File Summary

This document comprises the final design plans for Washington County's NW Turk Road Bridge Replacement project (Project Number 100762), prepared by Kittelson & Associates, Inc. with geotechnical engineering by Central Engineering Services. The project involves the replacement of the existing timber bridge structure (#671374) over West Fork Dairy Creek with a new 75-foot precast prestressed concrete slab beam bridge. The scope of work includes bridge construction, roadway approaches spanning 370 feet from station 1+13.00 to station 4+81.50, installation of guardrails, drainage improvements, erosion and sediment control measures, driveway approaches, and sheet pile retaining walls. The design incorporates six 30-inch precast prestressed slab beams supported on two bents with pipe pile foundations driven to nominal resistance depths of approximately 150 to 151 feet. Construction activities are limited during sensitive environmental periods, with in-water work restricted to July 15 through September 30. The project is estimated to cost between $1,000,000 and $2,000,000 and will require temporary road closure with detour routes to maintain local access to affected properties.

The design plans specify asphalt concrete pavement with 2-inch wearing course and base course over an 8-inch aggregate base course on both travel lanes. Erosion control measures include 18-inch compost filter socks totaling 910 linear feet, slope matting coverage of 420 square yards, permanent seed mix over 460 square yards of disturbed areas, and six check dams. Sheet pile retaining walls utilizing ASTM A328 SKZ24 sections will be installed on both sides of the structure, with Class 200 riprap slope protection and basin details specified. Bridge components include 2-tube side mount bridge rail systems, drainage curbs, three driveway approaches with asphalt or aggregate surfacing, and permanent signing. The project design complies with Oregon standards including utility notification requirements under ORS 92.044 and OAR 952-001-0010 through 0090, with coordination required for existing utility relocations involving Ziply telecommunications conduit and PGE power lines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

TL

.d w g

Pl ot

S ta m p:

/2

3/

1:

:0

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

W A S H I N G T O N C O U N T Y, O R E G O N

DEPARTMENT OF LAND USE AND TRANSPORTATION

PLANS FOR PROPOSED PROJECT

GUARDRAIL, STRUCTURE, & SIGNING

GRADING, DRAINAGE, PAVING,

WASHINGTON COUNTY

APRIL 2026

NW TURK ROAD

VICINITY MAP

Overall Length Of Project - 370 Ft.

Sunset Hwy.

Cornelius

WASHINGTON COUNTY

Ti m be r R d.

Gales Cr.Rd.

Hw y.4

7Grove Forest

Banks

TualatinSherwood

Wilsonville

I-5

Rd

King City Scholls

Hwy.219

Hillsboro T.V.Hwy 18

5t h

M ur ra y

Rd.

Tigard

Fry.

Cornell

Beaverton

Union Rd.

North PlainsWest

BRIDGE REPLACEMENT (#671374)

Oregon Law Requires You To Follow Rules Adopted By The Oregon Utility Notification Center.

Those Rules Are Set Forth In OAR 952-001-0010 Through OAR 952-001-0090. You May Obtain Copies Of The Rules From The Center.

The Telephone Number For The Oregon Utility Notification Center Is (503) 232-1987.

INDEX OF SHEETS

DESCRIPTIONSHT. NO. SHT. TITLE

INDEX OF SHEETS CONT. & STD. DWG. NOS.1A2

TITLE SHEET11

PROJECT LAYOUT1B3

SITE MAP

SCALE: NTS

GEOTECHNICAL ENGINEER

CENTRAL ENGINEERING SERVICES

CONTACT: Julio Vela, PE, GE ADDRESS: 1662 SW Mohawk St

Tualatin, OR 97062

PHONE: 503.616.9419

EMAIL: juliov@centralengr.com

ENGINEER

KITTELSON & ASSOCIATES, INC.

CONTACT: Anthony Davies, P.E.

ADDRESS: 851 SW 6th Ave. Suite 600

Portland, OR 97204

PHONE: 503.535.7456

EMAIL: adavies@kittelson.com

This Design Complies With ORS 92.044 (7) In That No Utility Infrastructure Is Designed To Be Within One Foot Of A Survey Monument Location Shown On A Subdivision Or Partition Plat. No Design Modification Nor Final Field Location Change Shall Be Permitted If It Would Cause Any Utility Infrastructure To Be Placed Within The Prohibited Area.

ORS 92.044

UTILITY NOTIFICATION:

ATTENTION: Oregon Law Requires You To Follow Rules Adopted By The Oregon Utility Notification Center. Those Rules Are Set Forth In OAR 952-001-0010 Through 952-001-0090. You May Obtain Copies Of The Rules By Calling The Center. (Note: The Telephone Number For The Oregon Utility Notification Center Is (503) 232-1987.)

UTILITY STATEMENT:

The Underground Utilities Shown Have Been Located From Field Survey Information And Existing Drawings. The Surveyor Makes No Guarantees That The Underground Utilities Shown Comprise All Such Utilities In The Area, Either In Service Or Abandoned. The Surveyor Further Does Not Warrant That The Underground Utilities Shown Are In The Exact Location Indicated Although He Does Certify That They Are Located As Accurately As Possible From Information Available. The Surveyor Has Not Physically Located The Underground Utilities. The Contractor Shall Coordinate With The Utility Companies. Call 1-800-332-2344 Before Digging.

Project Plans To Notify Excavator of Requirements of Law

ATTENTION: Oregon Law Requires You To Follow Rules Adopted By The Oregon Utility Notification Center. Those Rules Are Set Forth In OAR 952-001-0010 Through 952-001-0090. You May Obtain Copies Of The Rules By Calling The Center. (Note: The Telephone Number For The Oregon Utility Notification Center Is (503) 232-1987.)

Stat. Auth.: Sec. 1 - 5 and 7, Ch. 691, OL 1995 Stats. Implemented:

Hist.: OUNC 1-1997, f. and cert. ef. 4-17-97

ORS 952-001-0020

DATUM:

Horizontal Datum Oregon North State Plane Coordinate System NAD 83 (2011), International Feet.

Vertical Datum Held an elevation of 236.76 feet on Washington County Benchmark No.

493. Washington County (NGVD29). Located 72' east of Chrysler Dr on Highway 26.

PROJECT CONTACTS

PROJECT MANAGER

WASHINGTON COUNTY

CONTACT: Naomi Vogel ADDRESS: 1400 SW Walnut St., MS 18

Hillsboro, OR 97123

PHONE: 503.846.7914

EMAIL: Naomi_Vogel@washingtoncountyor.gov

NW Turk Road and NW Sell Road Located in the NW 1/4 of Section 14, T.2N., R.4W., W.M.

Washington County, Oregon

SITE INFORMATION:

BEGINNING OF PROJECT

STA. 1+13.00

END OF PROJECT

STA. 4+81.50

TI

TL

E

SH

EE

T

SURVEY

S&F LAND SERVICES

CONTACT: Jered McGrath, PLS ADDRESS: 4905 SW Scholls Ferry Road

Portland, OR 97225

PHONE: 503.345.0328

EMAIL: jered.mcgrath@sflands.com

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

TL

.d w g

Pl ot

S ta m p:

/2

3/

1:

:0

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

INDEX OF SHEETS (CONT'D)

