10-Appendix VIII - Depot District Charger As-Builts.pdf
PDF 48 MB Posted
- Solicitation number
- 25-03991VW
- Issued by
- Utah
About this file
The provided file "10-Appendix VIII - Depot District Charger As-Builts.pdf" appears to be a technical drawing or as-built documentation related to the Davis SLC Connector project in Utah. Based on the associated contract opportunity description, the document likely contains detailed technical specifications or infrastructure layout for charging infrastructure in the Depot District area, specifically for electric vehicle or bus charging facilities. The file is connected to a state and local contract opportunity for design services focused on bus stop and end-of-line facilities for the Davis-SLC Community Connector project.
While the specific details of the as-built drawings cannot be fully discerned without viewing the actual document, the related contract opportunity indicates this is part of a broader transportation infrastructure improvement initiative. The project involves final design and construction documents for bus facilities, with potential options for construction phase services. The contract appears to be located in Utah, specifically targeting improvements to community transportation connectivity between Davis and Salt Lake City (SLC). The technical documentation in this file likely provides critical infrastructure details to support the design and construction phases of the transportation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .