100 Percent Bid Documents-Drawings-Construct Additional Parking.pdf

PDF 18 MB Posted

Attached to
Y1LZ--Construct Additional Parking Hampton VA Medical Center Federal contract opportunity
Solicitation number
36C24622B0042
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document provides details on a federal contract opportunity to construct additional parking at the Hampton VA Medical Center. The solicitation number is 36C24622B0042 and seeks to construct additional parking at the Hampton VA Medical Center in Hampton, Virginia. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. Responses to the solicitation are due on the date specified in the 100 Percent Bid Documents-Drawings file, which contains the full technical requirements and specifications for the parking construction project. The contract award date will be determined based on the response timeline and a competitive bidding process. The opportunity is open to all qualified contractors able to complete the parking construction work at the Hampton VA Medical Center by the required deadline.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--Construct Additional Parking Hampton VA Medical Center, newest first.
File Type Posted
OF 1419_36C24622B0042.pdf PDF
36C24622B0042 0003.docx DOCX document
Parking Site Visit 19 Aug 2022 Attendance.pdf PDF
Sheet G-002 Bid Deduct Alternative Remove 15 Parking Stalls.pdf PDF
Solicitation 36C24622B0042 Questions and Answers.pdf PDF
36C24622B0042 0001.docx DOCX document
S02_Solicitation_36C24622B0042_1.pdf PDF
Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
100 Percent_Specifications1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

E

T

W

A

L

L

R

E

L

O

C

A

T

E

D

C

O

V

E

R

E

D

P

A

V

IL

L

IO

N

D

N

D N

D N

DN

DN

DN

D

N

D

N

D

N

DN

DN

DN

DN

S

E

W

E

L

L

A

V

E

N

U

E

A

M

S

R

E

E

T

T

H

O

M

P

S

O

N

R

E

E

T

F

R

A

N

K

L

I

B

U

L

E

V

A

R

D

E

M

A

N

C

I

P

A

T

I

D

A V

E N

U

E

M c C

L E

L L A

N

A V

E R

IL

L A

V E

N U

E

F

R

A

N

K

L

I

N

B

O

U

L

E

V

A

R

D

M

A

R

T

L

K

G

J

U

L

E

V

A

R

D

SHORE R

OAD

H

A

R

R

I

S

A

V

E

N

U

E

H A

R R

IS

F

R

A

N

K

L

U

L

E

V

A

R

D

C

O

N

T

R

A

C

T

O

R

A

G

I

E

A

M

A

L

L

O

Y

R

E

E

T

J

O

N

C

E

E

K

SALVAGE YARD

G

R

A

V

I V

E

W

A

Y

G

R

A

V

I V

E

W

A

Y

G

R

A

V

A

D

A

V

E

N

U

E

V

D

O

T

C

G

-1

E

N

T

R

A

N

C

E

V

D

O

T

C

G

-1

E

N

T

R

A

N

C

E

DN

D

N

D

N

DN

DN

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

DN

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

D

N

I-64

PROJECT SITE

HAMPTON UNIVERSITY

JAMES RIVER

HAMPTON RIVER

H

A

M

P

T

V

E

R

JAMES RIVER

L

H

I G

H

W

M

L

L

O

L

L

E

M

A

N

C

I

P

A

T

I

S

B

R I D

VICTORIA BLVD.

R

C

U

V

D

W

O

O

D

L

A

SITE

HAMPTON VAMC CAMPUS

H

A

M

P

T

A

D

S

B

R

I D

G

E

T

U

N

N

E

L

PHOEBUS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

BID DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT ADDITIONAL

PARKING

HAMPTON VAMC - HAMPTON, VA

590-20-103

N/A

12/15/2021

Revisions: Date:

www.atriaxgroup.com

Atriax PLLC

102 3rd Avenue, NE

Hickory, NC 28601

Phone: 828.315.9962

Fax: 828.315.9964

VA Engineering License No.:

0413000750

Exp. Date: 12/31/2021

BID DOCUMENTS

12/15/2021

CONSTRUCT ADDITIONAL PARKING

AT HAMPTON VA MEDICAL CENTER

HAMPTON VA MEDICAL CENTER

100 EMANCIPATION DRIVE, HAMPTON, VA 23667

PROJECT # 590-20-103

BID DOCUMENTS

INDEX OF DRAWINGS

DWG.#SHEET # DRAWING TITLE

GENERAL

G-001

SURVEY

CIVIL

CD101

C-101

DEMOLITION PLAN

COVER SHEET

CIVIL SITE PLAN

C-50107

CIVIL DETAILS 1

C-50208

CIVIL DETAILS 2

CIVIL UTILITIES

G-00202

GENERAL NOTES

V-10103

EXISTING CONDITIONS

GEOTECH

B-10104

GEOTECHNICAL BORINGS REPORT

CG10109

GRADING PLAN

CG501

PERVIOUS PAVER DETAILS 1

CG502

PERVIOUS PAVER DETAILS 2

EC102

EC103

EROSION AND SEDIMENT CONTROL PLAN - PHASE II

POST CONSTRUCTION DRAINAGE AREAS PLAN

EC50116

EROSION AND SEDIMENT CONTROL DETAILS 1

EC50217

EROSION AND SEDIMENT CONTROL DETAILS 2

ELECTRICAL

CU10118

UTILITIES ADJUSTMENTS AND CONSTRUCTION PLAN

SCALE: NTS

PROJECT LOCATION MAP

Scale: NTS

VICINITY MAP

E-001

E-101

ELECTRICAL COVER SHEET

ELECTRICAL - SITE PLAN

E-10222

ELECTRICAL - PHOTOMETRIC PLAN

CG102

SITE BMP AND STORMWATER NETWORK PLAN

EROSION

EC10113 EROSION AND SEDIMENT CONTROL PLAN - PHASE I

MARKINGS

CP10119

SITE MARKING AND SIGNAGE PLAN

APPROVAL SIGNATURES:

COR - ILSM & ICRA DATE:

REVIEWED: AFGE DATE:

REVIEWED: NAGE DATE:

APPROVED: INFECTION CONTROL DATE:

APPROVED: CONSTRUCTION SAFETY MANAGER DATE:

APPROVED: SAFETY MANAGER DATE:

APPROVED: INDUSTRIAL HYGIENEST DATE:

APPROVED: INDUSTRIAL HYGIENEST DATE:

APPROVED: FIRE INSPECTOR DATE:

APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:

APPROVED: CHIEF, POLICE & SECURITY DATE:

APPROVED: PHYSICAL SECURITY SPECIALIST DATE:

APPROVED: OFFICE OF INFORMATION & TECHNOLOGY DATE:

APPROVED: WOMEN'S VETERAN PROGRAM MANAGER DATE:

APPROVED: CONTRACTING DATE:

APPROVED: PATIENT SAFETY MANAGER DATE:

APPROVED: HAMPTON ENERGY MANAGER DATE:

APPROVED: SUPERVISORY PROJECT ENGINEER DATE:

APPROVED: ASSISTANT CHIEF, ENGINEERING DATE:

APPROVED: CHIEF, ENGINEERING DATE:

APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:

APPROVED: CHIEF OF STAFF DATE:

APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:

APPROVED: EXECUTIVE DIRECTOR, HAMPTON VA MEDICAL CENTER DATE:

BID SCHEDULE:

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

SURFACE

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

FOUNDER'S

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

SAP

AutoCAD SHX Text

SAPLING

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

BRICK SURFACE

AutoCAD SHX Text

BRICK SURFACE

AutoCAD SHX Text

FRANKLIN BLVD.

AutoCAD SHX Text

FRANKLIN BLVD.

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

EXPAND SCI, PHASE II (CURRENTLY UNDER CONSTRUCTION)

AutoCAD SHX Text

EHH

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST. CONC. RAMP

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text

LINE

AutoCAD SHX Text

LINES

AutoCAD SHX Text

PAINTED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text

STRIPE

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST. SHRUBS (TYP.)

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

E.E.VLT.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

WALK

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

RIM=9.67

AutoCAD SHX Text F

AutoCAD SHX Text

EXIST. PLANTING BED

AutoCAD SHX Text

ACC

AutoCAD SHX Text

RAMPS

AutoCAD SHX Text 6' C.L.F.

AutoCAD SHX Text

SS

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

ACC

AutoCAD SHX Text

20" CRAPE MYRTLE

AutoCAD SHX Text

30" OAK

AutoCAD SHX Text

36" OAK

AutoCAD SHX Text

UGE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

NO PARKING FIRE LANE

AutoCAD SHX Text

48" CHAIN LINK

AutoCAD SHX Text

GRAVEL PARKING AREA

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

CONC. RAMP

AutoCAD SHX Text

18"MAPLE

AutoCAD SHX Text

4"CREPE

AutoCAD SHX Text

MYRTLE

AutoCAD SHX Text

4"CREPE

AutoCAD SHX Text

MYRTLE

AutoCAD SHX Text

SIGN(2)

AutoCAD SHX Text

INV= 2.71

AutoCAD SHX Text

RIM= 10.89

AutoCAD SHX Text

ELEC MH

AutoCAD SHX Text 148T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 138A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text 137C

AutoCAD SHX Text 137B

AutoCAD SHX Text 137A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 148B

AutoCAD SHX Text 148S

AutoCAD SHX Text 148A

AutoCAD SHX Text 148D

AutoCAD SHX Text 148C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 173A

AutoCAD SHX Text

AutoCAD SHX Text 110B

AutoCAD SHX Text 110C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 13W

AutoCAD SHX Text 27A

AutoCAD SHX Text 27B

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

AVERILL AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

BLACK AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HJM

AutoCAD SHX Text

JTK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

AutoCAD SHX Text G-001

AutoCAD SHX Text A. BID ITEM #1 - BASE BID: WORK INCLUDES ALL LABOR, MATERIAL, BID ITEM #1 - BASE BID: WORK INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION TO COMPLETE ALL WORK FOR THE ENTIRE PROJECT AS INDICATED IN THE CONTRACT DOCUMENTS, INCLUDING DEMOLITION, GRUBBING AND SOIL REMOVAL, ADJUSTMENTS TO EXISTING UTILITIES, GRADING, SITE ALTERATIONS, AND GENERAL CONSTRUCTION OF ROADS, WALKS, CURBS AND GUTTER, STORMWATER STRUCTURES AND PIPE, DRAINAGE, PERMEABLE PAVERS AND STORMWATER MANAGEMENT SYSTEMS, NECESSARY REMOVAL AND DEMOLITION OF EXISTING, RELOCATION AND STORAGE, PAVEMENT MARKING, SIGNAGE, PAINTING, AND ALL OTHER ITEMS SHOWN ON THE CONTRACT DOCUMENTS. (TIME & COST) B. BID ITEM #2 - BID DEDUCT NO. 1: CONTRACTOR SHALL PERFORM ALL BID ITEM #2 - BID DEDUCT NO. 1: CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN THE BASE BID EXCEPT DEDUCT CONSTRUCTION OF 15 PERMEABLE PARKING STALLS ALONG HARRIS AVENUE. DEDUCT TO INCLUDE GRADING, DEMOLITION AND CONSTRUCTION OF NEW CURB AND GUTTER, ASPHALT, AND BOLLARDS AT THE PARKING STALLS. ALL OTHER WORK IN THE BID DEDUCT AREA NECESSARY TO COMPLETE THE REMAINDER OF THE PROJECT BASE BID AS DESIGNED, INCLUDING UTILITIES AND STORMWATER CONNECTIONS SHALL STILL BE PERFORMED BY THE CONTRACTOR. (TIME & COST)

TEMPORARY EROSION CONTROL MEASURES

LIMITS OF CONSTRUCTION (TOTAL AREA = 1.08 AC)

LIMITS OF DISTURBANCE (TOTAL AREA = 0.927 AC)

SILT FENCE

STORM DRAIN INLET PROTECTION

DIRECTION OF FLOW

TEMPORARY CONSTRUCTION

ENTRANCE WITH FILTER FABRIC

EROSION CONTROL MEASURE (TYP.)

SEDIMENT TRAP

DRAINAGE AREA

SF

INDICATES AREAS OF DEMOLITION

INDICATES AREAS WHERE ITEMS ARE TO

BE REMOVED AND STORED ELSEWHERE

PROPOSED

PROPOSED CONTOURS

SPOT ELEVATION

SLOPE ARROW

NORTHING/EASTING POINT

UTILITIES

WATER LINE

STORM WATER LINE

BMP UNDERDRAIN

BMP CLEANOUT

YARD HYDRANT

STORMWATER STRUCTURE

SITE LEGEND

HATCH TYPES

CONCRETE PAVEMENT

ASPHALT PAVEMENT

PERVIOUS PAVERS

ST

W

(-)1.23%

4.0

EC TYP

1.23

LOD

TOPOGRAPHY/GRADING

RE

T.

W

AL

L

RELOCATED

COVERED

PAVILLION

D N

D N

D N

DN

DN

DN

DN

D N

DN

DN

DN

DN

DN

SEW

ELL

AVENUE

AM

ES

TR

EE

T

TH

O

M

PS

O N

S

TR

EE

T

FRANKLIN BOULEVARD

EM

AN

CI

PA

TI

ON

DR

AVEN

U

E

M cC

LELLAN

AVERILL AVENUE

FR

AN

KL

IN

BOULE

VARD

MARTIN L. KING JR. BOULEVARD

SHORE ROAD

HARRIS

AVENUE

HARRIS

FRANKLIN BOULEVARD

CONTRACTOR'S STAGING AREA

MALLORY STREET

JONES CREEK

SALVAGE YARD

G R

AV

EL

D R

IV

EW

AY

G R

AV

EL

D R

IV

EW

AY

G R

AV

EL

R O

AD

AVENUE

9 9

11 124

PARKING

STALLS

VDOT CG-13

ENTRANCE

VDOT CG-13

ENTRANCE

POT Sta. 50+00.00

50+00

51+00

PC Sta. 51+25.70

52+00

PT

S ta . 5

2+

.4

PI 51+76.90

53+00

54+00

55+00

56+00

57+00

58+00

PC

S ta . 5

8+

.7

59+00

PT

S ta . 5

9+

.5

60+00

61+00

62+00

63+00

64+00

PI

St a.

4+

.3

65+00

PO

T

S ta

. 6 5+

.8

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

PARKING LOT A

PARKING LOT B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

BID DOCUMENTSOffice of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT ADDITIONAL

PARKING

HAMPTON VAMC - HAMPTON, VA

590-20-103

N/A

12/15/2021Revisions: Date:

www.atriaxgroup.com

Atriax PLLC 102 3rd Avenue, NE Hickory, NC 28601 Phone: 828.315.9962 Fax: 828.315.9964

VA Engineering License No.:

0413000750 Exp. Date: 12/31/2021

BID DOCUMENTS

12/15/2021

PROJECT DESCRIPTION:

THE CONSTRUCT ADDITIONAL PARKING PROJECT INVOLVES THE CONSTRUCTION OF TWO (2)

NEW PERVIOUS PAVER PARKING LOTS, ASPHALT ROADWAY, STORMWATER, SITE LIGHTING, AND

OTHER IMPROVEMENTS/UTILITIES ADJUSTMENTS.

THIS WILL REQUIRE INSTALLING EROSION CONTROL MEASURES, THE DEMOLITION OF EXISTING

FEATURES, GRADING THE SITE, CONSTRUCTION OF NEW STORMWATER FACILITIES AND

PERVIOUS PAVER PARKING LOTS, NEW UTILITIES, CONCRETE CURB AND GUTTER, AND ASPHALT

ROADWAY. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY TO COMPLETE

THE PROJECT AS DESIGNED. CONTRACTOR SHALL COORDINATE ANY UTILITIES OUTAGES WITH

THE OWNER.

GENERAL NOTES:

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. SCHEDULE ALL ON-SITE INSPECTIONS

WITH THE PROJECT COR.

2. CONTRACTOR SHALL COMPLY WITH ALL NATIONAL BUILDING (UBC), PLUMBING, ELECTRICAL

CODES, & VA STANDARDS.

3. CONTRACTOR SHALL COMPLY WITH OSHA, EPA, NFPA, AND ALL OTHER APPLICABLE SAFETY

CODES AND REGULATIONS AT ALL TIMES.

4. ALL WORK SHALL BE PER VA AND PLAN SPECIFICATIONS AND DETAILS. SHOULD WORK

DEVIATE OR CHANGES BE NECESSITATED, CONTACT THE COR IMMEDIATELY.

5. PROVIDE FINISH QUALITY REPAIR AS A RESULT OF ALL DEMOLITION.

6. SUBMITTALS AND COR APPROVAL REQUIRED ON ALL NEW MATERIALS.

7. VA HAS DEDICATED CONTRACTOR LAYDOWN YARDS ON SITE. CONTRACTOR TO CONTACT

VA FOR LOCATION PRIOR TO START OF CONSTRUCTION FOR ACCESS TO CONTRACTOR

LAYDOWN YARDS. LOCATIONS IN YARDS ARE ASSIGNED BY THE VA.CONTRACTOR STAGING

AND ACCESS SHALL BE FINALIZED AT THE PRE-CONSTRUCTION MEETING.

8. ALL WORK SHALL BE PERFORMED BY CRAFTSMEN WHO ARE JOURNEYMEN OF THE TRADE

IN WHICH THEY ARE PERFORMING WORK.

9. CONTRACTOR SUPERINTENDENT SHALL REPORT TO THE PROJECT COR EACH MORNING

BEFORE WORK BEGINS, AT WHICH TIME THE DAILY SCHEDULE SHALL BE DISCUSSED.

10. CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A NEAT AND ORDERLY FASHION AT ALL

TIMES. WALKWAYS SHALL BE KEPT CLEAR OF ALL DEBRIS AND OBSTRUCTIONS TO ALLOW

SAFE PASSAGE FOR EMPLOYEES, PATIENTS, VISITORS AND WORKERS. DISPOSE OF ALL

TRASH AND DISCARDED MATERIALS, AND MAINTAIN STORAGE ONLY WITHIN THE CONFINES

OF THE JOB SITE OR OTHER APPROVED AREAS.

11. ALL TRASH SHALL BE CORRECTLY DISPOSED OF IN BINS OR DUMPSTERS.

12. ANY WASTE MATERIALS ENCOUNTERED IN THE PROJECT SHALL BE LEGALLY DISPOSED OF

BY THE CONTRACTOR.

13. ANY WASTE PRODUCED DURING CONSTRUCTION SHALL BE DISPOSED OF PROPERLY.

LITTER AND GARBAGE SHALL NEVER BE LEFT ANYWHERE EXCEPT IN A RUBBISH BIN,

DUMPSTER, OR OTHER APPROVED LOCATION. TRASH SHALL NOT BE BURIED ON SITE OR

LEFT IN TRENCHES. SITE SHALL BE CLEANED AND FREE OF TRASH AT END OF EACH

WORKING DAY.

14. WALKWAYS TO BE KEPT OPEN DURING CONSTRUCTION ARE MARKED ON PLANS. THESE

ARE TO BE MADE PASSABLE BY LEAVING EXISTING PAVING IN PLACE, USING GRAVEL TO

CREATE A WALKWAY DURING CONSTRUCTION, AND SHALL ONLY BE CLOSED TO PUBLIC

USE FOR THE MINIMUM AMOUNT OF TIME NEEDED TO DEMOLISH EXISTING PAVING, AND

COMPLETE CURB, SIDEWALK, AND ASPHALT PLACEMENT AND CURING.

15. ALL DAMAGES INCURRED TO ADJACENT AREAS SHALL BE REPAIRED AND RESTORED TO

ORIGINAL CONDITION BY THE CONTRACTOR AT NO COST TO THE VA.

16. ALL MATERIALS REMOVED SHALL BECOME PROPERTY OF THE CONTRACTOR, TO BE

DISPOSED OF OFF-SITE, UNLESS SCHEDULED TO BE REINSTALLED OR TURNED OVER TO

THE VA.

17. CONTRACTOR SUPERINTENDENT SHALL CARRY A PHONE AT ALL TIMES. FURNISH NUMBERS

TO THE PROJECT COR UPON CONTRACT AWARD.

18. CONTRACTOR SHALL SCHEDULE ALL UTILITY INTERRUPTIONS WITH THE PROJECT COR AT

LEAST FOURTEEN (14) DAYS IN ADVANCE. UTILITY INTERRUPTIONS MAY REQUIRE OVERTIME

WORK FOR ALL TRADES INVOLVED, AND SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE VA.

19. ANY MANUFACTURER'S TRADE NAMES USED TO HEREIN IDENTIFY A MINIMUM STANDARD &

NOT A PRODUCT ENDORSEMENT. SUBJECT TO THE APPROVAL OF THE CONTRACTING

OFFICER AND HIS/HER REPRESENTATIVE, OTHER PRODUCTS SHALL BE CONSIDERED,

PROVIDED THEY ARE EQUIVALENT TO THESE STANDARDS AND MEET THE REQUIREMENTS

OF THE VA TECHNICAL SPECIFICATIONS AND DRAWINGS.

20. ALL UTILITIES LOCATIONS SHALL BE CONFIRMED AND MARKED BY THE CONTRACTOR.

21. CALL BEFORE YOU DIG. USE 811 AND UTILITIES LOCATE IN CONJUNCTION WITH PLANS TO

DETERMINE SUBSURFACE UTILITIES LOCATION. USE CAUTION. WHEN DIGGING. THE SAFETY

OF CONSTRUCTION WORKERS, THE HOSPITAL STAFF, AND PATIENTS OF THE HOSPITAL ARE

PARAMOUNT. WHEN IN DOUBT, STOP, CALL, AND VERIFY.

22. WHEN DELIVERIES OF MATERIALS AND EQUIPMENT REQUIRE USE OF INTERNAL VA ROADS,

CONTACT THE COR TO COORDINATE DELIVERY TIMES, AND EQUIPMENT ACCESS ROUTES

ON THE CAMPUS TO MINIMIZE DISRUPTION TO THE NORMAL OPERATIONS OF THE

HOSPITAL.

23. CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY UNEXPECTED CONDITIONS ON

SITE.

ABBREVIATIONS

BMP - BEST MANAGEMENT PRACTICE

BOC - BACK OF CURB

C.O. - CLEANOUT

CLF - CHAIN LINK FENCE

EF - EACH FACE

EOP - EDGE OF PAVEMENT

EW - EACH WAY

FFE - FINISHED FLOOR ELEVATION

FL - FLOWLINE

FT - FEET

FND. - FOUNDATION

M.H. - MANHOLE

RCP - REINFORCED CONCRETE PIPE

SF - SQUARE FEET

CY - CUBIC YARDS

(TBR) - TO BE REMOVED

PRE-CONSTRUCTION RISK ASSESSMENT/EVALUATION

FIRE SAFETY NOTES:

1. ALL FIRE HYDRANTS SHALL BE INSPECTED AND TESTED AT THE COMPLETION OF

CONSTRUCTION AT NO ADDITIONAL COST TO THE VA TO ENSURE THAT NO INADVERTENT

DAMAGE HAS OCCURRED TO THEM OR THEIR SUPPLY PIPING DURING CONSTRUCTION.

EROSION CONTROL MAINTENANCE NOTES:

1. ALL EROSION, INLET PROTECTION, AND SEDIMENT CONTROL MEASURES SHALL BE

CHECKED FOR STABILITY AND OPERATION AT LEAST ONCE A WEEK AND WITHIN 24 HOURS

AFTER ANY STORM EVENT GREATER THAN ONE-QUARTER OF A INCH (DURING A 24-HOUR

PERIOD). CONTRACTOR SHALL TAKE IMMEDIATE CORRECTIVE ACTION FOR ANY DEVICE

FAILURE

2. CONTRACTOR SHALL INSPECT ALL OUTFLOWS WHERE STORMWATER RUNOFF LEAVES THE

CONSTRUCTION SITE OR ENTERS AN EXISTING STORMWATER SYSTEMS, BMP, OR

WETLAND. CORRECTIVE ACTION MUST BE TAKEN IF SEDIMENT IS DEPOSITED OFF SITE, OR

INTO THE STORMWATER SYSTEM, BMP, OR WETLAND.

3. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT

0.5 FT DEEP AT THE FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO

MAINTAIN THE BARRIER.

4. TEMPORARY SEEDING MEASURES TAKEN TO STABILIZE THE SITE SHALL BE

APPROPRIATELY MAINTAINED, INCLUDING CUTTING AND FERTILIZING.

5. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEED AS NECESSARY, AND MULCHED AS

SPECIFIED TO MAINTAIN VIGOROUS, DENSE VEGETATIVE COVER.

6. ALL TEMPORARY DIVERSIONS SHALL BE MAINTAINED AND RESHAPED WHEN REQUIRED AS

THE GRADE OF SITE CHANGES TO MAINTAIN FUNCTIONALITY, OR WHEN DAMAGED DURING

CONSTRUCTION.

7. ALL STORMWATER INLETS AND INLET PROTECTION ARE TO BE KEPT CLEAR OF DEBRIS, OR

SEDIMENT SHOULD ANY ACCUMULATE.

8. WHEN SILT FENCE ARE DAMAGED, CORRECTIVE ACTION SHALL BE TAKEN IMMEDIATELY TO

RECONSTRUCT AND RESTORE THE SILT FENCE. AT NO POINT SHALL SILT FENCE BE LEFT

DAMAGED OR NON FUNCTIONAL ON THE SITE DUE TO INSUFFICIENT

MAINTENANCE/CORRECTIVE MEASURES.

9. ROADS ARE TO BE KEPT CLEAR OF DEBRIS OR SEDIMENT.

10. CONSTRUCTION ENTRANCES ARE TO BE MAINTAINED TO ENSURE CONTINUED

FUNCTIONALITY THROUGHOUT THE PROJECT.

11. RECORDS SHALL BE KEPT OF ALL INSPECTIONS AND ANY CORRECTIVE ACTIONS TAKEN BY

THE CONTRACTOR.

LEGEND:SITE FLOOD MAP INFORMATION:

1. SITE IS PART OF HAMPTON VA MEDICAL CENTER: 100 EMANCIPATION DRIVE, HAMPTON,

VIRGINIA 23667.

2. PROJECT LOCATION ON FEMA FIRM MAP: 5155270026H

3. DATE MAP WAS APPROVED FOR USE: 05/16/2016

4. DATE MAP WAS ACCESSED: 07/08/2021

5. PROJECT SITE IS LOCATED IN A SPECIAL FLOOD HAZARD AREAS:

5.1. ZONE AE (EL. 8)

5.2. ZONE AE (EL. 7).

CONTRACTOR LAYDOWN YARD

HAMPTON RIVER

JAMES RIVER

SCALE: 1" = 250'2 VICINITY MAP

HAMPTON VA MEDICAL CENTER CONSTRUCTION RISK ASSESSMENT/EVALUATION

PROJECT NAME: CONSTRUCT ADDITIONAL PARKING ASSESSMENT DATE: 16-AUG-2021

EXPECTED IMPACTS PLANS/MEASURES TO ADDRESS IMPACTS

PROJECT LOCATION: HAMPTON VAMC

RISK ASSESSMENT REQUIRED BASED ON VICINITY

OF PATIENT CARE AREAS?

Y N

SUBJECT TO CHANGE DURING CONSTRUCTION PHASE: N/A

PPD/TB RISK ASSESSMENT COMPLETED: N/A

NON-PATIENT CARE AREA NO TB SCREENING: N/A

ANY SYSTEM INTERRUPTIONS ARE TO BE MINIMIZED AND PRECEDED BY THE COR'S

AND THE VAMC'S WRITTEN APPROVAL A MINIMUM OF 48 HOURS IN ADVANCE AND

COORDINATED WITH ALL AFFECTED USERS.

ANY SYSTEM INTERRUPTIONS ARE TO BE MINIMIZED AND PRECEDED BY THE COR'S

AND THE VAMC'S WRITTEN APPROVAL A MINIMUM OF 48 HOURS IN ADVANCE AND

COORDINATED WITH ALL AFFECTED USERS.

ANY SYSTEM INTERRUPTIONS ARE TO BE MINIMIZED AND PRECEDED BY THE COR'S

AND THE VAMC'S WRITTEN APPROVAL A MINIMUM OF 48 HOURS IN ADVANCE AND

COORDINATED WITH ALL AFFECTED USERS.

ANY SYSTEM INTERRUPTIONS ARE TO BE MINIMIZED AND PRECEDED BY THE COR'S

AND THE VAMC'S WRITTEN APPROVAL A MINIMUM OF 48 HOURS IN ADVANCE AND

COORDINATED WITH ALL AFFECTED USERS.

N/A

ANY SYSTEM INTERRUPTIONS ARE TO BE MINIMIZED AND PRECEDED BY THE COR'S

AND THE VAMC'S WRITTEN APPROVAL A MINIMUM OF 48 HOURS IN ADVANCE AND

COORDINATED WITH ALL AFFECTED USERS.

PROVIDE DUST CONTROL THROUGH USE OF WATER TRUCKS OR OTHER METHODS

AS NECESSARY TO REDUCE USE.

MAKE ALL AFFECTED STAFF AWARE.

CONSTRUCTION BARRIERS AND DETOUR SIGNS WILL BE PROVIDED AS REQUIRED

TO DIRECT TRAFFIC. TRAFFIC INTERRUPTIONS WILL BE MINIMIZED DURING

CONSTRUCTION AND WILL ONLY OCCUR WHEN ABSOLUTELY NECESSARY.

N/A

N/A

MAKE ALL AFFECTED STAFF AWARE.

NO OUTAGES ANTICIPATED

MINOR VIBRATIONS MAY OCCUR DUE TO

MOVEMENT OF CONSTRUCTION EQUIPMENT

AND COMPACTION OF CONSTRUCTION

MATERIAL.

MINOR DUST (EXTERIOR ONLY) MAY BE CREATED

DURING CONSTRUCTION.

MINOR NOISE ISSUES MAY BE CREATED

DURING CONSTRUCTION.

NO OUTAGES REQUIRED.

NONE PROJECTED.

TRAFFIC FLOW WILL BE MODIFIED FOR

CONSTRUCTION OF THE PROJECT. TRAFFIC

WILL BE RESTRICTED TO ONE LANE DURING

MULTIPLE PHASES. DISRUPTIONS WILL BE

LIMITED TO OFF-HOURS WHENEVER POSSIBLE.

TEMPORARY WALLS, BARRIERS, AND

FENCES WILL BE INSTALLED TO SEPARATE

CONSTRUCTION AREA FROM PATIENTS AND

STAFF.

PLUMBING OUTAGES

MECHANICAL OUTAGES

ELECTRICAL OUTAGES

MISCELLANEOUS

OUTAGES

FIRE ALARM

VIBRATIONS

DUST (INFECTION

CONTROL)/(AIR QUALITY)

NOISE

EQUIPMENT

CREATION OR SPREAD

OF CONTAMINANTS

TRAFFIC FLOW PATTERNS

LIMITS OF

CONSTRUCTION,

BARRIER LOCATIONS

HVAMC 2021 ANNUAL

TB RISK ASSESSMENT

LEVEL IS LOW

NO OUTAGES ANTICIPATED

NO OUTAGES ANTICIPATED

NO OUTAGES ANTICIPATED

NO OUTAGES ANTICIPATED

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

GRAPHIC SCALE

1" = 250'

250'0 500'125'

SCALE: 1"=30'1 BID DEDUCT ALTERNATIVE

BID DEDUCT ALTERNATIVE:

REMOVE 15 PARKING STALLS

JONES CREEK

HAMPTON UNIVERSITY

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

SURFACE

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

FOUNDER'S

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

SAP

AutoCAD SHX Text

SAPLING

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

BRICK SURFACE

AutoCAD SHX Text

BRICK SURFACE

AutoCAD SHX Text

FRANKLIN BLVD.

AutoCAD SHX Text

FRANKLIN BLVD.

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

EXPAND SCI, PHASE II (CURRENTLY UNDER CONSTRUCTION)

AutoCAD SHX Text

EHH

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST. CONC. RAMP

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text

LINE

AutoCAD SHX Text

LINES

AutoCAD SHX Text

PAINTED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text

STRIPE

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST. SHRUBS (TYP.)

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

E.E.VLT.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

WALK

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

RIM=9.67

AutoCAD SHX Text F

AutoCAD SHX Text

EXIST. PLANTING BED

AutoCAD SHX Text

ACC

AutoCAD SHX Text

RAMPS

AutoCAD SHX Text 6' C.L.F.

AutoCAD SHX Text

SS

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

ACC

AutoCAD SHX Text

20" CRAPE MYRTLE

AutoCAD SHX Text

30" OAK

AutoCAD SHX Text

36" OAK

AutoCAD SHX Text

UGE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

NO PARKING FIRE LANE

AutoCAD SHX Text

48" CHAIN LINK

AutoCAD SHX Text

GRAVEL PARKING AREA

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

CONC. RAMP

AutoCAD SHX Text

18"MAPLE

AutoCAD SHX Text

4"CREPE

AutoCAD SHX Text

MYRTLE

AutoCAD SHX Text

4"CREPE

AutoCAD SHX Text

MYRTLE

AutoCAD SHX Text 148T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 138A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text 137C

AutoCAD SHX Text 137B

AutoCAD SHX Text 137A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 148B

AutoCAD SHX Text 148S

AutoCAD SHX Text 148A

AutoCAD SHX Text 148D

AutoCAD SHX Text 148C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 173A

AutoCAD SHX Text

AutoCAD SHX Text 110B

AutoCAD SHX Text 110C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 13W

AutoCAD SHX Text 27A

AutoCAD SHX Text 27B

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

AVERILL AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

BLACK AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

AutoCAD SHX Text

CHH

AutoCAD SHX Text

1-STY. METAL #95 FFE=5.99

AutoCAD SHX Text

1-STY. METAL BOAT HOUSE FFE=3.94

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

2-STY. BRICK #27

AutoCAD SHX Text

FFE=8.30

AutoCAD SHX Text

FFE=9.19

AutoCAD SHX Text

FFE=4.17

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

EMH RIM=5.06

AutoCAD SHX Text

UNK

AutoCAD SHX Text

UNK

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

EOI

AutoCAD SHX Text

UNK-VAULT

AutoCAD SHX Text

CONC. BULKHEAD

AutoCAD SHX Text

CONC. PORCH & STEPS

AutoCAD SHX Text

CONC. DECK & STEPS

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text

3-STY. BRICK #27

AutoCAD SHX Text

FFE=5.23

AutoCAD SHX Text

#27A FFE=4.02

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text A/C(5)

AutoCAD SHX Text

EMS(5)

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

UNK-HH

AutoCAD SHX Text

BOLLARDS(2)

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

(8"QLC)

AutoCAD SHX Text

EOI

AutoCAD SHX Text

EOI

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

CLEAT

AutoCAD SHX Text

CLEAT

AutoCAD SHX Text

CONC. BULKHEAD

AutoCAD SHX Text

CONC. BULKHEAD

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HJM

AutoCAD SHX Text

JTK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

G-002

SURVEY NOTES:

1. THE MERIDIAN SOURCE OF THIS TOPOGRAPHIC SURVEY IS BASED ON THE VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM (NAVD88). THE PROJECT MERIDIAN WAS ESTABLISHED USING GPS METHODS

AND WAS INITIATED AT NGS CONTROL MONUMENT "VETERAN 1941" AND "COHEN 1958"

2. ELEVATIONS REFER TO NAVD 1988.

3. THIS SURVEY WAS PREPARED TO SHOW EXISTING FEATURES AS OF SEPTEMBER 4, 2020 AND SEPTEMBER 15, 2020 AND DOES NOT CERTIFY TO CHANGES TO SITE CONDITIONS WHICH OCCUR SUBSEQUENT TO THIS DATE AND OR TO PROPOSED

IMPROVEMENTS.

4. THIS SURVEY DOES NOT CONSTITUTE A BOUNDARY SURVEY NOR A SUBDIVISION OF LAND.

5. PIPE MATERIAL TYPES ARE DETERMINED BY FIELD OBSERVATIONS TO THE BEST OF OUR ABILITY. PMI DOES NOT WARRANT

THE MATERIAL TYPE OF PIPES LOCATED IN CONFINED OR INACCESSIBLE SPACES.

6. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN DESIGNATED BY ACCUMARK SUBSURFACE UTILITY SERVICES UNDER THE DIRECT AND RESPONSIBLE CHARGE OF MIKE SCHWARTZ. THE DESIGNATION CONFORMS TO THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA 9CI/ASCE 38-02) FOR QUALITY LEVEL (QL) B. THE HAMPTON VAMC ALSO CONTACTED DISCOVERY UNDERGROUND LOCATING

COMPANY TO COMPLETE THE UTILITY DESIGNATIONS THAT ACCUMARK COULD NOT DESIGNATE.

7. THE TOPOGRAPHY AND PHYSICAL FEATURES SHOWN ON THIS MAP WERE OBTAINED UNDER THE DIRECT AND RESPONSIBLE CHARGE AND SUPERVISION OF, FRANK WINEINGER, LS. FROM AN ACTUAL GROUND SURVEY. THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON 09/04/2020 THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA MEETS MINIMUM ACCURACY

STANDARDS UNLESS OTHERWISE NOTED.

8. THIS TOPOGRAPHIC SURVEY WAS PREPARED/COMPILED BY: PRECISION MEASUREMENTS, INC.

PMI PROJECT #20237

SCALE: 1" = 20'

TOPOGRAPHIC SURVEY AT VETERANS AFFAIRS MEDICAL CENTER

ADDITIONAL PARKING - HAMPTON, VIRGINIA

AIR CONDITIONER

CABLE HAND HOLE

ELECTRIC HAND HOLE

ELECTRIC METER

ELECTRIC MANHOLE

LEGEND

STORM PIPES

FORCE MAIN

UNDERGROUND GAS LINE

UNDERGROUND FIBER OPTICS

CURB DRAINAGE INLET

TEMPORARY BENCH MARK

TRAVERSE POINT

SIGN

SANITARY FORCE MAIN VALVE

LIGHT POLE

UNDERGROUND WATER

UNDERGROUND TELEPHONE

WATER VALVE

POST INDICATOR VALVE

SHRUB

FIRE HYDRANT

HIGH DENSITY PLASTIC PIPE

SIZE/CURB & GUTTER

SIZE/CONCRETE CURB

ASPHALT SURFACE

CHAIN LINK FENCE WITH BARBED WIRE

METAL FENCE

BUILDING LINE

UNDERGROUND ELECTRIC

QUALITY LEVEL C

UNKNOWN

BOLLARD

END OF INFORMATION

CLEAT

BOTTOM OF STRUCTURE

POLYVINYL CHLORIDE

PRECISION MEASUREMENTS, INC.

SURVEYORS - GPS - GIS - MAPPING - 3-D LASER SCANNING

11835 CANON BLVD., SUITE B103

NEWPORT NEWS, VA. 23606

(757) 595-7570

WWW.PRECISIONMEASUREMENTS.COM

VIRGINIA BEACH - NEWPORT NEWS - RICHMOND, VIRGINIA

RE

T.

W

AL

L

RELOCATED

COVERED

PAVILLION

D N

D N

D N

DN

DN

DN

DN

D N

DN

DN

DN

DN

DN

SEW

ELL

AVENUE

AM

ES

TR

EE

T

TH

O

M

PS

O N

S

TR

EE

T

FRANKLIN BOULEVARD

EM

AN

CI

PA

TI

ON

DR

AVEN

U

E

M cC

LELLAN

AVERILL AVENUE

FR

AN

KL

IN

BOULE

VARD

MARTIN L. KING JR. BOULEVARD

SHORE ROAD

HARRIS

AVENUE

HARRIS

FRANKLIN BOULEVARD

CONTRACTOR'S STAGING AREA

MALLORY STREET

JONES CREEK

SALVAGE YARD

G R

AV

EL

D R

IV

EW

AY

G R

AV

EL

D R

IV

EW

AY

G R

AV

EL

R O

AD

AVENUE

VDOT CG-13

ENTRANCE

VDOT CG-13

ENTRANCE

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

BID DOCUMENTSOffice of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT ADDITIONAL

PARKING

HAMPTON VAMC - HAMPTON, VA

590-20-103

N/A

12/15/2021Revisions: Date:

www.atriaxgroup.com

Atriax PLLC 102 3rd Avenue, NE Hickory, NC 28601 Phone: 828.315.9962 Fax: 828.315.9964

VA Engineering License No.:

0413000750 Exp. Date: 12/31/2021

BID DOCUMENTS

12/15/2021

GRAPHIC SCALE

1" = 200'

200'0 400'100'

Scale: 1"=20'2 EXISTING CONDITIONS PLAN

Scale: 1"=200'1 HAMPTON VA MEDICAL CENTER OVERALL SITE MAP

SITE LOCATION

GRAPHIC SCALE

1" = 20'

20'0 40'10'

AutoCAD SHX Text N= 3,536,758.727

AutoCAD SHX Text E=12,114,208.604

AutoCAD SHX Text

ELEV=4.43

AutoCAD SHX Text

NAIL SPIKE #7001

AutoCAD SHX Text

CHH

AutoCAD SHX Text

EHH

AutoCAD SHX Text

EHH

AutoCAD SHX Text

EHH

AutoCAD SHX Text

EM

AutoCAD SHX Text

EM

AutoCAD SHX Text

EM

AutoCAD SHX Text

EM

AutoCAD SHX Text

EM

AutoCAD SHX Text

EM

AutoCAD SHX Text E

AutoCAD SHX Text

1-STY. METAL #95 FFE=5.99

AutoCAD SHX Text 48"C&G

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

42"VG

AutoCAD SHX Text

CDI #103 RIM=3.80 INV=0.90(SE) INV=0.88(NW)

AutoCAD SHX Text

CDI #102 RIM=3.80 INV=1.41(W) INV=1.37(N)

AutoCAD SHX Text

CDI #101 RIM=4.08 INV=1.63(SW) INV=1.62(E)

AutoCAD SHX Text

CDI #100 RIM=4.02 INV=1.82

AutoCAD SHX Text

1-STY. METAL BOAT HOUSE FFE=3.94

AutoCAD SHX Text

VET'S COVERED SHELTER ON CONC.

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

2-STY. BRICK #27

AutoCAD SHX Text

FFE=8.30

AutoCAD SHX Text

FFE=9.19

AutoCAD SHX Text

FFE=4.17

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

8"HDPP

AutoCAD SHX Text

8"CLAY

AutoCAD SHX Text

8"CLAY

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

EMH RIM=5.06

AutoCAD SHX Text

UNK

AutoCAD SHX Text

UNK

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

FH

AutoCAD SHX Text

PIV

AutoCAD SHX Text

WV

AutoCAD SHX Text

L/P BASE

AutoCAD SHX Text L/P

AutoCAD SHX Text

EM

AutoCAD SHX Text

WV

AutoCAD SHX Text

SFMV

AutoCAD SHX Text

6"CC

AutoCAD SHX Text

SFM-VAULT

AutoCAD SHX Text

EOI

AutoCAD SHX Text

UNK-VAULT

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

8'CLF W/BW

AutoCAD SHX Text

8'CLF W/BW

AutoCAD SHX Text

GATE

AutoCAD SHX Text

8'CLF

AutoCAD SHX Text

3'SILT FENCE

AutoCAD SHX Text

4'MF

AutoCAD SHX Text

CONC. BULKHEAD

AutoCAD SHX Text

UNK

AutoCAD SHX Text

CONC. PORCH & STEPS

AutoCAD SHX Text

CONC. DECK & STEPS

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

WV

AutoCAD SHX Text

SIGN

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text 30"C&G

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text

8'CLF W/BW

AutoCAD SHX Text

SAPLINGS

AutoCAD SHX Text

SHRUBS

AutoCAD SHX Text

SHRUBS

AutoCAD SHX Text

PLANTED

AutoCAD SHX Text

3-STY. BRICK #27

AutoCAD SHX Text

FFE=5.23

AutoCAD SHX Text

#27A FFE=4.02

AutoCAD SHX Text

BOLLARDS(3)

AutoCAD SHX Text A/C(5)

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

EMS(5)

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

UNK-HH

AutoCAD SHX Text

BOLLARDS(2)

AutoCAD SHX Text

GATE

AutoCAD SHX Text 3.83

AutoCAD SHX Text 3.66

AutoCAD SHX Text 3.76

AutoCAD SHX Text 3.81

AutoCAD SHX Text 3.63

AutoCAD SHX Text 3.66

AutoCAD SHX Text 3.96

AutoCAD SHX Text 3.81

AutoCAD SHX Text 3.71

AutoCAD SHX Text 3.99

AutoCAD SHX Text 3.98

AutoCAD SHX Text 4.49

AutoCAD SHX Text 4.36

AutoCAD SHX Text 4.32

AutoCAD SHX Text 4.38

AutoCAD SHX Text 4.52

AutoCAD SHX Text 4.39

AutoCAD SHX Text 4.33

AutoCAD SHX Text 4.18

AutoCAD SHX Text 4.28

AutoCAD SHX Text 4.32

AutoCAD SHX Text 4.17

AutoCAD SHX Text 4.57

AutoCAD SHX Text 4.43

AutoCAD SHX Text 4.21

AutoCAD SHX Text 4.21

AutoCAD SHX Text 4.46

AutoCAD SHX Text 4.06

AutoCAD SHX Text 4.13

AutoCAD SHX Text 4.51

AutoCAD SHX Text 4.28

AutoCAD SHX Text 4.14

AutoCAD SHX Text 4.00

AutoCAD SHX Text 4.01

AutoCAD SHX Text 4.71

AutoCAD SHX Text 4.42

AutoCAD SHX Text 4.51

AutoCAD SHX Text 4.13

AutoCAD SHX Text 4.19

AutoCAD SHX Text 4.06

AutoCAD SHX Text 4.20

AutoCAD SHX Text 4.01

AutoCAD SHX Text 3.95

AutoCAD SHX Text 3.38

AutoCAD SHX Text 3.45

AutoCAD SHX Text 3.44

AutoCAD SHX Text 3.44

AutoCAD SHX Text 3.40

AutoCAD SHX Text 3.84

AutoCAD SHX Text 3.81

AutoCAD SHX Text 3.70

AutoCAD SHX Text 4.41

AutoCAD SHX Text 3.89

AutoCAD SHX Text 3.98

AutoCAD SHX Text 3.80

AutoCAD SHX Text 3.57

AutoCAD SHX Text 3.51

AutoCAD SHX Text 4.00

AutoCAD SHX Text 3.44

AutoCAD SHX Text 4.05

AutoCAD SHX Text 3.41

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.73

AutoCAD SHX Text 3.5

AutoCAD SHX Text 4.5

AutoCAD SHX Text 4.3

AutoCAD SHX Text 4.1

AutoCAD SHX Text 4.2

AutoCAD SHX Text 3.9

AutoCAD SHX Text 3.8

AutoCAD SHX Text 3.7

AutoCAD SHX Text 3.7

AutoCAD SHX Text 3.9

AutoCAD SHX Text 3.7

AutoCAD SHX Text 4.8

AutoCAD SHX Text 5.0

AutoCAD SHX Text 4.5

AutoCAD SHX Text 4.4

AutoCAD SHX Text 4.6

AutoCAD SHX Text 4.6

AutoCAD SHX Text 4.5

AutoCAD SHX Text 4.3

AutoCAD SHX Text 3.8

AutoCAD SHX Text 4.1

AutoCAD SHX Text 4.5

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.42

AutoCAD SHX Text 3.54

AutoCAD SHX Text 3.59

AutoCAD SHX Text 3.40

AutoCAD SHX Text 3.50

AutoCAD SHX Text 3.36

AutoCAD SHX Text 3.23

AutoCAD SHX Text 3.51

AutoCAD SHX Text 3.54

AutoCAD SHX Text 4.04

AutoCAD SHX Text 3.91

AutoCAD SHX Text 3.92

AutoCAD SHX Text 3.90

AutoCAD SHX Text 4.08

AutoCAD SHX Text 3.90

AutoCAD SHX Text 3.90

AutoCAD SHX Text 3.75

AutoCAD SHX Text 3.86

AutoCAD SHX Text 3.96

AutoCAD SHX Text 3.70

AutoCAD SHX Text 4.10

AutoCAD SHX Text 3.95

AutoCAD SHX Text 3.74

AutoCAD SHX Text 3.79

AutoCAD SHX Text 3.97

AutoCAD SHX Text 3.73

AutoCAD SHX Text 3.69

AutoCAD SHX Text 4.05

AutoCAD SHX Text 3.86

AutoCAD SHX Text 3.68

AutoCAD SHX Text 3.56

AutoCAD SHX Text 3.40

AutoCAD SHX Text 3.29

AutoCAD SHX Text 3.40

AutoCAD SHX Text 3.55

AutoCAD SHX Text 3.33

AutoCAD SHX Text 3.58

AutoCAD SHX Text 3.59

AutoCAD SHX Text 3.36

AutoCAD SHX Text 3.67

AutoCAD SHX Text 3.66

AutoCAD SHX Text 3.56

AutoCAD SHX Text 3.44

AutoCAD SHX Text 3.48

AutoCAD SHX Text 3.56

AutoCAD SHX Text 3.49

AutoCAD SHX Text 3.68

AutoCAD SHX Text 3.65

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.43

AutoCAD SHX Text 3.44

AutoCAD SHX Text 3.32

AutoCAD SHX Text 3.16

AutoCAD SHX Text 3.64

AutoCAD SHX Text 3.59

AutoCAD SHX Text 4.27

AutoCAD SHX Text 4.17

AutoCAD SHX Text 4.19

AutoCAD SHX Text 4.02

AutoCAD SHX Text 3.91

AutoCAD SHX Text 3.90

AutoCAD SHX Text 3.88

AutoCAD SHX Text 4.03

AutoCAD SHX Text 3.85

AutoCAD SHX Text 3.90

AutoCAD SHX Text 3.66

AutoCAD SHX Text 3.84

AutoCAD SHX Text 3.92

AutoCAD SHX Text 3.70

AutoCAD SHX Text 3.73

AutoCAD SHX Text 3.73

AutoCAD SHX Text 3.97

AutoCAD SHX Text 3.92

AutoCAD SHX Text 3.62

AutoCAD SHX Text 3.75

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.99

AutoCAD SHX Text 4.26

AutoCAD SHX Text 3.89

AutoCAD SHX Text 3.75

AutoCAD SHX Text 3.61

AutoCAD SHX Text 3.55

AutoCAD SHX Text 4.59

AutoCAD SHX Text 3.82

AutoCAD SHX Text 3.77

AutoCAD SHX Text 3.61

AutoCAD SHX Text 3.83

AutoCAD SHX Text 3.74

AutoCAD SHX Text 3.94

AutoCAD SHX Text 3.68

AutoCAD SHX Text 3.93

AutoCAD SHX Text 3.85

AutoCAD SHX Text 3.80

AutoCAD SHX Text 3.89

AutoCAD SHX Text 5.05

AutoCAD SHX Text 5.10

AutoCAD SHX Text 4.00

AutoCAD SHX Text 4.03

AutoCAD SHX Text 4.00

AutoCAD SHX Text 4.02

AutoCAD SHX Text 3.98

AutoCAD SHX Text 3.90

AutoCAD SHX Text 3.49

AutoCAD SHX Text 3.79

AutoCAD SHX Text 4.04

AutoCAD SHX Text 3.83

AutoCAD SHX Text 4.16

AutoCAD SHX Text 3.8

AutoCAD SHX Text 4.38

AutoCAD SHX Text 4.24

AutoCAD SHX Text 4.25

AutoCAD SHX Text 4.4

AutoCAD SHX Text 4.5

AutoCAD SHX Text 4.2

AutoCAD SHX Text 4.07

AutoCAD SHX Text 4.20

AutoCAD SHX Text 4.27

AutoCAD SHX Text 4.34

AutoCAD SHX Text 4.90

AutoCAD SHX Text 3.97

AutoCAD SHX Text 4.07

AutoCAD SHX Text 4.32

AutoCAD SHX Text 3.71

AutoCAD SHX Text 3.83

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.79

AutoCAD SHX Text 3.70

AutoCAD SHX Text 3.73

AutoCAD SHX Text 4.20

AutoCAD SHX Text 4.25

AutoCAD SHX Text 3.98

AutoCAD SHX Text 3.87

AutoCAD SHX Text 3.89

AutoCAD SHX Text 4.42

AutoCAD SHX Text 4.60

AutoCAD SHX Text 4.60

AutoCAD SHX Text 4.24

AutoCAD SHX Text 3.9

AutoCAD SHX Text 4.3

AutoCAD SHX Text 4.4

AutoCAD SHX Text 3.8

AutoCAD SHX Text 3.7

AutoCAD SHX Text 3.9

AutoCAD SHX Text 3.5

AutoCAD SHX Text 3.7

AutoCAD SHX Text 3.9

AutoCAD SHX Text 4.3

AutoCAD SHX Text 4.1

AutoCAD SHX Text 4.5

AutoCAD SHX Text 4.2

AutoCAD SHX Text 3.4

AutoCAD SHX Text 4.2

AutoCAD SHX Text 4.0

AutoCAD SHX Text 4.1

AutoCAD SHX Text 4.2

AutoCAD SHX Text 6.3

AutoCAD SHX Text 5.9

AutoCAD SHX Text 4.7

AutoCAD SHX Text 4.8

AutoCAD SHX Text 6.5

AutoCAD SHX Text 6.0

AutoCAD SHX Text 5.7

AutoCAD SHX Text 5.9

AutoCAD SHX Text 4.8

AutoCAD SHX Text 5.2

AutoCAD SHX Text 4.8

AutoCAD SHX Text 5.6

AutoCAD SHX Text 5.2

AutoCAD SHX Text 3.4

AutoCAD SHX Text 3.6

AutoCAD SHX Text 3.4

AutoCAD SHX Text 3.3

AutoCAD SHX Text 3.2

AutoCAD SHX Text 3.4

AutoCAD SHX Text 3.2

AutoCAD SHX Text 3.5

AutoCAD SHX Text 3.2

AutoCAD SHX Text 3.5

AutoCAD SHX Text 3.7

AutoCAD SHX Text 3.8

AutoCAD SHX Text 3.7

AutoCAD SHX Text 3.70

AutoCAD SHX Text 3.92

AutoCAD SHX Text 4.41

AutoCAD SHX Text 3.59

AutoCAD SHX Text 3.60

AutoCAD SHX Text 3.83

AutoCAD SHX Text 4.14

AutoCAD SHX Text 4.56

AutoCAD SHX Text 4.51

AutoCAD SHX Text 4.54

AutoCAD SHX Text 4.20

AutoCAD SHX Text 4.01

AutoCAD SHX Text 3.92

AutoCAD SHX Text 3.87

AutoCAD SHX Text 3.96

AutoCAD SHX Text 4.04

AutoCAD SHX Text 4.11

AutoCAD SHX Text 4.17

AutoCAD SHX Text 4.20

AutoCAD SHX Text 4.37

AutoCAD SHX Text 4.27

AutoCAD SHX Text 4.16

AutoCAD SHX Text 3.97

AutoCAD SHX Text 3.94

AutoCAD SHX Text 3.74

AutoCAD SHX Text 4.16

AutoCAD SHX Text 4.34

AutoCAD SHX Text 4.31

AutoCAD SHX Text 4.24

AutoCAD SHX Text 4.15

AutoCAD SHX Text 3.83

AutoCAD SHX Text 3.67

AutoCAD SHX Text 3.96

AutoCAD SHX Text 4.49

AutoCAD SHX Text 3.64

AutoCAD SHX Text 3.73

AutoCAD SHX Text 3.96

AutoCAD SHX Text 3.64

AutoCAD SHX Text 3.53

AutoCAD SHX Text 3.27

AutoCAD SHX Text 3.37

AutoCAD SHX Text 3.57

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.81

AutoCAD SHX Text 3.89

AutoCAD SHX Text 3.60

AutoCAD SHX Text 3.42

AutoCAD SHX Text 3.69

AutoCAD SHX Text 3.46

AutoCAD SHX Text 3.58

AutoCAD SHX Text 3.70

AutoCAD SHX Text 3.73

AutoCAD SHX Text 3.81

AutoCAD SHX Text 3.78

AutoCAD SHX Text 3.46

AutoCAD SHX Text 3.62

AutoCAD SHX Text 3.86

AutoCAD SHX Text

CONC.

AutoCAD SHX Text 5.3

AutoCAD SHX Text 30"C&G

AutoCAD SHX Text

3"HDPP

AutoCAD SHX Text

3"HDPP

AutoCAD SHX Text

3"HDPP

AutoCAD SHX Text

WV

AutoCAD SHX Text

EHH

AutoCAD SHX Text

FAUCET

AutoCAD SHX Text

FAUCET

AutoCAD SHX Text

(8"QLC)

AutoCAD SHX Text 8"

AutoCAD SHX Text

EOI

AutoCAD SHX Text

EOI

AutoCAD SHX Text

EOI

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

6"PVC ROOF DRAIN SYSTEM

AutoCAD SHX Text 8"

AutoCAD SHX Text

EOI

AutoCAD SHX Text 4.01

AutoCAD SHX Text 3.91

AutoCAD SHX Text 3.63

AutoCAD SHX Text

8"IRON

AutoCAD SHX Text

TBM BOX CUT ON CONC. ELEV=3.62

AutoCAD SHX Text

CLEAT

AutoCAD SHX Text

CLEAT

AutoCAD SHX Text

INV=0.36 8"PVC

AutoCAD SHX Text

8"IRON

AutoCAD SHX Text

INV=1.28 6"PVC

AutoCAD SHX Text

6"PVC ROOF DRAIN SYSTEM

AutoCAD SHX Text

INV=1.07 6"PVC

AutoCAD SHX Text

CONC. BULKHEAD

AutoCAD SHX Text

CONC. BULKHEAD

AutoCAD SHX Text

DI #104 W/METAL PLATE RIM=4.66 INV=0.17(NW) BOS=-0.49 SE PIPE NOT FOUND

AutoCAD SHX Text

6"CLAY

AutoCAD SHX Text

AutoCAD SHX Text

OUTFALL PIPE NOT FOUND

AutoCAD SHX Text 4.40

AutoCAD SHX Text 4.47

AutoCAD SHX Text 4.42

AutoCAD SHX Text 4.45

AutoCAD SHX Text 4.39

AutoCAD SHX Text 4.39

AutoCAD SHX Text 4.52

AutoCAD SHX Text 4.50

AutoCAD SHX Text 4.36

AutoCAD SHX Text 3.34

AutoCAD SHX Text 3.29

AutoCAD SHX Text 3.30

AutoCAD SHX Text 3.33

AutoCAD SHX Text 3.35

AutoCAD SHX Text 3.37

AutoCAD SHX Text 3.33

AutoCAD SHX Text 3.35

AutoCAD SHX Text 3.31

AutoCAD SHX Text 3.35

AutoCAD SHX Text 4.15

AutoCAD SHX Text 3.22

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CDI

AutoCAD SHX Text

TBM

AutoCAD SHX Text L/P

AutoCAD SHX Text

CHH

AutoCAD SHX Text

EHH

AutoCAD SHX Text

EM

AutoCAD SHX Text E

AutoCAD SHX Text

HDPP

AutoCAD SHX Text 18"C&G

AutoCAD SHX Text

6"CC

AutoCAD SHX Text

CLF W/BW

AutoCAD SHX Text

MF

AutoCAD SHX Text

EM

AutoCAD SHX Text

EMH

AutoCAD SHX Text

SFMV

AutoCAD SHX Text

WV

AutoCAD SHX Text

PIV

AutoCAD SHX Text

FH

AutoCAD SHX Text

EOI

AutoCAD SHX Text

QLC

AutoCAD SHX Text

UNK

AutoCAD SHX Text

BOS

AutoCAD SHX Text

PVC

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

SURFACE

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

FOUNDER'S

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

SAP

AutoCAD SHX Text

SAPLING

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

BRICK SURFACE

AutoCAD SHX Text

BRICK SURFACE

AutoCAD SHX Text

FRANKLIN BLVD.

AutoCAD SHX Text

FRANKLIN BLVD.

AutoCAD SHX Text

ASPHALT SURFACE

AutoCAD SHX Text

EXPAND SCI, PHASE II (CURRENTLY UNDER CONSTRUCTION)

AutoCAD SHX Text

EHH

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST. CONC. RAMP

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text

LINE

AutoCAD SHX Text

LINES

AutoCAD SHX Text

PAINTED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text

STRIPE

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

EXIST. SHRUBS (TYP.)

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

E.E.VLT.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

WALK

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BED

AutoCAD SHX Text

RIM=9.67

AutoCAD SHX Text F

AutoCAD SHX Text

EXIST. PLANTING BED

AutoCAD SHX Text

ACC

AutoCAD SHX Text

RAMPS

AutoCAD SHX Text 6' C.L.F.

AutoCAD SHX Text

SS

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

ACC

AutoCAD SHX Text

20" CRAPE MYRTLE

AutoCAD SHX Text

30" OAK

AutoCAD SHX Text

36" OAK

AutoCAD SHX Text

UGE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NO PARKING FIRE LANE

AutoCAD SHX Text

48" CHAIN LINK

AutoCAD SHX Text

CONC. RAMP

AutoCAD SHX Text

18"MAPLE

AutoCAD SHX Text

4"CREPE

AutoCAD SHX Text

MYRTLE

AutoCAD SHX Text

4"CREPE

AutoCAD SHX Text

MYRTLE

AutoCAD SHX Text

SIGN(2)

AutoCAD SHX Text

INV= 2.71

AutoCAD SHX Text

RIM= 10.89

AutoCAD SHX Text

ELEC MH

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text

AVERILL AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

BLACK AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

5' CONC. SIDEWALK

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HJM

AutoCAD SHX Text

JTK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING CONDITIONS PLAN

AutoCAD SHX Text

V-101

EP

TH

(F

T)

SA

M

PL

E

N U

M

BE

R

SA

M

PL

E

TY

PE

SA

M

PL

E

D

IS

T.

(I

N

R

EC

O

VE

R Y

(IN

W

AT

ER

L

EV

EL

S

EL

EV

AT

IO

N (F

T)

BL

O

W S/

6"

CLIENT:

Atriax Group

PROJECT NAME:

Hampton Construct Additional Parking

PROJECT NO.:

07:15267

SITE LOCATION:

Harris Ave, Hampton, Virginia 23669

NORTHING:

12114176.5

EASTING:

3536820.7

STATION: SURFACE

ELEVATION: 3.0

BORING NO.:

CBR-1

DRILLER/CONTRACTOR:

Fishburne Drilling, Inc.

LOSS OF CIRCULATION

BOTTOM OF CASING

Plasc Limit Water Content Liquid Limit X─────────⚫─────────△

DESCRIPTION OF MATERIAL STANDARD PENETRATION BLOWS/FT

ROCK QUALITY DESIGNATION & RECOVERY

RQD

REC

CALIBRATED PENETROMETER TON/SF

S-1

S-2

S-3

S-4

S-5

SS

SS

SS

SS

SS

Topsoil Thickness[4.00"]

(SM FILL) FILL, SILTY FINE TO MEDIUM

SAND WITH GRAVEL, trace clay, contains brick asphalt rock fragments wood, dark brown, moist to wet, loose to very loose

(SM) SILTY FINE TO MEDIUM SAND,

trace clay, gray brown, wet, very loose

END OF DRILLING AT 10.0 FT -1

12-5-5-4 (10)

3-4-4-4 (8)

2-2-1-1 (3)

3-2-1-2 (3)

2-2-1-0 (3)

10 13.1

SHEET:

15 -6

20 -11

25 -16

30 -21

WL (First Encountered)

WL (Compleon)

WL (Seasonal High Water)

WL (Stabilized)

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL

4.50 BORING STARTED:

BORING

COMPLETED:

EQUIPMENT:

ATV CME-55

Sep 03 2020

Sep 03 2020

LOGGED BY:

MLK

GEOTECHNICAL BOREHOLE LOG

CAVE IN DEPTH:

HAMMER TYPE:

DRILLING

METHOD:

6.00

Auto

HSA

D

EP

TH

(F

T)

SA

M

PL

E

N U

M

BE

R

SA

M

PL

E

TY

PE

SA

M

PL

E

D

IS

T.

(I

N

R

EC

O

VE

R Y

(IN

W

AT

ER

L

EV

EL

S

EL

EV

AT

IO

N (F

T)

BL

O

W S/

6"

CLIENT:

Atriax Group

PROJECT NAME:

Hampton Construct Additional Parking

PROJECT NO.:

07:15267

SITE LOCATION:

Harris Ave, Hampton, Virginia 23669

NORTHING:

12114335.9

EASTING:

3536781.0

STATION: SURFACE

ELEVATION: 3.0

BORING NO.:

CBR-2

DRILLER/CONTRACTOR:

Fishburne Drilling, Inc.

LOSS OF CIRCULATION

BOTTOM OF CASING

Plasc Limit Water Content Liquid Limit X─────────⚫─────────△

DESCRIPTION OF MATERIAL STANDARD PENETRATION BLOWS/FT

ROCK QUALITY DESIGNATION & RECOVERY

RQD

REC

CALIBRATED PENETROMETER TON/SF

S-1

S-2

S-3

S-4

S-5

SS

SS

SS

SS

SS

Topsoil Thickness[3.00"]

(SM FILL) FILL, SILTY FINE TO MEDIUM

SAND WITH GRAVEL, trace clay, contains asphalt wood rock fragments, dark brown, moist, medium dense (CL) SANDY LEAN CLAY, gray brown, moist to wet, so

(SM) SILTY FINE TO MEDIUM SAND,

trace clay, contains mica, greenish gray, wet, very loose, contains marine shell fragments

(SC) CLAYEY FINE TO MEDIUM SAND,

trace clay, contains mica, greenish gray, wet, very loose, contains trace marine shell fragments

S-6

SS 24 24

(SP-SM) FINE TO MEDIUM SAND WITH

SILT, trace clay, contains mica, greenish gray, wet, very loose, contains trace marine shell fragments

S-7

SS 24 24

(SM) SILTY FINE TO MEDIUM SAND,

trace clay, contains mica, orange brown, wet, very loose, contains trace marine shell fragments

7-6-5-6 (11)

3-2-1-1 (3)

-2 1-2-1-1

(3)

1-1-0-0 (1)

1-1-1-1 (2)

-7

11 38.5

SHEET:

3 37.0

0-0-0-0 (0)

-12

0 30.4

1-1-1-2 (2)

-17

S-8

SS 24 24

1-1-2-2

(3)

END OF DRILLING AT 25.0 FT -22

30 -27

WL (First Encountered)

WL (Compleon)

WL (Seasonal High Water)

WL (Stabilized)

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL

5.00 BORING STARTED:

BORING

COMPLETED:

EQUIPMENT:

ATV CME-55

Sep 03 2020

Sep 03 2020

LOGGED BY:

MLK

GEOTECHNICAL BOREHOLE LOG

CAVE IN DEPTH:

HAMMER TYPE:

DRILLING

METHOD:

6.00

Auto

RWMD

REFERENCE NOTES FOR BORING LOGS

MATERIAL1,2

ASPHALT

CONCRETE

GRAVEL

TOPSOIL

VOID

BRICK

AGGREGATE BASE COURSE

FILL3

GW

GP

GM

GC

SW

SP

SM

SC

ML

MH

CL

CH

OL

OH

PT

MAN-PLACED SOILS

WELL-GRADED GRAVEL

gravel-sand mixtures, little or no fines

POORLY-GRADED GRAVEL

gravel-sand mixtures, little or no fines

SILTY GRAVEL

gravel-sand-silt mixtures

CLAYEY GRAVEL

gravel-sand-clay mixtures

WELL-GRADED SAND

gravelly sand, little or no fines

POORLY-GRADED SAND

gravelly sand, little or no fines

SM SILTY SAND

sand-silt mixtures

CLAYEY SAND

sand-clay mixtures

SILT

non-plastic to medium plasticity

ELASTIC SILT

high plasticity

LEAN CLAY

low to medium plasticity

FAT CLAY

high plasticity

ORGANIC SILT or CLAY non-plastic to low plasticity

ORGANIC SILT or CLAY high plasticity

PEAT

highly organic soils

1Classifications and symbols per ASTM D 2488-17 (Visual-Manual Procedure) unless noted otherwise.

2To be consistent with general practice, “POORLY GRADED” has been removed from GP, GP-GM, GP-GC, SP, SP-SM, SP-SC soil types on the boring logs.

3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol [Ex: (SM-FILL)].

4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot (tsf).

5Standard Penetration Test (SPT) refers to the number of hammer blows (blow count) of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches (ASTM D 1586). “N-value” is another term for “blow count” and is expressed in blows per foot (bpf). SPT correlations per 7.4.2 Method B and need to be corrected if using an auto hammer.

6The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in granular soils.