100762_13_Signature_Page_Fillable.pdf
PDF 112 KB Posted
- Solicitation number
- 2026.035-LUT CPS
- Issued by
- Washington County, Oregon
About this file
This is a signature page for a sealed bid submission related to Project 100762, the NW Turk Road Bridge Replacement, issued by Washington County, Oregon's Department of Land Use & Transportation. The project involves the complete replacement of an existing timber bridge structure over West Fork Dairy Creek with a new 75-foot precast prestressed concrete slab beam bridge, valued between $1,000,000 and $2,000,000. Deliverables include the bridge structure with pipe pile foundations, roadway approaches spanning 370 feet, guardrails, driveway approaches, drainage improvements, temporary and permanent traffic control, erosion control measures comprising 910 linear feet of compost filter socks, 420 square yards of slope matting, and six check dams. Bids must be submitted electronically through the OpenGov Procurement portal by April 15, 2026, at 1:00 p.m., with written questions due by April 10, 2026, at 5:00 p.m. The contract requires completion of two phases with the contractor reopening Turk Road to two traffic lanes no later than 90 calendar days after closure and finishing all work by October 15, 2026, with liquidated damages of $500 per day for the first milestone and $1,000 per day for final completion.
Bidders must provide a bid guaranty equal to ten percent of the total bid amount through an Oregon-authorized surety corporation and must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board. Washington County will retain five percent of the contract price, though contractors may submit a surety bond in lieu of cash retainage. The successful contractor must furnish both performance and payment bonds within ten calendar days of award and comply with prevailing wage requirements under Oregon Revised Statutes 279C.840 and 2024 Oregon Standard Specifications for Construction. First-tier subcontractors with contracts equal to or greater than five percent of the total project bid or $350,000 must be disclosed within two work hours of bid closing. Additionally, contractors must register applicable diesel nonroad equipment in The Yard compliance portal prior to bid submission, obtain workers' compensation insurance, and maintain commercial general liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate. In-water work is limited to July 15 through September 30 to comply with environmental protection requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NW Turk Road 1-1 Project # 100762 Bridge Replacement (#671374) Bid # 2026.035-LUT CPS
1.10 SIGNATURE PAGE
In the event this Bid is accepted by the County and the undersigned fails to execute a satisfactory contract and bond in accordance with 00130.50, and after receiving written notice within ten (10) calendar days (excluding Sundays) from the date of from the date of the "Notice of Award", the County may, at its option, declare that the undersigned has abandoned the contract and thereupon this Bid shall be returned to the undersigned.
The bidder, by their signature below, hereby acknowledges that they have read the offer, understands it, and agrees be bound by its terms and conditions.
Signature of Bidder
Printed Name of Bidder
Title
Telephone Number
Fax Number
Email Address
Company Name
Street Address or mailing address if different
City, State, Zip code
Federal Tax I.D. Number
CCB License Number
Expiration Date Dated this day of , 2026
APPROVED AS TO FORM:
/s/ Cortney D. Duke-Driessen
Sr. Assistant County Counsel (06/2020)
| Printed Name of Bidder: |
| Title: |
| Telephone Number: |
| Fax Number: |
| Email Address: |
| Company Name: |
| Street Address: |
| City State Zip code: |
| Federal Tax ID Number: |
| CCB License Number: |
| Expiration Date: |
| Date: |
| Month: |
File details come from the government source that posted it. Updated .