10-Fee Sheet - Asbestos Abatement.docx
DOCX document 17 KB Posted
- Attached to
- ASBESTOS ABATEMENT
- Solicitation number
- RFP 27-0627E5-005
- Issued by
- Erie County, New York
About this file
This is a fee sheet attachment for an RFP issued by Buffalo Public Schools in New York for asbestos abatement services. The District is soliciting certified firms to provide asbestos abatement and disposal services for both planned projects dictated by the current AHERA Management Plan and emergency work on an as-needed basis across its portfolio of over 70 schools and facilities. Required abatement services include pipe insulation removal and cleanup of insulation debris, repair of damaged pipe fittings, and removal of damaged asbestos floor tile and damaged fire doors.
The fee sheet requires contractors to provide pricing for labor (straight time and overtime rates) for supervisors, handlers, and project managers, as well as unit pricing for encapsulation and removal services. Specific pricing is requested for multiple abatement methods including pipe insulation removal (straight sections and fittings), duct and tank insulation, boiler and breeching insulation, various ceiling tile removal methods (drop-in, glued, and track system), floor tile removal (manual and mastic scrape) at different square footage thresholds, plaster and spray-on fireproofing removal, and roof flashing material removal. Contractors must also submit pricing for minimum fees per job, emergency fees, surcharges, and material and equipment markups.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUFFAO PUBLIC SCHOOLS PROCUREMENT OFFERING
RFP #
Asbestos Abatement Services Offering Specification
ATTACHMENT A : LIST OF FEES
| Contractor Name: | ______________________________ | |
| Address | ______________________________ |
| Contact Person | ______________________________ |
| Email Address | ______________________________ |
Labor
| Straight time $/hr |
| Overtime $/hr |
Supervisor
Handler
Project Manager
Removal/ Encapsulation of Products
| Unit |
| Encapsulation |
(unit price) Removal (unit price)
| Pipe Insulation (Straight) |
| per linear foot (< 260lf , > 25 lf ) |
| Pipe Insulation (Straight) |
| per linear foot (< 3lf) |
| Pipe insulation-fittings, elbows, Ts,etc. |
| each |
| Duct and tank insulation |
| per square foot |
| Boiler and breeching insulation |
| per square foot |
| Ceiling tile (drop in) |
| per square foot |
| Ceiling Tile (glued) |
| per square foot |
| Ceiling tile (track system) |
| per square foot |
| Floor tile (manual) |
| per square foot (> 160 sf) |
| Floor tile (manual) |
| per square foot (> 10 sf < 160 sf) |
| Floor tile (manual) |
| per square foot (> 10 sf < 160 sf) |
| Floor tile mastic (manual scrape) |
| per square foot (> 160 sf) |
| Floor tile mastic (manual scrape) |
| per square foot (> 10 sf < 160 sf) |
| Floor tile mastic (manual scrape) |
| per square foot (> 10 sf < 160 sf) |
| Plaster/troweled on ACM |
| per square foot |
| Spray on fireproofing |
| per square foot (>160 sf) |
| Roof Flashing Material |
| per square foot (>160 sf) |
Additional Fees (list any additional fees) Minimum Fee (per job)
Emergency fee Surcharge (per job)
% Mark up (materials, equipment))
File details come from the government source that posted it. Updated .