QA Honey Well B200.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 1022432-EW
About this file
The document is a Questionnaire/Comment Form for a Brand Name Sole Source procurement for Honeywell Controls System Replacement at Facility 200, Vance Air Force Base in Oklahoma. The procurement involves removing and replacing the existing building automation system with new Honeywell controls, specifically installing and integrating Comfort Point Open (CPO) controllers into the Energy Management Controls System (EMCS) Enterprise Building Integrator (EBI) System. The first question addresses the number of network controllers to be replaced, with the response indicating no network-level controllers are anticipated to be replaced beyond 35 VAV controllers, 6 FCU controllers, and 5 VFDs.
The solicitation is being managed by ASRC Federal Field Services and is structured as a Firm Fixed Price Contract, to be evaluated using Best Value/Technically Acceptable criteria. Proposals are due electronically by August 22, 2025, at 10:00 A.M. CST, with quotes required to be valid for 30 days. Vendors must be registered in the System of Award Management (SAM) to be eligible for award. The procurement is being conducted on behalf of the Department of the Air Force Air Education and Training Command, with proposals to be submitted via email to jay.woolsey.ctr@us.af.mil. The agency reserves the right to cancel the solicitation at any time and is not obligated to reimburse offerors for any associated costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questionnaire
| COMMENT / QUESTION FORM | ||||||
| Brand Name Sole Source Honeywell - CONTROLS SYSTEM REPLACEMENT, F200 Vance AFB, OK | ||||||
| Question # | Reference Document | Question | Response | |||
| 1 | 1. | How many Honeywell XL5000 network controllers (Listed as R7044) are there to be replaced with Comort Point Controllers?We just want to see if there are any network level controllers (the controllers the down stream controllers tie into ) that need to be replaced in addition to the | ||||
| 35 VAV controllerd, 6 FCU controllers, and 5 VFDs if any. | It is not anticipated that network controllers will need to be replaced in the scope of this project. There is a multi-port Black Box media converter available for connecting panel controllers to, which is located in the first-floor mechanical room. Contractor is required to provide complete and usable system. | |||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 |
File details come from the government source that posted it. Updated .