DESCRIPTIONSHT. NO. SHT. TITLE

TYPICAL SECTIONS2A Thru 2A-2

TYPICAL SECTIONS

4 - 5

EROSION CONTROL PLANS

2C9 EROSION & SEDIMENT CONTROL NARRATIVE

10 - 11 EROSION & SEDIMENT CONTROL PLAN2C-2 Thru 2C-3

TRAFFIC CONTROL PLANS

12 TRAFFIC CONTROL DETOUR NOTES2D

13 TRAFFIC CONTROL DETOUR PLAN2D-2

CONSTRUCTION PLANS

3 Thru 414 - 19 CONSTRUCTION NOTES, PLANS, & PROFILES

BRIDGE #24459

BR-01 BRIDGE PLAN AND ELEVATION20

BRIDGE GENERAL NOTES

29 SHEET PILE WALL PLANW-01

RETAINING WALLS

BRIDGE FOUNDATION DATA SHEET22

BRIDGE FOUNDATION PLAN23

BRIDGE BENT PLAN AND ELEVATION24

BRIDGE BENT DETAILS25

BRIDGE SLAB SCHEDULE26

BRIDGE PAVING DAM DETAILS27

BRIDGE MISCELLANEOUS DETAILS28

CONSTRUCTION DETAILS2B Thru 2B-3

CONSTRUCTION DETAILS

6 - 8

30 SHEET PILE WALL ELEVATIONSW-02

LEGEND

Existing Approximate Property Boundary

Existing Storm Sewer Pipe Existing Gas Line

Existing Sanitary Line

Existing Wire Fence Line

T T

SS

G G

X X X

Existing WaterlineW W Existing Overhead WiresOHP OHP

Existing Underground Power LinesE E

Existing Telephone Line

Existing Building Existing Edge of Landscaping) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

Existing Edge of Pavement

Existing Light-Lamp Post Existing Power Pole Existing Power Riser

Existing Ground Light Existing Guy Anchor

Existing Water Meter

Existing Traffic Signal Junction Box

Existing Tree - Deciduous Existing Tree - Conifer Existing Sign Existing Power Cabinet

Existing Monument - Iron Pipe Existing Monument - Mag Nail

Existing Communication Manhole Existing Telephone Riser Existing Unknown Riser

Existing Power Vault

Proposed Edge of Gravel Shoulder

Existing Sewer Cleanout Existing Bollard

Existing Irrigation Control Valve

Existing Gas Valve

Existing Monument - Brass Cap

Existing Water Valve

F F F F C C C

Proposed Fill Catch Line Proposed Cut Catch Line

STANDARD DWG. REFERENCES

ODOT STANDARD DRAWINGS

DRAWING # DESCRIPTION

RD100 - Mailbox Support RD101 - Mailbox Installation RD306 - Concrete Encasement, Cradle, and Cap Details RD318 - Sloped Ends for Concrete Pipe RD402 - Midwest Guardrail System Types RD403 - Midwest Guardrail System Wood Post and Block RD404 - Midwest Guardrail System Steel Post and Block RD406 - Placement of Guardrails on Slopes RD407 - Midwest Guardrail System (W-Beam) RD409 - Thrie Beam Guardrail RD410 - Thrie Beam Guardrail Transition RD415 - Guardrail and Metal Median Barrier Parts (29" Rail Height) RD416 - Midwest Guardrail System Standard Hardware (Nuts, Bolts, Washers and Misc.)

RD417 - Midwest Guardrail System End Sections RD419 - Midwest Guardrail System Grading for Terminals RD420 - Midwest Guardrail System Non-Flared Energy-Absorbing

Terminal RD442 - Midwest Guardrail System Typical Layouts at Bridge Ends RD450 - Guardrail Anchors (Steel) RD610 - Asphalt Concrete Pavement (ACP) Details RD701 - Drainage Curbs

RD1032 - Sediment Barrier Type 8 RD1055 - Slope and Channel Matting

BR206 - 2-Tube Curb Mount Rail BR226 - 2-Tube Side Mount Rail BR230 - 2-Tube Side Mount Rail Transition BR422 - 30" Precast Prestressed Slab BR445 - Precast Prestressed Boxes and Slabs Details

TM800 - Tables, Abrupt Edge and PCMS Details TM820 - Temporary Barricades TM821 - Temporary Sign Supports TM822 - Temporary Sign Supports TM830 - Temporary Concrete Barrier and Rumble Strip Details TM840 - Closure Details TM850 - 2-Lane, 2-way Roadways TM870 - Bridge Construction

WASHINGTON COUNTY STANDARD DRAWINGS

DRAWING # DESCRIPTION

1010 - Driveway and Driveway Approach Pavement Section 3020 - Pipe Bedding and Backfill Details 6510 - Permanent Signing Legend 6599 - Bridge Number Sign

1A

IN

DE

X

OF

S

HE

ET

S

CO

NT

ST

D.

D

W G.

N

OS

Existing Guardrailo o o o o o o o o o o

Existing Ditch Flow Line

Existing Right Of Way Ordinary High Water MarkOHW OHW

Proposed Guardrail

Proposed Sheet Pile Wall

Proposed Riprap Slope Protection

Proposed Riprap Basin

Proposed Edge of Pavement

BR-02

BR-03

BR-04

BR-05

BR-06

BR-07

BR-08

BR-09

31 REVETMENT DETAILSRSD-01

ROADSIDE DEVELOPMENT

Proposed Storm Sewer Pipe

SD SD

Wetlands / No Work Area

US Waterways / Regulated Work Area adavies Text Box 2026.03.23 adavies Image

C

F

F

F F

F

C

C

C C

CC

F F

C

C

C

C

C C C C C

F

C

C C

C

C C

F F C C C C

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

0+00

1+00

2+00

3+00 4+00 5+00

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

TL

.d w g

Pl ot

S ta m p:

/2

3/

1:

:1

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

4A

3A

Beginning Of Project Sta. 1+13.00

NW TURK ROAD

End Of Project Sta. 4+81.50

Note:

The Purpose Of This Sheet Is To Show The Full Project, As Well As Document Roadway Plan Sheet Organization. See Sheet 1 And Sheet 1A "Index Of Sheets" For Description And Numbering Series For Other Types Of Plan Sheets.

S ta

. 3 +1

Regulated Work Area

NW TURK ROAD

NW

S

EL

L

RO

AD

1B

PR

OJ

EC

T

LA

YO

UT

TAXLOT

2N4140001000

19430 NW TURK RD

TAXLOT

2N415A000100

19600 NW TURK RD

TAXLOT

2N415A001000

46585 NW SELL RD

TAXLOT

2N4140001111

19260 NW TURK RD

ROW FILE #01

TAXLOT

2N415A001100

46620 NW SELL RD

TAXLOT

2N4140001111

ROW FILE #01

adavies Text Box 2026.03.23

NW TURK ROAD

Notes:

1. See construction notes for locations. See Std. Drg. No. RD701.

2. All dimensions shown in feet unless otherwise noted.

3. Side slopes are shown as horiz. to vert.

4. Cross sections available. (Not to scale)

Profile grade

Extg. pavement surfacing width - 20' ±

ACP base course Level 2, 1/2 in. dense w/ PG64-22 binder Nom. thkn. - 2"

Aggregate base course Nom. comp. thkn. - 8"

Sl. 2.5%

Guardrail (See Std. Drg. Nos. RD402, RD403, RD404, RD406, RD407, RD409, RD410, RD416, RD417, RD419, RD420, RD442, & RD450)

1' Var. 10.5' to 12' *

12' Travel lane

30'

R/W

ACP wearing course Level 2, 1/2 in. dense w/ PG64-22 binder Nom. thkn. - 2"

Safety edge pvmt. const.

(See Std. Drg. No. RD610)

Guardrail (See notes, Lt. side)

3'

Centerline

2:1 max.

3'

STA. 1+13.00 to STA. 1+63.00 STA. 1+63.00 to STA. 2+35.00

30'

R/W

Subgrade geotextile

2:1 max.

2:1 max.

STA. 2+05.03 to STA. 2+35.00, LT. STA. 2+16.35 to STA. 2+35.00, RT.

2:1 max.

2:1 max.

1' Var. 9.5' to 12' *

12' Travel lane

Sl. 2.5%

2:1 max.

* (TAPER)

Drainage curb See note 1

Drainage curb See note 1

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

S.

dw g Pl ot S ta m p:

/2 3/

1:

:0

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

2A

TY

PI

CA

L

SE

CT

IO

NS

adavies Text Box 2026.03.23

NW TURK ROAD

Sl. 2.5%

1'

30'

R/W

3'

Centerline

3'

30'

R/W

STA. 2+35.00 to STA. 2+49.09, LT.

STA. 2+49.09 to STA. 2+66.51, LT.

Guardrail (See Std. Drg. Nos. RD402, RD403, RD404, RD407, RD409, RD410, RD416, RD417, RD419, RD420, &

RD442)

Guardrail (See notes, Lt. side)

STA. 3+58.79 to STA. 4+13.96, LT.

STA. 2+35.00 to STA. 2+50.86, RT.

STA. 2+50.86 to STA. 2+66.51, RT.

STA. 3+57.20 to STA. 4+12.76, RT.

STA. 3+41.50 to STA. 3+57.20, RT.

Drainage curb See note 1

1'

Sl. 2.5%

Extg. ground

Sheet pile retaining wall (See W- sheets)

4' min.

Notes:

1. See construction notes for locations. See Std. Drg. No. RD701.

2. All dimensions shown in feet unless otherwise noted.

3. Side slopes are shown as horiz. to vert.

4. Cross sections available. (Not to scale)

Extg. pavement surfacing width - 20' ±

ACP base course Level 2, 1/2 in. dense w/ PG64-22 binder Nom. thkn. - 2"

Aggregate base course Nom. comp. thkn. - 8"

Var. 12' to 9.4' ** 12'

Travel lane ACP wearing course Level 2, 1/2 in. dense w/ PG64-22 binder Nom. thkn. - 2"

Safety edge pvmt. const.

(See Std. Drg. No. RD610)

Guardrail (See notes, Lt. side)

2:1 max.

Subgrade geotextile 2:1 max.

2:1 max.

2:1 max.

Var. 12' to 9.8' ** 12'

Travel lane

2:1 max.

4' min.

Drainage curb See note 1

Extg. ground

Sheet pile retaining wall (See W- sheets)

Guardrail (See Std. Drg. Nos. RD402, RD403, RD404, RD406, RD407, RD409, RD410, RD416, RD417, RD419, RD420, RD442, & RD450)

STA. 3+41.50 to STA. 4+51.50 STA. 4+51.50 to STA. 4+81.50 ** (TAPER)

STA. 2+35.00 to STA. 2+66.51 STA. 2+66.51 to STA. 3+41.50 (STRUCTURE)

STA. 3+41.50 to STA. 3+58.79, LT.

Drainage curb See note 1

Drainage curb See note 1

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

S.

dw g Pl ot S ta m p:

/2 3/

1:

:0

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

2A-2

TY

PI

CA

L

SE

CT

IO

NS

adavies Text Box 2026.03.23

C F F F F F F

F F

F

F

FC C

C

C

1+75 2+00 2+25

0+

0+

0+

0+

0+

S5 0°

'5

0" E

Turk Road

STA:2+00.27

Dr iv ew ay

ST

A:

0+

.0

STA:0+12.00

STA:0+27.00

35.51' 31.18'

17.68'17.68'

R20.0' R15.0'

228.05

229.02227.31

227.51 227.64226.85

3.

8% 6.1

1.6%

SW Turk Road

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-D

W Y.

dw g

Pl ot

S ta m p:

/2

3/

1:

:1

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

2B

DR

IV

EW

AY

D

ET

AI

LS

Driveway Approach Surfacing Limits Shown Thus:

Asphaltic Concrete Surfacing - 640 sf (Nom. ACP Thkn. - 3") (Nom. Agg. Comp. Thkn. - 6")

SCALE: 1" = 10'

STA. 2+00.27 (Rt.)

DRIVEWAY PLAN

Existing right-of-way

TAXLOT

2N4140001111

19260 NW TURK RD

ROW FILE #01

adavies Text Box 2026.03.23

F

C C C C

PC

: 1

.9

1+00 1+25 1+50

0+

0+

0+

0+

0+

N3 6°

'3

0" W

Turk Road Sta:1+25.02

Dr iv ew ay

St a:

0+

.0

SW Turk Road

STA:0+09.91

STA:0+14.92

11.50'11.50'

5.

11.93' 18.06'

1.00'

R15.0'

227.44

227.20

227.58

227.16

227.49

227.07

227.09

8.

4%

5.

7%

6.2%

C C C

C

C C C

PC

: 4

.8

4+50 4+75 5+00

0+

0+

0+

0+

0+

Turk Road

STA:4+81.50

Dr iv ew ay

ST

A:

0+

.0

N6 9°

'5

3" W

SW Turk Road

STA:0+09.80

STA:0+16.567.39'

15.85'

6.

R10.0' 226.66

227.02 227.11

227.09

226.70

5.

5%5.0

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-D

W Y.

dw g

Pl ot

S ta m p:

/2

3/

1:

:1

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

2B-2

DR

IV

EW

AY

D

ET

AI

LS

Driveway Approach Surfacing Limits Shown Thus:

Aggregate Surfacing - 135 sf (Nom. Comp. Thkn. - 6")

SCALE: 1" = 10'

STA. 1+25.02 (Lt.)

DRIVEWAY PLAN

SCALE: 1" = 10'

STA. 4+81.50 (Lt.)

DRIVEWAY PLAN

Existing right-of-way Existing right-of-way

Driveway Approach Surfacing Limits Shown Thus:

Aggregate Surfacing - 75 sf (Nom. Comp. Thkn. - 6")

TAXLOT

2N415A001000

46585 NW SELL RD

TAXLOT

2N415A000100

19600 NW TURK RD

adavies Text Box 2026.03.23

Asphalt concrete pavement

See typical roadway Ssction

Roadway subgrade

Subgrade geotextile

18"

1' typ.

Varies

Aggregate base or stone embankment

Note: Construct subgrade stabilization in locations as directed by the Engineer.

3'-0"

3'-0"

AA

Riprap geotextile, type 1

End of storm sewer pipe

1'-0"

Loose riprap mixture, class 50 Pipe I.E. as shown

Sl. 2:1 Sl. 2:1

2'-0"

2'-0"

2'-0"

2'-0"

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-D

TL

S.

dw g

Pl ot

S ta m p:

/2

3/

1:

:5

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

2B-3

CO

NS

TR

UC

TI

ON

D

ET

AI

LS

N.T.S.

DRIVEWAY GUARDRAIL DETAILS

N.T.S.

18 INCH SUBGRADE STABILIZATION

GENERAL NOTES:

1. For transition details, see ODOT Std. Drg. BR230.

2. Place radius identification plate (For details, see ODOT Std. Drg. RD415).

3. Shop fabricate all radius rail to dimensions shown.

PLAN

SECTION A-A

4'-0"

6" 12"

Class 50 loose riprap mixture

Riprap geotextile

N.T.S.

RIPRAP OUTFALL SLOPE PROTECTION

N.T.S.

RIPRAP BASIN

adavies Text Box 2026.03.23

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-E

CP

.d w g

Pl ot

S ta m p:

/2

3/

1:

:2

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

2C

ER

OS

IO

N

SE

DI

M

EN

T

CO

NT

RO

L

NA

RR

AT

IV

E

Not To Scale

VICINITY MAP

SITE MAP Not To Scale

Sec. 14, R. 4 W., T. 2 N. , W. M.

Public Right Of Way Improvements

PROPERTY DESCRIPTION

Latitude________ Longitude _________ Washington County, Oregon

PROJECT LOCATION

NW Turk Road @ West Fork

-123.155145.6597

BOP

STA. 1+13.00

Washington County, Oregon

EOP

STA. 4+81.50

1. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAN OCTOBER 1ST. THE TYPE AND PERCENTAGES OF SEED IN THE MIX MUST BE IDENTIFIED ON THE PLANS.

2. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER AN UNDISTURBED,

PREFERABLY VEGETATED AREA, AND THROUGH A SEDIMENT CONTROL BMP (I.E. FILTER BAG).

3. ALL EXPOSED SOILS MUST BE COVERED DURING THE WET WEATHER PERIOD, OCTOBER 1ST - MAY

31ST.

4. THE IN-WATER WORK PERIOD FOR THIS PROJECT ON WEST FORK DAIRY CREEK IS JULY 15TH -

SEPTEMBER 30TH.

LOCAL AGENCY-SPECIFIC EROSION CONTROL NOTES

1. ALL PERIMETER CONTROL BMPS (INLET PROTECTION, SEDIMENT FENCING, TEMPORARY CONSTRUCTION WORK ZONE FENCING, SEDIMENT BARRIERS, AND GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO COMMENCEMENT OF CONSTRUCTION

ACTIVITIES.

2. SEDIMENT BARRIERS APPROVED FOR USE INCLUDE SEDIMENT FENCE, WATTLES, AND COMPOST SOCK.

3. SENSITIVE RESOURCES INCLUDING, BUT NOT LIMITED TO, TREES, WETLANDS, AND VEGETATED CORRIDORS SHALL BE CLEARLY DELINEATED WITH TEMPORARY CONSTRUCTION WORK ZONE FENCING (ORANGE COLOR) IN A MANNER THAN IS CLEARLY VISIBLE TO ANYONE IN THE AREA. NO ACTIVITIES ARE PERMITTED TO OCCUR

BEYOND THE CONSTRUCTION BARRIER.

4. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, STREET SWEEPING AND TIRE WASHING, MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.

PRE-CONSTRUCTION, CLEARING, AND DEMOLITION NOTES

1. SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE THE SURFACE ROUGHENED BY MEANS OF TRACK-WALKING OR THE USE OF OTHER APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES SEED BEDDING AND

REDUCES RUN-OFF VELOCITY.

2. LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA

SEEDING WITH APPROVED MIX AND APPLICATION RATE.

3. TEMPORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE: COVERING EXISTING EXPOSED SOIL WITH PLASTIC

SHEETING, STRAW MULCHING, WOOD CHIPS, OR OTHER APPROVED MEASURES.

4. STOCKPILED SOIL OR STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION AND CONFIGURATION. DURING "WET WEATHER" PERIODS, STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING OR STRAW MULCH. SEDIMENT FENCE IS REQUIRED

AROUND THE PERIMETER OF THE STOCKPILE.

5. EXPOSED CUT OR FILL AREAS SHALL BE STABILIZED THROUGH THE USE OF TEMPORARY SEEDING AND MULCHING, EROSION CONTROL BLANKETS OR MATS, MID-SLOPE SEDIMENT FENCES OR WATTLES, OR OTHER APPROPRIATE MEASURES. SLOPES

EXCEEDING 25% MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES.

6. AREAS SUBJECT TO WIND EROSION SHALL USE APPROPRIATE DUST CONTROL MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF WATER, PLASTIC SHEETING, STRAW MULCHING, OR OTHER APPROVED MEASURES.

7. CONSTRUCTION VEHICLES AND EQUIPMENT SHALL ENTER THE WORK AREA FROM EXISTING GRAVEL AREAS. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, TIRE WASHING, MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE

KEPT CLEAN FOR THE DURATION OF THE PROJECT.

8. SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE

SPILLAGE OF SEDIMENT AND SEDIMENT-LADEN WATER.

9. AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE TRUCKS IN A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN ENTER THE STORM WATER SYSTEM OR STREAMS/WETLANDS AND OTHER SENSITIVE AREAS. IF THE CONCRETE WASH-OUT AREA CANNOT BE CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE POINT, SECONDARY MEASURES SUCH AS BERMS OR TEMPORARY SETTLING PITS MAY BE REQUIRED. THE WASH-OUT SHALL BE LOCATED WITHIN

SIX FEET OF TRUCK ACCESS AND BE CLEANED WHEN IT REACHES 50% OF THE CAPACITY.

10. SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE TRANSFERRED TO THE STORM WATER SYSTEM.

SWEEPINGS SHALL BE PICKED UP AND DISPOSED IN THE TRASH.

11. USE BMPs SUCH AS CHECK-DAMS, BERMS, AND INLET PROTECTION TO PREVENT RUN-OFF FROM REACHING DISCHARGE

POINTS.

EROSION AND SEDIMENT CONSTRUCTION NOTES

GRADING, DRAINAGE STRUCTURE, AND STREET

Sunset Hwy.

Cornelius

WASHINGTON COUNTY

Ti m be r R d.

Gales Cr.Rd.

Hw y.4

7Grove Forest

Banks

TualatinSherwood

Wilsonville

I-5

Rd

King City Scholls

Hwy.219

Hillsboro T.V.Hwy 18

5t h

M ur ra y

Rd.

Tigard

Fry.

Cornell

Beaverton

Union Rd.

North PlainsWest

Overall Length Of Project 370 Ft.

Dairy Creek

FAX:

3. Inactive Periods Greater Than

4. Periods During Which The Site Is Inaccessible Due to

CESCL Certification:

2. Prior to the Site Becoming Inactive or in Anticipation

Philip_Trecker@washingtoncountyor.gov

Inclement Weather.

Seven (7) Consecutive Calendar Days

Of Site Inaccessibility.

SITE CONDITION

1. Active Period

EMail:

Occur Daily At A Relevant & Accessible Discharge Point Or Downstream Location.

Maintenance & Repair Must Be

Once Every Two (2) Weeks.

If Practical, Inspections Must

Made Prior to Leaving the Site.

MINIMUM FREQUENCY

Daily When Stormwater Runoff, Once to Ensure That Erosion & Sediment Control Measures Are In Working Order. Any Necessary

#82182

Including Runoff From Snowmelt, Is Occuring. Otherwise Weekly.

DEVELOPED CONDTIONS

PERMITTEE'S SITE INSPECTOR:

RECEIVING WATER BODIES

WASHINGTON COUNTY, DLUT

* Final Stabilization (September)

TOTAL DISTURBED AREA = 0.32 ACRES

TOTAL SITE AREA = 0.51 ACRES

SITE SOIL CLASSIFICATION

* Street Construction (September)

* Mass Grading (July-October)

* Utility Installation (June-October)

AND TIME OF MAJOR ACTIVITIES

NATURE OF CONSTRUCTION ACTIVITY

Concrete Bridge & Paved Approaches

* Clearing (July-August)

Bridge Replacement, Paving, Guardrail

NARRATIVE DESCRIPTIONS

EXISTING SITE CONDITIONS

West Fork Dairy Creek

Company/Agency:

Phone: (503) 846-7800

9 - Chehalis Silty Clay Loam, 0 to 3 percent slopes

Philip Trecker

On Site Soils Have a Moderate Erosion Potential.

* Hold a pre-construction meeting of project construction personnel that includes the Inspector to discuss erosion and sediment control measures and construction limits. (Schedule A.8.C.I.(3))

* All inspections must be made in accordance with DEQ's 1200-CN permit requirements.

* Inspection logs must be kept in accordance with DEQ's 1200-CN permit requirements.

* Retain a copy of the ESCP and all revisions on site and make it available on request to DEQ, agent, or the local municipality.

During inactive periods of greater than seven (7) consecutive calendar days, retain the ESCP at the construction site or at another location. (Schedule B.2.A)

(503) 846-7810

30 - McBee Silty Clay Loam, 0 to 3 percent slopes

Rural Local Road w/ Paved Travel Lanes & Paved Timber Bridge

43 - Wapato Silty Clay Loam, 0 to 3 percent slopes adavies Text Box 2026.03.23

210210215220225

225225

C

F F

F

F

F

C

C

C

C C

C

F

F

C CC C

C

C

C

C

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

1+00

2+00

3+00

7 22

1EXTG. R/W

NW TURK ROAD

EXTG. R/W

Direction of flow

Check dam

Tree/pile removal

Preserve and protect extg. tree

EROSION CONTROL LEGENDEROSION CONTROL NOTES

Slope matting, type 'C'Compost filter sock Install sediment barrier, type 8 18" compost filter sock - 425 ft.

(For details, see ODOT std. drg. RD1032)

Note not used

Remove existing timber bridge piles within ordinary high water - 11 ea.

Removal work limited to July 15 - September 30 (See Special Provisions 00290.34(c))

Trees previously removed - 2 each Stumps to be preserved (by Contractor)

Sediment fence

3 Install slope matting, type "C" - 170 sq. yd.

Rolled matting required (For details, see ODOT std. drg. RD1055)

No work area (wetlands)

4 Install permanent seed mix on all disturbed areas - 185 sq. yd.

(See Section 1030 of the Special Provisions)

Regulated work area (OHW) July 15 - September 30

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-E

CP

.d w g

Pl ot

S ta m p:

/2

3/

1:

:2

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

M

ATCH LINE STA. 3+10

SEE SHT. 2C-3

2C-2

ER

OS

IO

N

SE

DI

M

EN

T

CO

NT

RO

L

PL

AN

adavies Text Box 2026.03.23

C C C C C

F

C

C C

C C

C F F C C C C

OHW

OHW

OHW

OHW

230 22

4+00 5+00

EXTG. R/W

215210

NW TURK ROAD

EXTG. R/W11

EROSION CONTROL LEGENDEROSION CONTROL NOTES

Install check dam, type 3 - 6 ea.

(For details, see ODOT std. drg. RD1005)

Install sediment barrier, type 8 18" compost filter sock - 485 ft.

(For details, see ODOT std. drg. RD1032)

Note not used

Remove existing timber bridge piles within ordinary high water - 3 ea.

Removal work limited to July 15 - September 30 (See Special Provisions 00290.34(c))

Trees previously removed - 2 each Stumps to be removed (by Contractor)

3 Install slope matting, type "C" - 250 sq. yd.

Rolled matting required (For details, see ODOT std. drg. RD1055)

5 Install permanent seed mix on all disturbed areas - 275 sq. yd.

(See Section 1030 of the Special Provisions)

Direction of flow

Check dam

Tree/pile removal

Preserve and protect extg. tree

Slope matting, type 'C'Compost filter sock

Sediment fence Regulated work area (OHW) July 15 - September 30

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-E

CP

.d w g

Pl ot

S ta m p:

/2

3/

1:

:2

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

M A

TC

H

L

IN

E S

TA

. 3

+1

S E

E S

H T.

C

-2

2C-3

ER

OS

IO

N

SE

DI

M

EN

T

CO

NT

RO

L

PL

AN

adavies Text Box 2026.03.23

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

CP

.d w g

Pl ot

S ta m p:

/2

3/

1:

:0

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

Notes:

DETOUR

DETOUR

DETOURROAD CLOSED

TO THRU TRAFFIC

LOCAL ACCESS ONLY

TURK RDDETOUR

END

BLACK ON WHITE

60"x30"

OR11 - 4a

36"x12" BLACK ON ORANGE

(M4-9) 30"x24" BLACK ON ORANGE

(M4-9) 30"x24" BLACK ON ORANGE

(M4-9) 24"x30" BLACK ON ORANGE

60"x48" BLACK ON ORANGE (6" LETTERS)

24"x18" BLACK ON ORANGE (M4-8A)

CLOSED AT

TURK ROAD

SELL ROAD

USE DETOUR

MMM DD TO MMM DD

(503) 846-7800

8A

8R

8L

(4 Ea)

TYPE "W1"

(11 Ea)

(4 Ea)

(4 Ea)

(5 Ea)

(2 Ea)

RIDER SIGN, MOUNT BELOW SIGN AS SHOWN ON SHT 2D-2

1) Maintain private access to all driveways on Turk Road at all times.

2) Post the advance warning signs a minimum of 14 days prior to the road closure.

3) All signs shall be type "O4" unless otherwise noted.

4) All signs shall meet or exceed MUTCD Part VI and County specifications as outlined in the Special Provisions.

5) All signs shall meet or exceed minimum retroreflectivity levels as specified in the MUTCD.

6) All signs shall be mounted on separate posts or T.S.S. per ODOT standard drawings TM821 and TM822.

7) Notification to residents, schools, and emergency services to be performed by Washington County.

8) Modifications to the type, quantity, and/or location of signs may be required as conditions mandate.

9) Sign locations are for graphical purposes only. Actual locations shall be field adjusted to account for sight distances, fixed object obstructions, utilities, etc.

10) Traffic Control Plans accompanied by ODOT standard drawing no's. TM800, TM820, TM821, TM822, TM830, TM840, TM850, & TM870.

MOUNT ON TYPE III BARRICADE

WITH OR RIDER AS SHOWN

(2 Ea) 8L

4 DETOUR

AHEAD

48"X48" BLACK

ON ORANGE

(W20-2)

(2 Ea)

5 CLOSED

ROAD

AHEAD

48"X48" BLACK

ON ORANGE

(W20-3)

(1 Ea)

CLOSED

ROAD

MOUNT ON TYPE III BARRICADE

(R11-2) 48"x30" BLACK ON WHITE

TYPE "W1"

(2 Ea)

8R

6 CLOSED

ROAD

1/2 MILE

48"X48" BLACK

ON ORANGE

(W20-3)

(1 Ea)

2D

TR

AF

FI

C

CO

NT

RO

L

DE

TO

UR

N

OT

ES

adavies Text Box 2026.03.23

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-T

CP

.d w g

Pl ot

S ta m p:

/2

3/

1:

:3

AM

An th on y

Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

DETOUR ROUTE

4 - TEMP. CONC.

BARRIER

PROJECT SITE

DETAIL A

1 - 8' B(III)C

DETAIL A

8R

8L

1 - 8' B(III)C

1 - 8' B(III)C

8R

8A

8L

8A

8A

8A

8R

8R

8A

8L

8L

1 - 8' B(III)C

2D-2

TR

AF

FI

C

CO

NT

RO

L

DE

TO

UR

P

LA

N adavies Text Box 2026.03.23

STREET CONSTRUCTION NOTES

1 Sta. 1+13.00 ACP pavement match

2 Bridge no. 24459 Remove extg. structure #671374 and guardrail Const. structure - 75' Rdwy. width - 24' (See shts. BR-01 thru BR-09)

SIGNS

EXISTING

LEGEND:

1SIGN

2SIGN 3SIGN

SIGNING LEGEND

See Wash. Co. 6510 For Signing Legend

X

WASHINGTON

COUNTY

BRIDGE

24459

2SIGN

2SIGN 4SIGN

WEIGHT LIMIT

5 AXLES 29T

6 AXLES 30T

7 AXLES 32T3 Sta. 2+05.03 to 2+66.51, Lt.

Const. end piece (Type B) Const. guardrail - 25' (Type 2A) Const. guardrail - 12.5' (Type 3) Const. guardrail transition (For details, see ODOT std. drg. BR230) All posts to be steel

4 Sta. 2+16.35 to 2+66.51, Rt.

Const. end piece (Type B) Const. guardrail anchor - 2 (Type 1 mod.)

Const. guardrail - 25' (Type 2A) Const. guardrail - 12.5' (Type 3) Const. guardrail transition (For details, see ODOT std. drg. BR230) All posts to be steel

5 Const. asphalt driveway approach See table, this sheet (For details, see Wash. Co std. drg. 1010 & sht. 2B)

7 Sta. 2+23.26 to 2+66.51, Lt.

Sta. 2+36.76 to 2+66.51, Rt.

Const. P.C. conc. drainage curb (For details, see ODOT std. drg. RD701)

Const. aggregate driveway approach - Nom. thkn. 6" (Incidental to Aggregate Base pay item) See table, this sheet (For details, see sht. 2B-2)

8 Const. riprap outfall slope protection (For details, see sht. 2B-3)

9 Const. riprap basin (For details, see sht. 2B-3)

10 Const. sheet pile retaining wall (For details, see shts W-01 thru W-02)

11 Const. riprap slope protection (For details, see shts. RSD-01)

12 Preserve & protect existing building

13 Existing conduit on bridge to be permanently relocated (by others) Coordinate with Ziply for relocation

14 Preserve & protect existing utility pole Existing aerial power lines to be temporarily relocated (by others) Coordinate with PGE for temporary relocation

AsphaltAsphalt Asphalt 15.0'2+00.27, Rt. 35'640 sf

DRIVEWAY TABLE

Residential5

Appr.

Type

Throat Width

Extg.

Surface

Finished Surface

LengthType Station Appr.

Area

Agg.Agg. Agg. 5.0'1+25.02, Lt. 23'135 sf6 Residential

15 Sta. 1+79.58, 19.31' Lt.

Inst. 24" RCP storm sewer pipe - 10.5' I.E. In - 224.52 Pipe slope - 2.29% Const. 2:1 sloped end section (For details, see ODOT std. drg. RD318) Connect to existing storm sewer pipe Const. concrete closure collar (For details, see ODOT std. drg. RD306) (For details, see Wash. Co. std. drg. 3020)

16 Daylight existing roof drain and driveway culvert to riprap basin (Incidental to roof drain connections bid item)

17 Inst. single mailbox support - 1 ea.

Inst. concrete collar Coordinate with USPS for location (For details, see ODOT std. drgs. RD100 & RD101)

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-S

TR

EE

T.

dw g Pl ot S ta m p:

/2 3/

1:

:5

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

CO

NS

TR

UC

TI

ON

N

OT

ES

adavies Text Box 2026.03.23

F

F

F

F

C

C

C

C C

C

F

F

C CC C

C

C

C

C

C

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

PC

: 1

.9

PT: 2+81.48

1+00

2+00

3+00

L159.560 Δ30°28'25"

R300.00'

Extg. R/W

NW TURK ROAD

60'

Grading Limits

RX1

S

Extg. R/W

Grading Limits

RX1

S

RX2

EX3

S

RX2

S

S

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-S

TR

EE

T.

dw g Pl ot S ta m p:

/2 3/

1:

:5

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

Legend:

Regulated Work Area

M

ATCH LINE STA. 3+10

SEE SHT. C02

3A

CO

NS

TR

UC

TI

ON

P

LA

N

No Work Area

P R

O

JE

C T

LI

M

IT

S

S

TA

. 1 +1

3.

0 201020

Scale: 1" = 20'

TAXLOT

2N415A001000

46585 NW SELL RD

TAXLOT

2N4140001111

19260 NW TURK RD

ROW FILE #01

TAXLOT

2N4140001111

19260 NW TURK RD

ROW FILE #01

TAXLOT

2N415A001100

46620 NW SELL RD

adavies Text Box 2026.03.23

(2

.59

8.

(2

.36

7.

(2

.39

7.

(2

.28

7.

(2

.04

7.

(2

.06

7.

(2

.47

8.

(2

.33

9.

(2

.11

9.

(2

.08

0.

(2

.69

0.

(2

.85

0.

0+50 1+00 1+50 2+00 2+50 3+00 3+10

3.40%

HIGH POINT STA = 3+04.78

HIGH POINT ELEV = 230.58

PVI STA = 3+04.78

PVI ELEV = 231.85

K = 22.00 A = 6.80%

LVC = 149.60'

BV

C:

.9

EL

EV

: 2

.3

LOW PT STA = 1+27.31

LOW PT ELEV = 227.32

PVI STA = 1+51.32

PVI ELEV = 226.64

K = 26.00 A = 4.95%

LVC = 128.77'

BV

C:

.9

EL

EV

: 2

.6

EV

C:

.7

EL

EV

: 2

.8

-1.55%

STRUCTURE

Finished grade @ centerline

12" Existing grade @ centerline

12"

Beginning of Project Sta. 1+13.00

Subgrade, typ.

Proposed grade @ centerlineExisting grade @ centerline

(-0.24%)

Future Centerline Profile

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-S

TR

EE

T.

dw g Pl ot S ta m p:

/2 3/

1:

:0

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

3A-2

CO

NS

TR

UC

TI

ON

P

RO

FI

LE

102 Cu. Yds. Exc.

16 Cu. Yds. Emb.

Scale: 1" = 2' (Vert.)

22 1

Scale: 1" = 20' (Horiz.)

2020 10 adavies Text Box 2026.03.23

STREET CONSTRUCTION NOTES

1 Sta. 4+81.50 ACP pavement match

2 See sht. 3, note 2

SIGNS

EXISTING

LEGEND:

1SIGN

2SIGN 3SIGN

SIGNING LEGEND

X

WASHINGTON

COUNTY

BRIDGE

24459

2SIGN

See Wash. Co. 6510 For Signing Legend

WEIGHT LIMIT

5 AXLES 29T

6 AXLES 30T

7 AXLES 32T

DRIVEWAY TABLE

Appr.

Type

Throat Width

Extg.

Surface

Finished Surface

LengthType Station Appr.

Area

Agg.Agg. Agg. 6.75'4+81.50, Lt. 7.5'75 sf5 Residential

3 Sta. 3+41.50 to 4+13.96, Lt.

Const. guardrail transition (For details, see ODOT std. drg. BR230) Const. energy absorbing guardrail terminal Flare rate=0, W=1', E=0 All posts to be steel

6 Sta. 3+41.50 to 3+83.95, Lt.

Sta. 3+41.50 to 3+83.95, Rt.

Const. P.C. conc. drainage curb (For details, see ODOT std. drg. RD701)

Const. aggregate driveway approach - Nom. thkn. 6" (Incidental to Aggregate Base pay item) See table, this sheet (For details, see sht. 2B-2)

7 Const. riprap outfall slope protection (For details, see sht. 2B-3)

8 Const. sheet pile retaining wall (For details, see shts W-01 thru W-02)

9 Const. riprap slope protection (For details, see shts. RSD-01)

10 Tree stump removal (Incidental to Clearing and Grubbing pay item)

11 Sta. 3+44 to 4+15, Lt.

Remove existing wire fencing and posts

12 Existing conduit on bridge to be permanently relocated (by others) Coordinate with Ziply for relocation

13 Preserve & protect existing utility pole Existing aerial power lines to be temporarily relocated (by others) Coordinate with PGE for temporary relocation

Sta. 3+41.50 to 4+12.76, Rt.

Const. guardrail transition (For details, see ODOT std. drg. BR230) Const. energy absorbing guardrail terminal Flare rate=0, W=1', E=0 All posts to be steel

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-S

TR

EE

T.

dw g Pl ot S ta m p:

/2 3/

1:

:0

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

CO

NS

TR

UC

TI

ON

N

OT

ES

adavies Text Box 2026.03.23

C C C C

F

C C

C

C

C C

F F C C C C

OHW

OHW

OHW

OHW

PC

: 4

.8

4+00 5+00

N23°39'40"E 170.42' L106.113 Δ12°09'35"

R500.00'NW TURK ROAD

60'

Extg. R/W

Grading Limits

Grading Limits

RX1

S

Extg. R/W

2 3

10 10 11

12 13RX1

S

RX2

S

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-S

TR

EE

T.

dw g Pl ot S ta m p:

/2 3/

1:

:1

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

M A

TC

H

L

IN

E S

TA

. 3

+1

S E

E S

H T.

C

Legend:

Regulated Work Area

4A

CO

NS

TR

UC

TI

ON

P

LA

N

P R

O

JE

C T

LI

M

IT

S

S

TA

. 4 +8

1.

0 201020

Scale: 1" = 20'

TAXLOT

2N4140001000

19430 NW TURK RD

TAXLOT

2N415A000100

19600 NW TURK RD

adavies Text Box 2026.03.23

(2

.85

0.

(2

.12

0.

(2

.98

0.

(2

.42

9.

(2

.98

8.

(2

.65

7.

(2

.38

7.

(2

.46

7.

(2

.53

7.

(2

.96

8.

(2

.87

8.

3+10 3+50 4+00 4+50 5+00 5+50

-3.40%

HIGH POINT STA = 3+04.78

HIGH POINT ELEV = 230.58

PVI STA = 3+04.78

PVI ELEV = 231.85

K = 22.00 A = 6.80%

LVC = 149.60'

EV

C:

.5

EL

EV

: 2

.3

LOW POINT STA = 4+71.29

LOW POINT ELEV = 227.45

PVI STA = 5+12.66

PVI ELEV = 224.79

K = 21.70 A = 10.61%

LVC = 230.30'

BV

C:

.5

EL

EV

: 2

.7

STRUCTURE

12"

12" Existing grade @ centerline

Finished grade @ centerline

End of Project Sta. 4+81.50

Subgrade, typ.

Proposed grade @ centerlineExisting grade @ centerline

(0.32%)

Future Centerline Profile

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

-2

_0

-S

TR

EE

T.

dw g Pl ot S ta m p:

/2 3/

1:

:1

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

4A-2

CO

NS

TR

UC

TI

ON

P

RO

FI

LE

47 Cu. Yds. Exc.

12 Cu. Yds. Emb.

Scale: 1" = 2' (Vert.)

22 1

Scale: 1" = 20' (Horiz.)

2020 10 adavies Text Box 2026.03.23

F C

C

C C

CC

F F

F

C

C C

C

C C

F F

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

PT

: 2

.4

2+50 3+00 3+50

El. 229.94

El. 230.24

El. 229.96

El. 229.99

El. 230.28

El. 229.97

2+00 2+50 3+00 3+50 4+00

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

_2

_0

_B

R-

PE

.d w g Pl ot S ta m p:

/2 3/

1:

:4

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

OHWM el.

242.5±

100yr el.

227.60

Note:

Elevations are based on the National Geodetic Vertical Datum, 1929 (M.S.L. = 0.00)

75'-0" ctr.-ctr.

6 - 30" precast prestressed slab beams

PLAN

1" = 20'

West Fork Dairy Creek

ELEVATION

1" = 20'

'-0

La ne

'-0

La ne

'-0

O ut -o ut s tru ct ur e

VICINITY MAP

N.T.S.

C.

L.

B en t 2 St a.

+4 1.

C.

L.

B en t 1 St a.

+6 6.

Extg. bridge & foundation to be removed

Overhead utilities to be temporarily relocated by others

Sheet pile wall

R/W

R/W

Extg. ground @ Extg. ground @ 12' lt.

Extg. ground @ 12' rt.

Remove extg. piers

13 spaces @ 5'-10" = 75'-10" Rail pay limits, ea. side

2-tube side mount bridge rail, see dwg. BR226Guardrail transition

(see Dwg. BR230)

Bent 1CL Bent 2CL

LOCATION

GRADELINE DIAGRAM

N.T.S.

PP 18 x 0.625 open ended, typ.

E le v

1.

P V

I 3 +0

4.

E le v

9.

P V

C

+2 9.

L 149.60 FT

K 22.00

P V

T 3+

.5

E le v

9.

3.40%

Sheet pile wall, typ.

Cut, typ.

Riprap bank protection

90°0'0"

Sheet pile wall

Telecommunications conduit relocated by others

-3.40%

Remove extg. cut-off piers

BR-01

BR

ID

GE

P

LA

N

AN

D

EL

EV

AT

IO

N

Est. tip el. 150.00Est. tip el. 151.00

PinPin

Notes:

1. Elevations shown are finished grade at intersection of bent centerline and construction centerline, 12.0' left, and 12.0' right.

2. Angles measured tangent to roadway centerline to bent centerline.

3. Contractor to provide fall arrest system mounted to bridge railing, see sheet BR-09.

Proposed structure no. 24459 Replaces existing structure no. 671374

ODOT B.D.S. Dwg. No. 114051

CL

Regulated work area

Legend:

87°8'32" adavies Text Box 2026.03.23

WASHINGTON

Reinforcing Splice Lengths ( Class B ) Grade 60 f'c = 4.0 ksi, λrc = 0.4, 2in min. concrete clear cover

Bar Size #3 #4 #5 #6 #7 #8 #9 #10 #11 #14 & #18

Uncoated 1' -4" 1'-7" 2' -0" 2' -5" 2' -9" 3' -2" 3' -7" 4' -0" 4' -5" Not Permitted

COUNTY

BRIDGE

24459

BRIDGE ID SIGN

No Scale

NOTE:

See Washington County Drawing Number 6599

GENERAL NOTES:

Provide all materials and perform all work according to the Oregon Standard Specifications for Construction 2024.

Bridge is designed in accordance with the 9th edition of the "AASHTO LRFD Bridge Design Specifications" and 2025 edition of the "Oregon Bridge Design Manual." Design includes an allowance of 40 psf for present wearing surface and 25 psf for future wearing surface and all of the following Live Loads :

Service and Strength I Limit States:

HL-93: Design truck (or trucks per LRFD 3.6.1.3) or the design tandems and the design lane load.

Strength II Limit State:

ODOT Type STP-5BW Permit truck ODOT Type STP-4E Permit truck EV3 truck

Seismic design is performed in accordance with the "AASHTO Guide Specifications for LRFD Seismic Bridge Design" as modified by the 2025 edition "ODOT Bridge Design Manual". The Horizontal Peak Ground Acceleration Coefficients (PGA) for 1000-year return (Life Safety) and Cascadia Subduction Zone (Operational) are 0.30g and 0.20g respectively, based on 2014 USGS Seismic Hazard Maps. The bridge site is defined as Site Class E with Site Factor (Fpga) of 1.6.

Provide all reinforcing steel according to ASTM Specification A706, or AASHTO M31 (ASTM A615) Grade 60. Provide Field bent stirrups according to ASTM Specification A706. Use the following splice lengths (unless shown otherwise):

Increase all splice lengths 30% for horizontal or nearly horizontal bars so placed that more than 12” of fresh concrete is cast below the bar.

Splice reinforcing steel at alternate bars, staggered at least one splice length or as far as possible, unless shown otherwise.

Provide epoxy coated reinforcing steel, except prestressing steel, in precast slabs.

Place bars 2” clear of the nearest face of concrete (unless shown otherwise).

All reinforcing spacing is intended to be maximum (unless shown otherwise).

Provide a 3 4" chamfer on all exposed concrete edges (unless shown otherwise).

Provide Class 6000 - 1 or 3 4 concrete in precast prestressed slabs according to detail plans. See sht. BR-08. The minimum strength of concrete at transfer of prestress is 4500 psi.

Provide Class 4000 - 112, 1 or 3 4 concrete for all other concrete.

Provide prestressing steel according to detail plans.

Contractor to field verify all dimensions and elevations prior to beginning work.

See sht. BR-04 for Foundation Design Notes.

12'-0" lane

12'-0" lane

24'-0" O-O bridge

3" min. ACWS

2-tube side mount bridge rail and transition. See dwgs.

BR226 and BR230 for details.

Paving dam. see sht.

BR-09 for details.

6 - 30" prestressed precast slab beams

Cl as s su rfa ce fin ish (n o co at in g) ty p.

Sl. 2.5%

CL

TYPICAL SECTION

1/4" = 1'-0"

Const.

Sl. 2.5%

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

_2

_0

_B

R-

GN

.d w g Pl ot S ta m p:

/2 3/

1:

:1

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

BR-02

BR

ID

GE

G

EN

ER

AL

N

OT

ES

TYPE EV-3

3 Axle Vehicle Gross Weight = 86k

Axle No. 1 2 3

24k 31k 31k

15' 4' 19'

TYPE OR-STP-5BW

9 Axle Vehicle Gross Weight = 204k

Axle No. 1 2 3

12k 24k

18' 4.5' 99'

4 5 6 7 8 9

24k 24k 24k 24k 24k 24k 24k

14' 5' 5'32' 16' 4.5'

TYPE OR-STP-4E

13 Axle Vehicle Gross Weight = 258k

Axle No. 1 2 3

18k 20k

12' 5.5' 126'

4.5'

5 6

15' 5'

5'

8 9

5'

5'

11 12

16' 5'

5'43'

20k 20k 20k 20k 20k 20k 20k 20k 20k 20k 20k

PERMIT TRUCK DIAGRAMS

No Scale

Proposed structure no. 24459 Replaces existing structure no. 671374

ODOT B.D.S. Dwg. No. 114052 adavies Text Box 2026.03.23

OHW

OHW

OHW

OHW

OHW

OHW

OHW

PT

: 2

.4

2+50 3+00 3+50 4+00

2+15 2+50 3+00 3+50 4+00 4+10

PLAN

1" = 20'

West Fork Dairy Creek

ELEVATION

1" = 20'

R/W

R/W

Extg. ground line

BR-03

BR

ID

GE

F

OU

ND

AT

IO

N

DA

TA

S

HE

ET

LEGEND

= Standard Penetration Test (SPT)

= Geotechnical Test Boring (BH)

UNIT DESCRIPTIONS

GENERAL NOTES

1. Elevations are based on National Geodetic Vertical Datum (NGVD) 29.

2. 1' contour intervals shown.

3. Geotechnical data shown on this drawing are a consolidation and/or revision in terminology from the drill logs. The drill logs used in compiling this drawing are available upon request. Contractor shall refer to geotechnical reports and drill logs and information therein.

4. The number of blows required to drive the sampler of three, 6-inch increments of penetration were recorded in the field. The sum of the blow counts for the last two 6-inch increments of penetration are reported as the ASTM Test Method D 1556 Standard Penetration Test (SPT) N-value. Samples were collected using a 1-inch inside diameter standard split spoon sampler.

ASPHALT CONCRETE

AGGREGATE BASE (GP)

SILT (ML)

Silty SAND (SM-SP)

Clayey GRAVEL (GC)

Very-stiff SILT with SAND (MH)

Very-stiff sandy CLAY with GRAVEL (CL)

SAND (SP)

N-ValueB-3 Approx. Sta. 2+30.5 Off. 21.25' lt.

B-1 Approx. Sta. 2+53.5 Off. 1.05' lt. B-2

Approx. Sta. 3+54.5 Off. 2.35' rt.

B-4 Approx. Sta. 3+91.5 Off. 10.55' lt.

B-3 El. 226.75 Jan. 2025

B-1 El. 229.15 Jan. 2025

B-2 El. 228.91 Jan. 2025

B-4 El. 227.81 Jan. 2025

26 20

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

_2

_0

_B

R-

FD

S.

dw g Pl ot S ta m p:

/2 0/

:5

7:

P M

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

C

EN

T R

A L

EN

G

IN

EE

R

IN

G S

ER

V

IC

ES

F E B R U A R Y 0 8 , 2

0 0

J U L I O C V E L A

60333PE

RENEWS: 06/30/26

OREGON

ENGINEER

RE

GIS

TERED PROFESSIONAL

ASPHALT CONCRETE (4.0 inches) Medium-dense, gray, GRAVEL (GP) (10.0 inches)

Very-soft to soft, brown, SILT (ML), trace organics (fine roots and decomposed woody debris, moist

Very-loose, gray, SAND with some silt (SM-SP), wet, sand is medium to fine

Very-loose to loose, gray, silty SAND (SP), wet, sand is medium to coarse

Very-loose, gray, SAND with silt (SM-SP), minor woody debris, wet, sand is medium to coarse

Stiff, gray, SILT with sand, (ML), moist, sand is fine to coarse

Stiff, brown and gray, clayey GRAVEL (GC), moist, gravel is subrounded to subangular

Very-stiff, bluish-gray, brown, orange, dark gray, elastic SILT with sand (MH), moist

Very-stiff, gray, brownish gray, sandy CLAY with gravel (CL), moist, gravel is angular, sand is medium to coarse

ASPHALT CONCRETE (4.0 inches) Medium-dense, gray, GRAVEL (GP) (10.0 inches)

Very-soft to soft, brown, SILT (ML), minor organics (fine roots and decomposed woody debris), moist (FILL)

Very-loose, brown, silty SAND (SM-SP), moist, sand is medium to fine

Grades to gray, SAND with some (SM-SP), wet, sand is medium

Very-loose to loose, gray, SILT with some sand (ML), wet, sand is fine

Very-loose to loose, brown, silty SAND (SM-SP), moist, sand is medium to fine

Hard, gray, SILT with sand and gravel (ML), moist, sand is fine to coarse, gravel is angular

Grades to very-stiff, gray, dark gray, SILT (ML), trace sand, moist

Very-soft to soft, brown, sandy elastic SILT (MH), minor organics, moist, sand is fine to medium

Medium-stiff to very-stiff, brown, SILT (ML), with some sand and gravel

Soft, brown, sandy elastic SILT (MH), minor organics, moist, sand is fine to medium

Very-loose, brown, silty SAND (SM-SP), trace organics, wet, sand is fine to medium

Proposed structure no. 24459 Replaces existing structure no. 671374

ODOT B.D.S. Dwg. No. 114053

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

PT

: 2

.4

2+50

3+00 3+50

W

AS

HI

NG

TO

N

CO

UN

TY

TU

RK

R

OA

D

BR

ID

GE

R

EP

LA

CE

ME

NT

OV

ER

W

ES

T

FO

RK

D

AI

RY

C

RE

EK

Fi le

: H

\2

W as hi ng to n Co un ty

C iv il_ Ro ad w ay O n- Ca ll\

- T ur k

Ro ad

B rid ge R ep la ce m en t\d es ig n\ _C

D\

CD

_2

_0

_B

R-

FP

.d w g Pl ot S ta m p:

/2 3/

1:

:2

AM

An th on y Da vi es

RE

VI

SI

ON

S

NO

OF

SHEET TITLE

SHEET NO.

PROJECT NUMBER

100762

M a y 2 3 , 2 0 13A n t h o n y R y a n Da v i e s

83895PE

RENEWS: 12/31/27

OREGON

ENG INEER

RE

GIS

TERED PROFESSIONAL

75'-0" ctr.-ctr.

PLAN

1" = 10'

West Fork Dairy Creek

C.

L.

B en t 2 St a.

+4 1.

C.

L.

B en t 1 St a.

+6 6.

* 87°8'32"

BR-04

BR

ID

GE

F

OU

ND

AT

IO

N

PL

AN

Regulated work area

Legend:

* 90°0'0"

FOUNDATION TABLE

Est. tip el.

As const.

avg. tip

El.

Cut off / top El.

Nominal Resistance

Location Type (feet) (kips/pile) Bent 1 PP18.00 x 0.625" 151.00 221.85 215.0 Bent 2 PP18.00 x 0.625" 150.00 223.32 211.0

GENERAL FOUNDATION NOTES:

All Bents, Provide PP18.00 x 0.625, ASTM A252, Grade 3 piling driven open-ended to a nominal resistance as shown in the Foundation Table.

Pile tip elevation for minimum pile penetration at all bents is shown as according to the Foundation Table. Drive piles to the specified nominal resistance using driving criteria developed from the Wave Equation Analysis and verified using a Pile Driving Analyzer and Capwap Analysis as specified in the Special Provisions.

Conduct PDA testing during pile driving and at restrike.

All bents are parallel.

* Angle measured tangent to roadway centerline and bent centerline.

1'-6" 1'-6"

3'-0"

1'-6" 1'-6"

3'-0"

0'-412"

4'-1012" pi le s pa ce s

'-3

1' -0

5'

-1 1 2"

5' -1

1"

'-0 1 2" pi le s pa ce s

'-3

1' -0

5' -6

1 4" 5'

-6 1 4"

'-0

1 2"

PIPE PILE SPLICE

Scale: 1" =…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .