1-PA Prevailing Wages 10-23-26.pdf

PDF 21 KB Posted

Attached to
2025-BRP-017 Port Vue Demolition
Solicitation number
Not on record
Issued by
Allegheny County, Pennsylvania

About this file

This document is a Pennsylvania Department of Labor & Industry prevailing wage rate schedule for project 26-09334, the Port Vue Blight Removal project, administered by the Steel Rivers Council of Governments as the awarding agency. The project involves the demolition of three residential structures in Port Vue Borough, asbestos removal and abatement, backfill, grading, and seeding, with all work required to comply with Federal, State, County, and local regulations. The contract was awarded on June 18, 2026, with a project classification of Heavy/Highway. The prevailing wage rates in this document are effective as of October 23, 2026, and are applicable to all workers on this project, with rates varying by trade classification and effective dates ranging from 2016 through 2029.

The wage schedule establishes hourly rates and fringe benefits for numerous trade classifications, including asbestos and insulation workers, carpenters, electricians, laborers, operators, painters, plumbers, and other skilled trades. Rates are stratified by classification level and effective date, with total compensation (hourly rate plus fringe benefits) ranging from $27.63 for window film/tint installers to $104.60 for elevator constructors. The document lists separate prevailing wage tables for both Building and Heavy/Highway project classifications, reflecting the project's dual classification status. The Pittsburgh Field Office, located at (412)565-5300, manages this project and can provide additional information regarding compliance with the Pennsylvania Prevailing Wage Act of 1961, which mandates these wage rates for all applicable workers on the project.

View the file

Other files

File Type Posted
2-2025-BRP-017 Terms and Conditions.pdf PDF
3-2025-BRP-017 Technical Specifications.pdf PDF
4-2025-BRP-017 Required Documents.pdf PDF
1-CD 52-3.11.3 Required Docs.pdf PDF
3-CD 52-3.11.3 Terms Conditions.pdf PDF
2-CD 52-3.11.3 Specs.pdf PDF
1-CD 51-3.12.8 Specs and Drawings.pdf PDF
3-CD 51-3.12.8 Contract Labor and Wages info.pdf PDF
4-CD 51-3.12.8 REQUIRED DOCS.pdf PDF
2-CD51-3.12.8 Notice Terms Conditions.pdf PDF
2-2024-BRP-008 Specs Asbestos LeadSafe PA Wages.pdf PDF
3-2024-BRP-008 REQUIRED DOCUMENTS - affidavits and compliance.pdf PDF
1-2024-BRP-008 Terms Conditions SampleAgrmt.pdf PDF
1-CD 50-3.10.8 REQ DOCS statements affidavits compliance.pdf PDF
2-CD 50-7.6c-51-7.6b Paving specs.pdf PDF
3-CD 50-7.6c-51-7.6b REQUIRED DOCUMENTS.pdf PDF
2-Technical Specifications.pdf PDF
4-CD 50-7.6c-51-7.6b Coundy and Federal Conditions, Wages.pdf PDF
4-CD 50-3.10.8 D-B Wages, Federal Terms and Conditions.pdf PDF
1-CD 50-7.6c-51-7.6b SRCOG terms and conditions.pdf PDF
3-CD 50-3.10.0 SRCOG terms and conditions.pdf PDF
1-Affidavits, Certifications, Instruction, Selection Procedures, Sample contract.pdf PDF
4-CD 48-3.10.2-50-7.6e Updated Davis Bacon Wages, Payrolls, Labor info, optional documents.pdf PDF
2-CD 48-3.10.2-50-7.6e Compliance packet- REQUIRED DOCUMENTS.pdf PDF
3-CD 48-3.10.2-50-7.6e combined specifications maps and drawings.pdf PDF
2-General County Conditions HUD Fed Labor Standards Payroll WorkStoppage.pdf PDF
3-CD 50-3.10.6 Magnolia Street Reconstruction Specs and Scope of Work.pdf PDF
6-CD 49-7.6c CD 50-3.10.6 Davis-Bacon Wage Decision Letter.pdf PDF
5-REQUIRED DOCUMENTS CD 50-3.10.6 Procurement Packet.pdf PDF
3-Project Scope Site Plan Specs Mulchguidelines.pdf PDF
5-REQUIRED DOCUMENTS CD 49-7.6c Procurement Packet.pdf PDF
1-General County Conditions HUD Fed Labor Standards Payroll WorkStoppage.pdf PDF
4-REQUIRED DOCUMENTS Affidavits and Statements.pdf PDF
2-CD 49-7.6c Inst to Bidders Selection Procedures Sample Agree SRCOG Gen Requ.pdf PDF
4-REQUIRED DOCUMENTS - CD 49-7.6c Affidavits and Statements.pdf PDF
1-CD 50-3.10.6 Instructions to Bidders Contract Selection Procedures SRCOG Gen Requirements Sample Contract.pdf PDF
2-GEDTF Statutes (Appendix E).pdf PDF
3-2024-GEDTF-120 Bidders Compliance Packet.pdf PDF
1-SRCOG GeneralReq- Mgmt. Resp-GEDTF.pdf PDF
7-2024-GEDTF-120 PA Prevailing Wages.pdf PDF
6-2024-GEDTF-120 Instructions to Bidders.pdf PDF
5-2024-GEDTF-120 Scope of Work.pdf PDF
4-2024-GEDTF-120 Engineering Specifications.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Port Vue Blight Removal

General Description: Demolition of 3 residential structures in Port Vue Borough, asbestos removal and abatement as required, backfill, grading, and seeding of lot and all related work complete and in compliance with Federal, State, County and local laws.

Project Locality Port Vue Borough

Awarding Agency: Steel Rivers Council of Governments

Contract Award Date: 6/18/2026

Serial Number: 26-09334

Project Classification: Heavy/Highway

Determination Date: 10/23/2026

Assigned Field Office: Pittsburgh

Field Office Phone Number: (412)565-5300

Toll Free Phone Number: (877)504-8354

Project County: Allegheny County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 10/23/2026 Page 1 of 5

Project: 26-09334 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 8/1/2025 $45.10 $30.31 $75.41

Boilermakers 6/1/2016 $40.90 $27.61 $68.51

Bricklayer 12/1/2025 $42.00 $26.59 $68.59

Bricklayer 6/1/2026 $42.65 $26.94 $69.59

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $42.11 $23.36 $65.47

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $43.26 $24.35 $67.61

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2028 $44.45 $25.19 $69.64

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2029 $45.72 $26.01 $71.73

Cement Masons 6/1/2025 $35.52 $25.64 $61.16

Cement Masons 6/1/2026 $36.02 $26.14 $62.16

Drywall Finisher 6/1/2025 $35.16 $25.98 $61.14

Drywall Finisher 6/1/2026 $36.59 $27.30 $63.89

Electricians & Telecommunications Installation Technician

12/27/2024 $50.86 $32.69 $83.55

Electricians & Telecommunications Installation Technician

12/26/2025 $53.11 $33.72 $86.83

Elevator Constructor 1/1/2025 $61.07 $40.05 $101.12

Elevator Constructor 1/1/2026 $63.71 $40.89 $104.60

Glazier 9/1/2024 $37.06 $31.89 $68.95

Glazier 9/1/2025 $38.70 $33.75 $72.45

Iron Workers 6/1/2025 $41.50 $37.36 $78.86

Iron Workers 6/1/2026 $43.50 $37.91 $81.41

Laborers (Class 01 - See notes) 1/1/2025 $27.32 $19.96 $47.28

Laborers (Class 01 - See notes) 1/1/2026 $27.82 $20.46 $48.28

Laborers (Class 02 - See notes) 1/1/2025 $27.47 $19.96 $47.43

Laborers (Class 02 - See notes) 1/1/2026 $27.97 $20.46 $48.43

Laborers (Class 03 - See notes) 1/1/2025 $30.47 $19.96 $50.43

Laborers (Class 03 - See notes) 1/1/2026 $30.97 $20.46 $51.43

Landscape Laborer (Skilled) 1/1/2026 $26.79 $19.03 $45.82

Landscape Laborer (Tractor Operator) 1/1/2026 $27.09 $19.03 $46.12

Landscape Laborer 1/1/2026 $26.37 $19.03 $45.40

Millwright 6/1/2020 $41.68 $20.32 $62.00

Operators (Class 01 - see notes) 6/1/2025 $42.72 $24.79 $67.51

Operators (Class 01 - see notes) 6/1/2026 $43.74 $25.29 $69.03

Operators (Class 02 -see notes) 6/1/2025 $36.67 $24.79 $61.46

Operators (Class 02 -see notes) 6/1/2026 $37.67 $25.29 $62.96

Operators (Class 03 - See notes) 6/1/2025 $33.88 $24.79 $58.67

Operators (Class 03 - See notes) 6/1/2026 $34.88 $25.29 $60.17

Painters Class 6 (see notes) 6/1/2025 $34.16 $25.81 $59.97

Painters Class 6 (see notes) 6/1/2026 $35.26 $26.51 $61.77

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/23/2026 Page 2 of 5

Project: 26-09334 - Building Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 6/1/2024 $33.14 $21.04 $54.18

Plasterers 6/1/2026 $34.59 $22.59 $57.18 plumber 6/1/2026 $55.35 $28.47 $83.82 plumber 6/1/2027 $61.15 $25.87 $87.02

Pointers, Caulkers, Cleaners 12/1/2025 $41.50 $22.50 $64.00

Pointers, Caulkers, Cleaners 6/1/2026 $42.20 $22.80 $65.00

Roofers 12/1/2025 $41.21 $21.46 $62.67

Roofers 6/1/2026 $42.00 $23.17 $65.17

Sheet Metal Workers 7/1/2025 $45.00 $35.16 $80.16

Sheet Metal Workers 7/1/2026 $46.75 $36.61 $83.36

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 1/1/2026 $46.14 $28.30 $74.44

Sprinklerfitters 7/1/2026 $48.64 $28.30 $76.94

Steamfitters 6/1/2025 $50.20 $31.02 $81.22

Steamfitters 6/1/2026 $53.05 $31.27 $84.32

Stone Masons 12/1/2025 $44.10 $25.22 $69.32

Stone Masons 6/1/2026 $44.70 $25.62 $70.32

Terrazzo Finisher 12/1/2025 $42.75 $19.51 $62.26

Terrazzo Finisher 6/1/2026 $43.82 $19.94 $63.76

Terrazzo Mechanics 12/1/2025 $42.15 $21.76 $63.91

Terrazzo Mechanics 6/1/2026 $43.22 $22.19 $65.41

Tile Finisher 12/1/2025 $33.99 $18.71 $52.70

Tile Finisher 6/1/2026 $34.82 $18.98 $53.80

Tile Setter 12/1/2025 $40.80 $23.25 $64.05

Tile Setter 6/1/2026 $41.66 $23.49 $65.15

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

Window Film / Tint Installer 10/1/2019 $25.00 $2.63 $27.63

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/23/2026 Page 3 of 5

Project: 26-09334 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 1/1/2026 $42.60 $22.84 $65.44

Carpenter Welder 1/1/2025 $42.85 $22.09 $64.94

Carpenter Welder 1/1/2026 $44.10 $22.84 $66.94

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Cement Finishers 1/1/2024 $35.14 $26.30 $61.44

Cement Finishers 1/1/2025 $35.94 $27.50 $63.44

Cement Masons 1/1/2020 $32.84 $21.10 $53.94

Electric Lineman 6/3/2024 $53.97 $31.05 $85.02

Electric Lineman 6/2/2025 $57.10 $31.63 $88.73

Electricians & Telecommunications Installation Technician

12/26/2025 $54.16 $32.69 $86.85

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2025 $41.50 $37.36 $78.86

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2026 $43.50 $37.91 $81.41

Laborers (Class 01 - See notes) 1/1/2025 $33.70 $26.00 $59.70

Laborers (Class 01 - See notes) 1/1/2026 $34.70 $27.00 $61.70

Laborers (Class 02 - See notes) 1/1/2025 $33.86 $26.00 $59.86

Laborers (Class 02 - See notes) 1/1/2026 $34.86 $27.00 $61.86

Laborers (Class 03 - See notes) 1/1/2025 $34.25 $26.00 $60.25

Laborers (Class 03 - See notes) 1/1/2026 $35.25 $27.00 $62.25

Laborers (Class 04 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 04 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 05 - See notes) 1/1/2025 $35.11 $26.00 $61.11

Laborers (Class 05 - See notes) 1/1/2026 $36.11 $27.00 $63.11

Laborers (Class 06 - See notes) 1/1/2025 $31.95 $26.00 $57.95

Laborers (Class 06 - See notes) 1/1/2026 $32.95 $27.00 $59.95

Laborers (Class 07 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 07 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 08 - See notes) 1/1/2025 $36.20 $26.00 $62.20

Laborers (Class 08 - See notes) 1/1/2026 $37.20 $27.00 $64.20

Millwright 6/1/2025 $49.72 $23.72 $73.44

Operators (Class 01 - see notes) 1/1/2025 $40.39 $24.23 $64.62

Operators (Class 01 - see notes) 1/1/2026 $41.96 $24.66 $66.62

Operators (Class 02 -see notes) 1/1/2025 $40.13 $24.23 $64.36

Operators (Class 02 -see notes) 1/1/2026 $41.70 $24.66 $66.36

Operators (Class 03 - See notes) 1/1/2025 $36.48 $24.23 $60.71

Operators (Class 03 - See notes) 1/1/2026 $38.05 $24.66 $62.71

Operators (Class 04 - See notes) 1/1/2025 $36.02 $24.23 $60.25

Operators (Class 04 - See notes) 1/1/2026 $37.59 $24.66 $62.25

Operators (Class 05 - See notes) 1/1/2025 $35.77 $24.23 $60.00

Operators (Class 05 - See notes) 1/1/2026 $37.34 $24.66 $62.00

Operators Class 1-A 1/1/2025 $43.39 $24.23 $67.62

Operators Class 1-A 1/1/2026 $44.96 $24.66 $69.62

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/23/2026 Page 4 of 5

Project: 26-09334 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators Class 1-B 1/1/2025 $42.39 $24.23 $66.62

Operators Class 1-B 1/1/2026 $43.96 $24.66 $68.62

Painters Class 1 (see notes) 6/1/2022 $34.45 $22.82 $57.27

Painters Class 2 (see notes) 6/1/2025 $40.36 $25.81 $66.17

Painters Class 2 (see notes) 6/1/2026 $41.66 $26.51 $68.17

Painters Class 3 (see notes) 6/1/2025 $43.68 $25.81 $69.49

Painters Class 3 (see notes) 6/1/2026 $45.08 $26.51 $71.59

Painters Class 4 (see notes) 6/1/2019 $28.20 $20.06 $48.26

Painters Class 5 (see notes) 6/1/2019 $22.91 $20.06 $42.97

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/23/2026 Page 5 of 5

File details come from the government source that posted it. Updated .