This statement of work outlines requirements for remodeling quarters at two Bureau of Land Management sites in Utah. The contractor shall demolish and remove fixtures at the Muskrat Administration Site and Vernon Administration Site, then perform construction and installation of new finishes, doors, windows, plumbing fixtures, electrical work, and cabinetry. Additional options are requested to replace kitchen cabinets, flooring, and complete other minor upgrades. Work must be completed within 180 days of the notice to proceed. The solicitation from the Department of the Interior Bureau of Land Management Utah Region seeks bids for this remodeling project at the identified sites located in Grantsville and Vernon, Utah.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Muskrat and Vernon Quarters Remodel Statement of Work
May 2021 1
Muskrat and Vernon Quarters Remodel Statement of Work
Scope of Work:
The contract includes remodel of the Muskrat and Vernon Quarters. The contractor shall provide a quote of the Muskrat and Vernon base items, and then each additional option shall be included as a separate line item.
The following base work at Muskrat is included.
• Demolition o Removal of all showers and wall behind shower o Removal of all lavatory sinks, countertops, and cabinets o Removal of all indicated doors and/or hardware o Removal of all bedroom countertops o Removal of common area (kitchen) countertops o Removal of all toilets o Removal of ADA bathtub
• Construction o Repair/Install shower o Install shower curb in bathrooms (except ADA) o Finish ADA hallway door frames
• Doors and Windows o Replacement of bedroom closet doors (D1) with hollow core bid-fold door o Replacement hardware (except keypad) on D2 doors o Replacement of hardware on D3 doors o Replacement of door and hardware (except keypad) on D4 doors o Replacement of all windows with new vinyl tempered glass
• Finishes o Repair of shower walls o Tile shower and water closet floors and walls o Patch and paint all walls (except bathroom and shower) o Patch and paint all ceilings (except rooms with drop-down ceiling) o In workout room, raise portions of drop-down ceiling to accommodate weightlifting o Replace flooring in bedrooms with plank tile. Install new base o Paint flooring in downstairs mechanical and washroom o Replace single door desk hanging cabinet in rooms with hanging shelf countertop
(no drawers) o Replace hallway lavatory cabinets o Replace common area (kitchen) countertops with solid surface countertops o Replace common area bathroom sink and cabinet with hanging sink o Replace bedroom blinds with roller type blackout blinds o Replace common area and lower-level blinds with shade blinds
Muskrat and Vernon Quarters Remodel Statement of Work
May 2021 2
• Mechanical o Add range hood, duct work and vent
• Plumbing o Replace bedroom lavatories with new drop in and new hardware o Install new floor drain and shower head plumbing o Install Grab bars in ADA bathroom o Install soap holder with grab bar in all tile showers o New water closet hardware
• Electrical o Replace/Convert all interior lighting with LED lights o Replace all receptacles, light switches, and covers
▪ Each room to have 1 USB Type A dual outlet
The following Muskrat add on options should be quoted as shown in Basis of Payment:
• Demolition and Finishes – Replacement of Cabinets o Removal of common area (kitchen) cabinets o Replace common area (kitchen) cabinets with new
• Finishes – Refurbish Cabinets o Refurbish common area (kitchen) cabinets
• Finishes – Common area o Replace flooring in common area with plank tile and install new base
• Finishes – Admin, Office, Mechanical, Utility, and Lower Bathrooms flooring o Replace tile in Admin and Office rooms with plank vinyl tile and install new base o Replace tile in Mechanical, Utility, and Lower floor bathrooms with floor paint and install new base
• Electrical – Keypad and Electrical Add-ons o Replacement of keypad on all doors (D2, and D4) o Install wireless 3-way lighting in hallways o Move office area light switch
• Plumbing o Replace water closets o Replace utility sink o Install 2” water meter
The following base work at Vernon is included.
• Demolition o Removal of kitchen counters and countertops
• Finishes o Patch and paint all walls and ceilings o Replace flooring in kitchen and living room with plank tile o Install new MDF base o Replace kitchen counter and countertops o Replace all blinds with roller type blinds
• Plumbing o Replace all shower, lavatory, and water closet hardware
Muskrat and Vernon Quarters Remodel Statement of Work
May 2021 3
• Electrical o Replace all receptacles, light switches, and covers
▪ Each room to have 1 USB Type A dual outlet
The following Vernon add on options should be quoted as individual line items:
• Concrete o Install new (or re-install old) flagpole to be 90 deg from ground on all sides
The Contractor shall minimize disturbance to the sites to the greatest extent possible unless otherwise directed. All waste, trash, and debris generated from this effort shall be disposed of in a manner consistent with local and State regulations. During and after construction activities, the site shall be inspected and cleaned of any trash that has accumulated.
Locations:
Work under this contract shall take place at the following:
• Muskrat Administration Site, 50 Skull Valley Road, Grantsville, UT 84029
• Vernon Administration Site, BLM Vernon Station Road, Vernon, UT 84080
Period of Performance:
The period of performance on this contract will be 180 days from the date the Notice to Proceed is signed.
Work Schedule:
Work hours shall be Monday through Friday, 7:00 am to 7:00 pm, unless otherwise approved by the Contracting Officer.