1-SJSD MHS Security Upgrades - PM - 02.06.2026 (1).pdf

PDF 9 MB Posted

Attached to
NS26-90 San Juan School District - Monticello High School Security Upgrades
Solicitation number
NS26-90
Issued by
Tooele County, Utah

About this file

Construction Documents Summary: Monticello High School Security Upgrades

This project manual contains bidding requirements and technical specifications for building alterations and security upgrades at Monticello High School for the San Juan School District in Monticello, Utah. The work encompasses approximately 4,196 square feet of alterations to an existing single-story, sprinkled building of Construction Type V, including administration area security upgrades. Key bidding deadlines include a pre-bid conference scheduled for February 25, 2026 at 9:00 AM, a question submission deadline of March 3, 2026 at 4:00 PM, and a bid due date of March 5, 2026 at 2:00 PM through the U3P platform. The School Board will review proposals on March 10, 2026, with Notice to Proceed anticipated March 11, 2026 and construction commencement on March 16, 2026. The construction period extends from June 1, 2026 (site access) to August 1, 2026 (Substantial Completion) with final completion by September 1, 2026, subject to liquidated damages of $1,000 per day for delays.

The contract requires a bid security in the form of an AIA A310 Bid Bond equal to five percent of the Base Bid amount, with both Performance and Payment Bonds required at 100 percent of the Contract Sum. The base bid includes a four percent contingency allowance and access door quantity allowances, with two alternate bid items for toilet room alterations and laminated security film glazing. The project is exempt from Utah sales tax, with the Owner providing exemption certification forms to vendors. The contract is structured as a stipulated sum contract with payment terms of 95 percent progress payments and five percent retainage until Substantial Completion. The contractor must demonstrate a minimum of five years of experience in construction and installation of similar site improvements and maintain a qualified superintendent subject to Owner approval. Construction operations are limited to 7:00 AM to 6:00 PM Monday through Friday, and the contractor must comply with owner occupancy coordination requirements, security protocols, and comprehensive closeout procedures including final cleaning, punch list resolution, and submission of warranties and operation and maintenance manuals.

View the file

Other files

File Type Posted
2-SJSD MHS Security Upgrades - CDs - 02.06.2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P R O J E C T M A N U A L

280 S 400 W, Suite 250 . Salt Lake City . Utah . 84101 . 801.595.6700 . www.mhtn.com

© 2026 MHTN Architects, Inc.. All rights reserved

MONTICELLO HIGH SCHOOL SECURITY

UPGRADES

148 SOUTH 200 WEST

MONTICELLO, UTAH 84535

for

SAN JUAN SCHOOL DISTRICT

BIDDING REQUIREMENTS, CONTRACT PROVISIONS

and TECHNICAL SPECIFICATIONS DIVISIONS 1 through 32

CONSTRUCTION DOCUMENTS – 6 FEBRUARY 2026

MHTN PROJECT NO. 2023554.01

vision made rreal

Monticello High School Security Upgrades MHTN Project No. 2023554.01 San Juan School District Construction Documents –6 February 2026

TABLE OF CONTENTS TOC - 1

TABLE OF CONTENTS

Division Section Title Pages

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

Document 000107 Seals Page Document 000115 List of Drawing Sheets Document 001116 Invitation for Bids Instructions to Bidders, AIA A701-2018 Document 002213 Supplementary Instructions to Bidders Document 002600 Procurement Substitution Procedures Document 004113 Bid Form Document 004313 Bid Security Forms Bid Bond, A310-2010 Standard Form of Agreement between Owner and Contractor, A101-2017 A101 – 2017 Exhibit A General Conditions, AIA A201-2017 Supplementary Conditions to A201 General Conditions Payment Bond, AIA A312-2010 Performance Bond, AIA A312-2010 Change Order, AIA G701-2017 Application for Payment, AIA G702 Continuation Sheet, AIA G703

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary 012100 Allowances 012300 Alternates 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013233 Photographic Documentation 013300 Submittal Procedures 014000 Quality Requirements 014200 References 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training

DIVISION 02 - EXISTING CONDITIONS

024119 Selective Demolition

DIVISION 03 - CONCRETE

033000 Cast-in-place Concrete

TABLE OF CONTENTS TOC - 2

DIVISION 04 – MASONRY

042000 Unit Masonry

DIVISION 05 - METALS

051200 Structural Steel Framing 054000 Cold-Formed Metal Framing 055000 Metal Fabrications

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry 064023 Interior Architectural Woodwork

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

071900 Water Repellents 078413 Penetration Firestopping 078443 Joint Firestopping 079200 Joint Sealants 079219 Acoustical Joint Sealants

DIVISION 08 - OPENINGS

081113 Hollow Metal Door Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 083313 Coiling Counter Doors 084113 Aluminum-Framed Entrances and Storefronts 087100 Door Hardware 088000 Glazing

DIVISION 09 - FINISHES

092216 Non-Structural Metal Framing 092900 Gypsum Board 093013 Ceramic Tiling 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 096519 Resilient Tile Flooring 096813 Tile Carpeting 097260 Tackable Wallcovering 099113 Exterior Painting 099123 Interior Painting

DIVISION 10 - SPECIALTIES

101100 Visual Display Units

102113.17 Phenolic-Core Toilet Compartments

102600 Wall and Door Protection 102800 Toilet, Bath, and Laundry Accessories 104413 Fire Protection Cabinets 104416 Fire Extinguishers

DIVISION 11 – EQUIPMENT

105113 - Metal Lockers

DIVISION 12 - FURNISHINGS

TABLE OF CONTENTS TOC - 3

122413 Roller Window Shades 123616 Metal Countertops

DIVISION 22 - PLUMBING

220000 Plumbing 220700 Insulation

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230000 Heating - Cooling 230100 General Provisions 230501 Testing 230593 Balancing 230800 System Commissioning 230900 Basic Materials and Methods 233000 Air Distribution

DIVISION 25 – INTEGRATED AUTOMATION

251000 Automatic Temperature Controls

DIVISION 26 - ELECTRICAL

260001 Electrical General Provisions 260070 Electrical Connections for Equipment 260072 Electrical Supports and Seismic Restraints 260080 Electrical Demolition 260110 Conduit Raceways 260120 Conductors and Cables 260135 Electrical Boxes and Fittings 260140 Wiring Devices 260170 Disconnect Switches 260180 Overcurrent Protective Devices 260452 Grounding 260560 Network Lighting Control Systems 260800 Commissioning and Testing of Electrical Systems 265100 Interior and Exterior Building Lighting

DIVISION 27 - COMMUNICATIONS

270526 Grounding and Bonding for Communications Systems 271500 Communications Horizontal Cabling 275115 Audio Systems 275117 Video Systems 275123 Educational Intercommunications and Program System

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

280721 Digital, Addressable Fire-Alarm System 280730 Access Control System 282300 Video Surveillance

DIVISION 31 – EARTHWORK

312000 Earthmoving

APPENDIX

Utah Tax Exemption Certification Form TC-721g

TABLE OF CONTENTS TOC - 4

License and Indemnification Agreement Substitution Request Before Bid Substitution Request After Bid Substitution Request For Cause

END OF TABLE OF CONTENTS

SEALS PAGE 000107 - 1

DOCUMENT 000107 - SEALS PAGE

DESIGN PROFESSIONALS OF RECORD

ARCHITECT MECHANICAL ENGINEER ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

All professional seals (stamps) to be signed and dated; Architect Licensing Act Rules R156-3a, Utah Administrative Code, paragraph 601 and Professional Engineers Licensing Act Rules R156-22, Utah Administrative Code, paragraph 601.

San Juan School District Construction Documents – 6 February 2026

LIST OF DRAWING SHEETS 000115 - 1

DOCUMENT 000115 - LIST OF DRAWING SHEETS

1.1 LIST OF DRAWINGS

A. Drawings: Drawings that will be enumerated in the Owner/Contractor Agreement as part of the Contract Documents are listed on the Index to Drawings page of the separately bound drawing set titled Monticello High School Security Upgrades, dated 6 February 2026, as modified by subsequent Addenda and Modifications.

1. The words "Resource Drawing" or "For information" after the titles of drawings indicate that those drawings are not intended to be incorporated in the Contract Documents.

END OF DOCUMENT 000115

INVITATION FOR BIDS 001116 - 1

DOCUMENT 001116 – INVITATION FOR BIDS

Invitation for Bids for

Monticello High School Security Upgrades For San Juan School District

Pre-bid Conference Date and Time: 25 February 2026, 9:00 AM Deadline for Registering for the Pre-bid Conference: 24 February 2026, Noon

Deadline for Questions Date and Time: 3 March 2026, 4 PM Questions to be submitted through U3P

Bid Due Date and Time: 5 March 2026, 2PM Bid Submission: Through U3P

Presentation to School Board for Approval: 10 March 2026 Notice to Proceed Pending School Board Approval: 11 March 2026

Date of Commencement: 16 March 2026

A. Background/Purpose Statement

This Invitation for Bids (IFB) is issued in accordance with the Utah Procurement Code and applicable administrative rules of the Utah Administrative Code. If any provision of this IFB conflicts with the Utah Procurement Code or Utah Administrative Code, then the Utah Procurement Code or Utah Administrative Code will take precedence.

The purpose of this IFB is to enter into a contract award to the lowest cost responsive and responsible Bidder proposing to provide building alterations required by developing administration area security upgrades within an existing single story area of the Monticello High School, Construction Type IIB, for the San Juan School District, Blanding, Utah. (Procurement Unit).

B. Pre-bid Conference (Optional)

There will be an optional pre-bid conference at the project site, 148 South 200 West, Monticello, Utah 84535, on the date and time listed above. Attendees are to meet at the main building entrance. To attend the pre-bid conference, Bidders must email Todd Freebairn, MHTN Architects, Salt Lake City, Utah / todd.freebairn@mhtn.com, no later than the date and time indicated above.

An attendance log will be maintained including the name of each attendee, the entity the attendee is representing, and the attendee’s contact information. Minutes of the pre-bid conference, and copies of any documents distributed by the conducting procurement unit to the attendees shall be published as an addendum to the solicitation. Any verbal modifications made to any of the solicitation documents during the site visit shall be reduced to writing and will be published as an addendum to the solicitation.

C. Term

The contract resulting from this IFB will be for a one (1) time purchase.

D. Communications and Question and Answer Period

1. Bidders are prohibited from communications regarding this IFB with the Procurement Unit staff, evaluation committee members, or other associated individuals EXCEPT the procurement officer overseeing this IFB.

INVITATION FOR BIDS 001116 - 2

2. The Question and Answer period closes on the date and time specified above. All questions must be submitted as described above during the Question and Answer period. Questions may include notifying the Procurement Unit of any ambiguity, inconsistency, scope exception, excessively restrictive requirement, or other errors in this IFB. Questions are encouraged.

Answers from the Procurement Unit will be posted on U3P. Questions may be answered individually or may be compiled into one document.

Questions may also be answered via an addendum. An answered question or an addendum may modify the specification or requirements of this IFB. It is the responsibility of the Bidders to submit their bids as required by this IFB, including any requirements contained in an answered question and/or addenda.

Bidders should periodically check U3P for answered questions and addendums before the closing date. It is the responsibility of the Bidders to submit their bids as required by this IFB, including any requirements contained in an answered question and/or addendums.

E. Addenda

Prior to the closing date, the Procurement Unit may, at its sole discretion, issue addenda.

Addenda may modify any minimum requirement or specification of this IFB. It is the responsibility of the Bidders to submit their bids as required by this IFB, including any requirements contained in addenda issued by the Procurement Unit.

Addenda shall be distributed within a reasonable time to allow prospective Bidders to consider the addenda in preparing bids. After the due date and time for submitting bids, at the discretion of the Procurement Unit, addenda to this IFB may be limited to Bidders that have submitted bids, provided the addenda does not make a substantial change to this IFB.

F. Instructions to Bidders

1. The Procurement Unit reserves the right and may reopen this solicitation, or create a new solicitation if it determines there may be more competition for the procurement item than when the original solicitation was posted.

2. Protected Information

Bidders may request that part of its bid be protected by submitting a Claim of Business Confidentiality Form.

Pricing may not be classified as confidential or protected and will be considered public information.

Process for Requesting Non-Disclosure: To protect information under a Claim of Business Confidentiality, a Bidder must complete the Claim of Business Confidentiality form, at the time the bid is submitted, with the following information:

Include a concise statement of reasons supporting the claim of business confidentiality (Subsection 63G-2-309(1)).

Submit an electronic “redacted” (excluding protected information) copy of the bid. Copy must clearly be marked “Redacted Version.”

INVITATION FOR BIDS 001116 - 3

The Claim of Business Confidentiality form may be accessed at:

https://purchasing.utah.gov/wp-content/uploads/Business-Request-for-GRAMA-Business- Confidentiality-Claim.pdf

An entire bid cannot be identified as “PROTECTED”, “CONFIDENTIAL” or

“PROPRIETARY”.

Redacted Copy: If a Bidder submits a bid that contains information claimed to be confidential or protected, the Bidder MUST submit two separate bids: one redacted version for public release, with all protected business confidential information either blacked-out or removed, clearly marked as "Redacted Version"; and one non-redacted version for evaluation purposes clearly marked as "Protected Business Confidential."

All materials submitted become the property of the Procurement Unit. Materials may be evaluated by anyone designated by the Procurement Unit as part of the evaluation committee. Materials submitted may be returned only at the Procurement Unit's option.

3. Wherever in this IFB an item is defined by using a trade name, brand name, or a manufacturer and/or model number, it is required that the bidder provide the product, one of the products listed, or a product by one of the manufacturers listed, or a comparable product as directed by Section 016000 Product Requirements, contained in the Project Manual.

4. Bidders may be required to submit product samples to assist the Procurement Unit in evaluating whether a Procurement Item meets the specifications and other requirements set forth in the IFB. Product samples must be furnished free of charge unless otherwise stated in the solicitation, and if not destroyed by testing, will upon written request within any deadline stated in the invitation for bids, be returned at the Bidder's expense. Samples must be labeled or otherwise identified as specified in the solicitation by the Procurement Unit.

5. Terms and Conditions

The Standard Terms and Conditions (General and Supplementary Conditions contained within the Project Manual), will not be negotiated. The Utah Procurement Code requires that a bid will be rejected if it is not responsive or responsible. A bid that is not responsive includes a bid that: (a) is conditional; (b) attempts to modify the bid requirements; (c) contains additional terms or conditions; or (d) fails to conform with the requirements or specifications of the invitation for bids.

A bid that contains exceptions and/or additions to the Standard Terms and Conditions will be rejected and disqualified from this IFB. The Procurement Unit will not allow a Bidder to remove or withdraw exceptions and/or additions from the Standard Terms and Conditions from a bid. However, a Bidder may request an exception and/or addition to the Standard Terms and Conditions during the Question and Answer period.

The Procurement Unit will not allow a Bidder’s terms and condition to become part of a contract that results from this IFB. If a Bidder’s terms and conditions are attached, referenced, or embedded into a bid, whether intentionally or inadvertently, then the Bidder’s terms and conditions shall be null and void and will not become part of a contract that results from this IFB. If a Bidder is awarded a contract and the Bidder requests that its terms and conditions become part of the contract, then the Bidder’s bid will immediately be disqualified and the Bidder will not be awarded a contract.

G. Scope of Work: As described by the Construction Documents.

H. Mandatory Minimum Requirements

INVITATION FOR BIDS 001116 - 4

Bidders must demonstrate the ability to meet or exceed the mandatory minimum requirements outlined below by providing a narrative point by point response, in the order listed, to each requirement.

The following mandatory minimum requirements must be met in order for a Bid to be considered responsive:

1. Bidder must have a minimum of 5 years experience in construction and installation of site improvements similar to the scope of Work indicated.

All of the items described in this section are non-negotiable.

If it is determined that a bid does not meet these requirements, at any time during the solicitation process, the bid will be deemed non-responsive and disqualified from further consideration.

If a bid is considered responsive, then it will be considered for award.

I. Evaluation of Bids

Each bid received shall be evaluated for responsiveness as outlined in the Utah Procurement Code. This IFB shall be evaluated by the objective criteria described in this IFB. Bids submitted must comply with requirements of the IFB. Any bid that does not comply with the requirements will be deemed non responsive and will be rejected.

Multiple or alternate bids will not be accepted, unless otherwise specifically required to allowed in the invitation for bids. If a bidder submits multiple or alternate bids that are not requested in this IFB, the head of the Procurement Unit will only accept the Bidder’s primary bid and will not accept any other bids constituting multiple or alternate bids.

Any exceptions to the content of this IFB, must be protested in writing to the Procurement Unit during the question and answer period.

J. Evaluation of Costs

Bids will be evaluated using the following methodology to determine the lowest Bidder.

Award will be made to the responsive and responsible Bidder with the lowest stipulated sum price.

If a Bidder fails to provide a cost, then its bid will be considered non-responsive and the bid will be rejected.

K. Attachments: Construction Documents dated 6 February 2026 prepared by MHTN Architects, Inc., Salt Lake City, Utah.

END OF INVITATION FOR BIDS

Document A701® – 2018 Instructions to Bidders

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

FEDERAL, STATE, AND LOCAL

LAWS MAY IMPOSE

REQUIREMENTS ON PUBLIC

PROCUREMENT CONTRACTS.

CONSULT LOCAL AUTHORITIES

OR AN ATTORNEY TO VERIFY

REQUIREMENTS APPLICABLE TO

THIS PROCUREMENT BEFORE

COMPLETING THIS FORM.

It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.

for the following Project:

(Name, location, and detailed description)

THE OWNER:

(Name, legal status, address, and other information)

THE ARCHITECT:

(Name, legal status, address, and other information)

TABLE OF ARTICLES

1 DEFINITIONS

2 BIDDER’S REPRESENTATIONS

3 BIDDING DOCUMENTS

4 BIDDING PROCEDURES

5 CONSIDERATION OF BIDS

6 POST-BID INFORMATION

7 PERFORMANCE BOND AND PAYMENT BOND

8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

San Juan County School District 200 North Main Street Blanding, Utah 84511

MHTN Architects, Inc.

280 S 400 W, Ste. 250 Salt Lake City, Utah 84101

Montezuma Creek Elementary School Security Upgrades 1270 East Highway 162 Montezuma Creek, Utah 84534

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

ARTICLE 1 DEFINITIONS

§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.

§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.

§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.

§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.

§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.

§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.

§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.

§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.

§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.

ARTICLE 2 BIDDER’S REPRESENTATIONS

§ 2.1 By submitting a Bid, the Bidder represents that:

.1 the Bidder has read and understands the Bidding Documents;

.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;

.3 the Bid complies with the Bidding Documents;

.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;

.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and

.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.

ARTICLE 3 BIDDING DOCUMENTS

§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)

Owner's host site/platform: U3P

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.

§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.

§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.

§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.

§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.

§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)

§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.

§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.

§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.

§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.

§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.

§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.

§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)

§ 3.4.2 Addenda will be available where Bidding Documents are on file.

§ 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.

ARTICLE 4 BIDDING PROCEDURES

§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.

§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.

§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.

§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.

§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form.

§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.

§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.

§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.

§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:

(Insert the form and amount of bid security.)

§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.

Owner's host site/platform: U3P

AIA Document A310, Bid Bond, amount equal to five percent of the Base Bid amount.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning days after the opening of Bids, withdraw its Bid and request the return of its bid security.

§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:

(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)

§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof.

§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.

§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.

§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.

§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.

§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:

(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)

ARTICLE 5 CONSIDERATION OF BIDS

§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.

Returned with Bid withdrawn as indicated in Subparagraph 4.4.3.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.

§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.

§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.

ARTICLE 6 POST-BID INFORMATION

§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.

§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.

§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:

.1 a designation of the Work to be performed with the Bidder’s own forces;

.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and

.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.

§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.

§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.

§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.

ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND

§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.

§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.

(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)

§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.

§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.

§ 7.2.3 The bonds shall be dated on or after the date of the Contract.

§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.

ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:

.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.

(Insert the complete AIA Document number, including year, and Document title.)

.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.

.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.

.4 Building Information Modeling Exhibit, if completed:

.5 Drawings

Number Title Date

N/A

DOCUMENT 000115 - LIST OF DRAWING SHEETS

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:55:42 ET on 01/02/2025 under Order No.4104247862 which expires on 03/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (858936905)

.6 Specifications

Section Title Date Pages

.7 Addenda:

Number Date Pages

.8 Other Exhibits:

(Check all boxes that apply and include appropriate information identifying the exhibit where required.)

[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:

(Insert the date of the E204-2017.)

[ ] The Sustainability Plan:

Title Date Pages

[ ] Supplementary and other Conditions of the Contract:

Document Title Date Pages

.9 Other documents listed below:

(List here any additional documents that are intended to form part of the Proposed Contract Documents.)

Project Manual Table of Contents bound herein.

SUPPLEMENTARY CONDITIONS: A201 – 2017 General Conditions of the Contract for Construction x

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 1

DOCUMENT 002213 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

1.1 INSTRUCTIONS TO BIDDERS

A. Instructions to Bidders for Project consist of the following:

1. AIA Document A701, "Instructions to Bidders," a copy of which is bound in issued copies of this Project Manual.

2. The following Supplementary Instructions to Bidders that modify and add to the requirements of the Instructions to Bidders.

1.2 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS, GENERAL

A. The following supplements modify AIA Document A701-2018, "Instructions to Bidders." Where a portion of the Instructions to Bidders is modified or deleted by these Supplementary Instructions to Bidders, unaltered portions of the Instructions to Bidders will remain in effect.

1.3 ARTICLE 2 - BIDDER'S REPRESENTATIONS

A. Add Section 2.1.3.1:

1. 2.1.3.1 - The Bidder has investigated all required fees, permits, and regulatory requirements of authorities having jurisdiction and has properly included in the submitted bid the cost of such fees, permits, and requirements not otherwise indicated as provided by Owner.

B. Add Section 2.1.5:

1. 2.1.5 - The Bidder is a properly licensed Contractor according to the laws and regulations of the state of Utah and meets qualifications indicated in the Procurement and Contracting Documents.

C. Add Section 2.1.6:

1. 2.1.6 - The Bidder has incorporated into the Bid adequate sums for work performed by installers whose qualifications meet those indicated in the Procurement and Contracting Documents.

D. Add Section 2.2:

1. 2.2 – Pre-bid Conference:

2.2.1 - A pre-bid conference will be held at the project site on the date and time indicated in the Invitation For Bids for the purpose of reviewing the site, the scope of the Work and to answer any questions regarding the bid process.

1.4 ARTICLE 3 - BIDDING DOCUMENTS

A. 3.4 - Addenda:

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 2

1. Delete Section 3.4.3 and replace with the following:

a. 3.4.3 - Addenda may be issued at any time prior to the receipt of bids.

1.5 ARTICLE 4 - BIDDING PROCEDURES

A. 4.1 - Preparation of Bids:

1. Add Section 4.1.1.1:

a. 4.1.1.1 - Printable electronic Bid Forms and related documents are available from Owner.

2. Add Section 4.1.8:

a. 4.1.8 - The Bid shall include unit prices when called for by the Procurement and Contracting Documents. Owner may elect to consider unit prices in the determination of award. Unit prices will be incorporated into the Contract.

3. Add Section 4.1.8:

a. 4.1.8 - Owner may elect to disqualify a bid due to failure to submit a bid in the form requested, failure to bid requested alternates or unit prices, failure to complete entries in all blanks in the Bid Form, or inclusion by the Bidder of any alternates, conditions, limitations or provisions not called for.

4. Add Section 4.1.9:

a. 4.1.9 - Sales Tax: The project is exempt from sales tax. The Owner will provide Exemption Certificate Form TC-721 to be filed with each vendor upon award of Contract.

B. 4.2 – Bid Security:

1. Add Section 4.2.1:

a. 4.2.1 - (form and amount of bid security): AIA A310 Bid Bond, unless otherwise provided in the Bidding Documents, in an amount equal to not less than 5% of the Project total Base Bid amount.

C. 4.3 - Submission of Bids:

1. Add Section 4.3.1.2:

a. 4.3.1.2 - Include Bidder's Contractor License Number applicable in Project jurisdiction on the face of the sealed bid envelope.

D. 4.4 - Modification or Withdrawal of Bids:

1. Add the following sections to 4.4.2:

a. 4.4.2.1 - Such modifications to or withdrawal of a bid may only be made by persons authorized to act on behalf of the Bidder. Authorized persons are those so identified in the Bidder's corporate bylaws, specifically empowered by the Bidder's

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 3

charter or similar legally binding document acceptable to Owner, or by a power of attorney, signed and dated, describing the scope and limitations of the power of attorney.

Make such documentation available to Owner at the time of seeking modifications or withdrawal of the Bid.

b. 4.4.2.2 - Owner will consider modifications to a bid written on the sealed bid envelope by authorized persons when such modifications comply with the following: the modification is indicated by a percent or stated amount to be added to or deducted from the Bid; the amount of the Bid itself is not made known by the modification; a signature of the authorized person, along with the time and date of the modification, accompanies the modification. Completion of an unsealed bid form, awaiting final figures from the Bidder, does not require power of attorney due to the evidenced authorization of the Bidder implied by the circumstance of the completion and delivery of the Bid.

E. 4.6 - Subcontractors, Suppliers, and Manufacturers List Bid Supplement:

1. Add Section 4.6:

a. 4.6 - Provide list of major subcontractors, suppliers, and manufacturers furnishing or installing products no later than two business days…