These documents represent a comprehensive set of architectural, mechanical, and electrical design plans for the Ben Taub Hospital Green Elevator Modernization project located at 1504 Ben Taub Loop in Houston, Texas, prepared by Spur Design, LLC for Harris Health System. The project involves a complete modernization of the hospital's elevator system, specifically targeting elevators 7-12 across multiple floors (Basement through Level 6 and the Elevator Penthouse). The project scope includes replacing elevator doors, cab interiors, hall stations, lanterns, frames, and associated electrical and mechanical systems, with a 100% submission dated May 16, 2025. The design documents encompass 23 total sheets covering architectural, mechanical, and electrical disciplines, with detailed plans for demolition and new installation.

The project involves significant electrical and mechanical upgrades, including replacing the existing air conditioning unit (ACU-P-1) in the elevator penthouse, updating electrical distribution panels, and modernizing elevator equipment and controls. The design adheres to multiple building codes and standards, including the 2015 International Building Code, 2020 National Electrical Code, and Texas Accessibility Standards. Electrical work includes upgrading power systems, lighting, and control mechanisms for the elevators, with careful attention to maintaining existing circuit continuity and minimizing disruption to hospital operations. The project emphasizes coordination between disciplines, preservation of existing infrastructure where possible, and compliance with healthcare facility design requirements.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

GI000

23-1FC01327

NR

BGJ

05/16/2025

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

COVER SHEET

S U

B M

IS

S

IO

N

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[01] GENERAL

1 GI000 COVER SHEET

2 GI001 GENERAL INFORMATION

[02] ARCHITECTURAL

3 AE100 BASEMENT

4 AE101 LEVEL 1

5 AE102 LEVEL 2

6 AE103 LEVEL 3

7 AE104 LEVEL 4

8 AE105 LEVEL 5

9 AE106 LEVEL 6

10 AE107 ROOF LEVEL

11 AF701 FINISH FLOOR PLANS

[03] MECHANICAL

12 M-000 LEGEND AND ABBREVIATIONS

13 MH101 MECHANICAL HVAC PLAN

14 M-501 MECHANICAL DETAILS, SCHEDULES, & CONTROLS

[04] ELECTRICAL

15 E-000 ELECTRICAL LEGEND AND ABBREVIATIONS

16 E-100 ELECTRICAL POWER - BASEMENT

17 E-101 ELECTRICAL POWER - LEVEL 6

18 E-103 ELECTRICAL LIGHTING - BASEMENT

19 E-104 ELECTRICAL LIGHTING - ELEVATOR PENTHOUSE

20 E-501 ELECTRICAL DETAILS

21 E-601 ELECTRICAL - ONE LINE DIAGRAM

22 E-102 ELECTRICAL POWER - ELEVATOR PENTHOUSE

23 E-700 ELECTRICAL SCHEDULES

TOTAL SHEETS: 23

NN

LOCATION

PLAN

AREA

PLAN

PROJECT LOCATION

BEN TAUB HOSPITAL GREEN

ELEVATOR MODERNIZATION

1504 BEN TAUB LOOP

HOUSTON, TX 77030

100% SUBMISSION

ABBREVIATIONS CODES STANDARDS

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

CITY OF HOUSTON BUILDING CODES - WWW.HOUSTONPERMITTINGCENTER.ORG/HELP/CODES

• HOUSTON CONSTRUCTION CODE AMENDMENTS ORDIANCE (REV. APRIL 11, 2022)

• 2015 INTERNATIONAL BUIDLING CODE (REV. MARCH 20, 2023)

• 2020 NATIONAL ELECTRICAL CODE (REV. MARCH 20, 2023)

• 2015 INTERNATIONAL EXISITING BUILDING CODE (REV. APRIL 11, 2022)

• 2015 INTERNATIONAL FIRE CODE (REV. APRIL 11, 2022)

• 2015 UNIFORM MECHANICAL CODE (REV. APRIL 11, 2022)

• 2015 UNIFORM PLUMBING CODE (REV. APRIL 11, 2022)

• CITY CODE AMENDMENTS (REV. APRIL 11, 2022)

TEXAS DEPARTMENT OF LICENSING & REGULATION - ARCHITECTURAL BARRIERS

• 2012 TEXAS ACCESSIBILITY STANDARDS (TAS)

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: HOUSTON, TX

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 2A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM AND

MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING

ATTIC AND OTHER: R-49 EXISTING

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. N/A

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 N/A

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. N/A

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.36 EXISTING

OPERABLE: U-0.45 EXISTING

ENTRANCE DOOR: U-0.63 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT

OF THE ENTIRE DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO

SEPARATE WORK AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL

COST TO THE OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING

SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS.

