This Request for Proposals (RFP-UT-26-51) is issued by the City of Palm Coast, Florida for the rehabilitation of the WWTF #1 Headworks facility. The project encompasses cleaning, sandblasting, inspection, concrete repair and restoration, chemical-resistant coating installation, equipment removal and reinstallation, and site restoration for the Master Lift Station, Headworks, and Screening Structure. The work will be completed in two phases: Phase 1 includes the Headworks and Master Pump Station, and Phase 2 covers the Screening Structure. A mandatory pre-bid meeting is scheduled for June 16, 2026 at 9:00 AM, with a question deadline of June 23, 2026 at 2:00 PM. Qualifications and bids are due July 9, 2026 at 2:00 PM, with public opening occurring the same day. The contract time to achieve Substantial Completion is 270 consecutive calendar days from the Notice to Proceed, with an additional 30 days to achieve Final Completion. Bidders must be licensed as General Contractors and/or Underground Utility contractors and must submit all documents electronically through the City's Procurement Portal at https://palmcoastgov.bonfirehub.com/portal.
The bid pricing structure includes lump sum fees for mobilization, general and specific conditions, and sitework in Part A, with unit pricing for sandblasting, coating application, and concrete repair items in Part B across all three facility locations. Bid security in the form of a bond equal to at least five percent of the total bid amount is required for bids of $100,000 or greater. Upon contract award, the successful bidder must furnish Performance and Payment Bonds equal to the contract price and a Material and Workmanship Bond equal to ten percent of the contract price. The City is not subject to Florida Sales and Use Tax, and bidders must include all permit fees, taxes, and compliance costs in their proposals. The evaluation criteria weight Project Schedule/Completion Time at 45 percent, Price Proposal at 45 percent, and Experience and Technical Capability at 10 percent, with emphasis on the contractor's ability to minimize out-of-service time for these critical City facilities. The City reserves the right to reject all bids, waive formalities, or abandon the project at any time during the process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-RFP-UT-26-51 Submission Instructions.pdf | ||
| 3-Bid Form Detail Table.xlsx | XLSX spreadsheet | |
| 2-RFP-UT-26-51 Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Master Version – 03/05/2026
PROJECT MANUAL
Request for Proposals
RFP-UT-26-51
WWTF #1 Headworks Rehabilitation Project
ISSUED: May 27th, 2026 MANDATORY PRE-BID MEETING: June 16 at 9AM
QUESTION DEADLINE: June 23rd at 2:00 PM QUALIFICATIONS AND BID DUE DATE/TIME: July 9th at 2:00 PM
PURCHASING COORDINATOR PROJECT MANAGER
Taya Hoff Nency Thakkar Thoff@palmcoastgov.com NThakkar@palmcoastgov.com
Bidders are responsible for determining whether any addenda have been issued. All Addenda will be posted on the City’s Procurement Portal Web Page (https://palmcoastgov.bonfirehub.com/portal).
Bidders must sign, date, and return all Addenda with their bid submittal. Addenda information will be posted on the City’s Procurement Portal Web Page. It is the sole responsibility of the Bidders to ensure that they obtain information related to Addenda.
Trade Secrets: Any Bidder responsive materials that qualify as “trade secrets” must be segregated and clearly labeled in order not to be considered Public Record.
It is vital that Bidders adhere to the City’s bidding procedures as outlined in these bid documents.
If you have any questions, please contact the Purchasing Coordinator listed above.
City of Palm Coast Procurement Office
160 Lake Avenue, Palm Coast, FL 32164 palmcoastgov.com/government/purchasing
TABLE OF CONTENTS
BIDDING DOCUMENTS, CONTRACT DOCUMENTS AND FORMS
Request for Proposals Instructions to Bidders Qualification Forms Bid Forms Notice of No Bid Non-Collusion Affidavit of Subcontractor Draft Contract Performance Bond Payment Bond Material and Workmanship Bond Contractor’s Insurance Requirements General Conditions Notice to Award Notice to Proceed Change Order Form Application and Certificate for Progress Payment Certificate of Substantial Completion Certificate of Final Inspection & Completion Contractor’s Waiver and Release of Lien upon Progress Payment Contractor’s Waiver and Release of Lien upon Final Payment Contractor’s Request for Information Hydrostatic Test Results Work Change Directive Field Order Subcontractor/Vendor’s Waiver & Release of Lien upon Final Payment Consent of Surety to Final Payment Check Out Form Certificate of Completed Demonstration Form Supplementary Conditions Additional Supplemental Terms and Conditions Technical Specifications Appendix A Drawings
DIVISION 1 – GENERAL REQUIREMENTS
Summary of Work Measurement and Payment Application for Payment Field Engineering Permits and Fees Codes, References and Abbreviations Special Project Procedures Administrative Requirements Color Video – Audio Pre Construction Recorded Quality Control Temporary Facilities and Controls Material and Equipment Product Selection and Substitution Procedures Start-Up Contract Closeout Project Record Documents Operation and Maintenance Data Warranties and Bonds
Appendices
Appendix “A”….........City of Palm Coast Forms Appendix “B”……….Project Plans
CITY OF PALM COAST
Request for Proposals
RFP-UT-26-51
WWTF #1 HEADWORKS REHABILITATION PROJECT
SCOPE OF SERVICES: The overall project consists of cleaning, sand blasting, inspecting, concrete repair & restoration, preparation and installation of the chemical resistant coating, and site restoration for the master lift station, headworks, and screening structure including any necessary equipment removal and reinstallation. The project will be completed in two phases: (1) Headworks and Master Pump Station and (2) Screening Structure. The City of Palm Coast is responsible for draining and bypassing the facilities, including all valve operations and vacuum truck coordination. Sufficient resources shall be available by the Contractor to minimize the out of service time at the Master Pump Station, Headworks, and Screening Structure as this is a critical facility for the City. The Owner and Contractor will coordinate through the work sequencing plan and project schedule.
CONTRACT TIME: Total construction time to achieve Substantial Completion on both sites is two hundred and seventy (270) consecutive calendar days from the date of the “Notice to Proceed,” with an additional thirty (30) consecutive calendar days to achieve Final Completion.
DOCUMENT, AVAILABILITY, SUBMISSION, OTHER INFORMATION: Bid documents are available at no-cost through the City’s Procurement Portal at (https://palmcoastgov.bonfirehub.com/portal). Bid submittals shall be received electronically through the City’s Procurement Portal by the specified time and date. No other method of submission will be allowed or considered (i.e. mailed, emailed, or hand delivered).
CONTACT: All prospective Bidders are hereby instructed not to contact any member of the City of Palm Coast City Council, City Manager, or City of Palm Coast staff members other than the noted contact person(s) regarding this bid/request at any time prior to the bid/request having been formally presented to, and voted on by, the City Council. Any such contact shall be cause for rejection of your bid/request submittal.
QUESTIONS: Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through the City’s Procurement Portal Web Page (https://palmcoastgov.bonfirehub.com/portal) at least seven (7) calendar days prior to the due date.
ADDENDA: Should revisions to the bid documents become necessary; the City shall post addenda information on the City’s Procurement Portal Web Page (https://palmcoastgov.bonfirehub.com/portal). All Bidders should check the City’s Procurement Portal Web Page at least three (3) calendar days before the date fixed to verify information regarding Addenda. Bidder shall sign, date, and return all addenda with their bid submittal. Failure to do so shall result in rejection of the bid submittal as unresponsive.
BID SECURITY/BID BOND: A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater.
The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time.
PERFORMANCE, PAYMENT, & MATERIAL AND WORKMANSHIP BONDS: In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida.
AWARD OF CONTRACT: All submittals will be evaluated by City staff in accordance with the criteria set forth in the bid documents. The City reserves the right to reject all bids/submittals, and to solicit and re-advertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award. Pursuant to Florida Statutes § 287.05701, the City will not will not give preference to or request documentation of or consider a vendor’s social, political, or ideological interests when determining the vendor’s qualifications.
MANDATORY PRE-BID MEETING: June 16th at 9:00 AM
QUESTION DEADLINE: June 23rd at 2:00 PM
QUALIFICATIONS AND BID DEADLINE: July 9th at 2:00 PM
PUBLIC OPENING: The public opening shall take place July 9th at 2:00 PM, or shortly thereafter, at the City of Palm Coast City Hall, located at 160 Lake Avenue, Palm Coast, FL 32164.
ADA INFORMATION: Persons with disabilities needing assistance to participate in any of the proceedings should contact the Human Resources Office ADA Coordinator at 386-986-2570 at least forty-eight (48) hours in advance of the public opening, pre-bid meeting, or any other proceeding related to this bid.
FOR PUBLICATION ON WEDNESDAY, May 27th 2026
CITY OF PALM COAST
BUDGET AND PROCUREMENT OFFICE
160 LAKE AVENUE, PALM COAST, FL 32164
www.palmcoastgov.com
(386) 986-3730
RFP-UT-26-51 QUALIFICATION FORMS PACKAGE 00100-1
SECTION 00010
INSTRUCTIONS TO BIDDERS
SECTION 1: DEFINED TERMS
1.1 Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the General Conditions.
SECTION 2: COPIES OF BIDDING DOCUMENTS
2.1 Complete sets of the Bid Documents may be obtained from the City’s procurement portal at
(https://palmcoastgov.bonfirehub.com/portal).
SECTION 3: REQUIRED LICENSCES/PRE-QUALIFICATION OF BIDDERS
3.1 The following licenses/pre-qualifications shall be valid throughout the duration of the contract.
General Contractor and/or Underground Utility License
SECTION 4: EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1 Before submitting a Bid, each Bidder shall: (a) examine the Bid Documents; (b) visit the Site to become familiar with local conditions; (c) make written requests for interpretations promptly after discovering any conflicts, errors, ambiguities or inconsistencies; and if applicable, (d) contact all utilities and others who may be working at the Site, including City owned utilities, prior to submitting a Bid in order to determine the extent to which utility installations, utility relocations or adjustments (temporary and permanent) will impact the Bidder's responsibility to schedule, coordinate and sequence the Bidder's Work with the work of the City, utility work, and the work of others at the Site.
4.2 Before submitting a Bid, each Bidder shall, at Bidder's own expense, make or obtain any additional investigations, examinations, explorations and tests and obtain any additional information which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress or performance of the Work and which Bidder deems necessary to determine its Bid for performing the Work in accordance with the time, price and other terms and conditions of the Bid Documents. Bidder acknowledges that the Project and the Bidder's Work involves significant utility installations and that utility relocation (temporary and permanent) may be significant and require time to accomplish. Some utility facilities may need to be relocated and adjusted concurrently with the Bidder's Work, while some Work may be required above, adjacent to, and around utility facilities that are in-use and will remain in place.
4.3 At all points where the Work to be constructed by Bidder may connect to existing utilities and services, the actual Work of making the necessary connection to the existing service or utility shall be arranged and paid for by the Bidder and should be included as part of the Bid. Services and utilities included within (but not limited to) this responsibility are roads, ditches, electrical, sewer, mechanical utilities, water, fencing, etc.
4.4 On request, City will attempt to provide each Bidder reasonable access to the Site to conduct such investigations and tests as each Bidder deems necessary for submission of his Bid. If access is provided, Bidder shall restore Site to condition existing prior to conducting the investigations and tests.
4.5 The lands upon which the Work is to be performed, Rights-of-Way for access thereto and other lands designated for use by Bidder in performing the Work are identified in the Bid Documents. All additional lands and access thereto required for temporary construction facilities or storage of Materials and Equipment shall be provided by Bidder at Bidder’s expense.
SECTION 5: INTERPRETATIONS/ADDENDA
5.1 Any ambiguities or inconsistencies in the Bid Documents shall be brought to the attention of the City’s Budget & Procurement Office prior to the due date through the City’s Procurement Portal (https://palmcoastgov.bonfirehub.com/portal). Failure to do so, will constitute an acceptance by the Bidder of any subsequent award decision. Bidder shall submit any questions concerning the accuracy, completeness, intent, meaning and interpretations of the Bid Documents, including the sample Contract, or suggestions for Addenda to the Bid Documents, through the City’s Procurement Portal (https://palmcoastgov.bonfirehub.com/portal) at least seven (7) calendar days prior to the Bid due date. Neither City nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of Bid Documents, whether complete or incomplete.
Bidders should not rely on any oral statement or instructions made with regard to these Bid Documents. Any oral statements or instructions will not be binding on the City.
5.2 Should revisions to the Bid Documents become necessary, the City shall post Addenda information on the City’s Procurement Portal
(https://palmcoastgov.bonfirehub.com/portal). Bidders are advised to check the City’s Procurement Portal at least three (3) calendar days before both the Qualifications Due Date and the Bid Deadline as outlined in the Request for Proposal or as dates are otherwise modified, to verify information regarding Addenda. The City reserves the option to extend the due date (Qualifications and Bid Deadline) at any time. It is the sole responsibility of the Bidder to obtain information related to Addenda and to insure that the Bid considers all changes to the Bid Documents. The Bidder shall sign, date, and return all Addenda with the Bid prior to the Qualifications and Bid Deadline. Failure to do so shall result in immediate rejection and disqualification of the Bid.
SECTION 6: VALUE ENGINEERING INCENTIVE
6.1 No value engineering will be considered until after award of Contract.
SECTION 7: PREPARATION COSTS AND SUBMISSION OF BIDS (ONE-STEP PROCESS)
7.1 Expenses. The City shall not be liable for any expenses incurred in connection with preparation of a Bid. Bidders should prepare their Bids simply and economically, providing a straightforward and concise description of the Bidder’s ability to meet the requirements of these Bid Documents.
7.2 Permits. Unless expressly stated in the Bid Documents, all permits and fees required shall be the responsibility of the Bidder. No separate or additional payment will be made for these costs. Adherence to all applicable federal, state and local laws, ordinance, rules, regulations and policies are the responsibility of the Bidder.
7.3 Taxes. The City is not subject to Florida Sales and Use Tax; the City’s exemption does not extend to any Bidder as a result of construction of any City owned facility. The Bidder is cautioned to include costs related to Florida Sales and Use Tax in the Bid. The Bidder agrees to participate in any program of the City that will result in savings to the City. Taxes, customs, and tariffs on commodities or contractual services purchased under the contract will not be assessed against the City of Palm Coast unless mandated by State or Federal Law.
7.4 Warranty Against Fraud and Collusion By submitting a Bid in response to this Request for Proposal, each Bidder warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the Bidder, to solicit or secure this business and the resulting Contract, and that the Bidder has not paid, or agreed to pay, any person, company, corporation, individual or firm, other than a bona fide employee working solely for the Bidder, any fee, commission, percentage, gift, or other consideration contingent upon, or resulting from, the award or the resulting Contract. For the breach or violation of this provision, the City shall have the right to disqualify the Bid and terminate the Contract at its sole discretion, without liability, and to deduct from the contract price, or otherwise recover, the full amount of such fee, commission, percentage, gift or consideration. Further, by submission of a Bid, Bidder affirms that its Bid is made without prior understanding, agreement or connection with any corporation, firm, or person submitting a Bid for the same materials, supplies, equipment or services, and is in all respects fair and without collusion or fraud. Bidder agrees to abide by all conditions of these Bid Documents and the resulting contract.
7.5 One-Step Submission. Qualification Forms, Bid Security, Bid Forms, and Addenda must be submitted at one time.
STEP 1: Section 00100 “Qualification Forms Package”
• Section 00100 – Qualification Forms o Bidder Profile Sheet o Qualification Form A Certificate of Authorized Signatory o Qualification Form B Questionnaire o Qualification Form C Financial Statements o Qualification Form D Experience of Bidder o Qualification Form E Equipment List o Qualification Form F List of Proposed Subcontractors/Shop Fabricators o Qualification Form G Certification of Non-Segregated Facilities o Qualification Form H Qualification Forms Package Compliance Certification o Qualification Form I – E-Verify Registration and Use Affidavit o Qualification Form J Local Preference o Qualification Form K Foreign Country of Concern Attestation o Qualification Form L Anti-Human Trafficking Affidavit
Bid Security, Section 00200 “Bid Forms Package”, and Addenda
• Bid Security- A Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The
Bond shall be for an amount not less than five percent (5%) of the bid price/cost and shall be made payable to the City as a guarantee that the Bid will not be withdrawn and will remain firm for a period of one hundred twenty (120) calendar days after the day of the Bid opening and that the Bidder will execute the Contract with the City.
• Addenda - All Addenda.
• Section 00200 – Bid Forms o Bidder Bid Form o Bid Form A Lump Sum or Lump Sum Grand Total Bid Schedule o Bid Form B Direct Purchase of Materials o Bid Form C Certification Regarding Debarment o Bid Form D Trench Safety Act o Bid Form E Non-Collusion Affidavit of Bidder o Bid Form F Bid Forms Package Compliance Certification
7.6 All Addenda, proof of Bid Security and Required Forms shall be completed, signed, dated, and returned to be considered responsive and shall be received electronically through the City’s Procurement Portal by the specified time and date. No other method of submission will be allowed or considered (i.e. mailed, emailed, or hand delivered).
7.7 Use of City’s Procurement Portal. Upload all submissions to https://palmcoastgov.bonfirehub.com/opportunities/235503 Important Notes:
• Please note the type and number of files allowed. The maximum allowed file size is 1000MB.
• Do not embed any documents within the uploaded files, as they will not be accessible for evaluation.
• Each item of Requested Information will only be visible after the Closing Time.
• Uploading large documents may take significant time, depending on the size of the file(s) and your Internet connection.
• You will receive an email confirmation receipt with a unique confirmation number once you finalize your submission.
• Minimum system requirements: Internet Explorer 11, Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled.
SECTION 8: QUALIFICATION
8.1 Bidder shall sign, date and return all Addenda. Failure to do so will result in immediate rejection and disqualification of the Bid.
8.2 Bidder shall complete the Qualification Form Package. Failure to provide complete responses to the Qualification Forms Package will result in disqualification of the Bidder. Notwithstanding, if any Qualification Form is missing or determined by City to be incomplete, the City has the option, at City’s sole discretion, to immediately reject the Bid, or to request the missing or incomplete form. Upon such request by City, Bidder shall have one (1) business day to respond with the completed form. Failure to do so within the time frame provided shall result in rejection and disqualification of the Bid. Compliance with all requirements will be solely the responsibility of the Bidder. By submitting a response, the Bidder warrants that its responses to the Qualification Forms Package are correct.
8.3 Qualification Forms responses shall be reviewed by a City Staff Evaluation Committee to determine which Bidders are Pre-Qualified.
8.4 For the duration of the Work, Bidder's, both corporate and individual, and all subcontractors, must be fully licensed and certified for the type of work performed.
8.5 City may consider the qualifications and experience of Subcontractors and other persons and organizations (including, but not limited to, those who are to furnish the principal items of Material or Equipment) proposed for those portions of the Work. Operating costs, maintenance, considerations, performance data and guarantees of Materials and Equipment may also be considered by City.
8.6 City may conduct such investigations and require supplemental information as it deems necessary to assist in the Pre-Qualification evaluation and to establish the responsibility, qualifications and financial ability of the Bidders, proposed Subcontractors, proposed Equipment and Material suppliers, and other persons and organizations to do the Work in accordance with the Bid Documents to City’s satisfaction.
8.7 The City reserves the right to reject any Bidder who is behind, as determined by the City, on the completion schedule for any existing Contracts with the City, in litigation with the City, involved in any dispute resolution procedure with the City, has previously defaulted on a contract with the City or has previously failed to satisfy all City requirements related to life safety, including, but not limited to, the maintenance of traffic provisions on existing or previous contracts with the City.
8.8 Any of the following causes may also be considered sufficient grounds for disqualification of a Bidder as Non-Responsible:
(1) Information which is determined to be substantially inaccurate, misleading, exaggerated, or incorrect
(2) Bidders, both corporate and individual, who are not licensed and certified in the State of Florida for the type of services to be provided.
(3) Evidence establishing that Bidder may hinder or otherwise delay from timely completion of the Project.
(4) Lack of demonstrated ability, resources, and skill of the Bidder.
(5) Lack of demonstrated experience working in a similar capacity to that required by the scope of work in these Bid Documents on projects of similar scope, complexity, nature and size.
(6) Lack of quality performance under previous projects for the City of Palm Coast or for any other customer of Bidder.
(7) Previous and existing non-compliance by the Bidder with City’s policies and procedures, or the life safety requirements and other laws, ordinances and regulations.
(8) Lack of demonstrated Quality Control Program.
(9) Contract disputes, claims and litigation filed by or against Bidder in the past five (5) years that are related to the services Bidder provides in the regular course of business.
(10) Reprimand of any nature or suspension by the Department of Business and Professional Regulation (DBPR) or any other regulatory agency or professional association within the last five (5) years.
(11) Non-compliance with the requirements of these “Instructions to Bidders” including, but not limited to, failure to sign, date and return all Addenda.
SECTION 9: BID FORMS
9.1 Bidder shall sign, date and return all remaining Addenda before the Bid Deadline. Failure to do so will result in immediate rejection and disqualification of the Bid.
9.2 Bidder shall complete all Bid Forms Package. Failure to provide complete responses will result in disqualification of the Bid. Failure to provide a complete response to the Bidder Bid Form, Bid Form A (Bid Schedule), and Bid Form F (Compliance Certification) shall result in immediate disqualification of the Bid. Notwithstanding, if any other Bid Form Package form is missing or determined by City to be incomplete, the City has the option, at City’s sole discretion, to immediately reject the Bid, or to request the missing or incomplete form. Upon such request by City, Bidder shall have one (1) business day to respond with the completed form. Failure to do so within the time frame provided shall result in rejection and disqualification of the Bid. Compliance with all requirements will be solely the responsibility of the Bidder. By submitting a response, the Bidder warrants that its Bid is correct.
9.3 Bidders may withdraw their Bid through the City’s Procurement Portal prior to the time and date set for the Bid due date. Once opened, Bids become the property of the City. Bidders may not assign or otherwise transfer their Bids prior to or after the bid opening time.
SECTION 10: BID OPENING AND EVALUATION OF BIDS
10.1 At the specified time and place as indicated in the "Request for Proposals", Bids shall be opened publicly and read aloud. Persons with disabilities needing assistance to participate in the public opening should contact the City Human Resource Office ADA Coordinator at 386-986-2570 at least two business days in advance of the public opening.
10.2 All Bids shall remain firm for a minimum of one hundred and twenty (120) calendar days after the day of the Bid opening to allow for the evaluation, selection process and execution of the Contract. If need be, the Bidder and the City may mutually agree to extend that time up to an additional ninety (90) calendar days.
10.3 The City reserves the right to reject any or all Bids, or any part of a Bid for any reason and without penalty at any time during the process, including prior to or after the rankings are made by the City, and to terminate any contract negotiations commenced with any Bidder. The City reserves the right to inspect all facilities of Bidders in order to make a determination as to the foregoing. The City reserves the right to waive or enforce any irregularities, informalities, and technicalities. This section shall be construed liberally to benefit the public and not the Bidder.
10.4 If during the evaluation process, should City require additional information, data, forms, and attachments to assist with clarification on any proposal, upon City request, the Bidder shall have one (1) day to supply the additional information. If the additional information is not provided within the time frame provided herein, the bid will be disqualified. In the event of extension or addition error(s), the unit price and extension will prevail, and the Bidder’s total offer will be corrected accordingly. For lump sum Bids with no unit price extensions, written amounts take precedence over numerical amounts. Bids having edits must be initialed by the Bidder.
10.5 If within one (1) business day after Bids are opened, any Bidder files a duly signed written notice with City, and within two (2) business days thereafter demonstrates to the reasonable satisfaction of the City that: a) there has been a material and substantial mistake in the preparation of the Bid; b) the mistake is of such great consequence that to enforce the Contract would be unconscionable; and c) the mistake occurred notwithstanding the exercise of reasonable care in the preparation of the Bid; the Bidder may withdraw its Bid, and the Bid Security will be returned provided that the City is not seriously prejudiced, except for the loss of its bargain. Bidders shall not be allowed to correct a Bid with a material and substantial mistake. A Bidder withdrawing its Bid under this subsection shall be disqualified from further bidding on the Work.
10.6 Any of the following criteria may also be considered as sufficient grounds for deeming the Bidder non-responsive and rejecting the Bid:
(1) Submission of more than one (1) Bid for the same work by any entity under the same or different names.
(2) Work by any entity under the same or different names.
(3) Evidence of collusion among Bidders.
(4) Submission of an unbalanced Bid in which prices quoted for some items are out of proportion to the prices quoted for other or similar items in the same Bid.
(5) Bidder’s failure to submit missing Required Forms within one (1) business day following the date of the City’s request.
(6) Falsification of any entry made on the Bid shall be deemed a material irregularity.
(7) Non-compliance with the requirements of these “Instructions to Bidders”.
10.7 The City has a Local Business Preference Policy, see Section 2-30 of the City of Palm Coast Code of Ordinance, designed to aid Local Vendors.
The Policy allows Local Vendors (defined below) to be awarded a solicitation if their cost to the City is within 3% - 5% (depending on amount) up to total of $20,000 (see calculation below). The City’s Local Business Preference is not applicable to any “Invitations to Bid” where funding will be in whole or part from any federal or state agency; or a local agency with differing or no local preference.
(1) Local Vendor – For purposes of application of the Local Business Preference, a Local Vendor is a businesses that has its headquarters, manufacturing facility, or locally-owned franchise located in, or having a street address within, the legal boundaries of the City of Palm Coast for at least one (1) year immediately prior to this ITB. If the local business preference does not result in the Palm Coast business being awarded the ITB, then the local business preference shall be given to businesses have its headquarters, manufacturing facility, or locally-owned franchise located in, or having a street address within, the legal boundaries of Flagler County for at least one (1) year immediately prior to the ITB. Post office boxes do not qualify as a verifiable business address.
(2) Calculation of Amount of Preference - Five percent (5%) of the total quoted price up to $200,000.00 as referenced on the price schedule. Three percent (3%) of the total quoted price above $200,000.00 as referenced on the price schedule. Total local business preference shall be limited to $20,000.00 for each project.
10.8 Notice of Intent to Award will be posted on the City’s Procurement Portal (https://palmcoastgov.bonfirehub.com/portal) prior to City’s final approval process.
SECTION 11: BID PROTESTS
11.1 Protests hereunder shall be in accordance with City Code of Ordinances Chapter 2, Article 1, Division 3, Section 2-29 Bid Protest Procedures which can be found at the City’s website Under Government, City Codes and Ordinances, or by clicking on this Bid Protest Procedures Link.
SECTION 12: AWARD OF CONTRACT
12.1 The award will be made to a responsive, responsible Proposer consistent with the process and award criteria set forth in the Evaluation of Qualifications and Award herein. The City reserves the right to accept any proposal or combination of proposal alternates which, in the City’s judgment, will best serve the City’s interest. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit price. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Proposer understands that submission of its proposal constitutes Proposer’s acceptance of the terms and conditions of this Request for Proposal, including the contract template attached. However, Proposer also understands that its proposal does not constitute an agreement or a contract with the City. The City reserves the right to reject all proposals, to waive any formalities, to solicit and re-advertise for new proposals or to abandon the project in its entirety. The right is reserved to make a separate award of each item, group of items or all items, and to make an award, in whole or in part, whichever is deemed in the best interest of the City.
Pursuant to Florida Statutes § 287.05701, the City will not will not give preference to or request documentation of or consider a vendor’s social, political, or ideological interests when determining the vendor’s qualifications.
12.2 AWARD CRITERIA: Refer to Section entitled, “Evaluation of Qualifications and Award”.
12.3 The Contract will be awarded as soon as possible or within one hundred twenty (120) calendar days from the Bid opening date in accordance with award criteria. If the Bid Form indicates a base bid and additive or deductive alternates, the low combination of base bid and City determined accepted alternates shall be considered for the basis of award. The City reserves the right to accept or reject the base bid, any alternate bids, or any combination thereof at any time in the process.
12.4 If not already registered as a vendor with the City of Palm Coast, Bidder shall, within three (3) business days of receipt of Contract, register online at: https://www.palmcoastgov.com/vendor-registration.
SECTION 13: SIGNING OF CONTRACT/BONDS AND INSURANCE
13.1 Within fifteen (15) calendar days of receipt of Contract, the successful Bidder shall electronically execute the Contract.
13.2 The Bid Documents set forth City’s requirements as to Bonds and Insurance. When the successful Bidder submits the executed Contract, it shall be accompanied by copies of the required Bonds and insurance certificates. Attorneys-in-fact who sign Bid Bonds, Performance Bonds, Payment Bonds and Material and Workmanship Bonds must file with such Bonds a certified copy of their power-of-attorney to sign the Bonds.
13.3 The successful Bidder shall record the Performance Bond and Payment Bond with the Clerk of Flagler County and shall submit the original recorded Bonds to City within fifteen (15) calendar days after Bidder receives a copy of the fully executed Contract. In no event shall Work commence before City is in receipt of the original recorded Bonds.
13.4 Failure by a successful Bidder to execute the Contract or to furnish the required Bonds or insurance certificates shall be just cause for the annulment of the award and the forfeiture of the Bid Security.
END OF SECTION
PROPOSAL SUBMITTAL
The Proposer must submit a proposal that substantially complies with this RFP in all material aspects. All proposals must contain direct responses to the requested information. The response should be organized so that specific sections and questions being responded to are readily identifiable and in the same sequence as outlined below. The proposal shall cover in as much detail as possible the requirements of the RFP, subject to modification and enhancements as a result of information gained during the selection process.
However, Proposers are advised that lengthy or overly verbose or redundant submissions are not necessary. Proposers are advised to carefully follow these Instructions in order to be considered fully responsive to this RFP. Compliance with all requirements will be solely the responsibility of the Proposer. Proposers shall submit all required forms through the process outlined in the Preparing and Uploading Submission section below. By submitting a response, the Proposer warrants that its proposal is correct.
The proposal must be divided into four (4) sections with references to parts of this RFP done on a section number/paragraph number basis. The four (4) sections shall be named:
SECTION 1 - EXPERIENCE WITH SIMILAR PROJECTS/TECHNICAL CAPABILITY: Provide a listing of similar projects, maximum of three, by a team member who is specifically part of the team proposed in the response. Identify specific project details, including but not limited to, location, description of the funding entity, project budget, project description, length, and outcomes. Provide the contact information for the entities where work has been done for reference purposes.
SECTION 2 - PROJECT TEAM AND SCHEDULE: Provide an organizational chart and staffing plan clearly identifying the structure of the entire project team, including key personnel, major and minor subcontractors, and their specific roles and responsibilities for this project. Include contact information and technical resumes for all proposed key personnel and discuss each individual’s relevant experience on projects of similar scope and complexity. The City must approve any changes to Project Management or Key Personnel throughout the duration of the project. Information provided in this section shall be limited to only those individuals who will actively perform work on this project.
In addition, provide a detailed project schedule and sequencing plan identifying all major milestones, phasing, anticipated durations, and resource allocations necessary to complete the work. Proposers shall demonstrate their ability to provide an aggressive yet achievable schedule that minimizes out-of-service time for the Master Lift Station, Headworks, and Screening Structure, recognizing these as critical City facilities. The schedule should clearly identify critical path activities, coordination requirements, and measures the Contractor will implement to expedite completion and maintain project continuity.
The information provided under this section shall be limited to a maximum of ten (10) pages.
SECTION 3 - PROPOSAL COST FORM AND RATES: This section shall include the completed Pricing Bid Form for the WWTF #1 Headworks Rehabilitation Project, including all lump sum and unit pricing items identified therein. The Bid Form shall include all labor, materials, equipment, supervision, mobilization, taxes, fees, permits, subcontractor costs, travel, incidentals, and any other costs necessary to complete the work in accordance with the project requirements. The Contractor shall provide a total bid price for Parts A and B as identified in the Bid Form.
SECTION 4 - REQUIRED FORMS: This section shall include the required forms which are available at the end of this Proposal Manual.
EVALUATION OF QUALIFICATIONS AND AWARD
SELECTION CRITERIA: The selection criteria for this RFP is set forth below:
The City will evaluate proposals based on the Contractor’s proposed project schedule and financial proposal. Emphasis will be placed on the Contractor’s ability to complete the work efficiently while providing the best overall value to the City.
The evaluation will consider the following criteria:
Project Schedule / Completion Time (Weight: 45%)
• Proposed project timeline and ability to complete the work within the required schedule.
• Demonstrated approach to minimizing out-of-service time for the Master Lift Station, Headworks, and Screening Structure.
• Feasibility, aggressiveness, and comprehensiveness of the proposed sequencing and work plan.
• Ability to provide sufficient staffing and resources to maintain project continuity and expedite completion.
Price Proposal (Weight: 45%)
• Overall cost to the City for completion of the project.
• Clarity and completeness of the submitted pricing proposal.
• Cost effectiveness and overall value of the proposed services.
• Reasonableness of pricing in relation to the proposed schedule, staffing, and project approach.
Experience and Technical Capability (Weight: 10%)
• Demonstrated experience successfully completing projects of similar size, scope, and complexity, specifically involving wastewater treatment facilities, concrete rehabilitation, protective coatings, and related infrastructure improvements.
• Qualifications, technical expertise, and experience of the proposed project team, including key personnel and subcontractors.
• Demonstrated knowledge of sequencing, bypass coordination, and maintaining operations at critical facilities.
• Adequacy of available staffing, equipment, and technical resources necessary to complete the project.
SECTION 00100
QUALIFICATION FORMS PACKAGE
Project Name: WWTF #1 HEADWORKS REHABILITATION PROJECT
City Project No.: RFP-UT-26-51
BIDDER PROFILE SHEET
Full Legal Name of Bidder Organization:________________________________________________________
DBA (if any): ______________________________________________________________________________
Contact Name ____________________________________________________________________________
E-mail Address: _______________________________ Phone Number_______________________________
Mailing Address: __________________________________________________________________________
Physical Address (if different): _______________________________________________________________
Florida Contractor License Number:___________________________________________________________
Florida License Expiration Date: ______________________________________________________________
Florida Dept of State, Division of Corp (SunBiz) Document Number:_____________________________
List of Attachments to be completed and returned with the Bidder Profile Sheet:
• ATTACHMENT A: CERTIFICATION OF AUTHORIZED SIGNATORY
• ATTACHMENT B: QUESTIONNAIRE
• ATTACHMENT C: FINANCIAL STATEMENTS
• ATTACHMENT D: EXPERIENCE OF BIDDER
• ATTACHMENT E: EQUIPMENT LIST
• ATTACHMENT F: LIST OF PROPOSED SUBCONTRACTORS/SHOP FABRICATORS
• ATTACHMENT G: CERTIFICATE OF NON-SEGREGATED FACILITIES
• ATTACHMENT H: QUALIFICATION FORMS PACKAGE COMPLIANCE CERTIFICATION
• ATTACHMENT I: E-VERIFY REGISTRATION AND USE AFFIDAVIT
• ATTACHMENT J: LOCAL PREFERENCE
• ATTACHMENT K: FOREIGN COUNTRY OF CONCERN ATTESTATION
• ATTACHMENT L: ANTI-HUMAN TRAFFICKING AFFIDAVIT
Addenda Reminder Addenda will be posted on the City’s Procurement Portal at: https://palmcoastgov.bonfirehub.com/portal. Bidders MUST sign, date, and return all Addenda in accordance with the Instructions to Bidders. It is Bidder’s sole responsibility to obtain information related to Addenda.
QUALIFICATION FORM A
CERTIFICATION OF AUTHORIZED SIGNATORY
Print/Type Legal Business Name (same as name on W-9 form)
Print/Type FEIN #
Check the legal entity type that is applicable to the above named business:
• Sole Proprietorship – Complete Section A
• General or Limited Partnership – Complete Section B
• Corporation (Inc. , LLC) Complete Section C
SECTION A: SOLE PROPRIETORSHIP
I HEREBY CERTIFY that I am the sole owner of the business identified above and am authorized to sign legal documents on behalf of said business.
Signature:
Print name:
SECTION B: PARTNERSHIP
I HEREBY CERTIFY that I am a General Partner of the business identified above and am authorized to sign legal documents on behalf of said business.
Signature:
Print name:
SECTION C – CORPORATION
I HEREBY CERTIFY that a meeting of the Board of Directors of
Legal business name a corporation /LLC under the laws of the State of ___________________, was held on _____________20___. The following resolution was duly passed and adopted:
“RESOLVED, that _________________________________________ is an officer and director of the corporation (or the managing member of the LLC) and is hereby authorized to execute contracts between the City of Palm Coast, a municipal corporation and this corporation/LLC, and that execution thereof by said officer and director, attested by the Secretary of the corporation/LLC, shall be the official act and deed of this corporation/LLC.”
I FURTHER CERTIFY that said resolution is now in full force and effect.
IN WITNESS THEREOF, I have hereunto set my hand this ____ day of _________________, 20___.
Provide copy of Resolution
Corporate Secretary/Managing Member
QUALIFICATION FORM B
QUESTIONNAIRE
Instructions: Complete each question below. Include additional sheets if necessary.
1. Full Legal Name of Bidder Organization: ______________________________________________________________
2. How many years has your organization been in business as a General Contractor? ______________
3. How many years has your organization been in business as a Subcontractor? __________________
4. What is your organization’s current Experience Modification # ________________
5. How many full time permanent employees does your company have? _______________________
6. Name of Superintendent and length of time with your company? _____________________________________________
7. Have you ever failed, or been alleged to have failed, to complete work awarded to you? If so, where and why?
8. Have you ever failed, or been alleged to have failed, to complete work within the Contract Time? If so, where and why?
9. Have you ever been assessed liquidated damages, or had liquidated damages assessed against you? If so, where and why?
10. Have you ever had your bonding restricted or limited? If yes, provide explanation._____________________________________________
11. Have you ever had a Bond or letter of credit called by the owner of a project? If so, when?
12. Have you inspected the site of the proposed Work? Describe, in full, any anticipated problems with the Site and your proposed solutions? _______________________________________________________________________________________________________
13. Has Bidder been involved in litigation, claim(s), or contract dispute(s) filed by or against the Bidder in the past five (5) years that are related to the services the Bidder provides in the regular course of business? If yes, provide a summary of the litigation, claim(s), or contract dispute(s) filed by or against the Bidder in the past five (5) years that are related to the services the Bidder provides in the regular course of business.
The summary shall state the nature of the litigation, claim or contract dispute, a brief description of the case, the outcome or projected outcome, and monetary amounts involved.
14. Has Bidder been sanctioned by any regulatory or licensing agency with the past five (5) years. If yes, provide a list the regulatory and licensing agency sanctions._____________________________________________________________________________________________
15. Please provide all material facts pertaining to any felony conviction or any pending felony charges in the last three (3) years in this State or any other state of the United States against (i) the Bidder, (ii) any business entity related to or affiliated with the Bidder or (iii) any present or former owner of the Bidder or of any such related or affiliated entity. (This disclosure shall not apply to any person or entity which is only a stockholder, which person or entity owns twenty percent (20%) or less of the outstanding shares of the Bidder whose stock is publicly owned and traded.) If none, indicate “NONE”.
QUALIFICATION FORM C
FINANCIAL STATEMENTS
This information will be kept confidential and will NOT be made available to the public.
NAME OF BIDDER: ___________________________________________________________________
Please attach a copy of your most recent financial statements. Financial statements “audited” by an independent certified public accountant are preferred over documents that are “reviewed” by an independent certified public accountant. Documents “reviewed” by an independent certified public accountant are preferred over “compilations”. Internal financial statements are not acceptable. The financial information will be reviewed by a member(s) of the City’s finance department.
QUALIFICATION FORM D
EXPERIENCE OF BIDDER
NAME OF BIDDER ___________________________________________________________________________________________
1. How many active projects are you working on? _____________ Approximate dollar value total $__________________
2. In order of most recent/current to oldest, please provide the following information regarding experience within the past five (5) years in this particular scope of work. List ONLY projects of similar scope, complexity, nature and size. Please attach any pictures or other documentation supporting the project description. Use additional sheets if necessary.
REFERENCES CANNOT INCLUDE CURRENT CITY EMPLOYEES. FAILURE TO MEET THIS
REQUIREMENT MAY RESULT IN DISQUALIFICATION AND YOUR SUBMISSION DEEMED
NON-RESPONSIVE.
Project Name:
Date of Contract Client’s Name Contract Amount $
Notice to Proceed Date End Date/Current Client’s Phone Client’s Email
Project Location:
SHORT DESCRIPTION OF PROJECT :
Describe any challenges meeting project schedule:
SHORT DESCRIPTION OF PROJECT:
QUALIFICATION FORM E
EQUIPMENT LIST
NAME OF BIDDER _______________________________________________
List all Equipment available to perform the Work. Identify whether it is owned, rented or is to be purchased by Bidder.
Type of Equipment Make Model Status- (O) Owner, (R) Rented, or (TBP) To Be
Purchased
QUALIFICATION FORM F
LIST OF PROPOSED SUBCONTRACTORS/SHOP FABRICATORS
Bidder acknowledges and agrees that it must perform at least _______ % of the total work as measured by cost (Equipment and labor) within its own organization and excluding Material costs. Failure to perform the required percentage of Work shall constitute a material breach of the Contract.
Bidder expressly agrees that:
If awarded the Bid, list below by category the Subcontractors and/or shop fabricators to be used in the prosecution of the Work and whose value of work shall be at least 10% of the primary contract value. Only one (1) subcontractor and/or shop fabricator shall be used in each category. (Attach additional sheets if necessary.) No substitution will be permitted without City’s written approval.
PREVIOUS WORK Subcontractor
EXPERIENCE % VALUE
TOGETHER of total Contract
CATEGORY NAME/ADDRESS YES / NO
Bidder represents and warrants that the Subcontractors and/or shop fabricators listed are financially responsible and are qualified to do the Work for the category identified. _______ Initials
QUALIFICATION FORM G
CERTIFICATE OF NON-SEGREGATED FACILITIES
We, __________________________________________________________(Bidder Company Name) certify that we do not and will not maintain or provide for our employees any segregated facilities at any of our establishments, and that we do not and will not permit our employees to perform their services at any location, under our control, where segregated facilities are maintained. We understand and agree that breach of this certification is a violation of Equal Opportunity clause required by Executive Order 11246, amended.
As used in this certification, the term "segregated facilities” means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other…
This is the start of the file's text. The full file is on GovTribe.