10_EDLs_FD2020-24-50006.pdf

PDF 95 KB Posted

Attached to
B-1 Time Delay Initiators Federal contract opportunity
Solicitation number
FA8213-24-R-3018
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains nine Engineering Data Lists (EDLs) and a related federal contract opportunity notice. The EDLs provide technical data for ordnance time delay assemblies, initiators, cartridges, and propellants required for the B-1 aircraft munitions and egress systems. The federal contract opportunity is a solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center seeking proposals for B-1 time delay initiators corresponding to the national stock numbers and part numbers listed in the description. Offerors must submit proposals in response to solicitation number FA8213-24-R-3018. Award is anticipated to provide the specified components for the B-1 aircraft.

View the file

Other files for this federal contract opportunity

Other files attached to B-1 Time Delay Initiators, newest first.
File Type Posted
6_SPI_Combined.pdf PDF
8_JFQR_Combined.pdf PDF
4_CADPAD_ItemMarkingInstructionVer16.pdf PDF
3_ADC_SOW_Jan2018.pdf PDF
9_ItemDescriptionsFD2020-24-50006.pdf PDF
2_Repship11MAR14.pdf PDF
11_CDRLs_FD2020-24-50006.pdf PDF
1_AIR_SPEC_FD2020-24-50006_6Oct2023.pdf PDF
7_ES7034.pdf PDF
FA8213-24-R-3018.pdf PDF
5_PHST_SOW.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DATA LIST

DATE:

26 JAN 2023

REVISION: 11 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013565592ES

DATA TECH:

Smith, Carter L

END ITEM:

B-1B MUNITIONS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011-II

NOUN:

DELAY ELEMENT,CARTR

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D ORDINANCE TIME DELAY

ASSEMBLIES

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B Smith, Carter L 26 JAN 2023

W/ L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Smith, Carter L 26 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 1EDL Version 11Generated by PRPS using Jasper Reports on 31 Aug 2023

25 JAN 2023

REVISION: 12 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013565593ES

DATA TECH:

Merrill, Michael S

END ITEM:

B-1B EGRESS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011

NOUN:

DELAY ELEMENT,CARTR

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D ORDINANCE TIME DELAY

ASSEMBLIES

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B Merrill, Michael S 25 JAN 2023

WITH L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Merrill, Michael S 25 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

Page 1 of 1EDL Version 12Generated by PRPS using Jasper Reports on 31 Aug 2023

25 JAN 2023

REVISION: 12 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013568730ES

DATA TECH:

Merrill, Michael S

END ITEM:

B-1B EGRESS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011

NOUN:

INITIATOR,CARTRIDGE

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D ORDINANCE TIME DELAY

ASSEMBLIES

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B Merrill, Michael S 25 JAN 2023

WITH L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Merrill, Michael S 25 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

25 JAN 2023

REVISION: 11 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013568731ES

DATA TECH:

Merrill, Michael S

END ITEM:

B-1B EGRESS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011-XXI

NOUN:

INITIATOR,CARTRIDGE

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D ORDINANCE TIME DELAY

ASSEMBLIES

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B Merrill, Michael S 25 JAN 2023

WITH L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Merrill, Michael S 25 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

22 OCT 2021

REVISION: 13 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013568732ES

DATA TECH:

Smith, Cordell D

END ITEM:

B-1 (MUNITIONS-EGRESS SYSTEM)

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011

NOUN:

INITIATOR,CARTRIDGE

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D ORDINANCE TIME DELAY

ASSEMBLIES

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B Smith, Cordell D 22 OCT 2021

WITH L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Smith, Cordell D 22 OCT 2021

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

Page 1 of 1EDL Version 13Generated by PRPS using Jasper Reports on 31 Aug 2023

25 JAN 2023

REVISION: 11 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013568733ES

DATA TECH:

Smith, Cordell D

END ITEM:

B-1 EGRESS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011-XXIII

NOUN:

INITIATOR,CARTRIDGE

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D PROCUREMENT

SPECIFICATION

L 43999 L0000024 AB S D FINISH SPECIFICATION Smith, Cordell D 25 JAN 2023

WITH L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Smith, Cordell D 25 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

26 JAN 2023

REVISION: 13 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013568734ES

DATA TECH:

Smith, Carter L

END ITEM:

B-1B EGRESS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011-VI

NOUN:

INITIATOR,CARTRIDGE

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D ORDINANCE TIME DELAY

ASSEMBLIES

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B Smith, Carter L 26 JAN 2023

W/ L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Smith, Carter L 26 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

Page 1 of 1EDL Version 13Generated by PRPS using Jasper Reports on 31 Aug 2023

25 JAN 2023

REVISION: 12 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013568735ES

DATA TECH:

Smith, Cordell D

END ITEM:

B-1B EGRESS

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L325C2011

NOUN:

INITIATOR,CARTRIDGE

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L325C2011 C S D PROCUREMENT

SPECIFICATION

L 43999 L0000024 AB S D FINISH SPECIFICATION Smith, Cordell D 25 JAN 2023

WITH L617736

NAME: DATE:

STANDARD ENGINEERING TEXT

Smith, Cordell D 25 JAN 2023

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

18 MAR 2020

REVISION: 10 *HISTORY*

CAGE:

43999

PAGE:

NSN:

1377013758919ES

DATA TECH:

Stuart, Michael C

END ITEM:

MUNITIONS (B-1 AIRCRAFT)

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACB/

MANUFACTURER NAME:

THE BOEING COMPANY

REFERENCE NUMBER:

L320C2002

NOUN:

INITIATOR,PROPELLAN

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 43999 L320C2002 D S D INITIATOR, GAS-TO-SMDC/CDC Stuart, Michael C 18 MAR 2020

WITH AMENDMENT 1.

NAME: DATE:

L 43999 L0000024 AB S D FINISH DOCUMENT B-1B

STANDARD ENGINEERING TEXT

Stuart, Michael C 18 MAR 2020

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

Page 1 of 1EDL Version 10Generated by PRPS using Jasper Reports on 31 Aug 2023

EDL_1377013565592
EDL_1377013565593
EDL_1377013568730
EDL_1377013568731
EDL_1377013568732
EDL_1377013568733
EDL_1377013568734
EDL_1377013568735
EDL_1377013758919

File details come from the government source that posted it. Updated .