DRAWINGS, AS A WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL.

LACK OF COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST

TO THE OWNER.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES TO THE HOSPITAL PROJECT MANAGER, 48 HOURS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE OWNER PROJECT MANAGER. CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO THE OWNER. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE OWNER PROJECT MANAGER WHEN SUBMITTING THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE

CONSTRUCTION DOCUMENTS.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALK BOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CARPET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPOXY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

R

RAF RESILIENT ATHLETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSTICAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

TRUE

NORTH

4' -0

M

A X

4' -0

M

A X

1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT

BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,

FIXTURES, AND EQUIPMENT.

2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN

COUNTERTOPS @ 36"-48" MAX ON CENTER.

3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER

FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.

4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL

FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR

FIXTURE TYPES USED IN THIS PROJECT.

5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,

BACKING TO BE PROVIDED AS SHIM FOR FLUSH

APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.

PAPER TOWEL

DISPENSER

SANITARY

NAPKIN

DISPENSER

4' -0

"M A

X

WASTE

RECEPTACLE

4' -0

M

A X

SOAP

DISPENSER

4' -0

M

A X

WALL HOOK

7' -0

CLOCK

FIRE EXTINGUISHER

CABINET

WEIGHT > 40LBS

4' -0

"M A

X

TOILET SEAT

COVER

DISPENSER

HANDRAILS AND

BUMPER GUARDS

6"

3' -0

M

A X

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

3' -6

M

A X

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

GI001

23-1FC01327

NR

BGJ

05/16/2025

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

GENERAL INFORMATION

S U

B M

IS

S

IO

N

P neumatic Tube

N

KEY PLAN

GREEN ELEVATORS

10 11 12

2.08 2.082.08

2.07

2.06

2.09

2.05

2.11

2.22

2.05

2.21

2.05

2.222.22

2.08

2.05

2.082.08

2.06

2.052.05

2.09

2.21

2.21 2.22

2.222.22

10 11 12

10.32 10.3210.32

10.30

8.03

10.31

8.03

8.03

2.09

2.11

2.21

2.22

2.222.22

10.32 10.3210.32

10.30

8.038.038.03

2.09

2.21

2.21

2.22 2.222.22

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

B513

'-0

'-0

'-0

'-0

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

5'-0"

2.12

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

2.23

2.23

2.23

2.23

2.23

2.23

12'-0"

M

IN

4' -0

4'

-0

AE1004 3

9 10

G

H

J

K

AE1006 5

9.18.6 9.7 10.2

ELEV. LOBBY

B513

'-0

'-0

'-0

'-0

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

AF701

ELEV. 7

ELEV. 8

ELEV. 9

ELEV. 10

ELEV. 11

ELEV. 12

9.88

9.88

9.88

9.88

9.88

9.88

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE100

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

BASEMENT

S U

B M

IS

S

IO

N

3/8" = 1'-0" 1/ AE100

ELEVATOR LOBBY (B513) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0" 1/ AE100

ELEVATOR LOBBY (B513) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE100

ELEVATOR LOBBY (B513) - NEW ELEVATION - #10, #11, & #1253/8" = 1'-0" 2/ AE100

ELEVATOR LOBBY (B513) - NEW ELEVATION - #7, #8, & #96

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.21 EXISTING WALL PROTECTION TO REMAIN.

2.22 EXISTING ELEVARTOR DOOR FRAME TO REMAIN.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

N

1/8" = 1'-0"

BASEMENT - DEMOLITION PLAN1

N

1/8" = 1'-0"

BASEMENT - REFERENCE PLAN2

1 Addendum 01

8/7/25

9 10

G

H

J

K

ELEV. LOBBY

AE101AE101 56

9.18.6 9.7 10.2

'-0

'-0

'-0

'-0

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

ELEV. 7

ELEV. 8

ELEV. 9

ELEV. 10

ELEV. 11

ELEV. 12

9.88

9.88

9.88

9.88

9.88

9.88

N

KEY PLAN

GREEN ELEVATORS

10 11 12

2.08

2.052.05

2.06

2.09

2.08 2.08

2.05

2.10

2.10

2.10

2.11 2.07

2.052.05 2.05

2.08 2.08

2.06

2.08

2.09

2.10

2.10 2.10

10 11 12 2.09

10.32

8.038.03

10.30

10.32 10.32

8.03

2.10 2.10 2.10

2.11 10.31

10.32

8.038.038.03

10.32 10.32

2.09

10.30

2.10

2.102.10

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

'-0

'-0

'-0

'-0

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

2.12

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

2.23

2.23

2.23

2.23

2.23

2.23

4' -0

12'-0"

AE1014 3

M

IN

4' -0

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE101

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

LEVEL 1

S U

B M

IS

S

IO

N

N

1/8" = 1'-0"

LEVEL 1 - REFERENCE PLAN2

3/8" = 1'-0" 1/ AE101

ELEVATOR LOBBY (1511) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0" 1/ AE101

ELEVATOR LOBBY (1511) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE101

ELEVATOR LOBBY (1511) - NEW ELEVATION - #10, #11, & #1253/8" = 1'-0" 2/ AE101

ELEVATOR LOBBY (1511) - NEW ELEVATION - #7, #8, & #96

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.10 EXISTING ELEVATOR FRAME TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

N

1/8" = 1'-0"

LEVEL 1 - DEMOLITION PLAN1

1 Addendum 01

PHYS.

LOUNGE

CORR.

GUEST

TRANSP.

N

KEY PLAN

GREEN ELEVATORS

9 10

G

H

J

K

ELEV. LOBBY

AE1026 5

9.18.6 9.7 10.2

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

ELEV. 7

ELEV. 8

ELEV. 9

ELEV. 10

ELEV. 11

ELEV. 12

9.88

9.88

9.88 9.88

9.88

9.88

10 11 12

2.052.05

2.08 2.082.08

2.07

2.06

2.05

2.10

2.10

2.10

2.13

2.052.05

2.08

2.082.08

2.06

2.092.10 2.10

2.11

11 1210

10.32

8.03

10.30

10.3210.32

10.31

8.03

2.10

2.10

2.10

2.13

10.32

8.038.03

10.3210.32

10.30

2.09

2.10

2.10

2.11

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

2.12

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

2.23

2.23

2.23 2.23

2.23

2.23

12'-0" 4'

-0

M

IN

4' -0

AE1024 3

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE102

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

LEVEL 2

S U

B M

IS

S

IO

N

N

1/8" = 1'-0"

LEVEL 2 - REFERENCE PLAN2

3/8" = 1'-0" 1/ AE102

ELEVATOR LOBBY (2513) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0" 1/ AE102

ELEVATOR LOBBY (2513) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE102

ELEVATOR LOBBY (2513) - NEW ELEVATION - #10, #11, & #125

3/8" = 1'-0" 2/ AE102

ELEVATOR LOBBY (2513) - NEW ELEVATION - #7, #8, & #96

N

1/8" = 1'-0"

LEVEL 2 - DEMOLITION PLAN1

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.10 EXISTING ELEVATOR FRAME TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.13 EXISTING EMERGENCY EGRESS MAP TO REMAIN.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

1 Addendum 01

D N

U P

D NU P

D N

U P

D N

U P

D N

U P

FEFEFE

OR LEV 2 &

C-SECTION

LABOR &

DELIVERY

STAIR

F

PUBLIC

CIRCULATION

PUBLIC

SPACES

3000- F

DN

UP

DN

UP

N

KEY PLAN

GREEN ELEVATORS

9 10

G

H

J

K

ELEV. LOBBY

AE1036 5

9.18.6 9.7 10.2

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

9.88 9.88

9.88

9.889.88

9.88

10 11 12

2.052.05

2.08 2.082.08

2.07

2.05

2.06

2.09

2.10

2.10

2.10

2.112.052.05

2.082.08 2.08

2.05

2.06

2.09

2.10 2.10 2.10

10.3210.3210.32

10 11 12

10.318.038.03

10.30

2.09

2.10

2.10 2.10

2.11

10.32

8.038.03

10.3210.32

10.30

2.09

2.10 2.10

2.10

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

2.23

2.23

2.23

2.23

2.23

2.23

12'-0"

M

IN

4' -0

4'

-0

2.12

AE1034 3

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE103

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

LEVEL 3

S U

B M

IS

S

IO

N

N

1/8" = 1'-0"

LEVEL 3 - REFERENCE PLAN2

3/8" = 1'-0" 1/ AE103

ELEVATOR LOBBY (3539) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0"

ELEVATOR LOBBY (3539) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE103

ELEVATOR LOBBY (3539) - NEW ELEVATION - #10, #11, & #1253/8" = 1'-0" 2/ AE103

ELEVATOR LOBBY (3539) - NEW ELEVATION - #7, #8, & #96

N

1/8" = 1'-0"

LEVEL 3 - DEMOLITION PLAN1

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.10 EXISTING ELEVATOR FRAME TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

1 Addendum 01

KEY PLAN

GREEN ELEVATORS

9 10

G

H

J

K

ELEV. LOBBY

AE104AE1046 5

9.18.6 9.7 10.2

'-0

'-0

'-0

'-0

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

ELEV. 7

ELEV. 8

ELEV. 9

ELEV. 10

ELEV. 11

ELEV. 12

9.88

9.88

9.88

9.88

9.88

9.88

10 11 12

2.08

2.05

2.06

2.05

2.05

2.08 2.08

2.09

2.10

2.10 2.10

2.11

2.07

2.08 2.082.08

2.06

2.052.052.05

2.09

2.10 2.102.10

10.3210.32 10.32

8.038.038.03

10.30

2.09

2.10 2.102.10

10 11 12

10.32

8.038.03

10.30

8.03

10.3210.32

2.09

2.10

2.10 2.10

2.11

10.31

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

'-0

'-0

'-0

'-0

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

2.12

ELEV. 7

ELEV. 8

ELEV. 9

ELEV. 10

ELEV. 11

ELEV. 12

2.23

2.23

2.23

2.23

2.23

2.23

12'-0"

M

IN

4' -0

4'

-0

AE1044 3

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE104

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

LEVEL 4

S U

B M

IS

S

IO

N

N

1/8" = 1'-0"

LEVEL 4 - REFERENCE PLAN2

3/8" = 1'-0" 1/ AE104

ELEVATOR LOBBY (4515) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0" 1/ AE104

ELEVATOR LOBBY (4515) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE104

ELEVATOR LOBBY (4515) - NEW ELEVATION - #7, #8, & #96 3/8" = 1'-0" 2/ AE104

ELEVATOR LOBBY (4515) - NEW ELEVATION - #10, #11, & #125

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.10 EXISTING ELEVATOR FRAME TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

N

1/8" = 1'-0"

LEVEL 4 - DEMOLITION PLAN1

1 Addendum 01

D N U P

D N

U P

D N

U P

D N

U P

D N

U P

FE

FE FE FE

Fire Dept Valve

DN

UP

DN

UP

N

KEY PLAN

GREEN ELEVATORS

9 10

G

H

J

K

ELEV. LOBBY

AE1056 5

9.18.6 9.7 10.2

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

9.88

9.88

9.88

9.88

9.88

9.88

10 11 12

2.06 2.062.06

2.07

2.06

2.05

2.05

2.05

2.10

2.10 2.10

2.11

2.08

2.052.05

2.082.08

2.06

2.05

2.10 2.10 2.10

2.09

10.32 10.3210.32

10.30

8.038.03 8.03

2.10 2.10 2.10

2.09

10 11 12

8.038.03

10.32 10.3210.32

10.31

10.30

2.10

2.10 2.10

8.03

2.11

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

2.12

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

2.23 2.23

2.23

2.23 2.23

2.23

12'-0"

M

IN

4' -0

4'

-0

AE1054 3

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE105

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

LEVEL 5

S U

B M

IS

S

IO

N

N

1/8" = 1'-0"

LEVEL 5 - REFERENCE PLAN2

3/8" = 1'-0" 1/ AE105

ELEVATOR LOBBY (5506) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0" 1/ AE105

ELEVATOR LOBBY (5506) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE105

ELEVATOR LOBBY (5506) - NEW ELEVATION - #7, #8, & #96 3/8" = 1'-0" 2/ AE105

ELEVATOR LOBBY (5506) - NEW ELEVATION - #10, #11, & #125

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.10 EXISTING ELEVATOR FRAME TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

N

1/8" = 1'-0"

LEVEL 5 - DEMOLITION PLAN1

1 Addendum 01

Tectonic Copyright 2007 Tectonic Copyright 2007

E X

P

AN

S

IO

N J

O

IN

T

FE FE

FE

TV

N

KEY PLAN

GREEN ELEVATORS

9 10

G

H

J

K

ELEV. LOBBY

AE106AE106 56

9.18.6 9.7 10.2

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

9.88

9.88

9.88

9.88

9.88

9.88

10 11 12

2.082.08

2.07

2.08

2.06

2.05

2.10

2.10 2.10

2.052.05

2.11

2.08 2.082.08

2.06

2.09

2.10 2.10 2.10

2.05 2.052.05

10 11 12

10.32

10.30

8.038.03

8.03

10.3210.32

10.31

2.09

2.10

2.10 2.10

2.11

8.038.03

10.32 10.3210.32

8.03

10.30

2.09

2.10 2.10 2.10

GENERAL DEMOLITION NOTES

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE

CONSTRUCTION DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL

CONSTRUCTION DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. REFER TO HARRIS HEALTH STANDARDS FOR CONTAINMENT.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES.

5. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

6. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE

CAUSED BY THIER WORK OR ANY SUBCONTRACTOR.

7. CONTRACTOR TO PROTECT ALL EXISTING ITEMS, WHICH INCLUDE BUT NOT LIMITED TO: WALL

FINISHES, WALL PROTECTION, FLOOR BASE, ELEVATOR DOOR FRAME, CEILINGS, ETC.

NEW DOOR, FRAME AND

HARDWARE IN EXISTING

PARTITION

FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

NEW PARTITION

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME

EXISTING WINDOW

EXISTING MILLWORK

NEW MILLWORK

NEW WINDOW

NEW DOOR, FRAME AND

HARDWARE IN NEW

PARTITION

EXISTING DOOR, FRAME AND

HARDWARE TO BE

DEMOLISHED

DEMOLITION FLOOR PLAN LEGEND

AREA NOT IN CONTRACT

EXISTING PARTITION TO BE

DEMOLISHED

EXISTING PARTITION TO

REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED.

EXISTING DOOR & FRAME TO

REMAIN

EXISTING WINDOW & FRAME

TO REMAIN

EXISTING WINDOW & FRAME

TO BE DEMOLISHED

EXISTING MILLWORK TO

REMAIN

EXISTING MILLWORK TO BE

DEMOLISHED

GENERAL PLAN NOTES

1. ELEVATOR DOOR, CAB INTERIORS, CALL LANTERNS, AND ELEVATOR EQUIPMENT

REPLACEMENTS.

2. PATCH AND REPAIR ANY ELEVATOR LOBBY WALLS WITH MATCHING FINISHES.

3. CONTRACTOR TO COORDINATE ANY SHUT DOWNS WITH THE OWNER PRIOR TO AND WITH

ADVANCE NOTICE.

9 10

G

H

J

K

9.18.6 9.7 10.2

ELEV. LOBBY

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

2.12

ELEV. 7

ELEV. 8

ELEV. 9 ELEV. 12

ELEV. 11

ELEV. 10

2.23

2.23

2.23 2.23

2.23

2.23

M

IN

4' -0

4'

-0

12'-0"

AE1064 3

PARTITION LEGEND

EXISTING WALL TO REMAINEXISTING 2 HOUR FIRE

CONSTRUCTION

CONTAINMENT BARRIER

REVISIONS

ISSUE DATE

DRAWN BY

SHEET NAME NUMBER

PROJECT NUMBER (SPUR)

CHECKED BY

REGISTRATION

THIS DRAWING IS THE PROPERTY OF

SPUR DESIGN, LLC. THIS DRAWING IS

SUBMITTED UNDER A CONFIDENTIAL

RELATIONSHIP FOR A SPECIFIED

PURPOSE & THE RECIPIENT, BY

ACCEPTING THIS DOCUMENT, ASSUMES

CUSTODY & AGREES THAT THIS

DOCUMENT WILL NOT BE COPIED OR

REPRODUCED IN WHOLE OR IN PART, NOR

ITS CONTENTS BE REVEALED IN ANY

MANNER OR TO ANY PERSON EXCEPT TO

MEET THE PURPOSE FOR WHICH IT WAS

DELIVERED WITHOUT EXPRESS WRITTEN

PERMISSION FROM SPUR DESIGN, LLC.

S P U R D E S I G N

W W W . S P U R - D E S I G N . C O M

312 S W 25 T H S T R E E T ( 4 0 5 ) 8 4 2 - 6 1 0 0

Drawing #

(2291.01)

AE106

23-1FC01327

KJW

NR

08/09/2023

B E

N T

A U

B H

O S

P

IT

A L

G R

E E

N E

L E

V A

T O

R M

O D

E R

N

IZ

A T

IO

N

B

E N

T A

U B

L O

O P

H O

U S

T O

N T

X

LEVEL 6

S U

B M

IS

S

IO

N

N

1/8" = 1'-0"

LEVEL 6 - REFERENCE PLAN2

3/8" = 1'-0" 1/ AE106

ELEVATOR LOBBY (6527) - DEMO ELEVATION - #10, #11, & #1233/8" = 1'-0" 1/ AE106

ELEVATOR LOBBY (6527) - DEMO ELEVATION - #7, #8, & #94

3/8" = 1'-0" 2/ AE106

ELEVATOR LOBBY (6527) - NEW ELEVATION - #10, #11, & #1253/8" = 1'-0" 2/ AE106

ELEVATOR LOBBY (6527) - NEW ELEVATION - #7, #8, & #96

KEYNOTE LEGEND

2.05 REMOVE ELEVATOR DOOR AND REPLACE WITH NEW ELEVATOR DOOR

2.06 EXISTING HALL STATION TO BE REMOVED AND REPLACED.

2.07 EXISTING ICON RISER TO BE REMOVED AND REPLACED.

2.08 EXISTING HALL LANTERNS TO BE REMOVED AND REPLACED.

2.09 EXISTING WAYFINDING MAP TO REMAIN.

2.10 EXISTING ELEVATOR FRAME TO REMAIN.

2.11 EXISTING HAND SANITIZER TO REMAIN.

2.12 PROVIDE FULL HEIGHT CONSTRUCTION BARRIER WHILE RENOVATION IS TAKING PLACE. PER

HARRIS HEALTH, ONLY ONE ELEVATOR BANK (GROUP OF 3 ELEVATORS) WILL BE DONE AT A

TIME FOR RENOVATION. CONSTRUCTION BARRIER TO BE MOVED TO THE NEXT ELEVATOR

BANK ONLY WHEN CONSTRUCTION IS COMPLETE AND APPROVED TO BE MOVED BY THE

HOSPITAL.

2.23 CAB INTERIORS TO BE REMOVED AND PREPARED FOR NEW FINISHES. THIS INCLUDES:

FLOORING, WALL PANELS, RAILS, AND CEILINGS.

8.03 NEW STAINLESS STEEL ELEVATOR DOOR

9.88 NEW ELEVATOR FINISHES. REFER TO SHEET AF701 AND SPECIFICATIONS.

10.30 PROVIDE NEW HALL STATION. REFER TO SPECIFICATIONS.

10.31 PROVIDE NEW ICON RISER. REFER TO SPECIFICATIONS.

10.32 PROVIDE NEW HALL LANTERNS. REFER TO SPECIFICATIONS.

N

1/8" = 1'-0"

LEVEL 6 - DEMOLITION PLAN1

1 Addendum 01

V

SD

V

FD

V

FD

V

FD

V

FD

V FD V FD V FD V FD V FD

F

N

KEY PLAN

ELEVATOR PENTHOUSE

9 10

G

H

J

K

ELEV.

MACHINE

PH

9.18.6 9.7 10.2

36'-10"

8'-11" 1'-6" 16'-0" 5'-6" 4'-11"

'-0

'-0

'-0

'-0

2.15

2.152.15

2.152.152.152.15

2.15

2.15

2.16

2.16

2.16

2.16

2.16

2.16

2.17

2.182.18…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .