Text version

ALKYRE RUN WETLAND AND

FLOODPLAIN RESTORATION PROJECT

OCTOBER 2025

OHIO ENVIRONMENTAL PROTECTION AGENCY

SECTION 319(H) GRANT PROGRAM

CITY OF WESTERVILLE, OHIO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROJECT SITE

AutoCAD SHX Text

ERIC ONDERAK, P.E. REGISTERED ENGINEER NO. 73160

AutoCAD SHX Text

COUNTY LINE RD W

AutoCAD SHX Text

N CLEVELAND AVE

AutoCAD SHX Text

ALKYRE RUN

AutoCAD SHX Text

HANAWALT RD

AutoCAD SHX Text

ALUM CREEK

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

DRAWING DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 03-04-0404

AutoCAD SHX Text

TECHNICAL SPECIFICATIONS

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING CONDITIONS

AutoCAD SHX Text

AutoCAD SHX Text

SITE ACCESS AND LIMITS OF WORK

AutoCAD SHX Text

AutoCAD SHX Text

GRADING PLAN NORTH

AutoCAD SHX Text

AutoCAD SHX Text

GRADING PLAN SOUTH

AutoCAD SHX Text 09-10-1010

AutoCAD SHX Text

CROSS SECTIONS

AutoCAD SHX Text

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

CLEARING AND VEGETATION MANAGEMENT PLAN

AutoCAD SHX Text

AutoCAD SHX Text

SITE RESTORATION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PLANTING AND SEEDING SCHEDULES

AutoCAD SHX Text

AutoCAD SHX Text

SWPPP PLAN

AutoCAD SHX Text

AutoCAD SHX Text

SWPPP NOTES

AutoCAD SHX Text

AutoCAD SHX Text

SWPPP DETAILS

AutoCAD SHX Text

AFRICA RD

SAN SAN SAN

100YR 100YR 100YR

X X X

DESIGNED BY:

PROJECT NO.:

DATE:

OF

NO. ISSUED FORDATE BY

DRAWN BY:

CHECKED BY:

COPYRIGHT:

SHEET TITLE

SHEET

ENGINEER

FUNDING PROVIDER

OWNER

PROJECT

SCALE:

OCTOBER 2025

063-003

JDS

JAC

EDO

ALKYRE RUN WETLAND AND

FLOODPLAIN RESTORATION

GENERAL NOTES

NOT TO SCALE

GM GM GM

WM WM WM

STM STM STM

PL PL PL

AutoCAD SHX Text

%%UEXISTING SANITARY SEWER

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text ABBREVIATIONS AC ACRES ACRES ANSI AMERICAN NATIONAL STANDARDS INSTITUTE AMERICAN NATIONAL STANDARDS INSTITUTE APPX APPROXIMATELY APPROXIMATELY BM BENCHMARK BENCHMARK CTR CONTROL CONTROL DND DO NOT DISTURB DO NOT DISTURB ECB EROSION CONTROL BLANKET EROSION CONTROL BLANKET EL ELEVATION ELEVATION EX EXISTING EXISTING FL FLOWLINE FLOWLINE FLDWY FLOODWAY FLOODWAY FT FEET FEET INV INVERT INVERT NPDES NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM NTS NOT TO SCALE NOT TO SCALE OUPS OHIO UTILITIES PROTECTION SERVICE OHIO UTILITIES PROTECTION SERVICE PID PARCEL IDENTIFICATION NUMBER PARCEL IDENTIFICATION NUMBER PL PROPERTY LINE PROPERTY LINE PROP PROPOSED PROPOSED STA STATION STATION STM STORM DRAIN STORM DRAIN TYP TYPICALTYPICAL

AutoCAD SHX Text

%%UPROPOSED CONTOUR

AutoCAD SHX Text

DETAILS & SECTIONS IDENTIFICATION SYSTEM

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET ON WHICH DETAIL IS LOCATED

AutoCAD SHX Text

%%UEXISTING HYDROGRAPHY

AutoCAD SHX Text

%%UEXISTING TREELINE

AutoCAD SHX Text

%%UEXISTING CONTOUR

AutoCAD SHX Text

AutoCAD SHX Text

%%UEXISTING 100 YEAR FLOODPLAIN

AutoCAD SHX Text

AutoCAD SHX Text GENERAL CONSTRUCTION NOTES 1. CONTRACTOR SHALL CONTACT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT CONTRACTOR SHALL CONTACT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT SHALL CONTACT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT SHALL CONTACT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT CONTACT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT CONTACT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT LAURA BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT BALL, CITY OF WESTERVILLE PARK AND DEVELOPMENT CITY OF WESTERVILLE PARK AND DEVELOPMENT CITY OF WESTERVILLE PARK AND DEVELOPMENT OF WESTERVILLE PARK AND DEVELOPMENT OF WESTERVILLE PARK AND DEVELOPMENT WESTERVILLE PARK AND DEVELOPMENT WESTERVILLE PARK AND DEVELOPMENT PARK AND DEVELOPMENT PARK AND DEVELOPMENT AND DEVELOPMENT AND DEVELOPMENT DEVELOPMENT DEVELOPMENT ADMINISTRATOR (614-901-6545) A MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT (614-901-6545) A MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT (614-901-6545) A MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT A MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT A MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT MINIMUM OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT OF 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT 5 DAYS PRIOR TO MOBILIZING TO THE PROJECT DAYS PRIOR TO MOBILIZING TO THE PROJECT DAYS PRIOR TO MOBILIZING TO THE PROJECT PRIOR TO MOBILIZING TO THE PROJECT PRIOR TO MOBILIZING TO THE PROJECT TO MOBILIZING TO THE PROJECT TO MOBILIZING TO THE PROJECT MOBILIZING TO THE PROJECT MOBILIZING TO THE PROJECT TO THE PROJECT TO THE PROJECT THE PROJECT THE PROJECT PROJECT PROJECT SITE. CONTRACTOR SHALL MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, CONTRACTOR SHALL MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, CONTRACTOR SHALL MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, CONTRACTOR SHALL MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, SHALL MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, SHALL MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, MAINTAIN REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, REGULAR CONTACT WITH THE OWNER, OR THEIR DESIGNEE, CONTACT WITH THE OWNER, OR THEIR DESIGNEE, CONTACT WITH THE OWNER, OR THEIR DESIGNEE, WITH THE OWNER, OR THEIR DESIGNEE, WITH THE OWNER, OR THEIR DESIGNEE, THE OWNER, OR THEIR DESIGNEE, THE OWNER, OR THEIR DESIGNEE, OWNER, OR THEIR DESIGNEE, OWNER, OR THEIR DESIGNEE, OR THEIR DESIGNEE, OR THEIR DESIGNEE, THEIR DESIGNEE, THEIR DESIGNEE, DESIGNEE, DESIGNEE, THROUGHOUT THE DURATION OF THE PROJECT TO MINIMIZE ANY DISRUPTIONS TO OPERATIONS. 2. CONTRACTOR SHALL CONTACT THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM CONTRACTOR SHALL CONTACT THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM SHALL CONTACT THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM SHALL CONTACT THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM CONTACT THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM CONTACT THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM THE OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM OWNER OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM OR ENGINEER BEFORE MAKING ANY DEVIATIONS FROM ENGINEER BEFORE MAKING ANY DEVIATIONS FROM ENGINEER BEFORE MAKING ANY DEVIATIONS FROM BEFORE MAKING ANY DEVIATIONS FROM BEFORE MAKING ANY DEVIATIONS FROM MAKING ANY DEVIATIONS FROM MAKING ANY DEVIATIONS FROM ANY DEVIATIONS FROM ANY DEVIATIONS FROM DEVIATIONS FROM DEVIATIONS FROM FROM FROM THE PROJECT DRAWINGS GREATER THAN SPECIFIED CONSTRUCTION TOLERANCES. 3. EXISTING TOPOGRAPHY ON THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD EXISTING TOPOGRAPHY ON THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD TOPOGRAPHY ON THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD TOPOGRAPHY ON THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD ON THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD ON THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD THESE PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD PROJECT DRAWINGS HAS BEEN GENERATED FROM A FIELD DRAWINGS HAS BEEN GENERATED FROM A FIELD DRAWINGS HAS BEEN GENERATED FROM A FIELD HAS BEEN GENERATED FROM A FIELD HAS BEEN GENERATED FROM A FIELD BEEN GENERATED FROM A FIELD BEEN GENERATED FROM A FIELD GENERATED FROM A FIELD GENERATED FROM A FIELD FROM A FIELD FROM A FIELD A FIELD A FIELD FIELD FIELD TOPOGRAPHIC SURVEY PERFORMED IN MAY, 2025. 4. HORIZONTAL AND VERTICAL CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION HORIZONTAL AND VERTICAL CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION AND VERTICAL CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION AND VERTICAL CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION VERTICAL CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION VERTICAL CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION CONTROL COORDINATES ARE PROVIDED ON THE CONSTRUCTION COORDINATES ARE PROVIDED ON THE CONSTRUCTION COORDINATES ARE PROVIDED ON THE CONSTRUCTION ARE PROVIDED ON THE CONSTRUCTION ARE PROVIDED ON THE CONSTRUCTION PROVIDED ON THE CONSTRUCTION PROVIDED ON THE CONSTRUCTION ON THE CONSTRUCTION ON THE CONSTRUCTION THE CONSTRUCTION THE CONSTRUCTION CONSTRUCTION CONSTRUCTION DRAWINGS. CONTRACTOR SHALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL CONTRACTOR SHALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL CONTRACTOR SHALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL CONTRACTOR SHALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL SHALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL SHALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL UTILIZE A STATE OF OHIO REGISTERED SURVEYOR FOR ALL A STATE OF OHIO REGISTERED SURVEYOR FOR ALL A STATE OF OHIO REGISTERED SURVEYOR FOR ALL STATE OF OHIO REGISTERED SURVEYOR FOR ALL STATE OF OHIO REGISTERED SURVEYOR FOR ALL OF OHIO REGISTERED SURVEYOR FOR ALL OF OHIO REGISTERED SURVEYOR FOR ALL OHIO REGISTERED SURVEYOR FOR ALL OHIO REGISTERED SURVEYOR FOR ALL REGISTERED SURVEYOR FOR ALL REGISTERED SURVEYOR FOR ALL SURVEYOR FOR ALL SURVEYOR FOR ALL FOR ALL FOR ALL ALL ALL NECESSARY CONSTRUCTION LAYOUT AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING CONSTRUCTION LAYOUT AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING CONSTRUCTION LAYOUT AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING LAYOUT AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING LAYOUT AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING AND STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING STAKING. SURVEYOR SHALL BE CAPABLE OF WORKING SURVEYOR SHALL BE CAPABLE OF WORKING SURVEYOR SHALL BE CAPABLE OF WORKING SURVEYOR SHALL BE CAPABLE OF WORKING SHALL BE CAPABLE OF WORKING SHALL BE CAPABLE OF WORKING BE CAPABLE OF WORKING BE CAPABLE OF WORKING CAPABLE OF WORKING CAPABLE OF WORKING OF WORKING OF WORKING WORKING WORKING WITH ELECTRONIC CAD FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS ELECTRONIC CAD FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS ELECTRONIC CAD FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS CAD FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS CAD FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS FILES IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS IN ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS ORDER TO COMPLETE NECESSARY LAYOUT AND STAKING. AS TO COMPLETE NECESSARY LAYOUT AND STAKING. AS TO COMPLETE NECESSARY LAYOUT AND STAKING. AS COMPLETE NECESSARY LAYOUT AND STAKING. AS COMPLETE NECESSARY LAYOUT AND STAKING. AS NECESSARY LAYOUT AND STAKING. AS NECESSARY LAYOUT AND STAKING. AS LAYOUT AND STAKING. AS LAYOUT AND STAKING. AS AND STAKING. AS AND STAKING. AS STAKING. AS STAKING. AS AS AS NECESSARY, OWNER OR ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION OWNER OR ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION OWNER OR ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION OR ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION OR ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION ENGINEER MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION MAY FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION FIELD CHECK THE HORIZONTAL AND VERTICAL LOCATION CHECK THE HORIZONTAL AND VERTICAL LOCATION CHECK THE HORIZONTAL AND VERTICAL LOCATION THE HORIZONTAL AND VERTICAL LOCATION THE HORIZONTAL AND VERTICAL LOCATION HORIZONTAL AND VERTICAL LOCATION HORIZONTAL AND VERTICAL LOCATION AND VERTICAL LOCATION AND VERTICAL LOCATION VERTICAL LOCATION VERTICAL LOCATION LOCATION LOCATION OF COMPLETED CONSTRUCTION. OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD COMPLETED CONSTRUCTION. OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD COMPLETED CONSTRUCTION. OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD CONSTRUCTION. OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD CONSTRUCTION. OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD OWNER WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD WILL PROVIDE AWARDED CONTRACTOR WITH THE CAD PROVIDE AWARDED CONTRACTOR WITH THE CAD PROVIDE AWARDED CONTRACTOR WITH THE CAD AWARDED CONTRACTOR WITH THE CAD AWARDED CONTRACTOR WITH THE CAD CONTRACTOR WITH THE CAD CONTRACTOR WITH THE CAD WITH THE CAD WITH THE CAD THE CAD THE CAD CAD CAD FILES FOR THE PROJECT. 5. DUE TO SUBTLE NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS DUE TO SUBTLE NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS TO SUBTLE NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS TO SUBTLE NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS SUBTLE NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS SUBTLE NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS NATURE OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS OF PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS PROPOSED GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS GRADING, THE USE OF GPS-GUIDED EQUIPMENT IS THE USE OF GPS-GUIDED EQUIPMENT IS THE USE OF GPS-GUIDED EQUIPMENT IS USE OF GPS-GUIDED EQUIPMENT IS USE OF GPS-GUIDED EQUIPMENT IS OF GPS-GUIDED EQUIPMENT IS OF GPS-GUIDED EQUIPMENT IS GPS-GUIDED EQUIPMENT IS GPS-GUIDED EQUIPMENT IS EQUIPMENT IS EQUIPMENT IS IS IS HIGHLY RECOMMENDED. 6. LEVELING INSTRUMENT, SURVEY ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED LEVELING INSTRUMENT, SURVEY ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED INSTRUMENT, SURVEY ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED INSTRUMENT, SURVEY ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED SURVEY ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED SURVEY ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED ROD, AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED AND A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED A SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED SKILLED INSTRUMENT PERSON SHALL BE MAINTAINED INSTRUMENT PERSON SHALL BE MAINTAINED INSTRUMENT PERSON SHALL BE MAINTAINED PERSON SHALL BE MAINTAINED PERSON SHALL BE MAINTAINED SHALL BE MAINTAINED SHALL BE MAINTAINED BE MAINTAINED BE MAINTAINED MAINTAINED MAINTAINED ON-SITE BY CONTRACTOR DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER BY CONTRACTOR DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER BY CONTRACTOR DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER CONTRACTOR DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER CONTRACTOR DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER DURING WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER WORK HOURS AND SHALL BE MADE AVAILABLE TO OWNER HOURS AND SHALL BE MADE AVAILABLE TO OWNER HOURS AND SHALL BE MADE AVAILABLE TO OWNER AND SHALL BE MADE AVAILABLE TO OWNER AND SHALL BE MADE AVAILABLE TO OWNER SHALL BE MADE AVAILABLE TO OWNER SHALL BE MADE AVAILABLE TO OWNER BE MADE AVAILABLE TO OWNER BE MADE AVAILABLE TO OWNER MADE AVAILABLE TO OWNER MADE AVAILABLE TO OWNER AVAILABLE TO OWNER AVAILABLE TO OWNER TO OWNER TO OWNER OWNER OWNER AND ENGINEER FOR CONDUCTING GRADE CHECKS AS NECESSARY. 7. CONTRACTOR SHALL MAINTAIN AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY CONTRACTOR SHALL MAINTAIN AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY SHALL MAINTAIN AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY SHALL MAINTAIN AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY MAINTAIN AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY MAINTAIN AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY AND PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY PROVIDE THE OWNER WITH RECORD DRAWINGS INDICATING ANY THE OWNER WITH RECORD DRAWINGS INDICATING ANY THE OWNER WITH RECORD DRAWINGS INDICATING ANY OWNER WITH RECORD DRAWINGS INDICATING ANY OWNER WITH RECORD DRAWINGS INDICATING ANY WITH RECORD DRAWINGS INDICATING ANY WITH RECORD DRAWINGS INDICATING ANY RECORD DRAWINGS INDICATING ANY RECORD DRAWINGS INDICATING ANY DRAWINGS INDICATING ANY DRAWINGS INDICATING ANY INDICATING ANY INDICATING ANY ANY ANY CHANGES, REVISIONS, ADDITIONS, OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD REVISIONS, ADDITIONS, OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD REVISIONS, ADDITIONS, OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD ADDITIONS, OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD ADDITIONS, OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD OR DELETIONS TO PROPOSED IMPROVEMENTS. RECORD DELETIONS TO PROPOSED IMPROVEMENTS. RECORD DELETIONS TO PROPOSED IMPROVEMENTS. RECORD TO PROPOSED IMPROVEMENTS. RECORD TO PROPOSED IMPROVEMENTS. RECORD PROPOSED IMPROVEMENTS. RECORD PROPOSED IMPROVEMENTS. RECORD IMPROVEMENTS. RECORD IMPROVEMENTS. RECORD RECORD RECORD RECORD DRAWINGS SHALL ALSO INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. SHALL ALSO INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. SHALL ALSO INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. ALSO INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. ALSO INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. INCLUDE SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. SURVEYED CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. CERTIFICATION POINTS AS SHOWN ON THE DRAWINGS. POINTS AS SHOWN ON THE DRAWINGS. POINTS AS SHOWN ON THE DRAWINGS. AS SHOWN ON THE DRAWINGS. AS SHOWN ON THE DRAWINGS. SHOWN ON THE DRAWINGS. SHOWN ON THE DRAWINGS. ON THE DRAWINGS. ON THE DRAWINGS. THE DRAWINGS. THE DRAWINGS. DRAWINGS. DRAWINGS. CERTIFICATION POINTS SHALL BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING POINTS SHALL BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING POINTS SHALL BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING SHALL BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING SHALL BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING BE MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING MEASURED AND REPORTED TO OWNER IMMEDIATELY FOLLOWING AND REPORTED TO OWNER IMMEDIATELY FOLLOWING AND REPORTED TO OWNER IMMEDIATELY FOLLOWING REPORTED TO OWNER IMMEDIATELY FOLLOWING REPORTED TO OWNER IMMEDIATELY FOLLOWING TO OWNER IMMEDIATELY FOLLOWING TO OWNER IMMEDIATELY FOLLOWING OWNER IMMEDIATELY FOLLOWING OWNER IMMEDIATELY FOLLOWING IMMEDIATELY FOLLOWING IMMEDIATELY FOLLOWING FOLLOWING FOLLOWING ACHIEVEMENT OF FINAL GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT OF FINAL GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT OF FINAL GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT FINAL GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT FINAL GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT GRADE TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT TO VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT VERIFY COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT COMPLIANCE WITH THE DRAWINGS. FINAL PAYMENT WITH THE DRAWINGS. FINAL PAYMENT WITH THE DRAWINGS. FINAL PAYMENT THE DRAWINGS. FINAL PAYMENT THE DRAWINGS. FINAL PAYMENT DRAWINGS. FINAL PAYMENT DRAWINGS. FINAL PAYMENT FINAL PAYMENT FINAL PAYMENT PAYMENT PAYMENT WILL NOT BE MADE UNTIL SATISFACTORY RECORD DRAWINGS ARE PROVIDED TO THE OWNER. 8. CONTRACTOR SHALL ASSUME ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND CONTRACTOR SHALL ASSUME ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND SHALL ASSUME ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND SHALL ASSUME ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND ASSUME ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND ASSUME ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND ALL CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND CONSTRUCTION RISKS ASSOCIATED WITH THE NATURE AND RISKS ASSOCIATED WITH THE NATURE AND RISKS ASSOCIATED WITH THE NATURE AND ASSOCIATED WITH THE NATURE AND ASSOCIATED WITH THE NATURE AND WITH THE NATURE AND WITH THE NATURE AND THE NATURE AND THE NATURE AND NATURE AND NATURE AND AND AND BEHAVIOR OF THE SOIL WHICH MAY BE ENCOUNTERED. 9. CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA SHALL PERFORM ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA SHALL PERFORM ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA PERFORM ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA PERFORM ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA ALL CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA CONSTRUCTION ACTIVITY IN COMPLIANCE WITH OSHA ACTIVITY IN COMPLIANCE WITH OSHA ACTIVITY IN COMPLIANCE WITH OSHA IN COMPLIANCE WITH OSHA IN COMPLIANCE WITH OSHA COMPLIANCE WITH OSHA COMPLIANCE WITH OSHA WITH OSHA WITH OSHA OSHA OSHA STANDARDS FOR SAFETY. 10. IF THE CONTRACTOR FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION IF THE CONTRACTOR FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION THE CONTRACTOR FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION THE CONTRACTOR FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION CONTRACTOR FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION CONTRACTOR FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION FINDS ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION ANY SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION SIGNIFICANT DISCREPANCY BETWEEN THESE CONSTRUCTION DISCREPANCY BETWEEN THESE CONSTRUCTION DISCREPANCY BETWEEN THESE CONSTRUCTION BETWEEN THESE CONSTRUCTION BETWEEN THESE CONSTRUCTION THESE CONSTRUCTION THESE CONSTRUCTION CONSTRUCTION CONSTRUCTION DRAWINGS AND ACTUAL FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED AND ACTUAL FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED AND ACTUAL FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED ACTUAL FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED ACTUAL FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED FIELD CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED CONDITIONS, THE OWNER OR ENGINEER SHALL BE NOTIFIED THE OWNER OR ENGINEER SHALL BE NOTIFIED THE OWNER OR ENGINEER SHALL BE NOTIFIED OWNER OR ENGINEER SHALL BE NOTIFIED OWNER OR ENGINEER SHALL BE NOTIFIED OR ENGINEER SHALL BE NOTIFIED OR ENGINEER SHALL BE NOTIFIED ENGINEER SHALL BE NOTIFIED ENGINEER SHALL BE NOTIFIED SHALL BE NOTIFIED SHALL BE NOTIFIED BE NOTIFIED BE NOTIFIED NOTIFIED NOTIFIED IMMEDIATELY. 11. ANY COMPLETED CONSTRUCTION THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE ANY COMPLETED CONSTRUCTION THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE COMPLETED CONSTRUCTION THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE COMPLETED CONSTRUCTION THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE CONSTRUCTION THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE CONSTRUCTION THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE THAT IS FOUND TO BE IN NON-CONFORMANCE WITH THE IS FOUND TO BE IN NON-CONFORMANCE WITH THE IS FOUND TO BE IN NON-CONFORMANCE WITH THE FOUND TO BE IN NON-CONFORMANCE WITH THE FOUND TO BE IN NON-CONFORMANCE WITH THE TO BE IN NON-CONFORMANCE WITH THE TO BE IN NON-CONFORMANCE WITH THE BE IN NON-CONFORMANCE WITH THE BE IN NON-CONFORMANCE WITH THE IN NON-CONFORMANCE WITH THE IN NON-CONFORMANCE WITH THE NON-CONFORMANCE WITH THE NON-CONFORMANCE WITH THE WITH THE WITH THE THE THE ELEVATIONS AND LOCATIONS SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY AND LOCATIONS SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY AND LOCATIONS SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY LOCATIONS SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY LOCATIONS SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY SHOWN ON THE PROJECT DRAWING WILL BE CORRECTED BY ON THE PROJECT DRAWING WILL BE CORRECTED BY ON THE PROJECT DRAWING WILL BE CORRECTED BY THE PROJECT DRAWING WILL BE CORRECTED BY THE PROJECT DRAWING WILL BE CORRECTED BY PROJECT DRAWING WILL BE CORRECTED BY PROJECT DRAWING WILL BE CORRECTED BY DRAWING WILL BE CORRECTED BY DRAWING WILL BE CORRECTED BY WILL BE CORRECTED BY WILL BE CORRECTED BY BE CORRECTED BY BE CORRECTED BY CORRECTED BY CORRECTED BY BY BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN AT NO ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN AT NO ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN NO ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN NO ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN ADDITIONAL COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN COST TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN TO OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN OWNER UNLESS SUCH DEVIATIONS ARE APPROVED, IN UNLESS SUCH DEVIATIONS ARE APPROVED, IN UNLESS SUCH DEVIATIONS ARE APPROVED, IN SUCH DEVIATIONS ARE APPROVED, IN SUCH DEVIATIONS ARE APPROVED, IN DEVIATIONS ARE APPROVED, IN DEVIATIONS ARE APPROVED, IN ARE APPROVED, IN ARE APPROVED, IN APPROVED, IN APPROVED, IN IN IN ADVANCE, BY THE OWNER. 12. ALL NON-RECYCLABLE SPOILS, TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED ALL NON-RECYCLABLE SPOILS, TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED NON-RECYCLABLE SPOILS, TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED NON-RECYCLABLE SPOILS, TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED SPOILS, TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED SPOILS, TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED TRASH, AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED AND ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED ITEMS ENCOUNTERED, REMOVED, OR DEMOLISHED ENCOUNTERED, REMOVED, OR DEMOLISHED ENCOUNTERED, REMOVED, OR DEMOLISHED REMOVED, OR DEMOLISHED REMOVED, OR DEMOLISHED OR DEMOLISHED OR DEMOLISHED DEMOLISHED DEMOLISHED DURING CONSTRUCTION SHALL BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE CONSTRUCTION SHALL BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE CONSTRUCTION SHALL BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE SHALL BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE SHALL BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE BE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE REMOVED AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE AT CONTRACTOR'S EXPENSE EXCEPT FOR THOSE CONTRACTOR'S EXPENSE EXCEPT FOR THOSE CONTRACTOR'S EXPENSE EXCEPT FOR THOSE EXPENSE EXCEPT FOR THOSE EXPENSE EXCEPT FOR THOSE EXCEPT FOR THOSE EXCEPT FOR THOSE FOR THOSE FOR THOSE THOSE THOSE EXCESS MATERIALS THAT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT MATERIALS THAT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT MATERIALS THAT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT THAT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT THAT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT MAY REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT REMAIN ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT ON-SITE IN LOCATIONS AS INDICATED ON THE PROJECT IN LOCATIONS AS INDICATED ON THE PROJECT IN LOCATIONS AS INDICATED ON THE PROJECT LOCATIONS AS INDICATED ON THE PROJECT LOCATIONS AS INDICATED ON THE PROJECT AS INDICATED ON THE PROJECT AS INDICATED ON THE PROJECT INDICATED ON THE PROJECT INDICATED ON THE PROJECT ON THE PROJECT ON THE PROJECT THE PROJECT THE PROJECT PROJECT PROJECT DRAWINGS OR AS SPECIFICALLY APPROVED, IN WRITING, BY OWNER OR ENGINEER. 13. CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES IS RESPONSIBLE FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES IS RESPONSIBLE FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES RESPONSIBLE FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES RESPONSIBLE FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES FOR THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES THE PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES PROPER DISPOSAL AND MANAGEMENT OF ALL WASTES DISPOSAL AND MANAGEMENT OF ALL WASTES DISPOSAL AND MANAGEMENT OF ALL WASTES AND MANAGEMENT OF ALL WASTES AND MANAGEMENT OF ALL WASTES MANAGEMENT OF ALL WASTES MANAGEMENT OF ALL WASTES OF ALL WASTES OF ALL WASTES ALL WASTES ALL WASTES WASTES WASTES AND UNUSED CONSTRUCTION MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR UNUSED CONSTRUCTION MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR UNUSED CONSTRUCTION MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR CONSTRUCTION MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR CONSTRUCTION MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR MATERIALS. CONTRACTOR SHALL COMPLY WITH ALL STATE OR CONTRACTOR SHALL COMPLY WITH ALL STATE OR CONTRACTOR SHALL COMPLY WITH ALL STATE OR CONTRACTOR SHALL COMPLY WITH ALL STATE OR SHALL COMPLY WITH ALL STATE OR SHALL COMPLY WITH ALL STATE OR COMPLY WITH ALL STATE OR COMPLY WITH ALL STATE OR WITH ALL STATE OR WITH ALL STATE OR ALL STATE OR ALL STATE OR STATE OR STATE OR OR OR LOCAL REGULATIONS REGARDING WASTE MANAGEMENT AND DISPOSAL. 14. ACTIVE CONSTRUCTION WORK AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR ACTIVE CONSTRUCTION WORK AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR CONSTRUCTION WORK AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR CONSTRUCTION WORK AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR WORK AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR WORK AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR AREAS SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR SHALL NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR NOT BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR BE LEFT OPEN OR ACCESSIBLE OVERNIGHT OR LEFT OPEN OR ACCESSIBLE OVERNIGHT OR LEFT OPEN OR ACCESSIBLE OVERNIGHT OR OPEN OR ACCESSIBLE OVERNIGHT OR OPEN OR ACCESSIBLE OVERNIGHT OR OR ACCESSIBLE OVERNIGHT OR OR ACCESSIBLE OVERNIGHT OR ACCESSIBLE OVERNIGHT OR ACCESSIBLE OVERNIGHT OR OVERNIGHT OR OVERNIGHT OR OR OR DURING WEEKEND / HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT WEEKEND / HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT WEEKEND / HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT / HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT / HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT HOLIDAY PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT PERIODS. APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT APPROPRIATE MEASURES SHALL BE TAKEN TO PREVENT MEASURES SHALL BE TAKEN TO PREVENT MEASURES SHALL BE TAKEN TO PREVENT SHALL BE TAKEN TO PREVENT SHALL BE TAKEN TO PREVENT BE TAKEN TO PREVENT BE TAKEN TO PREVENT TAKEN TO PREVENT TAKEN TO PREVENT TO PREVENT TO PREVENT PREVENT PREVENT PUBLIC ACCESS TO EXCAVATIONS AND OTHER HAZARDOUS WORK AREAS. 15. CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING SHALL PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING SHALL PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, WARNING AND MAINTAIN ALL NECESSARY BARRICADES, WARNING AND MAINTAIN ALL NECESSARY BARRICADES, WARNING MAINTAIN ALL NECESSARY BARRICADES, WARNING MAINTAIN ALL NECESSARY BARRICADES, WARNING ALL NECESSARY BARRICADES, WARNING ALL NECESSARY BARRICADES, WARNING NECESSARY BARRICADES, WARNING NECESSARY BARRICADES, WARNING BARRICADES, WARNING BARRICADES, WARNING WARNING WARNING SIGNS, DANGER SIGNALS, FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR DANGER SIGNALS, FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR DANGER SIGNALS, FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR SIGNALS, FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR SIGNALS, FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR FLAGMEN AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR AND ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR ALL OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR OTHER APPROPRIATE PRECAUTIONS NECESSARY FOR APPROPRIATE PRECAUTIONS NECESSARY FOR APPROPRIATE PRECAUTIONS NECESSARY FOR PRECAUTIONS NECESSARY FOR PRECAUTIONS NECESSARY FOR NECESSARY FOR NECESSARY FOR FOR FOR PUBLIC SAFETY AND THE PROTECTION OF THE WORK. 16. THE CONTRACTOR SHALL PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR THE CONTRACTOR SHALL PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR CONTRACTOR SHALL PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR CONTRACTOR SHALL PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR SHALL PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR SHALL PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR PROVIDE ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR ACCESS TO THE CONSTRUCTION SITE FOR INSPECTORS OR TO THE CONSTRUCTION SITE FOR INSPECTORS OR TO THE CONSTRUCTION SITE FOR INSPECTORS OR THE CONSTRUCTION SITE FOR INSPECTORS OR THE CONSTRUCTION SITE FOR INSPECTORS OR CONSTRUCTION SITE FOR INSPECTORS OR CONSTRUCTION SITE FOR INSPECTORS OR SITE FOR INSPECTORS OR SITE FOR INSPECTORS OR FOR INSPECTORS OR FOR INSPECTORS OR INSPECTORS OR INSPECTORS OR OR OR OTHER OWNER-DESIGNATED PERSONNEL AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER OWNER-DESIGNATED PERSONNEL AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER OWNER-DESIGNATED PERSONNEL AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER PERSONNEL AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER PERSONNEL AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER AND SHALL PROVIDE MATERIAL SAMPLES UPON OWNER SHALL PROVIDE MATERIAL SAMPLES UPON OWNER SHALL PROVIDE MATERIAL SAMPLES UPON OWNER PROVIDE MATERIAL SAMPLES UPON OWNER PROVIDE MATERIAL SAMPLES UPON OWNER MATERIAL SAMPLES UPON OWNER MATERIAL SAMPLES UPON OWNER SAMPLES UPON OWNER SAMPLES UPON OWNER UPON OWNER UPON OWNER OWNER OWNER OR ENGINEER'S REQUEST. 17. CONTRACTOR MAY UTILIZE TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES CONTRACTOR MAY UTILIZE TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES MAY UTILIZE TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES MAY UTILIZE TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES UTILIZE TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES UTILIZE TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES TEMPORARY STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES STORAGE AREAS WITHIN WORK LIMITS FOR THE PURPOSES AREAS WITHIN WORK LIMITS FOR THE PURPOSES AREAS WITHIN WORK LIMITS FOR THE PURPOSES WITHIN WORK LIMITS FOR THE PURPOSES WITHIN WORK LIMITS FOR THE PURPOSES WORK LIMITS FOR THE PURPOSES WORK LIMITS FOR THE PURPOSES LIMITS FOR THE PURPOSES LIMITS FOR THE PURPOSES FOR THE PURPOSES FOR THE PURPOSES THE PURPOSES THE PURPOSES PURPOSES PURPOSES OF STORAGE OF EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR STORAGE OF EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR STORAGE OF EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR OF EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR OF EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR EQUIPMENT AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR AND MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR MATERIALS. ANY OTHER LOCATIONS THAT THE CONTRACTOR ANY OTHER LOCATIONS THAT THE CONTRACTOR ANY OTHER LOCATIONS THAT THE CONTRACTOR ANY OTHER LOCATIONS THAT THE CONTRACTOR OTHER LOCATIONS THAT THE CONTRACTOR OTHER LOCATIONS THAT THE CONTRACTOR LOCATIONS THAT THE CONTRACTOR LOCATIONS THAT THE CONTRACTOR THAT THE CONTRACTOR THAT THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR WISHES TO USE FOR STORAGE MUST BE APPROVED, IN ADVANCE, BY OWNER OR ENGINEER. 18. MAINTAIN ACCESS DRIVES TO CONTINUOUSLY PROVIDE SITE ACCESS TO OWNER AND ENGINEER. MAINTAIN ACCESS DRIVES TO CONTINUOUSLY PROVIDE SITE ACCESS TO OWNER AND ENGINEER. 19. WORKING HOURS SHALL BEGIN NO EARLIER THAN 7:00 A.M. AND END NO LATER THAN WORKING HOURS SHALL BEGIN NO EARLIER THAN 7:00 A.M. AND END NO LATER THAN ONE-HALF HOUR AFTER SUNSET AS DETERMINED BY THE U.S. NATIONAL WEATHER SERVICE, MONDAY THROUGH FRIDAY. ANY WORK TO BE PERFORMED BY CONTRACTOR OUTSIDE OF THESE ALLOWABLE TIMES SHALL BE APPROVED IN ADVANCE BY OWNER. 20. WORK SHALL BE LIMITED TO THE WORK LIMITS SHOWN ON THE DRAWINGS. WORK SHALL BE LIMITED TO THE WORK LIMITS SHOWN ON THE DRAWINGS. 21. ALL AREAS TEMPORARILY DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR ALL AREAS TEMPORARILY DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR AREAS TEMPORARILY DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR AREAS TEMPORARILY DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR TEMPORARILY DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR TEMPORARILY DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR DURING CONSTRUCTION SHALL BE RESTORED TO THEIR DURING CONSTRUCTION SHALL BE RESTORED TO THEIR CONSTRUCTION SHALL BE RESTORED TO THEIR CONSTRUCTION SHALL BE RESTORED TO THEIR SHALL BE RESTORED TO THEIR SHALL BE RESTORED TO THEIR BE RESTORED TO THEIR BE RESTORED TO THEIR RESTORED TO THEIR RESTORED TO THEIR TO THEIR TO THEIR THEIR THEIR ORIGINAL CONDITION UNLESS NOTED OTHERWISE ON THE DRAWINGS. 22. CONTRACTOR SHALL LIMIT EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO CONTRACTOR SHALL LIMIT EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO SHALL LIMIT EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO SHALL LIMIT EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO LIMIT EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO LIMIT EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO EQUIPMENT TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO TRAFFIC ON THE SITE TO DEFINED ACCESS ROUTES TO ON THE SITE TO DEFINED ACCESS ROUTES TO ON THE SITE TO DEFINED ACCESS ROUTES TO THE SITE TO DEFINED ACCESS ROUTES TO THE SITE TO DEFINED ACCESS ROUTES TO SITE TO DEFINED ACCESS ROUTES TO SITE TO DEFINED ACCESS ROUTES TO TO DEFINED ACCESS ROUTES TO TO DEFINED ACCESS ROUTES TO DEFINED ACCESS ROUTES TO DEFINED ACCESS ROUTES TO ACCESS ROUTES TO ACCESS ROUTES TO ROUTES TO ROUTES TO TO TO LIMIT COMPACTION OF SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY COMPACTION OF SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY COMPACTION OF SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY OF SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY OF SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY SOIL. CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY CONTRACTOR SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY SHALL DECOMPACT SOIL ALONG ACCESS ROUTES BY DECOMPACT SOIL ALONG ACCESS ROUTES BY DECOMPACT SOIL ALONG ACCESS ROUTES BY SOIL ALONG ACCESS ROUTES BY SOIL ALONG ACCESS ROUTES BY ALONG ACCESS ROUTES BY ALONG ACCESS ROUTES BY ACCESS ROUTES BY ACCESS ROUTES BY ROUTES BY ROUTES BY BY BY TILLING OR THROUGH OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 OR THROUGH OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 OR THROUGH OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 THROUGH OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 THROUGH OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 OTHER MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 MECHANICAL MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 MEANS THAT WILL LOOSEN SOIL TO A DEPTH OF 12 THAT WILL LOOSEN SOIL TO A DEPTH OF 12 THAT WILL LOOSEN SOIL TO A DEPTH OF 12 WILL LOOSEN SOIL TO A DEPTH OF 12 WILL LOOSEN SOIL TO A DEPTH OF 12 LOOSEN SOIL TO A DEPTH OF 12 LOOSEN SOIL TO A DEPTH OF 12 SOIL TO A DEPTH OF 12 SOIL TO A DEPTH OF 12 TO A DEPTH OF 12 TO A DEPTH OF 12 A DEPTH OF 12 A DEPTH OF 12 DEPTH OF 12 DEPTH OF 12 OF 12 OF 12 12 12 INCHES. CONTRACTOR IS RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG CONTRACTOR IS RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG CONTRACTOR IS RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG CONTRACTOR IS RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG IS RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG IS RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG RESPONSIBLE FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG FOR PREVENTING EXCESSIVE RUTTING OF SOIL ALONG PREVENTING EXCESSIVE RUTTING OF SOIL ALONG PREVENTING EXCESSIVE RUTTING OF SOIL ALONG EXCESSIVE RUTTING OF SOIL ALONG EXCESSIVE RUTTING OF SOIL ALONG RUTTING OF SOIL ALONG RUTTING OF SOIL ALONG OF SOIL ALONG OF SOIL ALONG SOIL ALONG SOIL ALONG ALONG ALONG ACCESS ROUTES. WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, ROUTES. WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, ROUTES. WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, WHERE RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, RUTS ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, ARE EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, EXCESSIVE AND AS DIRECTED BY ENGINEER OR OWNER, AND AS DIRECTED BY ENGINEER OR OWNER, AND AS DIRECTED BY ENGINEER OR OWNER, AS DIRECTED BY ENGINEER OR OWNER, AS DIRECTED BY ENGINEER OR OWNER, DIRECTED BY ENGINEER OR OWNER, DIRECTED BY ENGINEER OR OWNER, BY ENGINEER OR OWNER, BY ENGINEER OR OWNER, ENGINEER OR OWNER, ENGINEER OR OWNER, OR OWNER, OR OWNER, OWNER, OWNER, CONTRACTOR SHALL BE RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY SHALL BE RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY SHALL BE RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY BE RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY BE RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY RESPONSIBLE FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY FOR EXPLORATORY EXCAVATIONS AND ANY NECESSARY EXPLORATORY EXCAVATIONS AND ANY NECESSARY EXPLORATORY EXCAVATIONS AND ANY NECESSARY EXCAVATIONS AND ANY NECESSARY EXCAVATIONS AND ANY NECESSARY AND ANY NECESSARY AND ANY NECESSARY ANY NECESSARY ANY NECESSARY NECESSARY NECESSARY REPAIRS TO KNOWN, OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY TO KNOWN, OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY TO KNOWN, OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY KNOWN, OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY KNOWN, OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY OR UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY UNKNOWN UNDERLYING PIPING. DECOMPACTION, EXPLORATORY UNDERLYING PIPING. DECOMPACTION, EXPLORATORY UNDERLYING PIPING. DECOMPACTION, EXPLORATORY PIPING. DECOMPACTION, EXPLORATORY PIPING. DECOMPACTION, EXPLORATORY DECOMPACTION, EXPLORATORY DECOMPACTION, EXPLORATORY DECOMPACTION, EXPLORATORY EXPLORATORY EXPLORATORY EXCAVATIONS, AND ANY NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL AND ANY NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL AND ANY NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL ANY NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL ANY NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL NECESSARY UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL UNDERLYING PIPE REPAIRS ALONG ACCESS ROUTES SHALL PIPE REPAIRS ALONG ACCESS ROUTES SHALL PIPE REPAIRS ALONG ACCESS ROUTES SHALL REPAIRS ALONG ACCESS ROUTES SHALL REPAIRS ALONG ACCESS ROUTES SHALL ALONG ACCESS ROUTES SHALL ALONG ACCESS ROUTES SHALL ACCESS ROUTES SHALL ACCESS ROUTES SHALL ROUTES SHALL ROUTES SHALL SHALL SHALL BE COMPLETED BY CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.