10-Attachment G-Total Project Cost.pdf

PDF 109 KB Posted

Attached to
Ormond ROC Chiller Replacement
Solicitation number
PROJ-25-126
Issued by
Volusia County, Orlando City, Florida

About this file

This document is a Bid Form for Total Project Cost from Halifax Health Medical Center (HHMC) for a construction services project designated as PROJ-25-126 – Ormond ROC Chiller Replacement. The bid solicitation requires contractors to submit a comprehensive bid package including a detailed project schedule/timeline, a Schedule of Values broken down by division, and a detailed work description demonstrating full understanding of the project scope. Bidders must submit these materials with their response and are expected to hold their bid open for acceptance for 120 days from the bid due date.

The bid form requires contractors to be responsible for any facility repairs resulting from trucks traveling outside designated routes. Bidders must provide a total project cost, which will be left blank for the specific contractor to fill in. The successful bidder will be required to complete the work according to a detailed schedule submitted to and approved by HHMC. While specific financial details are not provided in this document, the bid form indicates that any requested allowances must be listed separately in the Schedule of Values, suggesting potential flexibility in project funding or cost allocations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

HALIFAX HEALTH MEDICAL CENTER

BID FORM of TOTAL PROJECT COST

Invitation to Bid for Construction Services

PROJ-25-126 – ORMOND ROC CHILLER REPLACEMENT

I/We propose to furnish the work described below at the following delivered price:

Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.

As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.

In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.

Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.

The Contractor agrees to:

A. Hold this bid open to acceptance for 120 days from the bid due date.

B. Accomplish project work in accordance with details provided in the bid solicitation.

C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.

BID SUBMITTED BY:

COMPANY: ___________________________________________________________

File details come from the government source that posted it. Updated .