The document is a comprehensive engineering and construction plan set for the City of Round Rock, Texas, prepared by BGE, Inc. for a 2 Million Gallon Reuse Ground Storage Tank (GST) project located at the Brushy Creek Regional Wastewater Treatment Plant. The project encompasses construction of a prestressed concrete ground storage tank with a 116.7-foot inside diameter, associated 12-inch potable water fill line, related piping, valving, metering, electrical, and instrumentation work. The project site covers approximately 47.31 acres, with 0.87 acres (1.8%) to be directly disturbed during construction, and is located within a municipal separate storm sewer system (MS4) operated by the City of Round Rock.
The project plans detail extensive civil, process, and electrical infrastructure, including site improvements, yard piping, water lines, drainage systems, and electrical connections. The ground storage tank will have a design water level at elevation 671.00', with a finish floor elevation of 646.00' and is designed to be located in a floodplain with minimum ground water elevation considerations. The engineering documents specify precise technical requirements for tank construction, including concrete specifications (4,000 psi for most components), reinforcement details, perimeter drainage, and integration with existing wastewater treatment plant infrastructure. The project includes multiple technical components such as butterfly valves, flexible coupling adapters, inlet and outlet piping, and comprehensive electrical control systems with programmable logic controllers (PLCs) and level monitoring equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-CoRR 2MG GST - Addendum 2-signed.pdf | ||
| 2-CSP Project Manual 2MGD Reuse GST.pdf | ||
| 3-CoRR 2MG GST - Addendum 1-signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROP ANNO
C R
IH 35
CR 123
N A
W G
R
IM
ES
B
LV
D
E PALM VALLEY BLVD
SH 45
SH
R
ED
B U
D L
AN
E
BRYANT CASWELL, P.E.
BGE, INC. TBPE NO. F-1046
2595 DALLAS PARKWAY SUITE 101
FRISCO, TEXAS 75034
(972) 464-4812 (MAIN)
(214) 673-1529 (DIRECT)
EMAIL: BCASWELL@BGEINC.COM
DATE
S U B M I T T E D B Y
N.T.S.
M
AG
N
ET
IC
AUGUST 2025
BRUSHY CREEK REGIONAL
WASTEWATER
TREATMENT PLANT
3939 EAST PALM VALLEY BLVD.
ROUND ROCK, TX 78665
CONSTRUCTION PLANS FOR
2 MILLION GALLON REUSE GROUND STORAGE TANK
UTILITIES AND ENVIRONMENTAL SERVICES DEPARTMENT
CITY OF ROUND ROCK, TEXAS
BGE JOB NO.
FILE
DATE
DESIGNED
DRAWN
REVISED
CHECKED
9336-00
DATEBYREVISIONNO.
2025-07-29
BC
DL
101 West Louis Henna Blvd. Suite 400 BGE, Inc.
Austin, TX 78728
TBPE Registration No. F-1046 Tel: 512-879-0400 ● www.bgeinc.com
V I C I N I T Y M A P
ALL RESPONSIBILITY FOR THE ADEQUACY OF THESE PLANS REMAINS WITH THE
ENGINEER WHO PREPARED THEM. IN ACCEPTING THESE PLANS, THE CITY OF ROUND
ROCK MUST RELY UPON THE ADEQUACY OF THE WORK BY THE DESIGN ENGINEER.
ACCEPTED FOR CONSTRUCTION:
------------------------------------------------------------------------------ DATE: ------------------------------------
CITY OF ROUND ROCK
UTILITIES AND ENVIRONMENTAL SERVICES
3400 SUNRISE ROAD
ROUND ROCK, TEXAS 78665
PHONE: (512) 218-5555
FAX: (512) 255-6911
CITY OFFICIALS
CRAIG MORGAN MAYOR
MICHELLE LY COUNCIL MEMBER
RENE FLORES COUNCIL MEMBER
MELISSA FLEMING COUNCIL MEMBER
FRANK ORTEGA COUNCIL MEMBER
KRISTIN STEVENS COUNCIL MEMBER/MAYOR PRO TEM
HILDA MONTGOMERY COUNCIL MEMBER
LAURIE HADLEY CITY MANAGER
MICHAEL THANE, P.E. UTILITIES DIRECTOR
BGE
BGE, Inc.
F-1046
AutoCAD SHX Text 7/30/2025
AutoCAD SHX Text 91721
AutoCAD SHX Text
D. BRYANT CASWELL
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text X
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
C R
CR 123
E PALM VALLEY BLVD
R
ED
B U
D L
AN
E
BRUSHY CREEK REGIONAL
WASTEWATER
TREATMENT PLANT
M
IL
LI
O N
G
AL
LO
N
R
EU
SE
G
R O
U N
D S
TO
R
AG
E
TA
N
K
BG
E
JO
B
N O
FI
LE
D
AT
E
D
ES
IG
N
ED
D R
AW
N
R
EV
IS
ED
C H
EC
KE
D
-0
D
AT
E
BY
R
EV
IS
IO
N N
O
SHEET
C
IT
Y O
F R
O U
N D
R O
C K
FI
LE
L O
C
AT
IO
N
\B
G
EI
N C
\D
AT
A\
TX
C \P
R O
JE
C
TS
\C
IT
Y_
R O
U N
D R
O C
K\
-0
0_ 1M
G G
R O
U N
D S
TO
R
AG
E
TA
N
K\
_C
AD
D \0
1_
SH
TS
\0
G -0
2.
D
W G
D
AT
E
SA
VE
D
: 7 /2
9/
OF 45
B G
E, IN
C
W E
S T
LO
U
IS
H
E N
N A
B
LV
D
S
TE
A U
S
TI
N , T
X
TB
P
E R eg is tra tio n N o.
F
-1
TE
L:
-8
-0 w w w .b ge in c.
co m
-0 7-
29 D F
JT
M
BG
E
BGE, Inc.
F-1046
M
AG
N
ET
IC
0 1,000' 2,000'500'
SCALE: 1" = 1000'
PROJECT LOCATION
CITY OF ROUND ROCK
WILLIAMSON COUNTY, TEXAS
SH
EE
T
IN
DE
X
AN
D
M
AP
S
IT
E
LO
CA
TI
O N
G
EN
ER
AL
00G-02
GENERAL DESCRIPTION OF WORK INCLUDED IN PROJECT:
1. CONSTRUCTION OF A 2.0 MILLION GALLON PRESTRESSED CONCRETE CLEARWELL TO STORE REUSE WATER.
2. CONSTRUCTION OF 12-INCH POTABLE WATER FILL LINE.
3. RELATED PIPING, VALVING, METERING, ELECTRICAL, AND INSTRUMENTATION WORK.
DRAWING INDEX
SERIES 0000 - GENERAL
1 00G-01 GENERAL - COVER SHEET
2 00G-02 GENERAL - SHEET INDEX AND MAP SITE LOCATION
3 00G-03 GENERAL - GENERAL NOTES
4 00G-04 GENERAL - ABBREVIATIONS
5 00G-05 GENERAL - LEGEND AND SYMBOLOGY
6 00G-06 GENERAL - SWPPP
7 00C-01 GENERAL - CIVIL - TREE PROTECTION AND EROSION SEDIMENTATION CONTROL DETAILS
8 00C-02 GENERAL - CIVIL - PAVING AND MISCELLANEOUS DETAILS
9 00C-03 GENERAL - CIVIL - WATER DETAILS - SHEET 1
10 00C-04 GENERAL - CIVIL - WATER DETAILS - SHEET 2
11 00C-05 GENERAL - CIVIL - DRAIN DETAILS - SHEET 1
12 00C-06 GENERAL - CIVIL - DRAIN DETAILS - SHEET 2
13 00C-08 GENERAL - CIVIL - REUSE WATER DETAILS
14 00C-09 GENERAL - CIVIL - SITE IMPROVEMENTS CIVIL THRUST BLOCKING DETAILS
15 00D-01 GENERAL - PROCESS - DRAIN AND NON-POTABLE WATER SCHEMATIC
16 00D-02 GENERAL - PROCESS - FLOW DIAGRAM AND CHLORINATION SYSTEM SCHEMATIC
17 00D-03 GENERAL - PROCESS - PROPOSED HYDRAULIC PROFILE
18 00D-04 GENERAL - PROCESS - PIPE SUPPORT DETAILS
19 00D-06 GENERAL - PROCESS - WALL PENETRATION DETAILS AND TYPICAL JOINT BONDING DETAIL
SERIES 1000 - CIVIL
20 01C-01 SITE IMPROVEMENTS - CIVIL - OVERALL SITE PLAN
21 01C-02 SITE IMPROVEMENTS - CIVIL - EROSION CONTROL AND CONSTRUCTION STAGING AREA - SHEET 1 22 01C-03 SITE IMPROVEMENTS - CIVIL - EROSION CONTROL AND CONSTRUCTION STAGING AREA - SHEET 2
23 01C-04 SITE IMPROVEMENTS - CIVIL - DRAINAGE AREA MAP
24 01C-05 SITE IMPROVEMENTS - CIVIL - HORIZONTAL CONTROL PAVING AND GRADING PLAN
25 01C-06 SITE IMPROVEMENTS - CIVIL - YARD PIPING
26 01C-07 SITE IMPROVEMENTS - CIVIL - YARD PIPING INDEX MAP
27 01C-08 SITE IMPROVEMENTS - CIVIL - WATER LINE PLAN AND PROFILE STA. 0+00 - 5+00 28 01C-09 SITE IMPROVEMENTS - CIVIL - WATER LINE PLAN AND PROFILE STA. 5+00 - 9+00 29 01C-10 SITE IMPROVEMENTS - CIVIL - WATER LINE PLAN AND PROFILE STA. 9+00 - 14+00 30 01C-11 SITE IMPROVEMENTS - CIVIL - WATER LINE PLAN AND PROFILE STA. 14+00 - END 31 01C-14 SITE IMPROVEMENTS - CIVIL - REUSE WATER CLEARWELL TANK INLET PLAN AND PROFILE 32 01C-15 SITE IMPROVEMENTS - CIVIL - REUSE WATER CLEARWELL TANK OUTLET PLAN AND PROFILE
33 01C-16 SITE IMPROVEMENTS - CIVIL - CLEARWELL DRAIN PLAN DR A STA. 1+00 - END
34 01C-17 SITE IMPROVEMENTS - CIVIL - CLEARWELL DRAIN PROFILE DR A STA. 1+00 - END
SERIES 2000 - CLEARWELL TANK
35 03D-01 CLEARWELL TANK - PROCESS - SECTIONAL AND COVER PLANS
36 03D-02 CLEARWELL TANK - PROCESS - ILLUSTRATIVE SECTION AND TYPICAL WALL SECTION
37 03D-03 CLEARWELL TANK - PROCESS - PIPING DETAILS 1
38 03D-05 CLEARWELL TANK - PROCESS - PIPING DETAILS 2
SERIES 3000 - ELECTRICAL
39 00E-01 SITE PLAN - ELECTRICAL SITE PLAN
40 00E-02 CLEARWELL TANK - ELECTRICAL CONTROL BUILDING POWER PLAN
41 00E-03 CLEARWELL TANK - ELECTRICAL DUCTBANK SECTIONS
42 00E-04 CLEARWELL TANK - ELECTRICAL CONTROL DIAGRAM 1
43 00E-05 CLEARWELL TANK - ELECTRICAL CONTROL DIAGRAM 2
44 00E-06 CLEARWELL TANK - ELECTRICAL CONTROL DIAGRAM 3
45 00E-07 CLEARWELL TANK - ELECTRICAL DETAILS
AutoCAD SHX Text
COLLINGWOOD DR
AutoCAD SHX Text
MEADOW WAY
AutoCAD SHX Text
FAIRVIEW DR
AutoCAD SHX Text
DAWSON RD
AutoCAD SHX Text
EVERGREEN DR
AutoCAD SHX Text
HARRELL PKWY
AutoCAD SHX Text
MEADOW RUN
AutoCAD SHX Text
MEANDERING WAY
AutoCAD SHX Text
TREVINO DR
AutoCAD SHX Text
HANK AARON LN
AutoCAD SHX Text
ATEN LOOP
AutoCAD SHX Text
BUTLER WAY
AutoCAD SHX Text
N RED BUD LN
AutoCAD SHX Text
KENNEYS WAY
AutoCAD SHX Text
HARRELL PKWY
AutoCAD SHX Text
BISON PATH
AutoCAD SHX Text
KENNEYS WAY
AutoCAD SHX Text
WHITLOW WAY
AutoCAD SHX Text
ROD CAREW DR
AutoCAD SHX Text
ROD CAREW DR
AutoCAD SHX Text
HARRELL PKWY
AutoCAD SHX Text
WOODLAND LOOP
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
FOREST CREEK DR
AutoCAD SHX Text
BLUFF VIEW
AutoCAD SHX Text
HILLWAY
AutoCAD SHX Text
ATEN LOOP
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
JOE DIMAGGIO BLVD
AutoCAD SHX Text
CRIMSON SKY CT
AutoCAD SHX Text
PEARSON WAY
AutoCAD SHX Text
BRUSHY CREEK RD
AutoCAD SHX Text
OAK VIEW
AutoCAD SHX Text
STILLMEADOW
AutoCAD SHX Text
CHAMBERLAIN DR
AutoCAD SHX Text
E OLD SETTLERS BLVD
AutoCAD SHX Text
RIDGE RUN
AutoCAD SHX Text
SHADED WAY
AutoCAD SHX Text
TWIN RIDGE PKWY
AutoCAD SHX Text
SCENIC TER
AutoCAD SHX Text
BOBBY JONES WAY
AutoCAD SHX Text
NOLAN RYAN BLVD
AutoCAD SHX Text
WILDERNESS WAY
AutoCAD SHX Text
SOUTHERN PL
AutoCAD SHX Text
WOODLAND LN
AutoCAD SHX Text
TY COBB PL
AutoCAD SHX Text
CLINTON PL
AutoCAD SHX Text
RAINBOW PARKE DR
AutoCAD SHX Text
SANDY KOUFAX LN
AutoCAD SHX Text
YOGI BERRA WAY
AutoCAD SHX Text
VINTAGE DR
AutoCAD SHX Text
FOREST BLUFF TRL
AutoCAD SHX Text
CRENSHAW DR
AutoCAD SHX Text
COUNTRY DR
AutoCAD SHX Text
STILLMEADOW
AutoCAD SHX Text
WILDFLOWER TRL
AutoCAD SHX Text
WOODHOLLOW TRL
AutoCAD SHX Text
GOLDEN CREEK DR
AutoCAD SHX Text
TIFFANY NICOLE
AutoCAD SHX Text
KIM CV
AutoCAD SHX Text
BRENDA LN
AutoCAD SHX Text
OLD OAKS DR
AutoCAD SHX Text
T C OATTS LN
AutoCAD SHX Text
JOSEPH ST
AutoCAD SHX Text
ALEXANDRIA WAY
AutoCAD SHX Text
JAMES PARKER LN
AutoCAD SHX Text
ROCKIN J RD
AutoCAD SHX Text
AMBERGLOW CT
AutoCAD SHX Text
TAMMY LN
AutoCAD SHX Text 7/30/2025
AutoCAD SHX Text 91721
AutoCAD SHX Text
D. BRYANT CASWELL
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text X
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
M
IL
LI
O N
G
AL
LO
N
R
EU
SE
G
R O
U N
D S
TO
R
AG
E
TA
N
K
BG
E
JO
B
N O
FI
LE
D
AT
E
D
ES
IG
N
ED
D R
AW
N
R
EV
IS
ED
C H
EC
KE
D
-0
D
AT
E
BY
R
EV
IS
IO
N N
O
SHEET
C
IT
Y O
F R
O U
N D
R O
C K
FI
LE
L O
C
AT
IO
N
\B
G
EI
N C
\D
AT
A\
TX
C \P
R O
JE
C
TS
\C
IT
Y_
R O
U N
D R
O C
K\
-0
0_ 1M
G G
R O
U N
D S
TO
R
AG
E
TA
N
K\
_C
AD
D \0
1_
SH
TS
\0
G -0
6.
D
W G
D
AT
E
SA
VE
D
: 6 /1
8/
OF 45
B G
E, IN
C
W E
S T
LO
U
IS
H
E N
N A
B
LV
D
S
TE
A U
S
TI
N , T
X
TB
P
E R eg is tra tio n N o.
F
-1
TE
L:
-8
-0 w w w .b ge in c.
co m
-0 7-
29 D F
JT
M
BG
E
BGE, Inc.
F-1046
G
EN
ER
AL
N O
TE
S
G
EN
ER
AL
00G-03
PROJECT NAME: 2 MILLION GALLON REUSE GROUND STORAGE TANK
GENERAL NOTES:
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF ROUND
ROCK STANDARD SPECIFICATIONS MANUAL AND TXDOT STANDARD
SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF HIGHWAYS
AND BRIDGES (2014).
2. ANY EXISTING UTILITIES, PAVEMENT, CURBS, SIDEWALKS, STRUCTURES,
TREES, ETC., NOT PLANNED FOR DESTRUCTION OR REMOVAL THAT ARE
DAMAGED OR REMOVED SHALL BE REPAIRED OR REPLACED AT
CONTRACTOR'S EXPENSE.
3. THE CONTRACTOR SHALL VERIFY ALL DEPTHS AND LOCATIONS OF
EXISTING UTILITIES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES
WITH THE CONSTRUCTION PLANS FOUND IN THE FIELD SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE ENGINEER WHO SHALL BE
RESPONSIBLE FOR REVISING THE PLANS ARE APPROPRIATE.
4. MANHOLE FRAMES, COVERS, VALVES, CLEANOUTS, ETC. SHALL BE RAISED
TO FINISHED GRADE PRIOR TO FINAL PAVING CONSTRUCTION.
5. THE CONTRACTOR SHALL GIVE THE CITY OF ROUND ROCK 48 HOURS
NOTICE BEFORE BEGINNING EACH PHASE OF CONSTRUCTION. TELEPHONE
512-218-3241 (CONSTRUCTION INSPECTION-MAIN LINE).
6. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION SHALL BE
REVEGETATED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
REVEGETATION OF ALL DISTURBED OR EXPOSED AREAS SHALL CONSIST
OF SODDING OR SEEDING, AT THE CONTRACTOR'S OPTION. HOWEVER, THE
TYPE OF REVEGETATION MUST EQUAL OR EXCEED THE TYPE OF
VEGETATION PRESENT BEFORE CONSTRUCTION.
7. PRIOR TO ANY CONSTRUCTION, THE ENGINEER SHALL CONVENE A
PRECONSTRUCTION CONFERENCE BETWEEN THE CITY OF ROUND ROCK,
HIMSELF, THE CONTRACTOR, OTHER UTILITY COMPANIES, ANY AFFECTED
PARTIES AND ANY OTHER ENTITY THE CITY OR ENGINEER MAY REQUIRE.
8. THE CONTRACTOR AND THE ENGINEER SHALL KEEP ACCURATE RECORDS
OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS. THE ENGINEER
SHALL FURNISH THE CITY OF ROUND ROCK ACCURATE "AS-BUILT"
DRAWINGS FOLLOWING COMPLETION OF ALL CONSTRUCTION. THESE "AS-
BUILT" DRAWINGS SHALL MEET WITH THE SATISFACTION OF THE
ENGINEERING AND DEVELOPMENT SERVICES DEPARTMENT PRIOR TO
FINAL ACCEPTANCE.
9. THE ROUND ROCK CITY COUNCIL SHALL NOT BE PETITIONED FOR
ACCEPTANCE UNTIL ALL NECESSARY EASEMENT DOCUMENTS HAVE BEEN
SIGNED AND RECORDED.
10. WHEN CONSTRUCTION IS BEING CARRIED OUT WITHIN EASEMENTS, THE
CONTRACTOR SHALL CONFINE HIS WORK TO WITHIN THE PERMANENT AND
ANY TEMPORARY EASEMENTS. PRIOR TO FINAL ACCEPTANCE, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL TRASH AND
DEBRIS WITHIN THE PERMANENT AND TEMPORARY EASEMENTS. CLEAN-UP
SHALL BE TO THE SATISFACTION OF THE CITY ENGINEER.
11. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL APPLY FOR AND
SECURE ALL PROPER PERMITS FROM THE APPROPRIATE AUTHORITIES.
12. AVAILABLE BENCHMARKS (CITY OF ROUND ROCK DATUM) THAT MAY BE
UTILIZED FOR THE CONSTRUCTION OF THIS PROJECT ARE DESCRIBED AS
FOLLOWS (SEE BENCHMARK INFORMATION SHEET 20.
13. MARK AND MAINTAIN 100-FOOT STATION INTERVALS FOR DURATION OF
PROJECT. CONSIDER SUBSIDIARY TO VARIOUS BID ITEMS.
14. THE LOCATIONS OF THE UTILITIES SHOWN ON THESE PLANS DOES NOT
RELIEVE THE CONTRACTOR FROM THE DUTY TO COMPLY WITH
APPLICABLE UTILITY DAMAGE PREVENTION LAWS AND REGULATIONS,
INCLUDING BUT NOT LIMITED TO, GIVING NOTIFICATION TO UTILITY
OWNER'S "ONE- CALL" CENTERS BEFORE EXCAVATION.
15. EQUIP ALL CONSTRUCTION EQUIPMENT USED IN ROADWAY WORK WITH A
PERMANENTLY MOUNTED 360 DEG REVOLVING OR STROBE WARNING
LIGHT WITH AMBER LENS. LIGHT WILL HAVE A MINIMUM LENS HEIGHT AND
DIAMETER OF 5 INCHES AND MOUNTING HEIGHT OF NOT LESS THAN 6 FEET
ABOVE THE ROADWAY SURFACE AND BE VISIBLE FROM ALL SIDES. ATTACH
AT EACH SIDE OF THE REAR END OF THE CONSTRUCTION EQUIPMENT AN
APPROVED ORANGE WARNING FLAG MOUNTED NOT LESS THAN 6 FEET
ABOVE THE ROADWAY SURFACE.
16. SAWCUT ANY CONCRETE OR ASPHALTIC CONCRETE PAVEMENT AREAS,
WHERE NEEDED, AS DIRECTED. CONSIDER SUBSIDIARY TO THE
PERTINENT ITEMS.
17. MAINTAIN POSITIVE DRAINAGE FOR PERMANENT, AS WELL AS, TEMPORARY
DRAINAGE FOR THE DURATION OF THE PROJECT. THIS WORK IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. CONSTRUCT TEMPORARY AND
PERMANENT DRAINAGE SYSTEMS PRIOR TO THE PLACEMENT OF
TEMPORARY PAVEMENT, WHEN POSSIBLE, BUT ABSOLUTELY PRIOR TO THE
PLACEMENT OF PERMANENT PAVEMENT. BE RESPONSIBLE FOR ANY ITEMS
ASSOCIATED WITH THE TEMPORARY/INTERIM DRAINAGE AND ALL RELATED
MAINTENANCE. NO DIRECT PAYMENT WILL BE MADE FOR THIS WORK. THE
ENGINEER WILL HAVE THE FINAL AUTHORITY IN DETERMINING THE
ADEQUACY OF ANY TEMPORARY/PERMANENT DRAINAGE FEATURES
INSTALLED.
18. CURB RAMP DETECTABLE WARNING SURFACE SHALL BE PREFABRICATED
DETECTABLE WARNING PANEL.
19. THE TECHNICAL SPECIFICATIONS WITHIN THIS CONTRACT'S PROJECT
MANUAL GOVERN. FOR ANY ADDITIONAL ITEMS NOT COVERED IN THE
PROJECT MANUAL, THE CONTRACTOR SHALL REFER TO CITY OF ROUND
ROCK STANDARD SPECIFICATIONS.
STREET AND DRAINAGE NOTES:
1. ALL TESTING SHALL BE DONE BY AN INDEPENDENT LABORATORY AT THE
OWNER'S EXPENSE. ANY RETESTING SHALL BE PAID FOR BY THE
CONTRACTOR. A CITY INSPECTOR SHALL BE PRESENT DURING ALL TESTS.
TESTING SHALL BE COORDINATED WITH THE CITY INSPECTOR AND HE
SHALL BE GIVEN A MINIMUM OF 24 HOURS NOTICE PRIOR TO ANY TESTING.
512-218-3241 (CONSTRUCTION INSPECTION-MAIN LINE).
2. BACKFILL BEHIND THE CURB SHALL BE COMPACTED TO OBTAIN A MINIMUM
OF 95% MAXIMUM DENSITY TO WITHIN 3" OF TOP OF CURB. MATERIAL USED
SHALL BE PRIMARILY GRANULAR WITH NO ROCKS LARGER THAN 6" IN THE
GREATEST DIMENSION. THE REMAINING 3" SHALL BE CLEAN TOPSOIL FREE
FROM ALL CLODS AND SUITABLE FOR SUSTAINING PLANT LIFE.
3. DEPTH OF COVER FOR ALL CROSSINGS UNDER PAVEMENT INCLUDING GAS,
ELECTRIC, TELEPHONE, CABLE TV, WATER SERVICES, ETC., SHALL BE A
MINIMUM OF 30" BELOW SUBGRADE.
4. STREET RIGHTS-OF-WAY SHALL BE GRADED AT A SLOPE OF 1/4" PER FOOT
TOWARD THE CURB UNLESS OTHERWISE INDICATED. HOWEVER, IN NO
CASE SHALL THE WIDTH OF RIGHT-OF-WAY AT 1/4" PER FOOT SLOPE BE
LESS THAN 10 FEET UNLESS A SPECIFIC REQUEST FOR AN ALTERNATE
GRADING SCHEME IS MADE TO AND ACCEPTED BY THE CITY OF ROUND
ROCK ENGINEERING AND DEVELOPMENT SERVICES DEPARTMENT.
5. BARRICADES BUILT TO CITY OF ROUND ROCK STANDARDS SHALL BE
CONSTRUCTED ON ALL DEAD-END STREETS AND AS NECESSARY DURING
CONSTRUCTION TO MAINTAIN JOB AND PUBLIC SAFETY.
6. ALL R.C.P. SHALL BE MINIMUM CLASS III.
7. THE SUBGRADE MATERIAL FOR THE STREETS SHOWN HEREIN WAS TESTED
BY RABA KISTNER ENGINEERING CONSULTANT AND THE PAVING SECTIONS
DESIGNED IN ACCORDANCE WITH THE CURRENT CITY OF ROUND ROCK
DESIGN CRITERIA. THE PAVING SECTIONS ARE TO BE CONSTRUCTED IN
ACCORDANCE WITH PLANS AND AS SUGGESTED BY GEOTECH REPORT.
THE GEOTECHNICAL ENGINEER SHALL INSPECT THE SUBGRADE FOR
COMPLIANCE WITH THE DESIGN ASSUMPTIONS MADE DURING
PREPARATION OF THE SOILS REPORT. ANY ADJUSTMENTS THAT ARE
REQUIRED SHALL BE MADE THROUGH REVISION OF THE CONSTRUCTION
PLANS.
8. WHERE PI'S ARE OVER 20, SUBGRADES MUST BE STABILIZED UTILIZING A
METHOD ACCEPTABLE TO THE CITY ENGINEER. THE GEOTECHNICAL
ENGINEER SHALL RECOMMEND AN APPROPRIATE SUBGRADE
STABILIZATION IF SULFATES ARE DETERMINED TO BE PRESENT.
9. ALL NON-CITY INFRASTRUCTURE INCLUDING GAS, ELECTRIC, CABLE, AND
TELECOMMUNICATIONS SHALL TRAVERSE UNDERNEATH CITY
INFRASTRUCTURE. THIS INCLUDES BUT IS NOT LIMITED TO WATERLINES,
WASTE WATER LINES AND STORM SEWER WITH A MINIMUM
OUTSIDE-TO-OUTSIDE CLEARANCE OF 18".
WATER AND WASTEWATER NOTES:
1. PIPE MATERIAL FOR WATER MAINS SHALL BE PVC (AWWA C-900, MIN. CLASS
200), OR DUCTILE IRON (AWWA C-100, MIN. CLASS 200). WATER SERVICES
(2" OR LESS) SHALL BE POLYETHYLENE TUBING (BLACK, 200 PSI, DR 9).
2. PIPE MATERIAL FOR PRESSURE WASTEWATER MAINS SHALL BE PVC
(AWWA C-900, MIN. CLASS 150), OR DUCTILE IRON (AWWA C-100, MIN. CLASS
200). PIPE MATERIAL FOR GRAVITY WASTEWATER MAINS SHALL BE PVC
(ASTM D2241 OR D3034, MAX. DR-26), DUCTILE IRON (AWWA C-100, MIN.
CLASS 200).
3. UNLESS OTHERWISE ACCEPTED BY THE CITY ENGINEER, DEPTH OF COVER
FOR ALL LINES OUT OF THE PAVEMENT SHALL BE 42" MIN., AND DEPTH OF
COVER FOR ALL LINES UNDER PAVEMENT SHALL BE A MIN. OF 30" BELOW
SUBGRADE.
4. ALL FIRE HYDRANT LEADS SHALL BE DUCTILE IRON PIPE (AWWA C-100, MIN.
CLASS 200).
5. ALL IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH MINIMUM 8-MIL
POLYETHYLENE AND SEALED WITH DUCT TAPE OR EQUAL ACCEPTED BY
THE CITY ENGINEER.
6. THE CONTRACTOR SHALL CONTACT THE CITY INSPECTOR AT 512-218-3241
TO COORDINATE UTILITY TIE-INS AND NOTIFY HIM AT LEAST 48 HOURS
PRIOR TO CONNECTING TO EXISTING LINES.
7. ALL MANHOLES SHALL BE CONCRETE WITH CAST IRON RING AND COVER.
ALL MANHOLES LOCATED OUTSIDE OF THE PAVEMENT SHALL HAVE
BOLTED COVERS. TAPPING OF FIBERGLASS MANHOLES SHALL NOT BE
ALLOWED.
8. THE CONTRACTOR MUST OBTAIN A BULK WATER PERMIT OR PURCHASE
AND INSTALL A WATER METER FOR ALL WATER USED DURING
CONSTRUCTION. A COPY OF THIS PERMIT MUST BE CARRIED AT ALL TIMES
BY ALL WHO USE WATER.
9. LINE FLUSHING OR ANY ACTIVITY USING A LARGE QUANTITY OF WATER
MUST BE SCHEDULED WITH THE WATER & WASTEWATER
SUPERINTENDENT, TELEPHONE 512-218-5555.
10. THE CONTRACTOR, AT HIS EXPENSE, SHALL PERFORM STERILIZATION OF
ALL POTABLE WATER LINES CONSTRUCTED AND SHALL PROVIDE ALL
EQUIPMENT (INCLUDING TEST GAUGES), SUPPLIES (INCLUDING
CONCENTRATED CHLORINE DISINFECTING MATERIAL), AND NECESSARY
LABOR REQUIRED FOR THE STERILIZATION PROCEDURE. THE
STERILIZATION PROCEDURE SHALL BE MONITORED BY CITY OF ROUND
ROCK PERSONNEL. WATER SAMPLES WILL BE COLLECTED BY THE CITY OF
ROUND ROCK TO VERIFY EACH TREATED LINE HAS ATTAINED AN INITIAL
CHLORINE CONCENTRATION OF 50 PPM. WHERE MEANS OF FLUSHING IS
NECESSARY, THE CONTRACTOR, AT HIS EXPENSE, SHALL PROVIDE
FLUSHING DEVICES AND REMOVE SAID DEVICES PRIOR TO FINAL
ACCEPTANCE BY THE CITY OF ROUND ROCK.
11. SAMPLING TAPS SHALL BE BROUGHT UP TO 3 FEET ABOVE GRADE AND
SHALL BE EASILY ACCESSIBLE FOR CITY PERSONNEL. AT THE
CONTRACTOR'S REQUEST, AND IN HIS PRESENCE, SAMPLES FOR
BACTERIOLOGICAL TESTING WILL BE COLLECTED BY THE CITY OF ROUND
ROCK NOT LESS THAN 24 HOURS AFTER THE TREATED LINE HAS BEEN
FLUSHED OF THE CONCENTRATED CHLORINE SOLUTION AND CHARGED
WITH WATER APPROVED BY THE CITY. THE CONTRACTOR SHALL SUPPLY A
CHECK OR MONEY ORDER, PAYABLE TO THE CITY OF ROUND ROCK, TO
COVER THE FEE CHARGED FOR TESTING EACH WATER SAMPLE. CITY OF
ROUND ROCK FEE AMOUNTS MAY BE OBTAINED BY CALLING THE
ENGINEERING AND DEVELOPMENT SERVICES DEPARTMENT AT
512-218-3241.
12. THE CONTRACTOR, AT HIS EXPENSE, SHALL PERFORM QUALITY TESTING
FOR ALL WASTEWATER PIPE INSTALLED AND PRESSURE PIPE
HYDROSTATIC TESTING OF ALL WATER LINES CONSTRUCTED AND SHALL
PROVIDE ALL EQUIPMENT (INCLUDING PUMPS AND GAUGES), SUPPLIES
AND LABOR NECESSARY TO PERFORM THE TESTS. QUALITY AND
PRESSURE TESTING SHALL BE MONITORED BY CITY OF ROUND ROCK
PERSONNEL.
13. THE CONTRACTOR SHALL COORDINATE TESTING WITH THE CITY OF
INSPECTOR AND PROVIDE NO LESS THAN 24 HOURS NOTICE PRIOR TO
PERFORMING STERILIZATION, QUALITY TESTING OR PRESSURE TESTING.
14. THE CONTRACTOR SHALL NOT OPEN OR CLOSE ANY VALVES UNLESS
AUTHORIZED BY THE CITY OF ROUND ROCK.
15. ALL VALVE BOXES AND COVERS SHALL BE CAST IRON.
16. ALL WATER SERVICE, WASTEWATER SERVICE AND VALVE LOCATIONS
SHALL BE APPROPRIATELY MARKED AS FOLLOWS:
WATER SERVICE "W" ON TOP OF CURB WASTEWATER SERVICE "S" ON
TOP OF CURB VALVE "V" ON FACE OF CURB
TOOLS FOR MARKING THE CURB SHALL BE PROVIDED BY THE
CONTRACTOR. OTHER APPROPRIATE MEANS OF MARKING SERVICE AND
VALVE LOCATIONS SHALL BE PROVIDED IN AREAS WITHOUT CURBS.
SUCH MEANS OF MARKING SHALL BE AS SPECIFIED BY THE ENGINEER
AND ACCEPTED BY THE CITY OF ROUND ROCK.
17. CONTACT CITY OF ROUND ROCK ENGINEERING AND DEVELOPMENT
SERVICES DEPARTMENT AT 512-218-3241 FOR ASSISTANCE IN OBTAINING
EXISTING WATER AND WASTEWATER LOCATIONS.
18. THE CITY OF ROUND ROCK FIRE DEPARTMENT SHALL BE NOTIFIED 48
HOURS PRIOR TO TESTING OF ANY BUILDING SPRINKLER PIPING IN ORDER
THAT THE FIRE DEPARTMENT MAY MONITOR SUCH TESTING.
19. SAND, AS DESCRIBED IN SPECIFICATION ITEM 510 PIPE, SHALL NOT BE
USED AS BEDDING FOR WATER AND WASTEWATER LINES. ACCEPTABLE
BEDDING MATERIALS ARE PIPE BEDDING STONE, PEA GRAVEL AND IN LIEU
OF SAND, A NATURALLY OCCURRING OR MANUFACTURED STONE MATERIAL
CONFORMING TO ASTM C33 FOR STONE QUALITY AND MEETING THE
FOLLOWING GRADATION SPECIFICATION:
SIEVE SIZE PERCENT RETAINED BY
1/2" 0 3/8" 0-2 #4 40-85 #10 95-100
20. THE CONTRACTOR IS HEREBY NOTIFIED THAT CONNECTING TO, SHUTTING
DOWN, OR TERMINATING EXISTING UTILITY LINES MAY HAVE TO OCCUR AT
OFF-PEAK HOURS. SUCH HOURS ARE USUALLY OUTSIDE NORMAL WORKING
HOURS AND POSSIBLY BETWEEN 12 A.M. AND 6 A.M.
21. ALL WASTEWATER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) REGULATIONS,
30 TAC CHAPTER 213 AND 317, AS APPLICABLE. WHENEVER TCEQ AND CITY
OF ROUND ROCK SPECIFICATIONS CONFLICT, THE MORE STRINGENT SHALL
APPLY.
TRENCH SAFETY NOTES:
1. IN ACCORDANCE WITH THE LAWS OF THE STATE OF TEXAS AND THE U. S.
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION REGULATIONS, ALL
TRENCHES OVER 5 FEET IN DEPTH IN EITHER HARD AND COMPACT OR
SOFT AND UNSTABLE SOIL SHALL BE SLOPED, SHORED, SHEETED, BRACED
OR OTHERWISE SUPPORTED. FURTHERMORE, ALL TRENCHES LESS THAN 5
FEET IN DEPTH SHALL ALSO BE EFFECTIVELY PROTECTED WHEN
HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. TRENCH SAFETY
SYSTEMS TO BE UTILIZED FOR THIS PROJECT (WILL BE PROVIDED BY THE
CONTRACTOR).
2. IN ACCORDANCE WITH THE U. S. OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION REGULATIONS, WHEN PERSONS ARE IN TRENCHES
4-FEET DEEP OR MORE, ADEQUATE MEANS OF EXIT, SUCH AS A LADDER OR
STEPS, MUST BE PROVIDED AND LOCATED SO AS TO REQUIRE NO MORE
THAN 25 FEET OF LATERAL TRAVEL.
3. IF TRENCH SAFETY SYSTEM DETAILS WERE NOT PROVIDED IN THE PLANS
BECAUSE TRENCHES WERE ANTICIPATED TO BE LESS THAN 5 FEET IN
DEPTH AND DURING CONSTRUCTION IT IS FOUND THAT TRENCHES ARE IN
FACT 5 FEET OR MORE IN DEPTH OR TRENCHES LESS THAN 5 FEET IN
DEPTH ARE IN AN AREA WHERE HAZARDOUS GROUND MOVEMENT IS
EXPECTED, ALL CONSTRUCTION SHALL CEASE, THE TRENCHED AREA
SHALL BE BARRICADED AND THE ENGINEER NOTIFIED IMMEDIATELY.
CONSTRUCTION SHALL NOT RESUME UNTIL APPROPRIATE TRENCH SAFETY
SYSTEM DETAILS, AS DESIGNED BY A PROFESSIONAL ENGINEER, ARE
RETAINED AND COPIES SUBMITTED TO THE CITY OF ROUND ROCK.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. EROSION CONTROL MEASURES, SITE WORK AND RESTORATION WORK
SHALL BE IN ACCORDANCE WITH THE CITY OF ROUND ROCK EROSION AND
SEDIMENTATION CONTROL ORDINANCE.
2. ALL SLOPES SHALL BE SODDED OR SEEDED WITH APPROVED GRASS,
GRASS MIXTURES OR GROUND COVER SUITABLE TO THE AREA AND
SEASON IN WHICH THEY ARE APPLIED.
3. SILT FENCES, ROCK BERMS, SEDIMENTATION BASINS AND SIMILARLY
RECOGNIZED TECHNIQUES AND MATERIALS SHALL BE EMPLOYED DURING
CONSTRUCTION TO PREVENT POINT SOURCE SEDIMENTATION LOADING OF
DOWNSTREAM FACILITIES. SUCH INSTALLATION SHALL BE REGULARLY
INSPECTED BY THE CITY OF ROUND ROCK FOR EFFECTIVENESS.
ADDITIONAL MEASURES MAY BE REQUIRED IF, IN THE OPINION OF THE
CITY ENGINEER, THEY ARE WARRANTED.
4. ALL TEMPORARY EROSION CONTROL MEASURES SHALL NOT BE REMOVED
UNTIL FINAL INSPECTION AND APPROVAL OF THE PROJECT BY THE
ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
MAINTAIN ALL TEMPORARY EROSION CONTROL STRUCTURES AND TO
REMOVE EACH STRUCTURE AS APPROVED BY THE ENGINEER.
5. ALL MUD, DIRT, ROCKS, DEBRIS, ETC., SPILLED, TRACKED OR OTHERWISE
DEPOSITED ON EXISTING PAVED STREETS, DRIVES AND AREAS USED BY
THE PUBLIC SHALL BE CLEANED UP IMMEDIATELY.
VEGETATIVE WATERING
1. MAINTAIN THE SEEDBED IN A CONDITION FAVORABLE FOR THE GROWTH OF
GRASS. WATERING CAN BE POSTPONED IMMEDIATELY AFTER A RAINFALL
ON THE SITE OF 1/2 INCH OR GREATER, BUT WILL BE RESUMED BEFORE
THE SOIL DRIES OUT. CONTINUE WATERING UNTIL FINAL ACCEPTANCE.
SPRINKLING
1. APPLY WATER FOR DUST CONTROL AS DIRECTED. WHEN DUST CONTROL
IS NOT BEING MAINTAINED, CEASE OPERATIONS UNTIL DUST CONTROL IS
MAINTAINED. CONSIDER SUBSIDIARY TO THE PERTINENT ITEMS.
ITEM 100 PREPARING RIGHT OF WAY
1. DO NOT BURN BRUSH, UNLESS OTHERWISE APPROVED. USE HAND
METHODS OR OTHER MEANS TO REMOVE OBJECTIONABLE MATERIAL AND
OBSTRUCTIONS, IF DOING WORK BY MECHANICAL METHODS IS
IMPRACTICAL. CONSIDER SUBSIDIARY TO THE PERTINENT ITEMS.
2. PROTECTION OF TREE, SHRUB, AND LANDFORM FEATURE SHALL CONFORM
TO THE NOTES AND DETAILS PROVIDED IN THE PLANS.
3. DAMAGE TO EXISTING TREES - THE CONTRACTOR WILL BE ASSESSED FOR
DAMAGES TO TREES DESIGNATED TO BE PROTECTED THAT RESULT FROM
THE CONTRACTOR'S NEGLIGENCE OR FAILURE TO COMPLY WITH THE
REQUIREMENTS OF THE SPECIFICATIONS. DAMAGES SHOULD BE
ASSESSED IN ACCORDANCE WITH THE CRITERIA ESTABLISHED IN THE
GUIDE FOR PLANT APPRAISAL, 9TH EDITION, BY THE INTERNATIONAL
SOCIETY OF ARBORICULTURE. DAMAGES AT THE RATE APPLICABLE
THEREIN SHOULD BE DEDUCTED FROM ANY MONIES DUE THE
CONTRACTOR AS LIQUIDATED DAMAGES.
4. PROJECT MOWING WILL BE AT INTERVALS OF NO GREATER THAN 60 DAYS
OR AS AGREED TO WITH THE ENGINEER. THIS WORK IS SUBSIDIARY TO
ITEM 100.
ITEM 162 - SODDING FOR EROSION CONTROL
1. PROVIDE COMMON BERMUDA. PROVIDE ST. AUGUSTINE IF THE ADJACENT
GRASS IS ST. AUGUSTINE.
TRAFFIC MARKING NOTES:
1. ANY METHODS, STREET MARKINGS AND SIGNAGE NECESSARY FOR
WARNING MOTORISTS, WARNING PEDESTRIANS OR DIVERTING TRAFFIC
DURING CONSTRUCTION SHALL CONFORM TO THE TEXAS MANUAL ON
UNIFORM TRAFFIC CONTROL, LATEST EDITION.
2. ALL PAVEMENT MARKINGS, MARKERS, PAINT, TRAFFIC BUTTONS, TRAFFIC
CONTROLS AND SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH THE
TEXAS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
FOR CONSTRUCTION AND MAINTENANCE OF HIGHWAYS, STREETS AND
BRIDGES AND, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES, LATEST EDITIONS.
EXCAVATION & EMBANKMENT:
1. UNSUITABLE MATERIAL ENCOUNTERED IN A CUT OR FILL SECTION WILL BE
CONSIDERED WASTE. THE ENGINEER WILL DEFINE UNSUITABLE MATERIAL,
WHICH THE CONTRACTOR MIGHT DEEM TO BE UNSATISFACTORY OR
UNSUITABLE, DUE TO MOISTURE CONTENT, WILL NOT BE CONSIDERED
UNSUITABLE MATERIAL, UNLESS OTHERWISE APPROVED.
2. IT IS IMPORTANT TO NOTE THAT SOME DRAINAGE PIPES ARE LOCATED
WITHIN OR ABOVE SUBGRADE. IN THESE INSTANCES, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTING THE PIPES DURING SUBGRADE
AND PAVEMENT STRUCTURE OPERATIONS AND SHALL BE RESPONSIBLE
FOR THE COST OF REPLACEMENT OF ANY PIPES THAT ARE DAMAGED.
3. GEOTECHNICAL INVESTIGATIONS CONCLUDED THAT PORTIONS OF
PROPOSED ROADWAY FOOTPRINT CONTAIN UNDOCUMENTED MATERIALS
THAT HAVE THE POTENTIAL TO SHRINK AND SWELL WITH VARYING
MOISTURE CONTENT. THIS MATERIAL SHALL BE EXCAVATED AND
REPLACED WITH COMPETENT FILL MATERIAL TO THE LIMITS AND DEPTH
SHOWN IN THE PLANS.
MANHOLES AND INLETS:
1. PROVIDE TEMPORARY DRAINAGE AT EACH CURB INLET AND MAINTAIN
UNTIL THE FINAL COURSE OF ASPHALTIC CONCRETE PAVEMENT IS PLACED.
TRAFFIC SIGNAL INSTALLATION NOTES:
1. EXACT LOCATION OF POLES, CONTROLLER, SIGNAL HEADS, GROUND
BOXES, ANTENNAS, OPTICOM DETECTORS, AND VIVDS CAMERAS SHALL BE
DETERMINED IN THE FIELD AND SUBJECT TO FINAL APPROVAL BY
ENGINEER IN THE FIELD. IT IS THE CONTRACTORS'S RESPONSIBILITY TO
VERIFY THE EXACT LOCATIONS FROM THE ENGINEER, PRIOR TO
CONSTRUCTION.
2. ALL CONDUITS UNDER PAVED SHOULDERS OR NATURAL GROUND SHALL
BE TRENCHED AND BURIED A MINIMUM OF 18 INCHES, AS PER TXDOT
STANDARD ED(8)-14, EXCEPT WHERE NOTED OTHERWISE IN PLANS. THE
CONTRACTOR SHALL BACKFILL, COMPACT, AND RESTORE THE TRENCHED
AREA TO ORIGINAL CONDITIONS AND MATCH EXISTING SURFACE
CONDITIONS TO THE DENSITY OF ADJACENT AREA.
3. ALL CONDUIT UNDER ROADWAYS SHALL BE BORED, UNLESS SPECIFICALLY
NOTED OTHERWISE. ENCASE ALL BORED CONDUITS WITH MINIMUM 2"
THICK PRESSURE GROUTED FLOWABLE FILL CEMENT. CONSIDER
SUBSIDIARY TO ITEM 618.
4. ALL NEW INFRASTRUCTURE SHALL TRAVERSE UNDERNEATH CITY
INFRASTRUCTURE. THIS INCLUDES, BUT IS NOT LIMITED TO WATER LINES,
WASTE WATER LINES, AND STORM SEWER WITH A MINIMUM OUTSIDE TO
OUTSIDE CLEARANCE OF 18 INCHES. TRAVERSING ABOVE CITY
INFRASTRUCTURE MAY BE ALLOWED, SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER, WHERE NEW CONDUIT WOULD HAVE TO BE PLACED AT A
DEPTH OF 8 FEET OR GREATER.
5. ALL POLES SHALL BE GROUNDED. ALL ELECTRICAL GROUND BOXES AND
GROUND BOX COVERS SHALL BE CONSTRUCTED ON REINFORCED
POLYMER CONCRETE.
6. ALL SIGNAL HEADS SHALL HAVE BACKPLATES AND 12-INCH LED
INDICATIONS.
7. SIGNAL HEADS SHALL NOT BE PLACED OVER THE ROADWAY UNTIL ALL
NECESSARY MATERIALS ARE AT HAND AS APPROVED BY THE ENGINEER IN
THE FIELD.
8. ALL PROPOSED LUMINAIRES SHALL BE LED. LUMINAIRES SHALL BE
INSTALLED TOWARDS THE ADJACENT STOP BAR UNLESS SPECIFIED
OTHERWISE.
9. NEW SIMENS EPAC M60 LINUX WITH 4.57A FIRMWARE T-2 TY 2 CONTROLLER
WITH ETHERNET. AND USB DATA PORT SHALL BE PLACED AS SHOWN IN
THE PROPOSED LAYOUT IN A SIZE P 16 POSITION BASED MOUNT CABINET.
THE CONTRACTOR SHALL PROVIDE THE LATEST FIRMWARE BEING USED
BY THE CITY OF ROUND ROCK.
10. ALL MMU SHALL SUPPORT THE FLASHING YELLOW ARROW OPERATION.
EDI MMU2 16 IP.
11. ONE (1) GLOBAL TRAFFIC TECHNOLOGIES (GTT) MODEL 760 CARD RACK
SHALL BE INSTALLED IN THE CONTROLLER CABINET AS SHOWN IN THE
PLANS. ONE (1) GTT MODEL 764 OPTICOM PHASE SELECTOR SHALL BE
INSTALLED AS SHOWN IN PLANS. GTT MODEL 722 OPTICOM DETECTORS
SHALL BE INSTALLED AS SHOWN IN THE PLANS. GTT MODEL 138
DETECTOR CABLE OR EQUIVALENT SHALL BE USED FOR CONNECTION OF
ALL EMERGENCY PREEMPTION EQUIPMENT. ALL EMERGENCY
PREEMPTION EQUIPMENT SHALL BE COMPATIBLE WITH EXISTING CITY OF
ROUND ROCK EMERGENCY PREEMPTION TRANSMITTERS.
12. ALL CONDUIT SHALL BE SCHEDULE 80.
13. PAVEMENT MARKINGS SHALL BE INSTALLED AS PER TXDOT STANDARD
SHEETS PM(1)-20.
14. CONTRACTOR SHALL HAVE QUALIFIED PERSONNEL TO ENSURE CORRECT
WIRING AND PROGRAMMING IN THE CABINET TO ALL SIGNAL PHASES &
OVERLAPS.
15. ALL PEDESTRIAN SIGNAL UNITS SHALL BE POLARA NAVIGATOR
ACCESSIBLE PEDESTRIAN SIGNAL (APS) UNITS WITH AUDIBLE
PUSH-BUTTON AND LED COUNTDOWN HEADS.
16. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE (1) TITAN
INTEGRATED DUALBAND (2.4/5.8 GHZ) WIRELESS RADIO (OR APPROVED
EQUIPMENT) AND CAT 5 ETHERNET CABLE AS SHOWN IN THE PLANS.
RADIO MUST BE COMPATIBLE WITH EXISTING COMMUNICATIONS
EQUIPMENT IN USE BY THE CITY OF ROUND ROCK.
17. THE CONTRACTOR SHALL PROVIDE COMNET ETHERNET SWITCH
(MANAGED) (PART NO. CNGE 3FE7MS2).
18. THE CONTRACTOR SHALL FURNISH AND INSTALL THE BATTERY BACK-UP
(BBU) SYSTEM PRIOR TO SIGNAL TURN ON.
19. THE CONTRACTOR SHALL FURNISH AND INSTALL AN ITERIS EDGE
CONNECT CARD FOR VIVDS.
20. THE CONTRACTOR TO PROVIDE AXIS NETWORK CAMERA P5655-E PTZ W/
POLE MOUNT BRACKET AND INSTALL.
21. THE CONTRACTOR TO PROVIDE AND INSTALL CAT 6 OUTDOOR CABLE FOR
AXIS NETWORK CAMERA.
22. CONTACT CITY OF ROUND ROCK SIGNAL DEPARTMENT WITH 2 WEEKS
NOTICE PRIOR TO CONSTRUCTION
SMALL ROADSIDE SIGN SUPPORTS AND ASSEMBLIES
1. FABRICATE ALL SMALL SIGNS NOT DETAILED ON THE PLANS IN
CONFORMANCE WITH THE LATEST EDITION OF THE "STANDARD HIGHWAY
SIGN DESIGNS FOR TEXAS".
RAISED PAVEMENT MARKERS
1. PLACE THE BITUMINOUS ADHESIVE AT A TEMPERATURE RANGE OF 380°F
TO 390°F. PLACE THE PAVEMENT MARKER ON THE BITUMINOUS ADHESIVE
APPROXIMATELY 20 SECONDS AFTER THE ADHESIVE IS PLACED ON THE
PAVEMENT. ENSURE THE PAVEMENT MARKER RESTS SOLELY ON THE
ADHESIVE AND NOT THE PAVEMENT SURFACE. ENSURE THAT A MINIMUM
OF 1/8INCH LAYER OF BITUMINOUS ADHESIVE REMAINS BETWEEN THE
PAVEMENT MARKER AND THE PAVEMENT SURFACE.
ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS
1. REMOVE THE EXISTING TRAFFIC BUTTONS AND PAVEMENT MARKERS,
DAILY, AS WORK PROGRESSES AND AS DIRECTED. CONSIDER SUBSIDIARY
TO THE PERTINENT ITEMS. GRINDING IS NOT AN ACCEPTABLE METHOD OF
STRIPE REMOVAL.
ITEM 502 - BARRICADES, SIGNS AND TRAFFIC HANDLING
1. INCORPORATE AND MAINTAIN A 3H:1V SAFETY WEDGE INTO THE
PROPOSED CONSTRUCTION FOR ANY ROADWAY EDGE OF 2 INCHES OR
GREATER ADJACENT TO A ROADWAY UNDER TRAFFIC.
2. COVER OR REMOVE ANY EXISTING SIGN(S), WHICH CONFLICT WITH
TEMPORARY TRAFFIC CONTROL OPERATIONS. INSTALL ALL PERMANENT
SIGNS DELINEATION, AND OBJECT MARKERS NECESSARY FOR THE
OPERATION OF ANY ROADWAY BEFORE OPENING THAT SECTION OF
ROADWAY TO TRAFFIC, REGARDLESS OF THE PHASE DURING WHICH THE
ROADWAY CONSTRUCTION OCCURS. ERECT THE SIGNS ON TEMPORARY
MOUNTS UNTIL THE PERMANENT MOUNTS ARE INSTALLED. CONSIDER ANY
COSTS ASSOCIATED WITH THE TEMPORARY MOUNTS SUBSIDIARY. REPAIR
OR REPLACE ANY SIGNS, WHICH ARE DAMAGED BY THE CONTRACTOR'S
OPERATIONS DURING CONSTRUCTION OR WHICH ARE DEEMED NOT
SUFFICIENT. THE ENGINEER WILL BE THE SOLE JUDGE OF THE ADEQUACY
OF THE SIGN(S). CONSIDER THIS WORK SUBSIDIARY TO THE PERTINENT
ITEMS.
NOTES:
"CORR" = CITY OF ROUND ROCK
AutoCAD SHX Text 7/30/2025
AutoCAD SHX Text 91721
AutoCAD SHX Text
D. BRYANT CASWELL
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text X
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
M
IL
LI
O N
G
AL
LO
N
R
EU
SE
G
R O
U N
D S
TO
R
AG
E
TA
N
K
BG
E
JO
B
N O
FI
LE
D
AT
E
D
ES
IG
N
ED
D R
AW
N
R
EV
IS
ED
C H
EC
KE
D
-0
D
AT
E
BY
R
EV
IS
IO
N N
O
SHEET
C
IT
Y O
F R
O U
N D
R O
C K
FI
LE
L O
C
AT
IO
N
\B
G
EI
N C
\D
AT
A\
TX
C \P
R O
JE
C
TS
\C
IT
Y_
R O
U N
D R
O C
K\
-0
0_ 1M
G G
R O
U N
D S
TO
R
AG
E
TA
N
K\
_C
AD
D \0
1_
SH
TS
\0
G -0
3.
D
W G
D
AT
E
SA
VE
D
: 7 /1
1/
OF 45
B G
E, IN
C
W E
S T
LO
U
IS
H
E N
N A
B
LV
D
S
TE
A U
S
TI
N , T
X
TB
P
E R eg is tra tio n N o.
F
-1
TE
L:
-8
-0 w w w .b ge in c.
co m
-0 7-
29 D F
JT
M
BG
E
BGE, Inc.
F-1046
GENERAL NOTES:
1. THESE ABBREVIATIONS APPLY TO
THE ENTIRE SET OF CONTRACT
DRAWINGS.
2. LISTING OF ABBREVIATIONS DOES
NOT IMPLY ALL ABBREVIATIONS ARE
USED IN THE CONTRACT DRAWINGS.
3. ABBREVIATIONS SHOWN ON THIS
DRAWING INCLUDE VARIATION OF
THE WORD, FOR EXAMPLE, "MOD"
MAY MEAN MODIFY OR
MODIFICATION; "INC" MAY MEAN
INCLUDED OR INCLUDING; "REINF"
MAY MEAN EITHER REINFORCE OR
REINFORCING.
4. SCREENING OR SHADING OF WORK
IS USED TO INDICATE EXISTING
COMPONENTS OR TO DE-EMPHASIZE
PROPOSED IMPROVEMENTS TO
HIGHLIGHT SELECTED TRADE WORK.
REFER TO CONTEXT OF EACH
DRAWING FOR USAGE.
AB
BR
EV
IA
TI
O
NS
G
EN
ER
AL
00G-04
A/C AIR CONDITIONER
A/E ARCHITECT/ENGINEER
A ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
ABAN ABANDON
AC ALTERNATING CURRENT
ACCS ACCESSORY
ACK ACKNOWLEDGE
ACP ACOUSTIC CEILING PANEL,
ASPHALTIC CONCRETE PAVEMENT
ACST ACOUSTIC
AD ADDENDUM, AREA DRAIN"
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT
AF AMP FRAME, AMP FUSE
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AGGR AGGREGATE
AH ACCESS HATCH
Al AREA INLET
AIC AMPS INTERRUPTING CAPACITY
ALIG ALIGNMENT
ALUM ALUMINUM
ALT ALTERNATE, ALTITUDE
AM ACOUSTICAL MATERIAL
AMB AMBIENT
ANC ANCHOR
AP ACCESS PANEL
APRX APPROXIMATE
APVD APPROVED
ARCH ARCHITECTURAL
ARD AROUND
ARV AIR RELEASE VALVE
ASSY ASSEMBLY
AT AMP TRIP
ATC ACOUSTICAL TILE CEILING
ATM ATMOSPHERE
AUTO AUTOMATIC
AUX AUXILIARY
AVE AVENUE
AVG AVERAGE
AWG AMERICAN WIRE GAGE
AWT ACOUSTICAL WALL TILE
B/B BACK TO BACK
BAL BALANCE
BBD BULLETIN BOARD
BC BASE CABINET, BOTTOM CHORD,
BOLT CENTER, BOLT CIRCLE
BD BOARD
BDY BOUNDARY
BE BOTH ENDS, BELL END
BF BOTH FACES, BOTTOM FACE,
BLIND FLANGE, BOARD FEET
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BKG BACKING
BL BASE LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BENCHMARK, BEAM
BOC BACK OF CURB
BOD BOTTOM OF DUCT
BOG BOTTOM OF GRILLE
BOL BOTTOM OF LOUVER
BOP BOTTOM OF PIPE
BOR BOTTOM OF REGISTER
BOT BOTTOM
BOU BOTTOM OF UNIT
BP BASE PLATE
BGR BEARING
BRGP BEARING PLATE
BRKT BRACKET
BS BOTH SIDES
BTU BRITISH THERMAL UNIT
BTW BETWEEN
BTWLD BUTT WELD
BU BELL UP, BUILT UP
BUR BUILT-UP ROOFING
BV BALL VALVE
BW BOTH WAYS, BACKWASH (SLUDGE)
BYP BYPASS
CC CENTER TO CENTER
C&G CURB & CUTTER
C CHANNEL SHAPE, CENTIGRADE,
CONDUIT, CIVIL (DRAWING DISCIPLINE)
CAB CABINET
CAP CAPACITY
CAT CATALOG
CAV CAVITY, COMBINATION AIR/VACUUM
RELEASE VALVE
CB CATCH BASIN
CCB CONCRETE BLOCK
CCW COUNTER CLOCKWISE
CDF CONTROLLED DENSITY FILL
CE CONCRETE EDGE, CLARIFIED EFFLUENT
CER CERAMIC
CF CUBIC FEET (FOOT)
CFL COUNTER FLASHING
CHFR CHAMFER
CHBD CHALKBOARD
CHD CHORD
CHH COMMUNICATION HANDHOLD
CI CURB INLET
CIP CLEAN IN PLACE, CAST-IN-PLACE
CIPB CONCRETE INTERLOCKING PAVER
BALLAST
CIRC CIRCULATION, CIRCULAR,
CIRCUMFERENCE
CJ CONSTRUCTION JOINT
CKT CIRCUIT
CL CENTERLINE, CLASS, CLOSE
CLG CEILING
CLJ CONTROL JOINT
CLKG CAULKING
CLR CLEAR
CMH COMMUNICATION MANHOLE
CMT CEMENT
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT, CONCRETE OPENING
COL COLUMN
COM COMMON
COMB COMBINATION
COMM COMMUNICATION
COMP COMPOSITION, COMPRESSIBLE,
COMPOSITE
CONC CONCENTRIC, CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
COOR COORDINATE
CORR CORROSIVE, CORRUGATED
CP CHECKER PLATE, CONTROL POINT
CPLG COUPLING
CPVC POLYVINYL CHLORIDE
CRL CORROSION RESISTANT LINING
CS CHLORINE SOLUTION
CSC COMPRESSION SLEEVE COUPLING
CSK COUNTERSINK
CSS CLINIC SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CTRL CONTROL
CV COVER
CVAC CHLORINE VACUUM
CVT CULVERT
CU COPPER, CUBIC
CW CLOCKWISE
CWI CLEARWELL INLET
CWE CLEARWELL EFFLUENT
CY CUBIC YARD
d PENNY (NAIL MEASURE)
D DEEP, DIFFUSER
DB DUCT BANK, DECIBEL, DRY BULB
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DC DIRECT CURRENT
DEG DEGREE
DEG C DEGREE CENTIGRADE
DEG F DEGREE FAHRENHEIT
DEMO DEMOLITION
DEP DEPRESSED
DEPT DEPARTMENT
DET DETAIL
DH DISCHARGE HEADER
DI DROP INLET, DUCTILE IRON
DIA DIAMETER
DIAG DIAGONAL, DIAGRAM
DIFF DIFFERENTIAL, DIFFERENCE
DIM DIMENSION
DISCH DISCHARGE
DIST DISTANCE, DISTRIBUTION
DIV DIVISION
DKG DECKING
DL DEAD LOAD
DMJ DOUBLE MECHANICAL JOINT
DMPF DAMP PROOFING
DN DOWN
DO DISSOLVED OXYGEN, DITTO
DP DEPTH
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DR DRAIN
DS DOWN SPOUT
DT DOUBLE TEE, DRIP TRAP ASSEMBLY
DTL DETAIL
DUP DUPLICATE
DWG DRAWING
DWL DOWEL
DWR DRAWER
E EAST, ELECTRICAL (DWG DISCIPLINE)
EA EACH, EXHAUST AIR
EC ELECTRICAL CONTRACTOR
ECC ECCENTRIC
ED EQUIPMENT DRAIN
EDB ELECTRICAL DUCT BAND
EE EACH END
EF EACH FACE
EFF EFFLUENT, EFFICIENCY
EHH ELECTRICAL HANDHOLE
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EL ELBOW
ELEC ELECTRICAL
ELEV ELEVATION
EMBD EMBEDDED
EMER EMERGENCY
EMH ELECTRICAL MANHOLE
ENC ENCASEMENT
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EOP EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE, EQUAL SPACE, EMERGENCY
SHOWER
ESEW EMERGENCY SHOWER AND EYE WASH
EST ESTIMATE, ELEVATED STORAGE TANK
EW EACH WAY, EMERGENCY EYE/FACE WASH
EWC ELECTRIC WATER COOLER
EXC EXCAVATION
EXH EXHAUST
EXST EXISTING
EXP EXPANSION, EXPOSED
EXT EXTERIOR, EXTERNAL, EXTENSION, EXTEND
F&B FACE & BYPASS
F TO F FACE TO FACE
FAB FABRICATE, FABRICATION
FB FLOOR BEAM
FBD FIBERBOARD
FBG FIBERGLASS
FBM BOARD FOOT MEASURE
FBO FURNISHED BY OWNER
FC FLUSHING CONNECTION, FERRIC CHLORIDE
FCA FLANGED COUPLING ADAPTOR
FD FLOOR DRAIN
FDC FLEXIBLE DUCT CONNECTION
FDTN FOUNDATION
FDR FEEDER
FE FLANGED END
FEC FIRE EXTINGUISHER CABINET
FES FLARED AND SECTION
FEXT FIRE EXTINGUISHER
FF FAR FACE, FACTORY FINISH, FLAT FACE,
FINISH FLOOR
FG FINISH GRADE
FIG FIGURE
FH FIRE HYDRANT
FIN FINISH
FJT FLUSH JOINT
FL FLOW, FLOW LINE
FLCA FLEXIBLE COUPLING ADAPTER
FLEX FLEXIBLE
FLFC FULL FACE
FLG FLANGE
FLOR FLUORESCENT
FLR FLOOR
FLS FLASHING, FLUSH
FO FINISHED OPENING, FIBER OPTIC
FM FORCE MAIN
FN FENCE
FOB FLAT ON BOTTOM
FOC FACE OF CONCRETE, FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FOT FLAT ON TOP
FPT FEMALE PIPE THREAD
FR FRAME
FRP FIBERGLASS REINFORCED PLASTIC
FRTM FIRE RETARDANT TREATED MATERIAL
FS FLOOR SINK, FAR SIDE"
FT FEET, FOOT
FTG FOOTING, FITTING
FUR FURRED, FURRING
FURN FURNITURE, FURNISH
FUT FUTURE
FV FACE VELOCITY
FW FIELD WELD, FIRE WALL, FLAT WASHER
FWD FORWARD
FWE FURNISH WITH EQUIPMENT
FXTR FIXTURE
G GRILLE, GROUND, GENERAL (DWG
DISCIPLINE)
GA GAGE (METAL THICKNESS)
GAL GALLON
GALV GALVANIZED
GB GRAB BAR, GRADE BREAK
GC GROOVED COUPLING
GD GUARD
GEN GENERAL
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFMU GROUND FACE MASONRY UNIT
GG GUTTER GRADE
GJ GROOVED JOINT
GL GLASS
GLB GLASS BLOCK
GND GROUND
GP GUY POLE
GR GRADE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSKT GASKET
GST GROUND STORAGE TANK
GT GREASE TRAP
GVL GRAVEL
GWB GYPSUM WALLBOARD
GYP GYPSUM HEADBOARD
H HIGH
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED, HOLLOW CORE,
HORIZONTAL CURVE
HC HORIZONTAL CENTERLINE
HDR HEADER
HDW HARDWARE
HEX HEXAGONAL
HGR HANGER
HH HANDHOLE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT, HORSEPOWER
HPC HORIZONTAL POINT OF CURVATURE
HPS HIGH PRESSURE SODIUM
HPT HORIZONTAL POINT OF TANGENCY
HR HOSE REEL, HOUR
HS HEADED STUD, HIGH STRENGTH
HSS HOLLOW STRUCTURAL SHAPE
HT HEIGHT
HTG HEATING
HV HIGH VOLTAGE
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWD HARDWOOD
HWL HIGH WATER LEVEL
HYD HYDRAULIC
HZ HERTZ, CYCLES PER SECOND
I INSTRUMENTATION (DWG DISCIPLINE)
ID INSIDE DIAMETER, INTERIOR DIMENSION
IE INVERT ELEVATION
IF INSIDE FACE
IH INTAKE HOOD
IMP IMPACT
IN INCH
INC INCLUDE, INCANDESCENT
INF INFLUENT
INSTR INSTRUMENTATION
INSUL INSULATION
INT INTERIOR, INTERSECTION
INTR INTERMEDIATE, INTERIOR
INV INVERT
IPS IRON PIPE SIZE
IPT INTERNAL PIPE THREAD
IR INSIDE RADIUS
IRR IRRIGATION
IS INSECT SCREEN
ISO ISOMETRIC
JB JUNCTION BOX
JCT JUNCTION
JF JOINT FILLER
JST JOIST
JT JOINT
K KIP
KB KNEE BRACE
KCMIL THOUSAND CIRCULAR MILS
KD KNOCK DOWN
KO KNOCK OUT
KSI KIPS PER SQUARE INCH
L ANGLE, LENGTH, LAVATORY
LAD LADDER
LAM LAMINATE
LATL LATERAL
LB LAG BOLT, POUND
LCTB LIQUID CHALK AND TACK BOARD
LDG LANDING
LDR LEADER
LE LIFTING EYE
LF LINEAR FOOT
LG LONG
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMLU LIQUID MARKER LECTURE UNIT
LN LINED
LNG LONGITUDINAL
LOC LOCATION
LP LOW POINT
LPA LOW PRESSURE AIR
LPS LOW PRESSURE SODIUM
LR LONG RADIUS
LT LEFT
LTD LIMITED
LTG LIGHTING
LTL LINTEL
LTNG LIGHTNING
LUB LUBRICATE, LUBRICATION
LV LOW VOLTAGE
LVR LOUVER
LW LIGHTWEIGHT, LOCK WASHER
LWC LIGHTWEIGHT CONCRETE
LWL LOW WATER LEVEL
M MECHANICAL (DWG DISCIPLINE)
MA MIXED AIR
MACH MACHINED
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBR MEMBER
MC MECHANICAL CONTRACTOR, MECHANICAL
COUPLING
MCB METAL CORNER BEAD
MCJ MASONRY CONTROL JOINT
MDMJ MODIFIED DOUBLE MECHANICAL JOINT
MECH MECHANICAL
MED MEDIUM
MFR MANUFACTURER
MH MANHOLE, METAL HALIDE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MLO MAIN LUGS ONLY
MMB MEMBRANE
MNWY MANWAY
MO MASONRY OPENING
MOD MODULAR, MODIFY
MON MONUMENT
MPT MALE PIPE THREAD
MRGWB MOISTURE RESISTANT GYPSUM
WALLBOARD
MS MOP SINK
MSL MEAN SEA LEVEL
MT MOUNT
MU MASONRY UNIT
MULL MULLION
MV MEDIUM VOLTAGE
MW MONITORING WELL
N NORTH, NEUTRAL
NA NOT APPLICABLE
NAT NATURAL
NC NORMALLY CLOSED
NEG NEGATIVE
NF NEAR FACE, NON-FUSED
NFV NOT FIELD VERIFIED
NG NATURAL GROUND
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NPW NON-POTABLE WATER
NPT NATIONAL STANDARD PIPE THREAD
NR NEOPRENE, NEOPRENE RUBBER
NS NEAR SIDE
NSG NON-SHRINK GROUT
NTS NOT TO SCALE
NWL NORMAL WATER LEVEL
O TO O OUT-TO-OUT
OA OUTSIDE AIR, OVERALL
OC ON CENTER
OCPD OVER CURRENT PROTECTION DEVICE
OD OUTSIDE DIAMETER
OED OPEN END DUCT
OF OUTSIDE FACE, OFFICE FURNISHING
OG ORIGINAL GROUND
OH OVERHEAD
OPGN OPENING
OPP OPPOSITE
OPT OPTIONAL
OR OUTSIDE RADIUS
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
OUT OUTFALL
OVFL OVERFLOW
OVHG OVERHANG
OZ OUNCE
P PAINT, PROCESS (DWG DISCIPLINE)
PA PUBLIC ADDRESS, PRESSURIZED AIR
PAR PARALLEL, PARAPET"
PB PANIC BAR, PULL BOX
PBD PARTICLE BOARD
PC POINT OF CURVE, PIECE PRECAST"
PCC POINT OF COMPOUND CURVATURE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PE PLAIN END
PED PEDESTAL
PEN PENETRATION
PERF PERFORATED
PERM PERMANENT
PERP PERPENDICULAR
PF POWER FACTOR
PFMU PREFACED MASONRY UNIT
PH PHASE
PI POINT OF INTERSECTION
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAS PLASTER
PLAT PLATFORM
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLT PLATE
PNEU PNEUMATIC
POL POLISH
POS POSITIVE, POSITION
PP POLYPROPYLENE, POWER POLE
PR PROPOSED
PRC POINT OF REVERSE CURVATURE
PREF PREFINISHED
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PREP PREPARE
PRES PRESSURE
PRI PRIMARY
PROP PROPERTY
PROT PROTECTION
PS PIPE SUPPORT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAGE
PST PRESTRESSED
PT POINT, POINT OF TANGENCY
PTN PARTITION
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PW POTABLE WATER
PWD PLYWOOD
PWJ PLYWOOD WEB JOIST
PZ PIEZOMETER
Q RATE OF FLOW
QT QUARRY TITLE
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R&R REMOVE AND REPLACE
R&S REMOVE AND SALVAGE
R RADIUS, REGISTER, RISER
RA RETURN AIR
RAS RETURN ACTIVATED SLUDGE
RB RESILIENT BASE, ROCK BERM
RCP REINFORCED CONCRETE PIPE
RCPT RECEPTACLE
RD ROOF DRAIN
RDJ RESTRAINED DISMANTLING JOINT
REC RECESS
RECD RECEIVED
RECT RECTANGULAR
RED REDUCER
REF REFERENCE
REINF REINFORCING, REINFORCED
REM REMOVE(D)
REQD REQUIRED
RESIL RESILIENT
RET RETAINING, RETURN
REV REVISION, REVERSE
RF RESILIENT FLOORING
RFG ROOFING
RFL REFLECTED, REFLECTOR
RGH ROUGH
RGS RIGID GALVANIZED STEEL
RGS-PVC PVC COATED RGS
RH RELIEF HOOD, RIGHT HAND, RELATIVE
HUMIDITY
RL REQUIRED LAP
RLFA RELIEF AIR
RND ROUND
RNG RUNNING
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RR RAILROAD
RS RAW SEWAGE
RSG ROUND SLIDE GATE
RSP ROCK SLOPE PROTECTION
RST RESTRAIN(ED)
RT RIGHT
RVT RESILIENT VINYL TILE
RW RECLAIMED WATER LINE
RWL RE-USE WATER LINE
RY READY
S SOUTH, SINK, STRUCTURAL (DWG
DISCIPLINE)
SA SUPPLY AIR
SAMU SOUND ABSORBING MASONRY UNIT
SAN SANITARY
SB SPLASH BLOCK, SODIUM BISULFATE
SC SOLID CORE, SCUM
SCC SHOTCRETE COVER
SCBA SELF CONTAINED BREATHING
APPARATUS
SCH SCHEDULE
SCHEM SCHEMATIC
SCN SCREEN
SCV SWING CHECK VALVE
SE STEEL/ALUMINUM EDGE
SEC SECONDARY, SECONDS
SECT SECTION
SEP SEPARATE
SF SQUARE FOOT
SG SHEET GLASS, SEALANT GROOVE,
SLIDE GATE SQUARE/RECTANGULAR)
SH SHOWER
SHT SHEET
SHTG SHEATHING
SIL SILENCE
SIM SIMILAR
SL SLUDGE LINE
SLTD SLOTTED
SLV SLEEVE
SMFN SMOOTH FINISH
SMLS SEAMLESS
SN SUPERNATANT
SOG SLAB ON GRADE
SP SOUNDPROOF, STANDPIPE
SPA SPACING
SPEC SPECIFICATION
SPLY SUPPLY
SPS STANCHION PIPE SUPPORT
SPST SINGLE POLE SINGLE THROW
SPT SET POINT
SQ SQUARE
SR SHORT RADIUS
SS SERVICE SINK
SST STAINLESS STEEL
ST STREET
STA STATION
STD STANDARD
STIF STIFFENER
STIR STIRRUP
STL STEEL
STM STORM SEWER
STOR STORAGE
STR STRUCTURAL, STRAIGHT
SUB SUBSTITUTE
SUC SUCTION
SUSP SUSPENDED
SWD SIDE WATER DEPTH
SWK SIDEWALK
SWI CLEARWELL INFLUENT
SY SQUARE YARD
SYM SYMBOL
SYMM SYMMETRICAL
SYN SYNTHETIC
SYS SYSTEM
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T TILE, TREAD
TA TOILET ACCESSORY, TEMPERED AIR
TAN TANGENT
TBM TEMPORARY BENCHMARK
TBD TO BE DETERMINED
TBR TO BE REMOVED
TCE TEMPORARY CONSTRUCTION EASEMENT
TEF TROWELED EPOXY FLOORING
TEMP TEMPORARY, TEMPERATURE
THD THREAD(ED)
THK THICK
THR THRUST
THRESH THRESHOLD
THRU THROUGH
TKBD TACK BOARD
TOB TOP OF BOLT, TOP OF BANK, TOP OF
BEAM
TOC TOP OF CURB, TOP OF CONCRETE"
TOD TOP OF DUCT
TOF TOP OF FOOTING
TOG TOP OF GRATING
TOL TOLERANCE, TOP OF LEDGER
TOM TOP OF MASONRY
TOP TOP OF PLATE
TOPO TOPOGRAPHY
TOS TOP OF SLAB, TOP OF STEEL
TW TOP OF WALL
TP TOILET PARTITION, TELEPHONE POLE, TOE
PLATE,TREE PROTECTION, TRAP PRIMER
TPD TOILET PAPER DISPENSER
TPG TOPPING
TPS TRANSFER PUMP STATION
TR TRANSOM
TRANS TRANSITION
TRD TRENCH DRAIN
TS THICKENED SLUDGE
TYP TYPICAL
U URINAL
UG UNDERGROUND
ULT ULTIMATE
UNC UNIFIED NATIONAL COARSE
UNEF UNIFIED NATIONAL EXTRA FINE
UNF UNIFIED NATIONAL FINE
UNFN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V VENT, VELOCITY, VOLT
VA VOLT AMPERE
VAC VACUUM
VAR VARNISH, VARIABLE, VOLT AMPERES
REACTIVE
VB VAPOR BARRIER, VINYL BASE, VALVE BOX
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE, VERTICAL
CENTERLINE
VEL VELOCITY
VENT VENTILATION
VERT VERTICAL
VG VERTICAL GRAIN
VIF VERIFY IN FIELD
VIN VINYL
VS VERSUS, VAPOR SEAL
VOL VOLUME
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF TANGENCY
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W/ WITH
W/O WITHOUT
W WATT, WEST, WIDE, WINDOW, WIRE, WIDE
FLANGE BEAM, POTABLE WATER LINE
WAS WASTE ACTIVATED SLUDGE
WB WOOD BASE
WC WATER CLOSET, WATER COLUMN,
WELL COLLECTION LINE
WD WOOD, WIDTH
WF WIDE FLANGE, WASH FOUNTAIN
WG WIRE GLASS, WATER GAGE, WEIR GATE
WH WALL HYDRANT, WEEP HOLE
WI WROUGHT IRON
WL WATER LEVEL, POTABLE WATERLINE
WLD WELDED
WKWY WALKWAY
WM WIRE MESH
WP WATERPROOF, WORKING POINT
WTHP WEATHERPROOF
WS WATERSTOP, WATER SURFACE
WSCT WAINSCOT
WT WEIGHT, WATER TIGHT
WW SANITARY SEWER
WWF WELDED WIRE FABRIC
XP EXPLOSION PROOF
XS EXTRA STRONG
XXS DOUBLE EXTRA STRONG
XSECT CROSS SECTION
YH YARD HYDRANT
YS YIELD STRENGTH
AutoCAD SHX Text 7/30/2025
AutoCAD SHX Text 91721
AutoCAD SHX Text
D. BRYANT CASWELL
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text X
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
CENTERLINE
RIGHT OF WAY LINE
PROPERTY LINE
EASEMENT LINE
FLOOD HAZARD ZONE 25 YEAR
FLOOD HAZARD ZONE 100 YEAR
CRITICAL WATER QUALITY ZONE
TRANSITION WATER QUALITY ZONE
DRAINAGE EDGE
DRAINAGE CENTERLINE
DITCH EDGE
TIME OF CONCENTRATION
MAJOR CONTOURS
MINOR CONTOURS
PAVED ROAD EDGE
PAVED PARKING / DRIVEWAY EDGE
GRAVEL EDGE
PAVED ROAD DEMOLITION
PAVED PARKING DEMOLITION
CURB LINE
CURB LINE DEMOLITION
BUILDING LINE
GUARDRAIL
GUARDRAIL DEMOLITION
HANDRAIL
HANDRAIL DEMOLITION
CHAINLINK FENCE
STEEL FENCE
FENCE DEMOLITION (GENERIC)
STONE / ROCK WALL
BRICK WALL
TRAFFIC CONE LINE
TRANSVERSE JOINT
LONGITUDINAL JOINT
EROSION ROCK BERM
EROSION DIVERSION DIKE
EROSION MULCH SOCK
EROSION SILT FENCE
EROSION TRI-FILTER DIKE
EROSION TREE PROTECTION
LIMITS OF CONSTRUCTION
COMMUNICATION OVERHEAD
COMMUNICATION UNDERGROUND
COMMUNIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .