Energy System Construction
November 20, 2025
Hood River County is providing this Addendum to clarify or confirm certain provisions of the Request for Proposals. This Addendum is based on questions raised during the solicitation process. None of these responses have resulted in any amendments to the existing solicitation or form of contract.
1. May I ask the reason for the re-bid?
The decision to re-bid was made to ensure that the procurement process remains equitable, transparent, and compliant with public contracting rules. The re-bid includes a revised scope of work with more details about the preferred structure and location.
2. Other than wider openings on the structure and one structure are there any other changes?
A list of changes is not available. Please review the full solicitation package to understand the project scope of work.
3. Does this project include a full re-roof? Please send the scope/plans and docs for this project.
The project scope is outlined in the RFP. See page seven for solar canopy specifications and requirements.
4. Is there a list of part numbers for this job to quote?
A list of part numbers is not available at this stage.
https://www.hoodrivercounty.gov/uploads/dm/6198/MHTH_Solar_Plus_Solar_Microgrid_ProjectRFP_2FINALreduced.pdf