10195411_-_Information_Letter_and_Addendum_2.pdf

PDF 265 KB Posted

Attached to
Geotechnical Engineering Services
Solicitation number
10195411
Issued by
California

About this file

This document is an Information Letter and Addendum for Request for Qualifications (RFQ) No. 10195411 for Geotechnical Engineering Services issued by the California Department of Water Resources (DWR), Division of Engineering, Geotechnical Services Branch. The RFQ seeks qualified firms to provide geotechnical engineering expertise on an as-needed basis, focusing on canals, levees, dams, and other DWR facilities including embankments and foundations, with particular emphasis on safety. The services include reviewing, evaluating, and analyzing geotechnical engineering parameters; developing engineering documents; and preparing geotechnical engineering reports related to DWR facilities, including State Water Project facilities. The RFQ originally had a submission deadline of May 9, 2024, which has been extended to May 13, 2024. DWR may award up to three contracts per geotechnical asset type (State Water Project Assets, Flood Control System Assets, and Environmental Stewardship Assets), with up to two additional back-up contracts per asset type.

The estimated contract value range is $40,000,000 to $50,000,000. This is a new contract, and there are currently three active geotechnical services contracts with AECOM, HDR, and COWI. The RFQ does not indicate a preference for Small Business Enterprise (SBE) or Disabled Veteran Business Enterprise (DVBE) participation, as this is a qualifications-based award. Firms can submit for one or more geotechnical asset types, and the selected contractors will be assigned task orders based on their qualifications and availability.

View the file

Other files

File Type Posted
10195411_-_Addendum_1.pdf PDF
RFQ_10195411_-_4-19-24_-_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM,

Governor

DEPARTMENT OF WATER RESOURCES

715 P STREET, P.O. BOX 942836

SACRAMENTO, CA 94236-0001

(916) 653-5791

May 1, 2024

Information Letter and Addendum 2

RFQ No. 10195411 for Geotechnical Engineering Services Division of Engineering

Geotechnical Services Branch

This provides answers as identified in Section IV for the RFQ:

Section 1 – Questions and Answers Section 2 – Negotiation Questions and Answers Section 3 – Addendum 2 Contains Revisions to published (RFQ) No. 10195411 (please apply to these updates to your SOQ as applicable.)

Section 1 – Questions and Answers

Q1: Will DWR consider Electronic Submittal Only – a bookmarked PDF emailed versus Five (5) hard copies and one (1) text readable pdf copy on a USB Flash Drive? (Green/Sustainable)

A1: DWR will not accept electronic SOQ submittals for this RFQ. DWR has revised the requirement from five (5) hard copies and one (1) text-readable PDF copy on a USB Flash Drive to four (4) hard copies and one (1) text-readable PDF copy on a USB Flash Drive of the SOQ.

Q2: Will DWR consider an extension to the deadline?

A2: Yes, DWR is extending the SOQ submittal date identified in Section X from Thursday, May 9, 2024 at 2:00 PM to Monday, May 13, 2024 at 2:00 PM.

Q3: Can you please tell me what firms currently hold or have recently held Geotechnical contracts with DWR? We will be looking to submit on your current solicitation.

A3: The A&E Program processes DWR-wide A&E contracts. DWR often contracts for geotechnical services depending on the needs of the requesting division. Currently there are three active contracts – AECOM 46-13352; HDR 46-13965; and COWI 46-13418 which provide support for three different divisions on separate projects.

Q4: Regarding v. Provide utility coordination including engineering support, research, and coordination with DWR, state and local agencies, utilities, and stakeholders; and locating, potholing, and design for modification or relocation of existing facilities. Can you confirm/clarify if intent is for our Team to perform utility locating and potholing work or if this support only?

A4: Regarding RFQ Section VI – Selection Criteria, item v, Contractor will be responsible for any ancillary utility location and potholing work necessary for the completion of identified geotechnical deliverables at time of Task Order issuance.

RFQ 10191137

Addendum 2

Q5: RE: w. Follow Project Management Body of Knowledge principles, provide project management and coordination to support engineering tasks in this SOW. and x. Utilize engineering expertise to attend, participate in, or make presentations at meetings - in person or via video/teleconference -as directed by the DWR Contract Manager. Provide verbal and written comments after each meeting. Please confirm that these general scope items are intended for inclusion in most or all task orders and are not intended to be the specific focus of task orders.

A5: Regarding RFQ Section VI – Selection Criteria, paragraphs w. and x. These items are intended to support geotechnical deliverables and may be included in most, if not all, task orders, each of which will have at least one geotechnical-type scope item that will be the focus of that task order.

Q6: We understand we can use an 11x17 page for our Organization Chart. Can we use an additional 11x17 page for our Organizational Matrix for Personnel and Subs?

A6: Firms can use two 11x17 pages, single sided (folded to 8-½” x 11”) for the Organizational Matrix.

Q7: It our is our understanding that we only include 1-page resumes for the individuals that we identify as key personnel with a symbol on our Org Chart. Or do you want a resume for every person on our Org Chart? Can you confirm?

A7: Firms are required to provide the resumes of key and non-key personnel listed on the Organization Chart.

Q8: Can we use an additional 11x17 page in Section 7 - qualification section for additional graphics/tables/matrix

A8: Firms can use an additional 11x17 page (folded to 8-½” x 11”) or additional 2 pages, double sided (1 sheet) for the qualification section graphics/tables/matrix.

Q9: Exhibit A, Item A, No. 9 – Is the RFQ referring to dam break analyses vs. dam breach analyses?

A9: See Section 3 of this Information Letter and Addendum where “Perform dam breach analyses” is struck out and removed from Exhibit A, Scope of Work, Item A.9 and RFQ Section VI - Selection Criteria, item A.1.i.

Q10: We understand DWR will let up to three contracts. How does DWR intend to assign task orders for the various asset types?

A10: Task orders will be assigned based on most qualified Contractor for the Geotechnical Asset Type, subject to availability. Refer to Exhibit E, paragraph 24, Contractor Work Assignments.

Q11: Can we include a second 11x17 for the Organizational Matrix referenced in V.2.c.?

A11: See answer A6 above.

Q12: With the 26 service areas that need to be addressed per VI-A.1, a-x, is it possible to provide a 2-page resume (i.e., 1 double-sided sheet)?

A12: Yes, firms can provide 2-page (1 double-sided sheet) resumes.

Q13: When a prime firm brings in subconsultants, does the entire team provide five project references or should each team member provide five project references?

A13: The Prime firm is to provide 5 projects references for the entire team.

Section 2 – Negotiation Questions and Answers

Q14: Are we able to know who the current incumbents on the contract are?

A14: This is a new contract.

Q15: Do you know the anticipated amount of what the contract value could be, based on what the Cal E-procure states.

A15: While we can provide an estimated range, we are unable to specify a precise amount for the advertisement of this RFQ. As indicated in the Cal e Procure listing, the estimated contract value for all awards falls within the range of $40,000,000 to $50,000,000.

Q16: Will the subconsultants need to meet the same insurance requirements as the prime consultants?

A16: How a subconsultant meets the insurance requirements are between the sub and the prime. The contractor (prime) must be able to show proof of all insurance requirements.

Q17: The RFQ says there will be three contracts awarded for each of the 3 categories. Does this infer that 9 contracts will be awarded?

A17: Up to three contracts may be awarded per asset type. Up to two additional contracts for each contract awarded may be identified as back-up based on availability.

Q18: Is there a preference in scoring for higher SBE % or SBE who are primes?

A18: No, there is not. However, the Department encourages DVBE/SBE participation but because this is a qualifications-based award, DVBE/SBE participation cannot be considered as a selection criteria.

Q19: If a contractor wanted to submit for several different asset types, is there a limit?

A19: The contractor has the flexibility to choose any or all Geotechnical Asset Type(s) they wish to pursue by marking one (1) or more of the corresponding checkboxes on the SOQ Checklist. If no specific boxes are checked, DWR will consider the submission is for all three Geotechnical Asset Types.

Q20: Exhibit E, Paragraph 6 states that a payment bond and performance bond is required if construction activities are performed. Will geotechnical drilling fall in that category?

A20: Geotechnical drilling, if deemed necessary, will be identified at time of Task Order. The bonds would not be required until a Task Order identifies the need. Exhibit A, Scope of Work.

Section 3 - Addendum 2

DWR is extending the SOQ Submittal Deadline for RFQ No. 10195411 from Thursday, May 9, 2024 to Monday, May 13, 2024. The following changes are made to reflect this extension:

Cover Page – Paragraph 3, is revised with the below.

Cover Page – Paragraph 3, is revised to extend the SOQ Submission Deadline to 5-13-2024 at 2:00 PM. The RFQ, Cover Page, paragraph 3, is revised and replaced with the below. Strikethrough language is removed and language in red font is added:

This package contains Request for Qualifications (RFQ) No. 10195411. In submitting your SOQ you will comply with the instructions found herein. The SOQ must be received by 2:00 p.m. on Thursday, May 9, 2024, Monday, May 13, 2024, at the address indicated in Section X, Submission of SOQs of the enclosed RFQ.

Section X – Submission of SOQs, paragraph A, is revised with the below.

Section X – Submission of SOQs, paragraph A and B, are revised to allow firms to submit four (4) hard copies and (1) text readable pdf copy on a USB Flash Drive of the SOQ. Section X – Submission of SOQs, paragraph B, is revised to extend the SOQ Submission Deadline to 5-13-2024. The RFQ, Section X – Submission of SOQs, paragraph A and paragraph B, is revised and replaced with the below. Strikethrough language is removed and language in red font is added:

A. Five (5) Four (4) hard copies and one (1) text readable pdf copy on a USB Flash Drive of the SOQ must be submitted (mailed or hand delivered) to the following addresses:

Mail: Overnight or Hand Delivery:

Department of Water Resources Department of Water Resources Division of Engineering Division of Engineering Attention: James Tedeschi Attention: James Tedeschi P. O. Box 942836 715 P Street, 4th Floor Sacramento, CA 94236-0001 Sacramento, CA 95814 Phone: (916) 803-6196 Phone: (916) 803-6196

B. The SOQs must be received by 2:00 PM on Thursday, May 9, 2024 Monday, May 13, 2024.

Envelopes should be clearly labeled: “Statement of Qualifications, No. 10195411. SOQs WILL NOT BE OPENED UNTIL THURSDAY, MAY 9, 2024 MONDAY, MAY 13, 2024.” SOQs received after the due date and time will be returned unopened to the submitting party.

Section XI – Time Schedule, paragraph E, is revised with the below.

Section XI – Time Schedule, paragraph E, is revised to extend the SOQ Submission Deadline to 5-13- 2024 at 2:00 PM. The RFQ, Section XI - Time Schedule, paragraph E, is revised and replaced with the below. Strikethrough language is removed and language in red font is added:

E. SOQ Submission Deadline 5-9-2024 5-13-2024 at 2:00 PM

Section V – Statement of Qualifications (SOQ) Requirements, paragraph 2.c, 3.a, 4.a, and 7.a, is revised and replaced with the below. Strikethrough language is removed and language in red font is added:

2. Team and Organization:

c. An Organizational Matrix listing all key personnel, including subcontractor(s), and which of the Selection Criteria Sections A.1a – A.1xw each will perform. Limit to two 11x17 pages, single sided (folded to 8-1/2x11).

3. Resumes

a. Provide resumes of all Key Personnel listed on the Organizational Matrix and others that are expected to be utilized. Prime firm will provide resumes of all Key and Non-Key Personnel on the Organization Chart. Resumes shall include education (degree obtained, field of study, school name (location), date completed), professional licenses (state and license #), certificates, training, and project experience as it relates to the Exhibit A, Scope of Work, not to exceed 1 page each 2 pages (1 double-sided sheet).

Include years of professional experience and the length of time spent on each project (month/year to month/year).

4. References

a. Provide references and brief project descriptions for five projects within the last 10 years Prime firm to provide 5 references and brief project descriptions of five projects within the last ten years for the team that best illustrate similar services described in Exhibit A, Scope of Work.

The projects should include the individuals identified on the Organizational Chart and Matrix. At least two of the five references should be non-DWR.

7. Qualifications

a. Experience related to each item as described in Selection Criteria Sections A.1a – A.1xw.

Describe the team’s key personnel and their competencies that clearly delineate how their experience fulfills the requirements of each item in Selection Criteria Sections A.1a-A.1xw.

Please also identify the Geotechnical Asset Type(s) which your firm are interested in being considered. The Geotechnical Asset Types are: 1) State Water Project Assets; 2) Flood

Control System Assets; and, 3) Environmental Stewardship Assets. If this information is not provided, DWR will consider your submission for all three Geotechnical Asset Types.

Please ensure those same Geotechnical Asset Types are identified in the SOQ Checklist

(page 20). This section is limited to 30 pages double sided (15 sheets) maximum and will be used as the basis to score each SOQ. This section is limited to 32 pages, double sided

(16 sheets) maximum and will be used as the basis to score each SOQ.

Section VI – Selection Criteria, paragraph A.1.i, is removed.

Section VI – Selection Criteria, is revised to remove paragraph A.1.i, updating the Selection Criteria items to A.1a

– A.1w. The RFQ, Selection Criteria, paragraph A.1.i, is revised and replaced with the below. Strikethrough language is removed and language in red font is added:

VI. Selection Criteria

A. Each SOQ for this proposed contract service will be evaluated and scored in accordance with the following Selection Criteria and for each Geotechnical Asset Type as follows: 1) State Water Project

Assets; 2) Flood Control System Assets; and, 3) Environmental Stewardship Assets. These criteria will also be used during the interview process. Up to three contracts may be awarded per asset type. Up to two additional contracts for each contract awarded may be identified as back-up based on availability. This solicitation may result in the award of up to three contracts. See Section VII, Evaluation Process.

Professional experience of the firm’s key personnel in relation to the following work items. Each SOQ should clearly delineate and address the firm’s relevant experience and how that experience fulfills the requirements of the services listed below.

1. Demonstrated knowledge, competency, and relevant professional experience to:

a. Solve geotechnical engineering problems and develop design solutions related to levees, dams, canals, and their appurtenances, including fish screens, fish ladders, fish handling facilities, radial gates, pipelines, tunnels, trash racks, embankments, inlet works, outlet works, spillways, bridges, access roads, and other associated structures.

b. Provide engineering geology (including geophysical and seismological), review and consultation;

evaluate rock excavation characteristics and evaluate controlled blasting near critical structures.

c. Provide analysis and interpretation of soil and foundation logging, soil collection and testing, and geologic interpretation.

d. Provide Geographic Information System (GIS) services and support related to geotechnical and geological investigations such as: layers and metadata, historic data, structural features, contract drawings, geologic information, and instrumentation data and measurements. Data delivered under this contract will comply with the current version of the DWR Spatial Data Standards.

e. Evaluate project risks associated with geotechnical engineering and provide recommendations for assessing and managing those risks including experience in Potential Failure Mode Analysis

(PFMA) workshops as a Subject Matter Expert, as described in FERC Engineering Guidelines, Chapter 14 - Dam Safety Performance Monitoring Program. This includes researching engineering documents, leading workshops, performing failure mode analyses, and providing engineering findings in memorandums and reports and participate in Semi-Quantitative Risk

Analyses (SQRAs) and Quantitative Risk Analyses (QRAs).

f. Provide value engineering for recommended engineering solutions as related to geotechnical engineering.

g. Perform static and dynamic stability analyses of dams and appurtenances; perform deformation analyses.

h. Evaluate instrumentation data and performance of dams, embankments, and levees.

i. Perform dam breach analyses.

i. Evaluate foundation for structures.

j. Provide high and low mobility grouting mix design and execution guidance for embankments, foundations, and equipment.

k. Perform seepage estimates and analyses, groundwater modeling and flow net analyses.

l. Perform filter compatibility, internal erosion, continuing erosion, and piping analyses.

m. Perform seismic hazard and develop ground motions.

n. Evaluate potential for liquefaction and other types of ground failure.

o. Evaluate actual and potential ground surface subsidence from groundwater extraction.

p. Perform general concrete design services for aqueduct liners, boat ramps, parking lots, and slabs on grade.

q. Provide coffer dam design services for water conveyance facilities.

r. Prepare documents in support of construction contracts including drafting full, complete, and accurate sets of plans, specifications, and cost estimates. Provide engineering support services during contract bidding and construction phases, including reviewing contractor submittals and requests for information (RFI), periodic site visits for engineering analysis and design to address emergent construction issues.

s. Review detailed engineering and geology reports, documents, analyses, calculations, plans, specifications, and provide recommendations and comments.

t. Provide support to obtain permits necessary to carry out assigned tasks, including field work, site reviews and other activities related to the work such as:

I. Provide engineering support to address Right of Way (ROW) for appraisal and acquisition services by DWR, including preparing data, graphics, and other documentation to describe project-based ROW requirements, and to assist with securing temporary entry permits. Work closely with DWR's Real Estate Branch (REB) policies, procedures, and applicable template forms.

II. Provide engineering support to DWR in preparing documentation necessary to secure local, State, or federal environmental permits.

u. Provide utility coordination including engineering support, research, and coordination with DWR, state and local agencies, utilities, and stakeholders; and locating, potholing, and design for modification or relocation of existing facilities.

v. Follow Project Management Body of Knowledge principles, provide project management and coordination to support engineering tasks in this SOW.

w. Utilize engineering expertise to attend, participate in, or make presentations at meetings - in person or via video/teleconference - as directed by the DWR Contract Manager. Provide verbal and written comments after each meeting.

Section VII – Evaluation Process, paragraph B, is revised.

Section VII, Evaluation Process, paragraph B, is revised to update Selection Criteria items to A.1a – A.1w.

Strikethrough language is removed and language in red font is added:

B. Up to three contracts may be awarded from this solicitation based on qualifications for each Geotechnical Asset Type: 1) State Water Project Assets; 2) Flood Control System Assets; and, 3) Environmental Stewardship Assets. A DWR panel will evaluate the SOQs submitted by Asset Type and determine which firms will be interviewed based on the aggregate total of scores using the Selection Criteria items A.1.a – A.1.xw. Those SOQs achieving the value of 70 percent or better of total scores will be interviewed. If less than three SOQs are submitted, all will be interviewed. Per firm, only one interview will be held for all three Geotechnical Asset types. The interviews will be held and an evaluation will be made based on the published Selection Criteria, items A.1a – A.1xw. From those interviews, there will be a maximum of three contractors awarded contracts based on the contractors deemed most qualified, 2nd most qualified, and 3rd most qualified for each Geotechnical Asset Type.

Exhibit A – Scope of Work, paragraph A.9, is removed.

Exhibit A, Scope of Work is revised to remove paragraph A.9 and updates the Scope of Work items to A.1 – A.25.

Exhibit A, Scope of Work, paragraph A.9, is removed. Strikethrough language is removed and language in red font is added:

RFQ No. 10195411 Exhibit A

ARCHITECTURAL & ENGINEERING CONTRACTS

Department of Water Resources/Division of Engineering/Geotechnical Services Branch

SCOPE OF WORK

On Call Geotechnical Engineering Services

I. BACKGROUND

The Division of Engineering (DOE), has specialized expertise in engineering, and in constructing a wide variety of water resources projects. DOE serves a variety of clients that include, but are not limited to, the public, State Water Contractors, State and federal agencies, and other California Department of Water Resources (DWR) divisions. DOE analyzes, designs, and constructs dams and appurtenant structures, canals, tunnels, bridges, pipelines, pumping and power plants, buildings, non-building structures, flood protection facilities, fish enhancement projects, recreational facilities, and facilities to improve water quality.

II. DESCRIPTION OF SERVICES AND PURPOSE

The Contractor (attached Exhibit A, Attachment 3 Work Assignment Matrix identifies Contractor selection for each asset type and back-ups) will provide DOE, Geotechnical Services Branch (GSB) with geotechnical engineering expertise on an as directed as needed basis supporting the following Geotechnical Asset Types, with particular emphasis in safety:

1. State Water Project Assets, such as for dams and canals;

2. Flood Control System Assets, such as for river embankments; and,

3. Environmental Stewardship Assets, such as for fish ladders, fish screens, inlet/outlet works, and restoration projects.

Contractor will be required to review, evaluate, and analyze geotechnical engineering parameters;

develop engineering documents; prepare geotechnical engineering reports related to facilities owned or under the responsibility of DWR as follows:

A. SPECIFIC SERVICES:

1. Solve geotechnical engineering problems and develop design solutions related to levees, dams, canals, and their appurtenances, including fish screens, fish ladders, fish handling facilities, radial gates, pipelines, tunnels, trash racks, embankments, inlet works, outlet works, spillways, bridges, access roads, and other associated structures.

2. Provide engineering geology (including geophysical and seismological), review and consultation.

Evaluate rock excavation characteristics and evaluate controlled blasting near critical structures.

3. Provide analysis and interpretation of soil and foundation logging, soil collection and testing, and geologic interpretation.

4. Provide Geographic Information System (GIS) services and support related to geotechnical and geological investigations such as: layers and metadata, historic data, structural features, contract drawings, geologic information, and instrumentation data and measurements. Data delivered under this contract shall comply with the current version of the DWR Spatial Data Standards.

5. Evaluate project risks associated with geotechnical engineering and provide recommendations for assessing and managing those risks including experience in Potential Failure Mode Analysis

(PFMA) workshops as a Subject Matter Expert, as described in FERC Engineering Guidelines, Chapter 14 - Dam Safety Performance Monitoring Program. This includes researching engineering documents, leading workshops, performing failure mode analyses, and providing engineering findings in memorandums and reports and participate in Semi-Quantitative Risk Analyses (SQRAs) and Quantitative Risk Analyses (QRAs).

6. Provide value engineering for recommended engineering solutions as related to geotechnical engineering.

7. Perform static and dynamic stability analyses of dams and appurtenances. Perform deformation analyses.

8. Evaluate instrumentation data and performance of dams, embankments, and levees.

9. Perform dam breach analyses.

9. Evaluate foundation for structures.

10. Provide high and low mobility grouting mix design and execution guidance for embankments, foundations, and equipment.

11. Perform seepage estimates and analyses; groundwater modeling; and flow net analyses.

12. Perform filter compatibility, internal erosion, continuing erosion, and piping analyses.

13. Perform seismic hazard and develop ground motions.

14. Evaluate potential for liquefaction and other types of ground failure.

15. Evaluate actual and potential ground surface subsidence from groundwater extraction.

16. Perform general concrete design services for aqueduct liners, boat ramps, parking lots, and slabs on grade.

17. Provide coffer dam design services for water conveyance facilities.

18. Prepare documents in support of construction contracts including drafting full, complete, and accurate sets of plans, specifications, and cost estimates. Provide engineering support services during contract bidding and construction phases, including reviewing contractor submittals and requests for information (RFI), periodic site visits for engineering analysis and design to address emergent construction issues.

19. Review detailed engineering and geology reports, documents, analyses, calculations, plans, specifications, and provide recommendations and comments.

20. Provide support to obtain permits necessary to carry out assigned tasks, including field work, site reviews and other activities related to the work such as:

a. Provide engineering support to address Right of Way (ROW) for appraisal and acquisition services by DWR, including preparing data, graphics, and other documentation to describe project-based ROW requirements, and to assist with securing temporary entry permits. Work closely with DWR's Real Estate Branch (REB) policies, procedures, and applicable template forms.

b. Provide engineering support to DWR in preparing documentation necessary to secure local, State, or federal environmental permits.

21. Provide utility coordination including engineering support, research, and coordination with DWR, state and local agencies, utilities, and stakeholders; and locating, potholing, and design for modification or relocation of existing facilities.

22. Follow Project Management Body of Knowledge principles, provide project management and coordination to support engineering tasks in this Scope of Work (SOW).

23. Utilize engineering expertise to attend, participate in, or make presentations at meetings - in person or via video/teleconference - as directed by the DWR Contract Manager. Provide verbal and written comments after each meeting.

24. Provide technical briefings, presentations, and answer technical questions of SOW items 1 - 24 with DWR staff. Training specific to the items listed above may be required if DWR requires knowledge transfer.

25. Prepare proposed work plans for review by DOE GSB Contract Manager (CM) or their delegate

(Task Order Manager). Specific task order elements to be developed such as scope, deliverables, schedules, and budgets will be directed by DWR Task Order Manager.

III. DELIVERABLES

1. The deliverables supporting SOW items 1-2625 will be provided as defined in task orders.

Deliverables will include:

a. Preliminary reports, memorandums, and supporting engineering documents. Supporting documents include but are not limited to: field investigations, calculations; software data, modeling data and results; references; etc.

b. Drawings, specifications, cost data, and other construction contract support documents.

c. ESRI Arc GIS data, metadata/documentation.

d. Stamped and signed contract documents, including drawings and specifications in conformance with Caltrans or DWR standards as required.

e. Stamped and signed calculations.

f. Stamped and signed memoranda and reports.

g. Electronic files in pdf format and hard copy (bound paper) format.

h. Electronic files in the software native format, including but not limited to dwg, dgn, xls, doc.

i. CAD files re-formatted to match DOE CAD standards.

j. Digital photos and raw data; design, construction, and analysis documents, written reports, recommendations, and verbal comments.

k. QA/QC documentation with each deliverable including checklists, signed certifications, and other appropriate items demonstrating compliance with the applicable procedures described in the approved QA/QC plan. Deliverables will be neat and orderly for final documentation and archiving, such as final stamped and signed reports, calculations, as-built drawings, and specifications.

2. For all deliverables, please see Exhibit E, Paragraph XX – DELIVERABLES AND OTHER

WORK PRODUCTS.

3. Upon DOE’s request, Contractor will provide electronic copies of progress sets or final packages in AutoCAD, MicroStation, and PDF, as determined by DOE.

Detail, clarification, and direction regarding services to be performed and deliverables to be provided, pursuant to this scope of work, will be issued by task order. (See Exhibit A, Attachment 1 and 2, Sample Task Order and Budget Detail). Deliverables will be provided in accordance with the

Deliverables and Other Work Product clause in Exhibit E.

CONTRACTOR PERSONNEL

See Exhibit E, Paragraph 13 – CONTRACTOR PERSONNEL

CONTRACTOR WORK ASSIGNMENTS

Work will be assigned according to Exhibit E, Paragraph 24 – Contractor Work Assignments

ADDITIONAL CONDITIONS

Travel is required. See Exhibit E, Paragraph 2, Reimbursement Clause for additional information.

CONTACT INFORMATION

The Contract Managers for DWR and Contractor during the term of this Agreement will be:

Department of Water Resources Contractor Name

Mahadevan “Lanka” Ilankatharan Representative Name 715 P Street, 4th Floor Sacramento, CA 95814 Phone: (916) 398-1480 Email: mahadevan.ilankatharan@water.ca.gov

Contract Managers may be changed by written notice to the other party.

mailto:mahadevan.ilankatharan@water.ca.gov

SOQ Checklist is revised as follows:

SOQ CHECKLIST, page 20, is revised to allow firms to submit four (4) hard copies and (1) text readable pdf copy on a USB Flash Drive of the SOQ and revise language in references section. Strikethrough language is removed and language in red font is added:

SOQ CHECKLIST

Please submit the following items in your SOQ in the order listed below. Additionally, the SOQ will may not be considered responsive unless the following documents are included in your SOQ Submission Section V (SOQ requirements), Item 7, identifies items that must be submitted to be deemed responsive. DWR reserves the right to waive immaterial deviations:

Team and Organization

Legal name and corresponding address of Firm.

Name, title, address, telephone number, and email address of the person DWR can contact concerning the Firm’s SOQ.

Organizational Chart.

Organizational Matrix.

Staff Availability table or graph.

Qualification of Firm’s Key Personnel

Education and experience of Key Personnel.

Copies of valid California professional Civil Engineer, Geotechnical Engineer, and Certified Engineering Geologist license.

Geotechnical Asset Type - Please identify which asset types you are interested in below (check one or more). If no box is checked, DWR will consider your submission for all asset types:

State Water Project Assets

Flood Control System Assets

Environmental Stewardship Assets

Resumes of Key Personnel

References

Prime firm to provide references of for five projects within the last ten years for the team, at least two of the five should be Non-DWR References.

Certification Sheets

Potential Qualified Firms Certification Sheet (signed by Firm’s authorized individual).

Certification Regarding Lobbying (Page 5 of Exhibit FEMA) (Signed by Firm’s authorized individual).

Conflict of Interest Statement that identifies any of the conditions listed in and states the Firm’s ability to meet the terms and conditions addressed in Exhibit D – Conflict of Interest, and Exhibit E, Political Reform Act.

Five (5) Four (4) hard copies and one (1) text readable pdf copy on a USB Flash Drive of the SOQ must be submitted (mailed or hand delivered).

Attended Mandatory Pre-SOQ Conference.

Please return a completed copy of this checklist with your SOQ.

End of Addendum