This is a demolition special conditions memorandum from the City of Jackson, Michigan's Neighborhood & Economic Operations Department to the Purchasing Department, dated December 9, 2025, regarding the solicitation of bids for the demolition and site restoration of a 440-square-foot garage at 109 E. Mason Street (Parcel Number 5-020800000). The project requires comprehensive demolition services including hazardous materials abatement in accordance with MIOSHA and DEQ regulations, site clearing, curb and gutter work, public sidewalk replacement, tree and vegetation removal, chain link fence removal, and full site regrading. Specific deliverables include removal of one curb cut and entry approach (15 linear feet), installation of 28 linear feet of curb and gutter with potential road repair, removal and replacement of 20 linear feet of cracked and broken public sidewalks, removal of all trees and brush from the north and east fence lines with branch clearing up to 12 feet, removal of chain link fencing on three sides, and removal of a large rock in the right-of-way area. The Request for Quotation was issued on December 9, 2025, with bid responses due by December 17, 2025, at 10:00 AM, and a project completion deadline of January 16, 2026, with a winter work extension available through April 27, 2026.
Contractors must submit lump-sum bids with separate line items for greening costs, demolition, and potential asbestos abatement, and must maintain comprehensive general liability insurance of $1,000,000 per occurrence, automobile liability insurance of $1,000,000, and worker's compensation coverage. The project is funded through Community Development Block Grant (CDBG) resources and includes Section 3 compliance requirements mandating employment and economic opportunities for low- and very low-income persons. Contractors must comply with Davis-Bacon Act labor standards for contracts exceeding $2,000 and meet federal environmental and equal employment opportunity requirements. The procurement includes set-asides and preference provisions for small and minority-owned businesses and women's business enterprises. Contractors are responsible for verifying that neighboring water and sewer services remain operational upon completion and for managing hazardous materials in accordance with the Pre-Demolition Compliance Survey assessment and applicable regulatory standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 109_E._MASON_ST_-_DEMOLITION_OF_GARAGE.pdf | ||
| 109_E._Mason-_Demolition_Special_Conditions.docx | DOCX document | |
| 109_E__Mason.msg | MSG file | |
| 109_E_MASON_ST-_water_sewer_card.pdf | ||
| 109_E_Mason_St._Asbestos_and_Hazardous_Materials_Report_101625.pdf | ||
| CDBG_Additional_Forms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| To: | Kari Kerstetter, Purchasing Department |
| From: | Neighborhood & Economic Operations Dept. |
| Date: | 12-09-25 |
| Re: | Please solicit bids for demolition of the following property as soon as possible. |
Property Address: 109 E. Mason St
Parcel Number: 5-020800000
Sq Ft: 440 sq. ft. (garage)
Special Conditions to include:
1) Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment.
2) Compact all clean backfill material with a hoe-pack or vibrating roller compactor.
3) Remove _ _1_ curb(s) cut(s) and entry approach(s). (15 lineal feet)
4) Install _ __28_ lineal feet of curb and gutter. If road is in disrepair, contractor will need to cut the road asphalt, have forms installed to form front gutter pan and then repair overcut with hot patch asphalt upon completion of concrete work.
5) Remove and replace _ 20 lineal feet _of cracked, heaved and broken public sidewalks.
6) See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to insure that neighboring water and sewer services are operational at the conclusion of the demolition.
1) Trees/shrubs: Remove all trees and brush from the N front fence line, all trees and brush from the E fence line, cut low hanging branches over garage up 12’ from grade and remove all vines and low hanging vegetation.
2) Miscellaneous: Remove chain link fence to N, E and extending approximately 24’ west of garage. Remove large rock in ROW area. Fully regrade entire site to blend with all surrounding grades.