About this file
This is an Invitation for Bid (IFB) document for the Parris Island (PI) 16-Inch Steel Water Transmission Main Replacement project, issued by the Beaufort-Jasper Water & Sewer Authority (BJWSA) in Beaufort County, South Carolina. Phase II of this project involves the installation of approximately 1,700 linear feet of 16-inch fusible PVC pipe using horizontal directional drill (HDD) technology to cross under Archer Creek, along with 155 linear feet of 16-inch DR18 C900 PVC installed via open cut on both sides of the creek. The work also includes removal of the existing waterline currently suspended from the bridge and connection of the new waterline to Phase I installations. The document was issued for bidding on December 5, 2025, with detailed plans and specifications provided across multiple sheets including plan and profile drawings for two alternatives (Alternative 2 for the north side and Alternative 3 for the south side). The engineer of record is KCI Technologies, Inc., with project number CIP-2305, and the project location is on Malecon Drive in Beaufort, South Carolina.
The project specifications require contractors to submit their own traffic control plans to the South Carolina Department of Transportation (SCDOT) for approval at least 30 days prior to construction and to notify residences and businesses 21 days in advance. All piping and fittings must be restrained according to EBAA specifications, and contractors must coordinate with BJWSA and MCB Parris Island regarding existing waterline status and service schedules. Contractors must conduct site visits to familiarize themselves with existing conditions and verify all distances and elevations before construction begins. The HDD pipe material shall be 16-inch fusible PVC DR 18, with drilling contractors required to provide sealed engineering calculations for pipe selection. Connections to existing water distribution mains must occur on Tuesdays, Wednesdays, or Thursdays with advance coordination, and all work must comply with erosion control measures, stream protection requirements, and traffic control standards established by MUTCD and SCDOT utility accommodation guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
IS
SU
E
SE
QU
EN
CE
NO
DA
TE
DE
SC
RI
PT
IO
N o:\
_jo bs \bj w
- 0
7 -pa rri s i sla nd w l re pla ce me nt\
CA
DD
\ca dd dr aw ing s\P
AR
RI
S
IS
LA
ND
P
HA
SE
II
- W L H
DD
T
S.
dw g Pr int ed
: 1 /27
/20
B y:
K er ry.
W ian t
C la ir D riv e
P ie dm on t, So ut h
C ar ol in a
-7
P h o n e
-0
F a x:
-9 all rig hts re se rve d)
K
CI
T ec hn olo gie s, Inc . 2
Pu rsu an t to ag re em en t b etw ee n K
CI
T ec hn olo gie s, Inc
KC
I) an d t he pa rty fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed
, th es e d oc um en ts an d a ll d ata , p lan s, sp ec ific ati on s a nd ot he r in for ma tio n c on tai ne d h er ein ar e t he so le an d e xc lus ive pr op er ty of
KC
I, a nd m ay be us ed on ly in co nn ec tio n w ith th e p ro jec t fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed by K
CI
, a nd fo r n o o the r p ur po se . A ny un au tho riz ed us e o f th es e d oc um en ts for an y p ur po se sh all be at th e u se r's so le ris k, wi tho ut lia bil ity to
K
CI
, a nd su bje ct to re as on ab le co mp en sa tio n b y t he us er to
K
CI
, a s d ete rm ine d b y K
CI
in its so le dis cre tio n.
A ll r igh ts of de sig n a nd in ve nti on ar e r es er ve d t o K
CI
Th is do cu me nt wa s c re ate d e lec tro nic all y.
T his m ed ia sh ou ld no t b e c on sid er ed a ce rtif ied do cu me nt un les s i t h as be en pr op er ly se ale d a nd or igi na lly si gn ed by a re gis ter ed pr ofe ss ion al en gin ee r a t th e o ffic e o f K
CI
T ec hn olo gie s, Inc . A uth or ity O
.C .G
.A . 4
3-
-2 2.
KJW
MRB
WRT
00030337_001
C
IP
-2
PA
R R
IS
IS
LA
N
D (P
I)
-IN
C
H S
TE
EL
W
AT
ER
T
R
AN
SM
IS
SI
O
N M
AI
N
R
EP
LA
C
EM
EN
T (M
AL
EC
O N
D R
IV
E)
PH
AS
E
II
Be au fo rd
, S ou th C ar ol in a
/05 /25
IS
SU
ED
F
OR
B
ID
DI
NG
TS
TI
TL
E
SH
EE
T
PROJECT
LOCATION
Know what's below.
before you dig.Call
R
CIP-2305 PARRIS ISLAND (PI) 16-INCH STEEL WATER
TRANSMISSION MAIN REPLACEMENT (MALECON DRIVE) -
PHASE II - ALTERNATE 2 & 3
FOR
BEAUFORT-JASPER WATER & SEWER AUTHORITY
JANUARY 2026 PROJECT DESCRIPTION:
THIS PROJECT IS LOCATED IN BEAUFORT COUNTY, SOUTH CAROLINA AND GENERALLY
CONSISTS OF WATERLINE REHABILITATION.
PHASE I (UNDER SEPARATE COVER):
THIS PHASE OF WORK INCLUDES INSTALLATION OF APPROXIMATELY 12,200 LINEAR FEET
OF 16" LINER INSIDE OF AN EXISTING 16" STEEL WATERLINE AND OTHER RELATED WORK
REQUIRED FOR A COMPLETE AND PROPER INSTALLATION. THIS PHASE ALSO INCLUDES A
WATERLINE INTERCONNECT WITH A FIRE HYDRANT.
PHASE II :
THIS PHASE OF WORK INCLUDES INSTALLATION OF APPROXIMATELY 1,700 LINEAR FEET OF
16" FUSIBLE PVC INSTALLED BY HORIZONTAL DIRECTIONAL DRILL (HDD) AND 155 LINEAR
FEET OF 16" DR18 C900 PVC INSTALLED BY OPEN CUT ON BOTH SIDES OF ARCHER CREEK.
THIS WORK ALSO INCLUDES REMOVAL OF THE EXISTING WATERLINE CURRENTLY
SUSPENDED FROM THE BRIDGE.
OWNER:
BEAUFORT - JASPER WATER & SEWER AUTHORITY
6 SNAKE ROAD
OKATIE, SOUTH CAROLINA 29909
OWNER CONTACT:
ERIC VEACH
PROJECT MANAGER
6 SNAKE ROAD
OKATIE, SOUTH CAROLINA 29909
PHONE: (843) 987-8066
ENGINEER:
KCI TECHNOLOGIES, INC.
MATTHEW BRODERICK, P.E.
106 CLAIR DRIVE
PIEDMONT, S.C. 29673
PHONE: (864) 269-0890
FAX: (864) 269-9030
TOPOGRAPHIC SURVEY:
ATLAS SURVEYING, INC.
168 BOARDWALK DRIVE, SUITE A
RIDGELAND, SC 29936
PROJECT NO: BFT-24384
PLAT DATE 04-24-2025, FILE: BFT-24384 AT1.DWG
VICINITY MAP
BEAUFORD, SOUTH CAROLINA
Sheet List Table
Sheet Number Sheet Title
TS TITLE SHEET
G-1 GENERAL NOTES
G-2 KEY MAP
C-1 PLAN AND PROFILE NORTH STA. 0+00 TO STA.
6+00 - PHASE II - ALTERNATIVE 2
C-2 PLAN AND PROFILE NORTH STA. 6+00 TO END -
PHASE II - ALTERNATIVE 2
C-3 PLAN AND PROFILE SOUTH STA. 0+00 TO STA.
7+00 - PHASE II - ALTERNATIVE 3
C-4 PLAN AND PROFILE SOUTH STA. 7+00 TO END -
PHASE II - ALTERNATIVE 3
C-5 DETAILS
C-6 DETAILS
EC-1 EROSION CONTROL DETAILS
EC-2 EROSION CONTROL DETAILS
AutoCAD SHX Text
KCI
AutoCAD SHX Text
TECHNOLOGIES
AutoCAD SHX Text
INC.
AutoCAD SHX Text No. C0651
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text Z
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text O
AutoCAD SHX Text S
FFL
G-1
G
EN
ER
AL
N O
TE
S
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
IS
SU
E
SE
QU
EN
CE
NO
DA
TE
DE
SC
RI
PT
IO
N o:\
_jo bs \bj w
- 0
7 -pa rri s i sla nd w l re pla ce me nt\
CA
DD
\ca dd dr aw ing s\P
AR
RI
S
IS
LA
ND
P
HA
SE
II
- W L H
DD
T
S.
dw g Pr int ed
: 1 /27
/20
B y:
K er ry.
W ian t
C la ir D riv e
P ie dm on t, So ut h
C ar ol in a
-7
P h o n e
-0 x:
-9 all rig hts re se rve d)
K
CI
T ec hn olo gie s, Inc . 2
Pu rsu an t to ag re em en t b etw ee n K
CI
T ec hn olo gie s, Inc
KC
I) an d t he pa rty fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed
, th es e d oc um en ts an d a ll d ata , p lan s, sp ec ific ati on s a nd ot he r in for ma tio n c on tai ne d h er ein ar e t he so le an d e xc lus ive pr op er ty of
KC
I, a nd m ay be us ed on ly in co nn ec tio n w ith th e p ro jec t fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed by K
CI
, a nd fo r n o o the r p ur po se . A ny un au tho riz ed us e o f th es e d oc um en ts for an y p ur po se sh all be at th e u se r's so le ris k, wi tho ut lia bil ity to
K
CI
, a nd su bje ct to re as on ab le co mp en sa tio n b y t he us er to
K
CI
, a s d ete rm ine d b y K
CI
in its so le dis cre tio n.
A ll r igh ts of de sig n a nd in ve nti on ar e r es er ve d t o K
CI
Th is do cu me nt wa s c re ate d e lec tro nic all y.
T his m ed ia sh ou ld no t b e c on sid er ed a ce rtif ied do cu me nt un les s i t h as be en pr op er ly se ale d a nd or igi na lly si gn ed by a re gis ter ed pr ofe ss ion al en gin ee r a t th e o ffic e o f K
CI
T ec hn olo gie s, Inc . A uth or ity O
.C .G
.A . 4
3-
-2 2.
KJW
MRB
WRT
00030337_001
C
IP
-2
PA
R R
IS
IS
LA
N
D (P
I)
-IN
C
H S
TE
EL
W
AT
ER
T
R
AN
SM
IS
SI
O
N M
AI
N
R
EP
LA
C
EM
EN
T (M
AL
EC
O N
D R
IV
E)
PH
AS
E
II
Be au fo rd
, S ou th C ar ol in a
/05 /25
IS
SU
ED
F
OR
B
ID
DI
NG
Know what's below.
before you dig.Call
R
GENERAL PROJECT NOTES:
1. ALL WORK SHALL BE PERFORMED WITHIN ROAD RIGHTS-OF-WAY. WORK ON PRIVATE PROPERTY SHALL ONLY BE PERFORMED WITHIN THE LIMITS OF
OBTAINED EASEMENTS.
2. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS BEFORE SUBMITTING HIS BID.
3. ALL DISTANCES, DIMENSIONS AND ELEVATIONS SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATIONS MAY BE MADE PRIOR TO THE START OF WORK.
4. THE PROPOSED GRADES AS SHOWN ARE THE FINISHED GRADES UNLESS OTHERWISE NOTED.
5. THE CONTRACTOR SHALL SUPPLY AND ESTABLISH SURVEY CONTROL, INCLUDING THE HORIZONTAL AND VERTICAL CONTROL POINTS. THE CONTRACTOR
SHALL MAINTAIN THIS CONTROL AND PROVIDE ALL BENCHMARKS, STAKES, GRADES, LEVELS, AND LINES NECESSARY FOR CONSTRUCTION. CONTRACTOR(S) SHALL PROVIDE ADEQUATE SUPERVISION TO PREVENT DAMAGE AND MOVEMENT FROM EQUIPMENT WORKING AROUND CONSTRUCTION STAKES. THESE CONSTRUCTION STAKES SHALL REMAIN IN PLACE & BE PROTECTED UNTIL OWNER APPROVES THEIR REMOVAL. ANY STAKES THAT HAVE BEEN DISPLACED AS A RESULT OF CONSTRUCTION ACTIVITY ARE TO BE REPLACED BY A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR AT NO COST TO THE
OWNER.
6. ALL EXISTING FACILITIES DAMAGED AS A RESULT OF CONSTRUCTION OPERATIONS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION TO THE
SATISFACTION OF THE OWNER.
7. ALL EXISTING PAVEMENT AND CONCRETE TO BE JOINED SHALL BE SAWCUT IN RECTANGULAR SHAPES.
10. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL CLEAN THE ENTIRE SITE OF ALL CONSTRUCTION RELATED MATERIAL AND DEBRIS.
11. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ON ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFFSITE GRADING, WRITTEN PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER(S).
11. INSTALL ALL TEMPORARY EROSION CONTROL MEASURES PRIOR
12. THE CONTRACTOR SHALL MAINTAIN EACH STREAM OR CREEK IN AN UNOBSTRUCTED STATE. CONTRACTOR SHALL INSTALL SILT FENCE IN A MANNER AS TO
NOT ALLOW TRENCHING OPERATION TO SPILL EXCESS SOIL INTO WATERS OF THE STATE.
13. THE ENGINEER HAS NOT REVIEWED THE STRUCTURAL STABILITY OF ANY IMPOUNDMENTS ON THE SITE AND DOES NOT ASSUME RESPONSIBILITY FOR THEM.
14. THE ENGINEER WILL NOT BE CONTINUOUSLY PRESENT IN THE FIELD. IT IS SPECIFICALLY UNDERSTOOD THAT HE DOES NOT UNDERTAKE NOR ASSUME ANY
OBLIGATION FOR SUPERVISION OF CONSTRUCTION, SAFETY MEASURES TAKEN DURING THE COURSE OF CONSTRUCTION, RESPONSIBILITY FOR SCHEDULING THE WORK FOR INSURING COMPLETE COMPLIANCE WITH THE CONTRACT DOCUMENTS AND/OR ALL CODE REQUIREMENTS, RULES AND REGULATIONS OF ANY PUBLIC OR PRIVATE AUTHORITY HAVING JURISDICTION OVER THE WHOLE OR ANY PART OF THE WORK. IN ADDITION, THE ENGINEER NEITHER UNDERTAKES, ASSUMES, NOR GUARANTEES THE WORK AND/OR PERFORMANCE OF THE CONTRACTOR.
WATERLINE REHABILITATION NOTES:
1. CONTRACTOR TO COORDINATE AND VERIFY WITH BJWSA AND MCB PARRIS ISLAND ON STATUS OF EXISTING WATERLINES PRIOR TO CONSTRUCTION.
CERTAIN EXISTING WATERLINES ARE PROPOSED TO BE ABANDONED, HOWEVER, CONTRACTOR SHALL CONFIRM WITH BJWSA AND MCB PARRIS ISLAND HOW
AND WHEN THESE LINES WILL BE TAKEN OUT OF SERVICE WITH WATERLINE REHABILITATION.
2. MAXIMUM AREA OF GROUND DISTURBANCE IS 10 FT X 30FT FOR EACH TRENCHLESS REHABILITATION ACCESS PIT.
3. PAVEMENT CUTS SHALL BE TEMPORARILY FILLED WITH CRUSHED STONE FLUSH TO TOP OF PAVEMENT UNTIL PERMANENT PAVEMENT PATCH IS INSTALLED.
ALL ROADS.
GENERAL RECOMMENDED SEQUENCE OF CONSTRUCTION:
1. CONDUCT KICKOFF MEETING WITH BJWSA, ENVIRONMENTAL DIVISION OF PARRIS ISLAND, AND MCB PARRIS ISLAND.
2. VERIFY ALL PERMITS HAVE BEEN OBTAINED.
3. INSTALL ANY EROSION CONTROL MEASURES IDENTIFIED ON APPROVED SEDIMENT AND EROSION CONTROL PLANS.
4. COORDINATE WITH BJWSA AND MCB PARRIS ISLAND TO CONFIRM SOUTH 16" WL IS IN SERVICE AND NORTH LINE (LINE TO BE REHABILITATED) IS OUT OF
SERVICE.
5. SETUP TEMPORARY TRAFFIC CONTROL MEASURES.
6. BEGIN TRENCHLESS REHABILITATION OF 16" WATERLINE ON NORTH SIDE OF MALECON DRIVE.
7. ONCE INSTALLATION IS COMPLETE, PERFORM PRESSURE AND BACTERIOLOGICAL TESTING.
8. ONCE APPROVAL IS OBTAINED FROM ENGINEER, BJWSA, AND MCB PARRIS ISLAND, PLACE REHABILITATED 16" WATERLINE INTO PERMANENT SERVICE.
9. CLEANUP SITE AND INSTALL PERMANENT PAVEMENT REPAIR.
10. REMOVE TEMPORARY EROSION CONTROL MEASURES.
TRAFFIC CONTROL PLAN:
1. A SUGGESTED TRAFFIC CONTROL PLAN (TCP) IS PROVIDED TO ESTABLISH MINIMUM, ACCEPTABLE REQUIREMENTS FOR TRAFFIC CONTROL ASSOCIATED WITH THE SUGGESTED SEQUENCE OF CONSTRUCTION (SEE SHEET G-1) AND TO AID IN THE INCLUSION OF THE ASSOCIATED COSTS IN THE PREPARATION OF THE BID. THIS PLAN AND THE USE THEREOF DOES NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES OF THE PROTECTION OF THE WORK
AND PUBLIC SAFETY.
2. THE CONTRACTOR SHALL SUBMIT HIS OWN TRAFFIC CONTROL PLANS TO SCDOT FOR REVIEW AND APPROVAL A MINIMUM OF 30 DAYS PRIOR TO BEGINNING CONSTRUCTION. ANY AND ALL DEVIATIONS FROM THE TRAFFIC CONTROL PLANS SHALL BE APPROVED BY SCDOT.
3. ALL RESIDENCES AND BUSINESS SHALL BE NOTIFIED BY THE CONTRACTOR 21 DAYS IN ADVANCE OF CONSTRUCTION.
4. NO SATURDAY AND HOLIDAY WORK HOURS ARE PERMITTED WITHOUT ADVANCE NOTICE AND APPROVAL BY SCDOT AND BEAUFORT COUNTY.
5. THE CONTRACTOR SHALL NOTIFY RESIDENT ENGINEER AT LEAST 48 HOURS PRIOR TO ANY ROAD CLOSURE, LANE CLOSURE, OR FLAGGING OPERATION.
6. AT A MINIMUM, ALL TRAFFIC CONTROL METHODS AND MEASURES SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD), CURRENT EDITION AND THE SCDOT UTILITY ACCOMMODATION MANUAL
7. IF UNSAFE CONDITIONS ARE OBSERVED DURING CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ADDITIONAL TRAFFIC CONTROL MEASURES AS
DIRECTED BY SCDOT AND/OR BEAUFORT COUNTY.
8. ACCESS FOR PUBLIC, MILITARY, AND EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES.
9. TRAVEL LANES SHALL BE A MINIMUM OF 10 FEET WIDE.
10. NO MATERIALS OF CONSTRUCTION SHALL BE STOCKPILED WITHIN THE "CLEAR ZONE" AS DEFINED BY THE AASHTO "ROADSIDE DESIGN GUIDE, " WHILE WORK
IS NOT BEING PERFORMED.
11. NO EQUIPMENT OR MACHINERY SHALL BE LEFT PARKED, UNATTENDED OR WITHIN THE CLEAR ZONE AS DEFINED BY THE AASHTO "ROADSIDE DESIGN GUIDE, "
WHILE WORK IS NOT BEING PERFORMED.
12. ANY AND ALL DAMAGED OR REMOVED TRAFFIC SIGNAL APPURTENANCES, TRAFFIC CONTROL DEVICES, AND/OR PAVEMENT MARKINGS SHALL BE RESTORED
BY THE CONTRACTOR.
13. THE CONTRACTOR SHALL CHECK ALL SIGNS, DRUMS, AND BARRICADES WITHIN THE PROJECT AREA EVERY MORNING BEFORE WORK AND EVERY EVENING WHEN WORK IS STOPPED FOR THE DAY TO ENSURE THAT THEY ARE SERVICEABLE AND IN PROPER WORKING ORDER. ON WEEKENDS. HOLIDAYS, AND WHEN THE PROJECT IS SHUTDOWN, THE CONTRACTOR SHALL HAVE THESE TRAFFIC CONTROL DEVICES CHECKED DAILY.
14. PERMANENT TRAFFIC CONTROL AND INFORMATION SIGNS SUCH AS, NOT LIMITED TO ,EXISTING SPEED LIMIT, STOP SIGNS, AND STREET NAME SIGNS SHALL
BE MAINTAINED AT ALL TIMES. THIS IS CONSIDERED INCIDENTAL TO THE WORK.
15. THE SCDOT TRAFFIC ENGINEER RESERVES THE RIGHT TO MAKE CHANGES TO THE TRAFFIC CONTROL PLAN AS DEEMED NECESSARY.
16. ALL SIDE STREETS WITHIN THE WORK ZONE OR SIGN SEQUENCE SHALL ALSO BE SIGNED.
17. ALL OPEN HOLES OR TRENCHES SHALL BE BACKFILLED AND THE SHOULDER MADE READY TO HANDLE EMERGENCY TRAFFIC BY THE END OF EACH WORKDAY, OTHERWISE OPEN HOLES OR TRENCHES SHALL BE COVERED WITH APPROPRIATE STEEL PLATING TO PROTECT AGAINST PEDESTRIAN AND/OR ERRANT VEHICLE INTRUSION. AT NO TIME SHALL STEEL PLATING BE USED IN TRAVEL LANES OPEN TO VEHICULAR TRAFFIC.
18. OPEN HOLES OR TRENCHES SHALL NOT BE LEFT UNATTENDED OR UNPROTECTED WHENEVER WORK IS NOT BEING PERFORMED.
SURVEY NOTES:
1. ATLAS SURVEYING, INC.
168 BOARDWALK DRIVE, SUITE A
RIDGELAND, SC 29936
PROJECT NO: BFT-24384
PLAT DATE 04-24-2025, FILE: BFT-24384 AT1.DWG
2. SURVEY AS DATED: 4-30-2025
3. ALL DISTANCES ARE HORIZONTAL GROUND MEASUREMENTS UNLESS NOTED.
4. ANY UNDERGROUND IMPROVEMENTS ARE SHOWN BASED ON SURFACE EVIDENCE ONLY.
THE SURVEYOR CAN NOT CERTIFY TO NOR ACCEPT LIABILITY FOR THE PRESENCE AND/OR
LOCATION OF BURIED OR OTHERWISE NON-VISIBLE IMPROVEMENTS TO THIS SITE.
4. COORDINATE SYSTEM: HARN/SC SOUTH CAROLINA STATE PLANES (INTNL FOOT)
5. DATUM: NAD83 2011 (HORIZONTAL), NAVD88 (VERTICAL)
HIGH PRESSURE GAS LINE NOTIFICATION
AN EXISTING HIGH PRESSURE GAS LIN RUNS PARALLEL TO THE PROPOSED
WATER LINE ALIGNMENT. PARTICULAR CARE SHALL BE MADE TO MAINTAIN
ADEQUATE SEPARATION TO AVOID ANY DAMAGE TO THE PIPELINE. THE
EXACT LOCATION OF THE GAS LINE HAS NOT BEEN VERIFIED. CONTRACTOR
SHALL CLEARLY MARK THE EXACT LOCATION AND MAKE ADJUSTMENTS TO
THE WATERLINE ALIGNMENT TO PROVIDE A MINIMUM OF 2 FEET OF
SEPARATION BETWEEN LINES. ANY DEPRAVATIONS FROM THE ALIGNMENT
SHOWN ON THESE DRAWINGS SHALL BE APPROVED BY THE
OWNER/ENGINEER FIELD REPRESENTATIVE.
A. CONNECTIONS TO EXISTING WATER DISTRIBUTION MAINS:
1. CONNECTIONS TO EXISTING WATER DISTRIBUTION MAINS SHALL NOT BE MADE WITHOUT PRIOR COORDINATION WITH OWNER PERSONNEL AND THE
ENGINEER.
2. AT LEAST FIVE (5) WORKING DAYS PRIOR TO SCHEDULING CONNECTION WITH OWNER, THE CONTRACTOR SHALL PERFORM SUCH FIELD VERIFICATION WORK
AS REQUIRED TO CONFIRM EXISTING SITE CONDITIONS IN THE AREA OF THE PROPOSED CONNECTION, INCLUDING, BUT NOT NECESSARILY LIMITED TO:
- LOCATION, DEPTH, SIZE, AND MATERIAL OF EXISTING WATER DISTRIBUTION MAIN
- LOCATION, DEPTH, SIZE, ETC. OF EXISTING UTILITIES ADJACENT TO THE PROPOSED CONNECTION
- OTHER EXISTING CONDITIONS WHICH MIGHT AFFECT THE PERFORMANCE OF THE PROPOSED CONNECTION
3. CONTRACTOR TO PREPARE WITH THE ENGINEER AND OWNER A PLAN OF ACTION TO BE FOLLOWED IN PERFORMING THE PROPOSED CONNECTION. SUCH PLAN SHALL INCLUDE THE PROPOSED DATE AND TIME THE WORK IS TO BEGIN, IDENTIFICATION OF EXISTING DISTRIBUTION SYSTEM AREAS WHICH WILL BE AFFECTED BY THE CONNECTION, ACTIONS WHICH ARE REQUIRED OF THE ENGINEER AND OWNER, APPROXIMATE DOWNTIME OF EXISTING WATER
DISTRIBUTION SYSTEM, AND OTHER ITEMS DEEMED APPROPRIATE.
4. UNLESS OTHERWISE APPROVED OR REQUIRED, CONNECTIONS TO EXISTING WATER DISTRIBUTION MAINS SHALL BE MADE ON TUESDAYS, WEDNESDAYS, OR
THURSDAYS.
5. SHOULD WATER SYSTEM DEMANDS REQUIRE POSTPONEMENT OR RESCHEDULING OF A PROPOSED CONNECTION, THE CONTRACTOR SHALL DO SUCH WORK
AT NO ADDITIONAL COST TO THE OWNER.
6. CONNECTIONS TO THE EXISTING SYSTEM SHALL NOT BE MADE WITHOUT THE PRESENCE OF THE ENGINEER OR OWNER.
7. PRIOR TO CUTTING OF THE EXISTING WATER DISTRIBUTION MAIN, THE CONTRACTOR PERSONNEL SHALL HAVE AS MUCH OF THE PIPING, FITTINGS, VALVES, ETC. PROPOSED AT THE CONNECTION PIPED-UP AND READY TO BE LOWERED INTO THE EXCAVATION.
8. PRIOR TO CUTTING OF THE EXISTING WATER DISTRIBUTION MAIN, THE CONTRACTOR SHALL PLACE A 12-INCH DEPTH OF #57 WASHED STONE IN THE
EXCAVATION.
9. ALL EXISTING VALVES LOCATED NEAR THE PROPOSED CONNECTION POINT SHALL BE OPERATED TO ENSURE THAT THE WATER LINE CAN BE PROPERLY
ISOLATED DURING THE CONNECTION OPERATION.
B. LOCATION OF VALVES, HYDRANTS, BLOW-OFFS, ETC:
1. NO VALVE, HYDRANT, BLOW-OFF, ETC. SHALL BE PLACED IN A DITCH LINE UNLESS SPECIFICALLY APPROVED BY THE OWNER. SHOULD THE CONTRACTOR LOCATE SUCH ITEMS IN A DITCH LINE WITHOUT APPROVAL OF THE OWNER, THE APPURTENANCES SHALL BE REMOVED AND RELOCATED TO A SUITABLE
LOCATION AT NO ADDITIONAL COST TO THE OWNER.
2. ALL HYDRANTS, BLOW-OFFS, AIR RELEASE VALVES, ETC. SHALL BE LOCATED ADJACENT TO THE ROAD RIGHT-OF-WAY, APPROXIMATELY TWO (2) FEET FROM
THE RIGHT-OF-WAY LINE.
3. HYDRANTS, BLOW-OFFS, ETC. PROPOSED UNDER THIS PROJECT SHALL BE LOCATED SUCH THAT OPERATION OF SAID HYDRANTS, BLOW-OFFS, ETC. WILL NOT DAMAGE ADJACENT PROPERTIES. OBTAIN THE APPROVAL OF THE ENGINEER AND THE OWNER FOR EACH LOCATION. FAILURE BY THE CONTRACTOR TO OBTAIN APPROVAL MAY REQUIRE THE CONTRACTOR TO RELOCATE SUCH APPURTENANCES AT HIS OWN EXPENSE.
4. UNLESS OTHERWISE APPROVED BY THE OWNER, DO NOT LOCATE HYDRANTS, BLOW-OFFS, ETC. IN FRONT OF EXISTING RESIDENCES OR BUSINESSES.
C. FLUSHING ACTIVITIES:
1. FLUSHING OF NEWLY INSTALLED WATER LINES SHALL ONLY OCCUR WHEN CONTRACTOR PERSONNEL ARE ON SITE. NO FLUSHING ACTIVITY SHALL BE LEFT
UNATTENDED.
2. THE CONTRACTOR SHALL PROVIDE APPROPRIATE LENGTHS OF FIRE HOSE, PIPE, ETC. TO ENSURE THAT THE FLUSHING DISCHARGE DOES NOT DAMAGE
ADJACENT PROPERTY, ROADSIDE DITCHES, ETC.
3. THE CONTRACTOR SHALL PERFORM FLUSHING EVENTS ONLY DURING TIMES AUTHORIZED BY THE OWNER. SHOULD WATER SYSTEM DEMANDS REQUIRE
RESCHEDULING OR DISCONTINUING FLUSHING ACTIVITIES, THE CONTRACTOR SHALL DO SUCH AT NO ADDITIONAL COSTS TO THE OWNER.
4. THE CONTRACTOR WILL NOT BE CHARGED FOR WATER USED DURING AN AUTHORIZED FLUSHING EVENT. THE CONTRACTOR MAY BE CHARGED FOR WATER
IF THE FLUSHING EVENT IS UNAUTHORIZED BY THE OWNER. THE COST OF WATER SHALL BE BASED ON THE CURRENT RATE SCHEDULE. THE ENGINEER WILL DETERMINE THE AMOUNT OF WATER USED DURING THE UNAUTHORIZED EVENT. THE ENGINEER'S DECISION WILL BE FINAL IN THIS MATTER.
5. ALL WATER DISCHARGED FROM FLUSHING EVENTS SHALL NOT BE DIRECTLY DISCHARGED INTO A CREEK, RIVER, LAKE, OR OTHER BODY OF WATER WITHOUT
FIRST BEING DE-CHLORINATED.
NATURAL GAS:
DOMINION ENERGY SOUTH CAROLINA GAS
SOUTHERN DIVISION
601 OLD TAYLOR ROAD
CAYCE, SOUTH CAROLINA 29033
CONTACT: UTILIQUEST PR
PHONE: (803) 960-3310
POWER:
DOMINION ENERGY
TELECOMMUNICATIONS:
BRIGHTSPEED
CONTACT: DEWAYNE BEGLEY
PHONE: (540)938-9590
TELECOMMUNICATIONS:
HARGRAY INC.
CONTACT: USIC PR
PHONE: (800) 778-9140
MCRD PARRIS ISLAND:
PARRIS ISLAND, SOUTH CAROLINA
CONTACT : ANDY MATTIE
EMAIL ANDY.MATTIE@BJWSA.ORG
AutoCAD SHX Text
FEMA FLOOD LINE
AutoCAD SHX Text
KCI
AutoCAD SHX Text
TECHNOLOGIES
AutoCAD SHX Text
INC.
AutoCAD SHX Text No. C0651
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text Z
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text O
.6
6' S0
2°
'4 6"
E
.8 6'
S1 4°
'5
2" E
.7
1'
L5
S0 5°
'2
0" W
.2
0'
L5
S0 1°
'5
0" E
.3
6'
L5
S0 1°
'0
5" W
.1
4'
L5
S1 0°
'4
1" W
.3
5'
L5
S1 0°
'2
1" E
.6
4'
L5
S1 1°
'4
7" E
.2
1'
L5
S1 0°
'1
6" E
.9
7'
.8
8' N
°0
6'
"E
.3 9'
L1
S7 0°
'4
4" E
.6
2'
L1
S2 8°
'3
7" E
.8
5'
L1
S4 1°
'5
2" E
.8
0'
L1
N
°5 9'
"E
.6
6'
L1
N
°2 0'
"E
.0
3'
L1
N
°5 4'
"E
.8
3'
L1
N
°0 6'
"E
6.
L1
N
°0 2'
"E
.6
6'
L1
N
°4 1'
"E
.0
5'
L1
N
°1 0'
"E
.0
8'
L1
N
°3 7'
"E
.1
9'
.6
0' S8
0°
'3 8"
E
.6 4'
S7 8°
'3
6" E
.1
8'
L1
S7 5°
'0
0" E
.9
5'
L1
S7 5°
'5
3" E
.9
9'
L1
S6 9°
'3
3" E
.3
4'
L1
S4 5°
'5
8" E
.6
9'
L1
S8 1°
'2
5" E
.0
9'
L1
S5 5°
'4
8" E
.2
2'
L1
S2 8°
'5
2" E
9.
L1
S4 1°
'2
4" E
.3
8'
L1
S5 1°
'4
4" E
.2
1'
L1
S5 1°
'5
7" E
.7
9'
L1
S0 3°
'5
2" W
.9
7'
L1
S2 5°
'2
8" E
7.
L1
S4 0°
'1
1" E
.2
9'
L1
S5 3°
'4
8" E
.3
3'
.4
9' S7
0°
'1 0"
E
.6 9'
S0 6°
'4
8" E
.9
2'
L2
S4 2°
'3
5" E
.3
8'
L2
S3 3°
'3
4" E
.2
0'
L2
S2 9°
'2
7" E
.8
5'
L2
S3 1°
'4
3" E
.5
8'
L2
S3 1°
'3
6" E
.2
7'
L2
S3 4°
'2
4" E
.1
1'
L2
S3 4°
'2
6" E
.2
7'
L2
S3 3°
'2
6" E
.1
1'
L2
S3 4°
'0
7" E
.9
8'
L2
S3 0°
'2
3" E
.0
0'
L2
S3 0°
'5
9" E
.3
9'
L2
N
°3 2'
"E
.8
5'
L2
S0 6°
'0
1" E
.2
7'
L2
S1 4°
'1
0" E
9.
L2
S3 4°
'0
5" E
.0
0'
L2
S4 1°
'0
1" E
.2
5'
L2
S2 9°
'3
6" E
.6
3'
L2
S0 6°
'4
5" E
.5
4'
ADDITIONAL AREA LIMITS
(5-27-2025)
ADDITIONAL AREA LIMITS
(5-27-2025)
ADDITIONAL AREA LIMITS
(5-27-2025)
ADDITIONAL AREA LIMITS
(5-27-2025)
UNTRACEABLE
RIP-RAP
HDD
1, 0' M
IN
IM
U M
R
AD
IU
S
H D
D E
XI
T
PO
IN
T, D
EG
. E N
TR
Y
AN
G
LE
EX
IS
TI
N
G G
R
AD
E
M
AI
N
TA
IN
PO
SI
TI
VE
SL
O
PE
M
IN
IM
U
M
0' C
LE
AR
AN
C
E
AR
C
H
ER
S C
R
EE
K
EX
IS
TI
N
G G
R
AD
E
M
AI
N
TA
IN
PO
SI
TI
VE
SL
O
PE
M
AI
N
TA
IN
PO
SI
TI
VE
SL
O
PE
1, 0' M
IN
IM
U M
R
AD
IU
S
H D
D E
N
TR
Y
PO
IN
T, D
EG
. E
N
TR
Y
AN
G
LE
" H
D D
F U
SI
BL
E
PV
C W
AT
ER
L
IN
E
R
ES
TR
AI
N
ED
6"
D R
C
PV
C
R
ES
TR
AI
N
ED
6"
D R
C
PV
C
" M
IN
IM
U M
C O
VE
R
(T
YP
IC
AL
" M
IN
IM
U M
C O
VE
R
(T
YP
IC
AL
" H
D D
F U
SI
BL
E
PV
C W
AT
ER
L
IN
E
ST
A.
+5 0+
T
R
AN
SI
TI
O N
T O
6"
H D
D F
U
SI
BL
E
PV
C
SE
E
C O
N C
R
ET
E C
O
LL
AR
TR
AN
SI
TI
O N
D
ET
AI
L
O N
S H
EE
T
C -5
ST
A.
+2
4+
T R
AN
SI
TI
O
N
TO
6" H
D D
F U
SI
BL
E
PV
C
SE
E
C O
N C
R
ET
E C
O
LL
AR
TR
AN
SI
TI
O N
D
ET
AI
L
O N
SH
EE
T C
-5
" M J
° B
EN
D
FI
BE
R O
PT
IC
C
AB
LE
" W
AT
ER
LI
N
E
FI
BE
R O
PT
IC
C
AB
LE
" W
AT
ER
LI
N E
U N
D
ER
G R
O U
N D
PO
W
ER
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
IS
SU
E
SE
QU
EN
CE
NO
DA
TE
DE
SC
RI
PT
IO
N
O:
\20
_jo bs \bj w
- 0
7 -pa rri s i sla nd w l re pla ce me nt\
CA
DD
\ca dd dr aw ing s\P
AR
RI
S
IS
LA
ND
P
HA
SE
II
- W L H
DD
.dw g Pr int ed
: 1 /28
/20
B y:
K er ry.
W ian t
C la ir D riv e
P ie dm on t, So ut h
C ar ol in a
-7
P h o n e
-0 x:
-9 all rig hts re se rve d)
K
CI
T ec hn olo gie s, Inc . 2
Pu rsu an t to ag re em en t b etw ee n K
CI
T ec hn olo gie s, Inc
KC
I) an d t he pa rty fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed
, th es e d oc um en ts an d a ll d ata , p lan s, sp ec ific ati on s a nd ot he r in for ma tio n c on tai ne d h er ein ar e t he so le an d e xc lus ive pr op er ty of
KC
I, a nd m ay be us ed on ly in co nn ec tio n w ith th e p ro jec t fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed by K
CI
, a nd fo r n o o the r p ur po se . A ny un au tho riz ed us e o f th es e d oc um en ts for an y p ur po se sh all be at th e u se r's so le ris k, wi tho ut lia bil ity to
K
CI
, a nd su bje ct to re as on ab le co mp en sa tio n b y t he us er to
K
CI
, a s d ete rm ine d b y K
CI
in its so le dis cre tio n.
A ll r igh ts of de sig n a nd in ve nti on ar e r es er ve d t o K
CI
Th is do cu me nt wa s c re ate d e lec tro nic all y.
T his m ed ia sh ou ld no t b e c on sid er ed a ce rtif ied do cu me nt un les s i t h as be en pr op er ly se ale d a nd or igi na lly si gn ed by a re gis ter ed pr ofe ss ion al en gin ee r a t th e o ffic e o f K
CI
T ec hn olo gie s, Inc . A uth or ity O
.C .G
.A . 4
3-
-2 2.
KJW
MRB
WRT
00030337_001
C
IP
-2
PA
R R
IS
IS
LA
N
D (P
I)
-IN
C
H S
TE
EL
W
AT
ER
T
R
AN
SM
IS
SI
O
N M
AI
N
R
EP
LA
C
EM
EN
T (M
AL
EC
O N
D R
IV
E)
PH
AS
E
II
Be au fo rd
, S ou th C ar ol in a
/05 /25
IS
SU
ED
F
OR
B
ID
DI
NG
SCALE 1" = 500'
KEY SHEET
G-2
KE
Y
M
AP
Know what's below.
before you dig.Call
R
SHEET: C-1
AR
C
H
ER
C R
EE
K
R
IB
BO
N
C R
EE
K
3rd BATTALION POND ROAD
MALECON DRIVE
PARRIS ISLAND G
ATEW
AY
RIBAUT RO
AD
US HW
Y 21
BA
TT
ER
Y
C R
EE
K
MALECON DRIVE
TALASEA STREET
BOKI STREET
WAKE BLVD.
BATAAN STREET
SHEET: C-2
SHEET: C-3
SHEET: C-4
PHASE I - LINE "A"
REHABILITATION
UNDER SEPARATE COVER
PHASE I - LINE "B"
REHABILITATION
UNDER SEPARATE COVER
ALTERNATIVE 2
ALTERNATIVE 3
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
W BO
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AV
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text -1
AutoCAD SHX Text -1
AutoCAD SHX Text -2
AutoCAD SHX Text -2
AutoCAD SHX Text -3
AutoCAD SHX Text -3
AutoCAD SHX Text -4
AutoCAD SHX Text -4
AutoCAD SHX Text -5
AutoCAD SHX Text -5
AutoCAD SHX Text -6
AutoCAD SHX Text -6
AutoCAD SHX Text -7
AutoCAD SHX Text -7
AutoCAD SHX Text -8
AutoCAD SHX Text -8
AutoCAD SHX Text -9
AutoCAD SHX Text -9
AutoCAD SHX Text -10
AutoCAD SHX Text -10
AutoCAD SHX Text -11
AutoCAD SHX Text -11
AutoCAD SHX Text -12
AutoCAD SHX Text -12
AutoCAD SHX Text -13
AutoCAD SHX Text -13
AutoCAD SHX Text -14
AutoCAD SHX Text -14
AutoCAD SHX Text -15
AutoCAD SHX Text -15
AutoCAD SHX Text -16
AutoCAD SHX Text -16
AutoCAD SHX Text -17
AutoCAD SHX Text -17
AutoCAD SHX Text -18
AutoCAD SHX Text -18
AutoCAD SHX Text -19
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
KCI
AutoCAD SHX Text
TECHNOLOGIES
AutoCAD SHX Text
INC.
AutoCAD SHX Text No. C0651
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text Z
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text O
HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD
FFLFFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
S.W.L.
D.Y.L.
S.W.L.
MALECON DRIVE
R/W VARIES
DRAIN PIPE
FLUME
ARCHERS CREEK
ARCHERS CREEK
FLUME
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
SCDES-BCM CRITICAL LINE
CONTINUES OUTSIDE OF THE
SURVEY LIMITS
GUARDRAIL
GUARDRAIL
GUARDRAIL
GUARDRAIL
END OF SIGNAL
SCDES-BCM CRITICAL LINE
SCDES-BCM
CRITICAL LINE
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
FFL
FFLFFLFFLFFLFFLFFLFFLFFLFFLFFL
UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG
W
HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD
0+00 1+00 2+00 3+00 4+00 5+00 6+00
HDD HDD HDD HDD HDD HDD HDD
22.5' ±
32' ±
SCALE: 1"=30' H., 1"=30' V.
PROFILE - PROPOSED WATERLINE PHASE II HDD NORTH, 0+00 - 6+00
-60
-50
-40
-30
-20
-10
-60
-50
-40
-30
-20
-10
MINIMUM 30'
CLEARANCE
ARCHERS CREEK
EXISTING GRADE
MAINTAIN
POSITIVE
SLOPE
MAINTAIN
POSITIVE
SLOPE
1,600' MINIMUM RADIUS
HDD ENTRY POINT,
10 DEG. ENTRY ANGLE
16" HDD FUSIBLE
PVC WATER LINE
RESTRAINED 16" DR18 C900 PVC
48" MINIMUM COVER
(TYPICAL)
0+00 1+00 2+00 3+00 4+00 5+00 6+00
STA. 0+24+/- TRANSITION
TO 16" HDD FUSIBLE PVC,
SEE CONCRETE COLLAR /
TRANSITION DETAIL ON
SHEET C-5
16" MJ 45° BEND
FIBER OPTIC CABLE
16" WATERLINE UNDERGROUND
POWER
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
IS
SU
E
SE
QU
EN
CE
NO
DA
TE
DE
SC
RI
PT
IO
N o:\
_jo bs \bj w
- 0
7 -pa rri s i sla nd w l re pla ce me nt\
CA
DD
\ca dd dr aw ing s\P
AR
RI
S
IS
LA
ND
P
HA
SE
II
- W L H
DD
.dw g Pr int ed
: 1 /27
/20
B y:
K er ry.
W ian t
C la ir D riv e
P ie dm on t, So ut h
C ar ol in a
-7
P h o n e
-0 x:
-9 all rig hts re se rve d)
K
CI
T ec hn olo gie s, Inc . 2
Pu rsu an t to ag re em en t b etw ee n K
CI
T ec hn olo gie s, Inc
KC
I) an d t he pa rty fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed
, th es e d oc um en ts an d a ll d ata , p lan s, sp ec ific ati on s a nd ot he r in for ma tio n c on tai ne d h er ein ar e t he so le an d e xc lus ive pr op er ty of
KC
I, a nd m ay be us ed on ly in co nn ec tio n w ith th e p ro jec t fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed by K
CI
, a nd fo r n o o the r p ur po se . A ny un au tho riz ed us e o f th es e d oc um en ts for an y p ur po se sh all be at th e u se r's so le ris k, wi tho ut lia bil ity to
K
CI
, a nd su bje ct to re as on ab le co mp en sa tio n b y t he us er to
K
CI
, a s d ete rm ine d b y K
CI
in its so le dis cre tio n.
A ll r igh ts of de sig n a nd in ve nti on ar e r es er ve d t o K
CI
Th is do cu me nt wa s c re ate d e lec tro nic all y.
T his m ed ia sh ou ld no t b e c on sid er ed a ce rtif ied do cu me nt un les s i t h as be en pr op er ly se ale d a nd or igi na lly si gn ed by a re gis ter ed pr ofe ss ion al en gin ee r a t th e o ffic e o f K
CI
T ec hn olo gie s, Inc . A uth or ity O
.C .G
.A . 4
3-
-2 2.
KJW
MRB
WRT
00030337_001
C
IP
-2
PA
R R
IS
IS
LA
N
D (P
I)
-IN
C
H S
TE
EL
W
AT
ER
T
R
AN
SM
IS
SI
O
N M
AI
N
R
EP
LA
C
EM
EN
T (M
AL
EC
O N
D R
IV
E)
PH
AS
E
II
Be au fo rd
, S ou th C ar ol in a
/05 /25
IS
SU
ED
F
OR
B
ID
DI
NG
SCALE 1" = 40'
PLAN
C-1
PL
AN
A N
D P
R O
FI
LE
N O
R
TH
S
TA
. 0 +0
TO
ST
A.
+0
- P
H
AS
E
II
- A
LT
ER
N
AT
E
15'X30' HDD ENTRY PIT
NEW 16" WATER LINE UNDER
ARCHERS CREEK (NORTH)
EXISTING 16"
WATER LINE
DOMINION GAS LINE (HDD)
M
AT
C H
L
IN
E
S
EE
S H
EE
T
C -2
Know what's below.
before you dig.Call
R
00 30' 60'
GRAPHIC SCALE: 1" = 30'
NEW 16" WATER LINE UNDER
ARCHERS CREEK (SOUTH SEE SHEET C-3)
GENERAL NOTES:
1. PIPE MATERIAL FOR HORIZONTAL DIRECTIONAL DRILL (HDD) SHALL BE 16" FUSIBLE PVC, DR 18 BASED ON ENGINEER'S CALCULATIONS. DRILLING CONTRACTOR SHALL PROVIDE A DRILLING PLAN WITH THE CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER PROVIDING ANTICIPATED LOADINGS AND APPROPRIATE PIPE SELECTION BASED EQUIPMENT TO BE USED AND ANTICIPATED BORING CONDITIONS. ALTERNATE PIPE MATERIALS MAY
BE SUBMITTED FOR APPROVAL.
2. ANY ADJUSTMENTS TO THE VERTICAL OR HORIZONTAL ALIGNMENT OF THE HDD SHALL BE APPROVED BY THE
ENGINEER, BEAUFORT - JASPER WATER & SEWER AND MCB PARRIS ISLAND.
STA. 0+00
16" MJ 45° BEND
EXISTING
WATER LINE TO BE CAPPED AND ABANDONED IN
PLACE BEFORE DAYLIGHT POINT (UNDERGROUND
- DRAIN, CLOSE VALVE AND CAP WITH BLIND
FLANGE AND SMITH-BLAIR MODEL 911)
BEGIN NEW 16" WATERLINE
FOR HDD UNDER ARCHERS CREEK
CONNECT TO EXISTING 16" DIP
(PHASE II)
EXISTING
WATER LINE TO BE
ABANDONED, REMOVE
PIPING FROM BRIDGE,
HANGERS TO REMAIN, SEE
DETAIL ON SHEET C-5
DATUMS FOR 8668092, BATTERY CREEK SC
NOTICE: ALL DATA VALUES ARE RELATIVE
TO MEAN SEA LEVEL
MEAN HIGH WATER 3.48 FT
MEAN LOW WATER -4.16 FT
DOUBLE ROW SILT FENCE
CONNECT TO PHASE I
CAPPED STUB OUT
NOTES:
1. BUTTERFLY VALVES: PROVIDE DEZURIK'S MODEL NUM. BAW,16 ,MJ, CI, NBRN-NBR, 150B, DI-S2*GB-6B-N-ENGS, GLPI
OR ENGINEER APPROVED EQUAL.
2. ALL PIPING AND FITTINGS TO BE RESTRAINED.
EXISTING PIPING SHOWN IS APPROXIMATE BASED
ON FIELD OBSERVATIONS AND EXISTING RECORD
DRAWINGS. FIELD VERIFY EXACT LOCATION
PRIOR TO CONSTRUCTION.
EXISTING
WATER LINE TO BE CAPPED
AND ABANDONED IN PLACE
BEFORE DAYLIGHT POINT
(UNDERGROUND - DRAIN AND
CAP WITH BLIND FLANGE AND
SMITH-BLAIR MODEL 911)
AutoCAD SHX Text
FLOOD ZONE X
AutoCAD SHX Text
ZONE AE ELEV. 10'
AutoCAD SHX Text
FLOOD ZONE X(0.2% CHANCE)
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
FO
AutoCAD SHX Text G
AutoCAD SHX Text
FO
AutoCAD SHX Text
FO
AutoCAD SHX Text
BEAUFORT COUNTY UNINCORPORATED AREAS COMMUNITY #450025
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text -1
AutoCAD SHX Text -1
AutoCAD SHX Text -2
AutoCAD SHX Text -2
AutoCAD SHX Text -3
AutoCAD SHX Text -3
AutoCAD SHX Text -4
AutoCAD SHX Text -4
AutoCAD SHX Text -5
AutoCAD SHX Text -5
AutoCAD SHX Text -6
AutoCAD SHX Text -6
AutoCAD SHX Text -7
AutoCAD SHX Text -7
AutoCAD SHX Text -8
AutoCAD SHX Text -8
AutoCAD SHX Text -9
AutoCAD SHX Text -9
AutoCAD SHX Text -10
AutoCAD SHX Text -10
AutoCAD SHX Text -11
AutoCAD SHX Text -11
AutoCAD SHX Text -12
AutoCAD SHX Text -12
AutoCAD SHX Text -13
AutoCAD SHX Text -13
AutoCAD SHX Text -14
AutoCAD SHX Text -14
AutoCAD SHX Text -15
AutoCAD SHX Text -15
AutoCAD SHX Text -16
AutoCAD SHX Text -16
AutoCAD SHX Text -17
AutoCAD SHX Text -17
AutoCAD SHX Text -18
AutoCAD SHX Text -18
AutoCAD SHX Text -19
AutoCAD SHX Text
KCI
AutoCAD SHX Text
TECHNOLOGIES
AutoCAD SHX Text
INC.
AutoCAD SHX Text No. C0651
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text Z
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text O
W WFFLFFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFLFFLFFLFFLFFLFFLFFLFFLFFLFFL
FFL
FFL
FFL FFL FFL FFL FFL FFL FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFLFFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FFL
FF
L
FF
L
D.Y.L.
S.D.W.L.
D.Y.L.
S.W.L.
D.Y.L.
S.W.L.
D.Y.L.
D.Y.L.
S.W.L.
MALECON DRIVE
R/W VARIES
BACK OF CURB
FFLFFLFFLFFLFFLFFLFFLFFLFFL
FFL
END OF SIGNAL
IE:8.53'
12" MCP PD
SDMH
RIM:10.10'
IE:6.62'
SUMP:6.78'
GI
RIM:9.50'
IE(N):5.95'
IE(SE):5.72'
IE(W):CNA
SUMP:2.80'
IE:5.56'
±67LF
18" RCP @ 1.00%
DRAIN PIPE
DRAIN PIPE
FLUME
RETIRED IN PLACE
SCDES-BCM CRITICAL LINE
CONTINUES OUTSIDE OF THE
SURVEY LIMITS
GUARDRAIL
GUARDRAIL
GUARDRAIL
END OF SIGNAL
CONTROL PANEL
WATERLINE IS UNTRACEABLE BY ATLAS.
LOCATION SHOWN IS PER BJWSA MARKINGS.
(BEGINNING AT THIS POINT)
SCDES-BCM
CRITICAL LINE
AREA ERODED NEAR
CONCRETE PAD
UNTRACEABLE
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
RIP-RAP
UG UG UG UG UG UG UG UG
UG
HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD W
W
W
5+00 6+00 7+00 8+00
8+57HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD
32' ± 37'±
SCALE: 1"=30' H., 1"=30' V.
PROFILE - PROPOSED WATERLINE PHASE II HDD NORTH, 6+00 - 8+80
-60
-50
-40
-30
-20
-10
-60
-50
-40
-30
-20
-10
1,600' MINIMUM RADIUS
HDD EXIT POINT,
10 DEG. ENTRY ANGLEEXISTING GRADE
MAINTAIN
POSITIVE
SLOPE RESTRAINED 16" DR18 C900 PVC
48" MINIMUM COVER
(TYPICAL)
16" HDD FUSIBLE
PVC WATER LINE
6+00 7+00 8+00 8+80
STA. 8+50+/- TRANSITION TO 16"
HDD FUSIBLE PVC, SEE
CONCRETE COLLAR / TRANSITION
DETAIL ON SHEET C-5
FIBER OPTIC CABLE
16" WATERLINE
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
IS
SU
E
SE
QU
EN
CE
NO
DA
TE
DE
SC
RI
PT
IO
N
O:
\20
_jo bs \bj w
- 0
7 -pa rri s i sla nd w l re pla ce me nt\
CA
DD
\ca dd dr aw ing s\P
AR
RI
S
IS
LA
ND
P
HA
SE
II
- W L H
DD
.dw g Pr int ed
: 1 /28
/20
B y:
K er ry.
W ian t
C la ir D riv e
P ie dm on t, So ut h
C ar ol in a
-7
P h o n e
-0 x:
-9 all rig hts re se rve d)
K
CI
T ec hn olo gie s, Inc . 2
Pu rsu an t to ag re em en t b etw ee n K
CI
T ec hn olo gie s, Inc
KC
I) an d t he pa rty fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed
, th es e d oc um en ts an d a ll d ata , p lan s, sp ec ific ati on s a nd ot he r in for ma tio n c on tai ne d h er ein ar e t he so le an d e xc lus ive pr op er ty of
KC
I, a nd m ay be us ed on ly in co nn ec tio n w ith th e p ro jec t fo r w hic h t he se do cu me nts ha ve be en pr ep ar ed by K
CI
, a nd fo r n o o the r p ur po se . A ny un au tho riz ed us e o f th es e d oc um en ts for an y p ur po se sh all be at th e u se r's so le ris k, wi tho ut lia bil ity to
K
CI
, a nd su bje ct to re as on ab le co mp en sa tio n b y t he us er to
K
CI
, a s d ete rm ine d b y K
CI
in its so le dis cre tio n.
A ll r igh ts of de sig n a nd in ve nti on ar e r es er ve d t o K
CI
Th is do cu me nt wa s c re ate d e lec tro nic all y.
T his m ed ia sh ou ld no t b e c on sid er ed a ce rtif ied do cu me nt un les s i t h as be en pr op er ly se ale d a nd or igi na lly si gn ed by a re gis ter ed pr ofe ss ion al en gin ee r a t th e o ffic e o f K
CI
T ec hn olo gie s, Inc . A uth or ity O
.C .G
.A . 4
3-
-2 2.
KJW
MRB
WRT
00030337_001
C
IP
-2
PA
R R
IS
IS
LA
N
D (P
I)
-IN
C
H S
TE
EL
W
AT
ER
T
R
AN
SM
IS
SI
O
N M
AI
N
R
EP
LA
C
EM
EN
T (M
AL
EC
O N
D R
IV
E)
PH
AS
E
II
Be au fo rd
, S ou th C ar ol in a
/05 /25
IS
SU
ED
F
OR
B
ID
DI
NG
SCALE 1" = 40'
PLAN
C-2
PL
AN
A N
D P
R O
FI
LE
N O
R
TH
S
TA
. 6 +0
TO
E N
D
PH
AS
E
II
- A
LT
ER
N
AT
E
15'X15' HDD EXIT PIT
NEW 16" WATER LINE UNDER
ARCHERS CREEK (NORTH)
EXISTING 10"
WATER LINE
DOMINION GAS LINE (HDD)
Know what's below.
before you dig.Call
R
00 30' 60'
GRAPHIC SCALE: 1" = 30'
M
AT
C H
L
IN
E
S
EE
S H
EE
T
C
NEW 16" WATER LINE UNDER
ARCHERS CREEK (SOUTH)
GENERAL NOTES:
1. PIPE MATERIAL FOR HORIZONTAL DIRECTIONAL DRILL (HDD) SHALL BE 16" FUSIBLE PVC, DR 18 BASED ON ENGINEER'S CALCULATIONS. DRILLING CONTRACTOR SHALL PROVIDE A DRILLING PLAN WITH THE CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER PROVIDING ANTICIPATED LOADINGS AND APPROPRIATE PIPE SELECTION BASED EQUIPMENT TO BE USED AND ANTICIPATED BORING CONDITIONS. ALTERNATE PIPE MATERIALS MAY
BE SUBMITTED FOR APPROVAL.
2. ANY ADJUSTMENTS TO THE VERTICAL OR HORIZONTAL ALIGNMENT OF THE HDD SHALL BE APPROVED BY THE
ENGINEER, BEAUFORT - JASPER WATER & SEWER AND MCB PARRIS ISLAND.
STA. 8+54 +/-
16" MJ 45° BEND
EXISTING
WATER LINE TO BE
ABANDONED, REMOVE
PIPING FROM BRIDGE,
HANGERS TO REMAIN, SEE
DETAIL ON SHEET C-5 END NEW 16" WATERLINE
FOR HDD UNDER ARCHERS CREEK.
CONNECT TO EXISTING 16" DIP
(PHASE II)
DATUMS FOR 8668092, BATTERY CREEK SC
NOTICE: ALL DATA VALUES ARE RELATIVE
TO MEAN SEA LEVEL
MEAN HIGH WATER 3.48 FT
MEAN LOW WATER -4.16 FT
DOUBLE ROW SILT FENCE
CONNECT TO PHASE I
CAPPED STUB OUT
NOTES:
1. BUTTERFLY VALVES: PROVIDE DEZURIK'S MODEL NUM. BAW,16 ,MJ, CI, NBRN-NBR, 150B, DI-S2*GB-6B-N-ENGS, GLPI
OR ENGINEER APPROVED EQUAL.
2. ALL PIPING AND FITTINGS TO BE RESTRAINED.
EXISTING 16"
WATER LINE
EXISTING PIPING SHOWN IS APPROXIMATE BASED
ON FIELD OBSERVATIONS AND EXISTING RECORD
DRAWINGS. FIELD VERIFY EXACT LOCATION
PRIOR TO CONSTRUCTION.EXISTING
WATER LINE TO BE CAPPED
AND ABANDONED IN PLACE
BEFORE DAYLIGHT POINT
(UNDERGROUND - DRAIN AND
CAP WITH BLIND FLANGE AND
SMITH-BLAIR MODEL 911)
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text
APPROXIMATE LOCATION OF FEMA FLOOD LINE
AutoCAD SHX Text
ZONE AE ELEV. 10'
AutoCAD SHX Text
ZONE AE ELEV. 9'
AutoCAD SHX Text
FLOOD ZONE X
AutoCAD SHX Text
ZONE AE ELEV. 9'
AutoCAD SHX Text
ZONE AE ELEV. 10'
AutoCAD SHX Text
FLOOD ZONE X(0.2% CHANCE)
AutoCAD SHX Text
APPROXIMATE LOCATION OF FEMA FLOOD LINE
AutoCAD SHX Text
APPROXIMATE LOCATION OF FEMA FLOOD LINE
AutoCAD SHX Text
ZONE AE ELEV. 9'
AutoCAD SHX Text
CP
AutoCAD SHX Text
CB
AutoCAD SHX Text E
AutoCAD SHX Text
FO
AutoCAD SHX Text
FO
AutoCAD SHX Text
FO
AutoCAD SHX Text
FO
AutoCAD SHX Text
FO
AutoCAD SHX Text
TR
AutoCAD SHX Text
TR
AutoCAD SHX Text
FO
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
BEAUFORT COUNTY UNINCORPORATED AREAS COMMUNITY #450025
AutoCAD SHX Text
BEAUFORT COUNTY UNINCORPORATED AREAS COMMUNITY #450025
AutoCAD SHX Text
TOWN OF PORT ROYAL COMMUNITY #450028
AutoCAD SHX Text W
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TR
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text -1
AutoCAD SHX Text -2
AutoCAD SHX Text -3
AutoCAD SHX Text -4
AutoCAD SHX Text -5
AutoCAD SHX Text -6
AutoCAD SHX Text -7
AutoCAD SHX Text -8
AutoCAD SHX Text -9
AutoCAD SHX Text -10
AutoCAD SHX Text -11
AutoCAD SHX Text -12
AutoCAD SHX Text -13
AutoCAD SHX Text -14
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
KCI
AutoCAD SHX Text
TECHNOLOGIES
AutoCAD SHX Text
INC.
AutoCAD SHX Text No. C0651
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text Z
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text O
HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD
S.W.L.
D.Y.L.
S.W.L.
MALECON DRIVE
R/W VARIES
ARCHERS CREEK
ARCHERS CREEK
FLUME
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
GUARDRAIL
GUARDRAIL
GUARDRAIL
GUARDRAIL
END OF SIGNAL
SCDES-BCM CRITICAL LINE
SCDES-BCM
CRITICAL LINE
SCDES-BCM CRITICAL LINE CONTINUES
OUTSIDE OF THE SURVEY LIMITS
FFL
FFLFFLFFLFFLFFLFFLFFLFFLFFLFFL
UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG
W
HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD HDD
0+00
1+00 2+00
3+00 4+00
5+00 6+00
HDD HDD HDD HDD HDD
22.5' ±
SCALE: 1"=30' H., 1"=30' V.
PROFILE - PROPOSED WATERLINE PHASE II HDD SOUTH, 0+00 - 7+00
-60
-50
-40
-30
-20
-10
-60
-50
-40
-30
-20
-10
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
FOR CONNECTION DETAIL
SEE INSET THIS SHEET
MINIMUM 30'
CLEARANCE
ARCHERS CREEK
EXISTING GRADE
MAINTAIN
POSITIVE
SLOPE
MAINTAIN
POSITIVE
SLOPE
1,600' MINIMUM RADIUS
HDD ENTRY POINT,
10 DEG. ENTRY ANGLE4' MINIMUM COVER
(TYPICAL)
STA. 0+45 +/-
TRANSITION TO 16" FUSIBLE
PVC, SEE CONCRETE
COLLAR / TRANSITION
DETAIL ON SHEET C-5
RESTRAINED 16" DR18
C900 PVC
16" HDD FUSIBLE PVC WATER LINE
8" HIGH PRESSURE HDD
GAS MAIN
(CONTRACTOR TO FIELD
VERIFY DEPTH AND
LOCATION)
16" RJ 45° BEND
STA. 00+42±
5' MIN. CLEARANCE
UG UG
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
IS
SU
E
SE
QU
EN
CE
NO
DA
TE
DE
SC
RI
PT
IO
N o:\
_jo bs \bj w
- 0
7 -pa rri s i sla nd w l re pla ce me nt\
CA
DD
\…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .