1-Orem Well 10 Exterior Cathodic Protection System - Specifications and Plans.pdf
PDF 15 MB Posted
- Attached to
- Well #10 - Exterior Cathodic Protection System
- Solicitation number
- 26-019
- Issued by
- Utah
About this file
This is a bidding document package for the City of Orem, Utah, for the installation of an exterior cathodic protection system at Well #10. The project involves installing a deep well anode system, rectifier, and associated equipment to provide cathodic protection to the well house and appurtenant work located southwest of the intersection at 400 South and 400 West in Orem, Utah 84058. The work is organized into three line items: mobilization, the main cathodic protection system installation, and demobilization, all as lump sum bid items. Bids were due electronically via Bonfire or in person at the Community Development Offices, 56 North State Street, Orem, Utah 84057, by July 7th at 2:00 PM. The contract requires substantial completion within 60 days from the Notice to Proceed, with final completion required 30 days after substantial completion. Liquidated damages are assessed at $500 per calendar day for delays beyond 30 days from substantial completion. The project documents were prepared by Hansen, Allen & Luce, Inc., consultants and engineers, with drawings numbered CP-1 through CP-5 prepared by Hansen, Allen & Luce, Inc. and Infinity Corrosion, dated June 2026.
Bidders must submit a bid bond equal to five percent of the total bid amount and, upon award, provide performance and payment bonds each in the amount of 100 percent of the contract price with an approved corporate surety. All bidders must hold a valid Utah State Contractors License applicable to the work type at the time of bid opening. Required insurance includes commercial general liability of $2,000,000 combined single limit per occurrence (with aggregate limits of either $4,000,000 or $3,000,000 depending on policy structure), business auto liability of $2,000,000 combined single limit per accident, and workers' compensation with employer's liability limits of $1,000,000 per accident. The City of Orem, its elected and appointed officials, officers, employees, and volunteers must be named as additional insureds on all liability policies. Contractors must provide a current certificate of insurance, a construction superintendent resume, a financial statement with references, and three recent projects of similar type and complexity. Payment will be made via automated clearinghouse (ACH) transfer within fifteen days of invoice receipt, with the City retaining ten percent of progress payments until final completion, reducible to five percent after fifty percent of work completion. All work must comply with the current building code and City of Orem Construction Standards and Specifications, with the contractor responsible for obtaining required building permits and coordinating all inspections and submittals. A one-year warranty period applies to all materials, equipment, and workmanship from the date of substantial completion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OREM CITY
EXTERIOR CATHODIC
PROTECTION SYSTEM
PROJECT
BIDDING DOCUMENTS
JUNE 2026
06/2026 INSIDE COVER
119.08.100 PAGE 00 01 01 - 1
OREM CITY
EXTERIOR CATHODIC PROTECTION SYSTEM
PROJECT
JUNE - 2026
BIDDING DOCUMENTS
Project Engineer Cathodic Protection Engineer
HANSEN, ALLEN, & LUCE, INC.
Consultants/Engineers
859 West South Jordan Parkway – Ste 200 South Jordan, Utah 84095
(801) 566-5599
06/22/2026
Erik S. LlewellynBenjamin D. Miner
06/22/2026
06/2026 INSIDE COVER
119.08.100 PAGE 00 01 01 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
06/2026 TABLE OF CONTENTS
119.08.100 PAGE 00 01 10 - 1
TABLE OF CONTENTS
SECTION PAGE(S)
00 00 01 Inside Cover ........................................................................................ 00 00 01 - 1 to 2 00 01 10 Table of Contents ................................................................................ 00 01 10 - 1 to 2
PART 1 - BIDDING REQUIREMENTS
00 00 30 Advertisement for Bids ...................................................................... 00 00 30 - 1 to 1 00 10 00 Instructions to Bidders ....................................................................... 00 10 00 - 1 to 3 00 30 00 Bid Forms ......................................................................................... 00 30 00 - 1 to 2 00 35 00 Bid Bond ........................................................................................... 00 35 00 - 1 to 1 00 40 00 Contractor Qualification Form............................................................ 00 40 00 - 1 to 4
PART 2 - CONTRACT FORMS
00 50 00 Agreement ........................................................................................ 00 50 00 - 1 to 6 00 61 00 Performance Bond .......................................................................... 00 61 00 - 1 to 2 00 62 00 Payment Bond .................................................................................. 00 62 00 - 1 to 2 00 63 00 Notice of Award ................................................................................. 00 62 50 - 1 to 1 00 64 00 Notice to Proceed.............................................................................. 00 62 50 - 1 to 1 00 65 00 Change Order ................................................................................... 00 62 50 - 1 to 1
PART 3 - CONTRACT CONDITIONS
00 70 00 General Conditions ........................................................................... 00 70 00 - 1 to 21
PART 4 - TECHNICAL SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 Summary of Work ............................................................................... 01 11 00 - 1 to 4 01 25 00 Measurement and Payment ................................................................ 01 25 00 - 1 to 3 01 30 00 Submittals ........................................................................................... 01 30 00 - 1 to 7 01 40 00 Coordination and Site Conditions ........................................................ 01 40 00 - 1 to 3 01 45 00 Quality Control .................................................................................... 01 45 00 - 1 to 3 01 50 00 Construction Facilities and Temporary Controls .................................. 01 50 00 - 1 to 6 01 70 00 Project Closeout .................................................................................. 01 70 00 - 1 to 3
DIVISION 02 - NOT USED
DIVISION 03 - NOT USED
DIVISIONS 04 THROUGH 25 - NOT USED
DIVISION 26 - ELECTRICAL
TABLE OF CONTENTS (CONT=D)
SECTION PAGE(S)
06/2026 TABLE OF CONTENTS
119.08.100 PAGE 00 01 10 - 2
26 42 10 Impressed Current Cathodic Protection – Exterior Well ..................... 26 42 10 - 1 to 21
DIVISIONS 27 THROUGH 48 - NOT USED
PART 5 - DRAWINGS
PART 1
BIDDING DOCUMENTS
05/2026 INSTRUCTION TO BIDDERS
119.08.100 00100 - 1
SECTION 00100
INSTRUCTION TO BIDDERS
1.1 SUBMISSION OF BIDS: BIDS will be received by the CITY OF OREM, herein called the "OWNER", electronically submitted using Bonfire or at Community Development
Offices, 56 North State Street, Orem, UT 84057 until July 7th at 2:00 PM and then at said office publicly opened or downloaded from Bonfire and read aloud.
Each BID must be submitted electronically on Bonfire If submitted electronically ensure the name of the project is clearly marked on the bid submittal sheets.
All BIDS must be made on the required BID form. All blank space for BID prices must be completed in ink or typewritten, and the BID form must be fully completed and executed when submitted. Only one copy of the BID form is required.
The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any
BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the bid opening.
1.2 BID BOND: Each BID must be accompanied by a BID bond payable to the OWNER for five percent of the total amount of the BID. This must be submitted electronically if submitting using Bonfire. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible BIDDERS. When the
Agreement is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the payment
BOND and performance BOND have been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND.
A performance BOND and a payment BOND, each in the amount of 100 percent of the
CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. Attorney's-in-fact who sign BID BONDS or payment BONDS and performance BONDS must file with each BOND a certified and effective dated copy of their power of attorney.
1.3 INTERPRETATIONS: BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID Schedule by examination of the site and a review of the drawings and specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done.
The CONTRACT DOCUMENTS contain the provisions required for the construction of the
PROJECT. Information obtained from an officer, agent, or employee of the OWNER or
119.08.100 00100 - 2 any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve him from fulfilling any of the conditions of the contract.
1.4 DISQUALIFICATION OF BIDDERS: The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK specified therein. A conditional or qualified BID will not be accepted. Award will be made to the lowest responsible BIDDER.
All applicable laws, ordinances, rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the contract throughout.
Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to his BID.
1.5 NOTICE OF AWARD: The successful BIDDER will be required to execute the Agreement and obtain the performance BOND and payment BOND within ten (10) calendar days from the date the NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary Agreement and BOND forms. In case of failure of the BIDDER to execute the Agreement, the OWNER may at his option consider the
BIDDER in default, in which case the BID BOND shall become the property of the
OWNER.
The OWNER within ten (10) days of receipt of acceptable performance BOND, payment
BOND and Agreement signed the successful bidder shall sign the Agreement and return an executed duplicate of the Agreement to the successful BIDDER. Should the OWNER not execute the Agreement within the specified time period, the BIDDER may, by
WRITTEN NOTICE, withdraw his signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the OWNER.
1.6 NOTICE TO PROCEED: The NOTICE TO PROCEED shall be issued within ten (10) calendar days of the execution of the Agreement by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within such period, the time may be extended by mutual Agreement between the OWNER and CONTRACTOR. If the NOTICE
TO PROCEED has not been issued within the ten (10) day period or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement without further liability on the part of either party. The low BIDDER shall supply the names and addresses of major material SUPPLIERS and SUBCONTRACTORS when requested to do so by the
OWNER. Further, the BIDDER agrees to abide by the Federal requirements for Equal
Opportunity if required.
119.08.100 00100 - 3
1.7 COMPETENCY OF BIDDERS: The OWNER may make such investigations as he deems necessary to determine the ability of the BIDDER to perform the WORK. In selecting the lowest responsive, responsible Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the
WORK covered by the Bid. To this end, each Bid shall be supported by a statement of the
Bidder's experience as of recent date on the form entitled "INFORMATION REQUIRED
OF BIDDER,; bound herein. No Bid for the WORK will be accepted from a contractor who does not hold a valid contractor's license in the State where the WORK is to be performed
(if required by the State) applicable to the type of work bid upon at the time of opening
Bids.
06/2026 BID FORMS
119.08.100 00300 - 1
SECTION 00300
BID FORMS
BID
1. Proposal of (hereinafter called "BIDDER"), organized and existing under the laws of the State of Utah doing business as to the CITY
OF OREM (hereinafter called "OWNER").
2. In compliance with your advertisement for BIDS, BIDDER herein proposes to perform all WORK for the construction of WELL HOUSE # 10 EXTERIOR CATHODIC PROTECTION SYSTEM PROEJCT in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below.
3. By submission of this BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies that this BID has been arrived at independently without consultation, communication or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.
4. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to complete PROJECT 90 days from Notice to Proceed, unless the period for completion is extended otherwise by the CONTRACT DOCUMENTS. BIDDER further agrees to pay, as liquidated damages, the sum of $500 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions.
5. BIDDER acknowledges receipt of the following ADDENDUM:
6. BIDDER agrees to perform all work described in the CONTRACT DOCUMENT for the following unit prices which shall reflect all in-place final costs by the BIDDER to the OWNER:
NOTE: BIDS shall include sales tax and all other applicable taxes and fees. A total contract AMOUNT shall be entered for each item and shall be the product of the number under UNIT times the UNIT PRICE unless the units are a lump sum whereby the AMOUNT shall also reflect the lump sum price. AMOUNT column shall be totaled as indicated below.
06/2026 BID FORMS
119.08.100 00300 - 2
Item No
DESCRIPTION
QTY
UNIT
UNIT PRICE
(Material &
Labor)
TOTAL
Mobilization
LS
WELL #10 – EXTERIOR
CATHODIC PROTECTION
SYSTEM – Deep Well Anode
System, Rectifier, and Associated Equipment
Demobilization
GRAND TOTAL
Respectfully submitted:
Contractor Name Telephone Number
License Address
Signature City, State & Zip
Title .... Date
Federal I.D. Number
(SEAL - if BID is by a corporation)
Attest:
05/2026 BID BOND
119.08.100 00350 - 1
SECTION 00350
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, , as Principal, and as Surety, are hereby held and firmly bound unto the CITY OF OREM as OWNER in the penal sum for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assign.
Signed, this day of , 2026. The Condition of the above obligation is such that whereas the
Principal has submitted to the CITY OF OREM a certain BID, attached hereto and hereby made a part hereof to enter into a contract in writing, for the construction of OREM CITY WELL #10 - EXTERIOR CATHODIC
PROTECTION SYSTEM.
NOW, THEREFORE,
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said contact, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligation of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within the OWNER may accept such BID;
and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed an these presents to be signed by their officers, the day and year first set forth above.
(L.S.)
Principal
Surety
By:
IMPORTANT - Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.
06/2026 CONTRACTOR QUALIFICATION FORM
119.08.100 00400 - 1
SECTION 00400
CONTRACTOR QUALIFICATION FORM
The Bidder shall furnish the following information. Additional sheets shall be attached as required. Failure to complete Item Nos. 1, 2 and 6, will cause the bid to be non-responsive and may cause its rejection.
In any event, no award will be made until all the Bidder's General Information (i.e., items 1 through 6, inclusive) is delivered to the OWNER.
1. CONTACT INFORMATION:
Contractor Name:
Address:
Telephone Number:
2. LICENSE: A copy of your current Utah State Contractors License must be attached.
3. INSURANCE: Attach a Certificate of Insurance from your insurance company. Minimum amount of insurance under General Liability are as follows:
General Liability: $2,000,000.00 combined single limit per occurrence for bodily injury, personal injury and property damage. If the General Liability Insurance has a general aggregate limit, either the general aggregate limit shall be $4,000,000.00 or the general aggregate limit shall apply separately to this Agreement/Project, pursuant to a policy endorsement. If the general aggregate limit applies separately to this agreement/project, the general aggregate limit shall be $3,000,000.00.
Automobile Liability: $2,000,000.00 combined single limit per accident for bodily injury and property damage.
The Certificate of Insurance must include an additional insured endorsement. Blanket additional insured endorsements are usually acceptable. If not using a blanket additional insured endorsement, the additional insured endorsement must list the following as additional insureds: “THE CITY OF OREM, ITS’ ELECTED AND APPOINTED OFFICIALS, OFFICERS, EMPLOYEES AND VOLUNTEERS.” Certificates without additional insured endorsements will not be accepted.
Workers' Compensation and Employers Liability: Workers' compensation limits s required by Utah State Law and Employer's Liability Limits of $1,000,000.00 per accident or as required by Section 21 of the General Conditions.
Please NOTE the following is part of the contract: The CITY, its officers, officials, employees and volunteers shall be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of CONTRACTOR, including the insured’s general supervision of CONTRACTOR;
119.08.100 00400 - 2 products and completed operations of CONTRACTOR; premises owned, occupied or used by CONTRACTOR; or automobiles owned, leased, hired or borrowed by CONTRACTOR. The coverage shall contain no special limitations on the scope of protection afforded to the OWNER, its officers, officials, employees or volunteers. The applicant shall hold harmless, indemnify and defend the City of Orem from any liability claims, losses or damages arising or alleged to arise from the work covered by any permit but not including the sole negligence of the City of Orem.
4. CONSTRUCTION SUPERINTENDENT: Attach to this Bid the experience resume of the person who will be designated chief construction superintendent or on-site construction manager.
5. FINANCIAL STATEMENT: Attach to this Bid a financial statement, references, and other information, sufficiently comprehensive to permit an appraisal of CONTRACTOR's current financial condition.
6. RECENT PROJECTS: Attach to this Bid three projects completed as of recent date involving work of similar type and complexity:
119.08.100 00400 - 3
RECENT PROJECTS
1) Project:
Contract Price:
Reference: Name:
Address:
Telephone Number:
2) Project:
Contract Price:
Reference: Name:
119.08.100 00400 - 4
3) Project:
Contract Price:
Reference: Name:
PART 2
CONTRACT FORMS
06/2026 AGREEMENT
119.08.100 00500 - 1
Section 00500
AGREEMENT
This Agreement is executed in duplicate this day of , 20___, by and between the City of Orem, a municipal corporation and political subdivision of the State of
Utah, with its principal offices located at 56 North State Street, Orem, Utah 84057 (hereinafter referred to as the "City"), and , a _________________________ with its principal offices located at _________________________________________________
(hereinafter referred to as "Contractor").
RECITALS
WHEREAS the City desires to hire a contractor to perform construction work related to the
OREM CITY WELL #10 - EXTERIOR CATHODIC PROTECTION SYSTEM PROJECT
(hereinafter referred to as the “Project”); and
WHEREAS the Project includes cathodic protection to WELL HOUSE # 10 and all other associated items and appurtenant work located southwest of the intersection at 400 S and 400 W in Orem, Utah 84058.
WHEREAS the City has advertised a request for bids for the Project; and
WHEREAS the bid submitted by Contractor was the lowest responsible bid; and
WHEREAS the City desires to accept the bid of Contractor; and
WHEREAS it is important that the Project be completed by COMPLETION DATE; and
WHEREAS Contractor is willing and able to begin work on the Project immediately and to complete the Project in an expeditious manner; and
WHEREAS, the City and Contractor desire to set for their respective rights and responsibilities in this Agreement.
COVENANTS
NOW, THEREFORE, in consideration of the mutual covenants of the parties as hereinafter set forth, the City and Contractor mutually agree as follows:
1. OREM CITY WELL #10 - EXTERIOR CATHODIC PROTECTION SYSTEM PROJECT.
Contractor shall construct cathodic protection to WELL HOUSE # 10 and all other associated items and appurtenant work as described in the following documents which are incorporated
119.08.100 00500 - 2 herein by reference. Items 1.1 through 1.7 are attached hereto as Exhibit “A” and item 1.7 has been posted by the City on Bonfire.
1.1. Advertisement for Bids.
1.2. General Conditions.
1.3. Special Conditions.
1.4. Technical Specifications.
1.5. Project Addendum 1 dated
1.6. Contractor’s Bid and Bid Schedule
1.7. Drawings prepared by Hansen, Allen & Luce, Inc. and Infinity Corrosion dated
, 2026 numbered CP-1 through CP-5 and posted on Bonfire.
2. Compensation.
2.1 Payment. Upon completion of the Project, the City shall pay compensation to Contractor in the amount of
Dollars and cents. ($###,###.##). This amount shall be the total compensation due to Contractor. Payment shall be made within fifteen (15) days of the City’s receipt of
Contractor’s invoice.
2.2 ACH Payment Only. All payments owed by the City under this agreement shall be made using automated clearinghouse (“ACH”) bank transfers. The City will not make payments using checks, credit cards, or other means beyond an ACH transfer. Contractor agrees to provide the City with the information necessary for an ACH transfer and authorizes the City to make payments to Contractor through ACH transfers.
3. Time for Construction and Completion. The PROJECT shall be substantially completed 60 days from Notice to Proceed. Contractor shall complete construction of the entire Project on or before 30 days from Substantial Completion.
4. Liquidated Damages. Time deadlines for the completion of the Project are material terms of this Agreement and Contractor agrees to pay liquidated damages of $500/day to the City for each calendar day beyond 30 days from Substantial Completion that the work on the Project is not complete. The liquidated damages shall be assessed as provided in Section 15 of the General
Conditions and may be used to offset the amount that the City is required to pay Contractor pursuant to this Agreement.
5. Warranty. Contractor warrants to the City that all parts and materials used will be of good quality and new unless otherwise required or permitted by the City and that all labor will be performed in a workmanlike manner and will be free from faults and defects. Contractor shall replace or repair any faults or defects that are due to a defect in materials or workmanship and which are discovered within one year after completion of the Project.
6. Building Permits. Contractor shall be responsible for obtaining any required building permits
119.08.100 00500 - 3 required by the City Building Department. All work shall comply with the current building code and
City of Orem Construction Standards and Specifications. Contractor shall be responsible to coordinate all inspections and submittals.
7. Insurance Requirements.
7.1. Types. Contractor shall procure and maintain the following types of insurance for the duration of this Project. Any subcontractor hired by Contractor to perform the Project shall also meet these insurance requirements.
7.1.1. Commercial General Liability. Commercial General Liability (CGL) insurance with coverage that is at least as broad as the Insurance Services Office Commercial General
Liability coverage (occurrence form).
7.1.2. Business Auto. Business Auto insurance with coverage that is at least as broad as the Insurance Services Office Business Auto Coverage form.
7.1.3. Workers’ Compensation and Employer’s Liability. Workers’ Compensation insurance as required by the State of Utah and Employer’s Liability Insurance.
7.2. Coverage Limits. Contractor’s required insurance shall have the following minimum coverage limits:
7.2.1. Commercial General Liability. $2,000,000.00 combined single limit per occurrence for bodily injury, personal injury and property damage. If the policy contains a general aggregate limit, the general aggregate limit must apply separately to this
Agreement or the general aggregate limit shall be $3,000,000.00.
7.2.2. Business Auto. $2,000,000.00 combined single limit per accident for bodily injury and property damage. “Any auto” coverage is required.
7.2.3. Workers’ Compensation and Employer’s Liability. Workers’ Compensation as required by the State of Utah and $1,000,000.00 per accident for Employer’s Liability.
7.3. Deductibles. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City’s option, the City may require that:
7.3.1. The insurer reduces or eliminate the deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or
7.3.2. Contractor shall procure a bond or letter of credit guaranteeing payment of any deductibles or self-inured retentions.
7.4. Policy Provisions. The policies shall contain, or be endorsed to contain, the following provisions:
7.4.1. Additional Insured. The City and its officers, officials, elected representatives, employees and volunteers shall be listed as additional insureds under the CGL and
Automobile Liability policies. The coverage shall contain no special limitations on the scope of protection afforded to the City, Contractor and their respective officers, officials, elected representatives, employees, or volunteers.
7.4.2. Primary Insurance. Contractor’s insurance coverage shall be primary insurance.
Any insurance or self-insurance maintained by the City shall be excess of Contractor’s insurance and shall not contribute with it.
7.4.3. Reporting. Any failure to comply with reporting provisions of the policies shall not
119.08.100 00500 - 4 affect coverage provided to the City, its officers, officials, elected representatives, employees or volunteers.
7.4.4. Separate Application. Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
7.4.5. Waiver of Subrogation. The insurers shall waive, in writing, all rights of subrogation against the City, its officers, officials, elected representatives, employees and volunteers for losses arising from Contractor’s actions in performing (or failing to perform) this
Agreement.
7.4.6. Cancellation. Each insurance policy required by this Agreement shall be endorsed to state that coverage shall not be suspended, voided, canceled, or reduced in coverage or in limits, except after thirty (30) days’ prior written notice by certified mail has been given to the City. If required insurance lapses, the City shall have the option of:
7.4.6.1. Purchasing the insurance on behalf of Contractor and deducting the insurance costs from the amount owed to Contractor; or
7.4.6.2. Terminating this Agreement.
7.5. Best's Rating. Each insurer shall have a Best's rating of A-: VII or better. Insurers must maintain the A-: VII or better rating for the entire term of this Agreement.
7.6. Certificates of Insurance. Contractor shall provide the City with certificates of insurance and with original endorsements effecting coverage required. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. All certificates and endorsements shall be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. Contractor shall obtain certificates of insurance from its subcontractors and provide copies of such to the City upon the City’s request.
7.7. Subcontractors. Contractor shall include any subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein.
7.8. Insurance Coverage. The City does not represent that the insurance coverage specified herein (whether in scope or amounts of coverage) is adequate to protect the obligations of
Contractor or its subcontractors, and Contractor and its subcontractors shall be solely responsible for any deductibles and deficiencies thereof.
8. Indemnification. Contractor shall indemnify and hold the City and its officers, officials, elected representatives, employees, agents and volunteers harmless from and against all claims, damages, losses and expenses, and costs arising out of or resulting from Contractor’s acts or failures to act in performing this Agreement and completing the Project. Contractor shall not be liable for the City’s own negligent acts.
05/2026 AGREEMENT
119.08.100 00500 - 5
9. Lawful Agreement. The parties represent that each of them has lawfully entered into this
Agreement, having complied with all relevant statutes, ordinances, resolutions, by-laws and other legal requirements applicable to their respective operations.
10. Utah Law. This Agreement shall be interpreted pursuant to the laws of the State of Utah.
11. Time of the Essence. Time shall be of the essence of this Agreement.
12. Interpretation. The invalidity of any portion of this Agreement shall not prevent the remainder from being carried into effect. Whenever the context of any provision shall require it, the singular number shall be held to include the plural number, and vice versa, and the use of any gender shall include any other genders. Any paragraph or section headings in this Agreement are for convenience only, and do not constitute a part of the provisions hereof.
13. Amendments. No oral modifications or amendments to this Agreement shall be effective, but this Agreement may be modified or amended by written agreement.
14. No Presumption. Should any provision of this Agreement require judicial interpretation, the
Court interpreting or construing the same shall not apply a presumption that the terms hereof shall be more strictly construed against one party, by reason of the rule of construction that a document is to be construed more strictly against the person who himself or through his agents, prepared the same, it being acknowledged that both parties have participated in the preparation hereof.
15. Binding Effect. This Agreement shall be binding upon the heirs, executors, administrators, successors, and assigns of each of the parties hereto.
16. Limitation of Liability. Neither party shall be liable to the other for any special, indirect, incidental, consequential, punitive or exemplary damages, including, but not limited to, lost profits, even if such party has knowledge of the possibility of such damages.
17. Electronic Transaction and Signature. Each party agrees that this transaction may be conducted by electronic means. Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Electronic signature means any electronic sound, symbol, or process attached to or logically associated with a record and executed and adopted by a party with the intent to sign such a record, including facsimile or email electronic signatures.
05/2026 AGREEMENT
119.08.100 00500 - 6
SIGNED AND ENTERED INTO THIS ____ day of , 2026.
City of Orem
Brenn Bybee, City Manager
ATTEST:
Teresa McKitrick, City Recorder
Contractor
Name and Title
STATE OF UTAH)
: ss.
COUNTY OF UTAH)
The foregoing instrument was acknowledged before me this ___ day of
, 2026, by _______________________________, as the
_________________________________ of Contractor, who acknowledged that he/she executed this agreement on behalf of Contractor.
Notary Public
(Seal)
My Commission Expires:
Residing at:
Section 00610
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor) a , hereafter called Principal, and (Corporation, Partnership or Individual)
(Name of Surety)
(Address of Surety) hereinafter called Surety, are held and firmly bound unto The City of Orem, 56 North State Street, Orem, Utah, 84057 hereinafter called OWNER, in the penal sum of _______________ Dollars, ($_____) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THE OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of , 202 , a copy of which is hereto attached and made a part hereof for the construction of OREM CITY WELL #10 - EXTERIOR CATHODIC PROTECTION
SYSTEM PROJECT.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreement of said contract during the original term thereof, and any extensions thereof may be granted by the OWNER, with or without notice to the Surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the OWNER from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said surety, for value received hereby stipulates and agrees that no charge, extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in (Number) counterparts, each one of which shall be deemed an original, 06/2026 PERFORMANCE BOND
119.08.100 00610 - 1
06/2026 PERFORMANCE BOND
119.08.100 00610 - 2 this the day of , 202 .
By (Principal Secretary)
(SEAL)
AddressWitness as to Principal
Address
Surety Secretary
(SEAL)
Attorney-in FactWitness as to Surety
Address Address
NOTE: Date of BOND must not be prior to the date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the PROJECT is located.
Section 00620
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
that , (Name of Contractor)
(Address of Contractor) a , hereinafter called Principal, and
(Name of Surety)
(Address of Surety) hereinafter called Surety, are held and firmly bound unto The City of Orem 56 North State Street, Orem, UT 84057 hereinafter called OWNER, in the penal sum of _______________ Dollars ($_____) in lawful money of the United States, for the payment of which sum well and truly be made, we bind ourselves successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of , 202 , a copy of which is hereto attached and made a part hereof for the construction of OREM CITY WELL #10 - EXTERIOR CATHODIC PROTECTION
SYSTEM PROJECT.
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, SUBCONTRACTORS, and the corporation furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise, to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
06/2026 PAYMENT BOND
119.08.100 00620 - 1
06/2026 PAYMENT BOND
119.08.100 00620 - 2
IN WITNESS WHEREOF, this instrument is executed in (Number) counterparts, each one of which shall be deemed an original, this the day of , 202 .
Principal Secretary
Witness as to Principal
Attorney-in-Fact
AddressWitness as to Surety
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is partnership, all partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the PROJECT is located.
06/2026 NOTICE OF AWARD
119.08.100 00630 - 1
SECTION 00630
NOTICE OF AWARD
TO:
PROJECT:
PROJECT NUMBER:
The OWNER has considered the BID submitted by you for the above described WORK in response to its Advertisement for Bids dated , and Information for Bidders.
You are hereby notified that your BID has been accepted for items in the amount of .
You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR'S PERFORMANCE BOND, PAYMENT BOND and Certificates of Insurance within ten (10) days from the date of this Notice to you.
If you fail to execute said Agreement and to furnish said BONDS within ten (10) days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER'S acceptance of your BID as abandoned and as forfeiture of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law.
You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER.
Dated this day of , 202 .
CITY OF OREM
Brenn Bybee, City Manager
Receipt of the NOTICE OF AWARD is hereby acknowledged by:
this the day of , 202 .
Title
06/2026 NOTICE TO PROCEED
119.08.100 00640 - 1
SECTION 00640
NOTICE TO PROCEED
To:
Date:
Project:
Project Number:
You are hereby notified to commence WORK in accordance with the Agreement dated on _________________, and you are to complete the PROJECT by __________________. The date of completion of all WORK is therefore __________________ unless the period for completion is extended by a properly signed and accepted CHANGE ORDER. Performance & Payment Bonds were received.
You are required to return an acknowledged copy of this NOTICE TO PROCEED to the OWNER.
Taggart Bowen City Engineer
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PROCEED is hereby acknowledged by:
this the day of , 202 .
Signature
Title
06/2026 CHANGE ORDER
119.08.100 00650 - 1
SECTION 00650
CHANGE ORDER
PROJECT CHANGE ORDER FORM
DATE
PROJECT MANAGER
PROJECT TITLE
CONTRACTOR
CHANGE ORDER #
PROJECT #
P. O. #
CHANGES TO BE MADE TO THE CONTRACT DOCUMENTS
A. ORIGINAL CONTRACT PRICE
B. TOTAL OF PREVIOUS CHANGE ORDERS
C. AMOUNT OF THIS CHANGE ORDER
D. NEW CONTRACT PRICE (ADD A THROUGH C)
E. CHANGES IN CONTRACT TIME:
SIGNATURE REQUIRED FOR APPROVAL
PROJECT MANAGER
CONTRACTOR
CONSTRUCTION ENGINEER
CITY ENGINEER
SECRETARY:
DATE ENTERED INTO THE SYSTEM:
PART 3
CONTRACT CONDITIONS
06/2026 GENERAL CONDITIONS
119.08.100 00700 - 1
SECTION 00700
GENERAL CONDITIONS
1. Definitions
2. Additional Instructions and Detail Drawings
3. Schedules, Reports and Records
4. Drawings and Specifications
5. Shop Drawings
6. Materials, Services and Facilities
7. Inspection and Testing
8. Substitutions
9. Patents
10. Surveys, Permits, Regulations
11. Protection of Work, Property and Persons
12. Supervision by Contractor
13. Changes in the Work
14. Changes in Contract Price
15. Time for Completion and Liquidated
Damages
16. Correction of Work
17. Subsurface Conditions
18. Suspension of Work, Termination and
Delay
19. Payments to Contractor
20. Acceptance and Final Payment as Release
21. Insurance
22. Contract Security
23. Assignments
24. Indemnification
25. Separate Contracts
26. Subcontracting
27. Engineer's Authority
28. Land and Rights-of-Way
29. Guaranty
30. Arbitration
31. Taxes
32. Wage Rates
33. Contingency Item
DEFINITIONS
Wherever used in the CONTRACT DOCUMENTS, the following terms shall have the meanings indicated which shall be applicable to both the singular and plural thereof:
1.1 ADDENDA - Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the CONTRACT DOCUMENTS. DRAWINGS and SPECIFICATIONS, by additions, deletions, clarifications or corrections.
1.2 BID - The offer or proposal of the BIDDER submitted on the prescribed form setting forth the prices for the WORK to be performed.
1.3 BIDDER - Any person, firm or corporation submitting a BID for the WORK.
1.4 BONDS - Bid, Performance, and Payment Bonds and other instruments of security, furnished by the CONTRACTOR and his surety in accordance with the CONTRACT DOCUMENTS.
119.08.100 00700 - 2
1.5 CHANGE ORDER - A written order to the CONTRACTOR authorizing an addition, deletion or revision in the WORK within the general scope of the CONTRACT DOCUMENTS, or authorizing and adjustment in the CONTRACT PRICE or CONTRACT TIME.
1.6 CONTRACT DOCUMENTS - The contract, including Advertisement For Bids, Information For
Bidders, BID, Bid Bond, Agreement, Payment Bond, Performance Bond, NOTICE OF AWARD, NOTICE TO PROCEED, CHANGE ORDER, DRAWINGS, SPECIFICATIONS, and
ADDENDA.
1.7 CONTRACT PRICE - The total monies payable to the CONTRACTOR under the terms and conditions of the CONTRACT DOCUMENTS.
1.8 CONTRACT TIME - The number of calendar days stated in the CONTRACT DOCUMENTS for the completion of the WORK.
1.9 CONTRACTOR - The person, firm or corporation with whom the OWNER has executed the Agreement.
1.10 DRAWINGS - The part of the CONTRACT DOCUMENTS which show the characteristics and scope of the WORK to be performed and which have been prepared or approved by the
ENGINEER.
1.11 ENGINEER - The person, firm or corporation named as such in the CONTRACT
DOCUMENTS.
1.12 FIELD ORDER - A written order effecting a change in the WORK not involving an adjustment in the CONTRACT PRICE or an extension of the CONTRACT TIME, issued by the ENGINEER to the CONTRACTOR during construction.
1.13 1.14 NOTICE TO AWARD - The written notice of the acceptance of the BID form the OWNER to the successful BIDDER.
1.14 1.15 NOTICE TO PROCEED - Written communication issued by the OWNER to the CONTRACTOR authorizing him to proceed with the WORK and establishing the date of commencement of the WORK.
1.15 OWNER - A public or quasi-public body or authority, corporation, association, partnership, or individual for whom the WORK is to be performed.
1.16 PROJECT - The undertaking to be performed as provided in the CONTRACT DOCUMENTS.
119.08.100 00700 - 3
1.17 RESIDENT PROJECT REPRESENTATIVE - The authorized representative of the OWNER who is assigned to the PROJECT site or any part thereof.
1.18 SHOP DRAWINGS - All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the CONTRACTOR, a SUBCONTRACTOR, manufacturer, SUPPLIER or distributor, which illustrate how specific portions of the WORK shall be fabricated or installed.
1.19 SPECIFICATIONS - A part of the CONTRACT DOCUMENTS consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship.
1.20 SUBCONTRACTOR - An individual, firm or corporation having a direct contract with the CONTRACTOR or with any other SUBCONTRACTOR for the performance of a part of the WORK at the site.
1.21 SUBSTANTIAL COMPLETION - That date as certified by the ENGINEER when the construction of the PROJECT or a specified part thereof is sufficiently completed, in accordance with the CONTRACT DOCUMENTS, so that the PROJECT or specified part can be utilized for the purposes for which it is intended.
1.22 SUPPLEMENTAL GENERAL CONDITIONS - Modifications to General Conditions required by a Federal agency for participation in the PROJECT and approved by the agency in writing prior to inclusion in the CONTRACT DOCUMENTS, or such requirements that may be imposed by applicable state laws.
1.23 SUPPLIER - Any person or organization who supplies materials or equipment for the WORK, including that fabricated to a special design, but who does not perform labor at the site.
1.24 WORK - All labor necessary to produce the construction required by the CONTRACT DOCUMENTS, and all materials and equipment incorporated or to be incorporated in the
PROJECT.
1.25 WRITTEN NOTICE - Any notice to any party of the Agreement relative to any part of this Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at his last given address, or delivered in person to said party or his authorized representative on the WORK.
119.08.100 00700 - 4
ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS
2.1 The CONTRACTOR may be furnished additional instructions and detail drawings, by the
ENGINEER, as necessary to carry out the WORK required by the CONTRACT
2.2 The additional drawings and instruction thus supplied will become a part of the CONTRACT DOCUMENTS. The CONTRACTOR shall carry out the WORK in accordance with the additional detail drawings and instructions.
SCHEDULES, REPORTS AND RECORDS
3.1 The CONTRACTOR shall submit to the OWNER such schedule of quantities and costs, progress schedules, payrolls, reports, estimates, records and other data where applicable as are required by the CONTRACT DOCUMENTS for the WORK to be performed.
3.2 Prior to the first partial payment estimate the CONTRACTOR shall submit construction progress schedules showing the order in which he proposes to carry on the WORK, including dates at which he will start the various parts of the WORK, estimated date of completion of each part and, as applicable:
3.2.1 The dates at which special detail drawings will be required; and
3.2.2 Respective dates for submission of SHOP DRAWINGS, the beginning of manufacture, the testing and the installation of materials, supplies and equipment.
3.3 The CONTRACTOR shall also submit a schedule of payments that he anticipates he will earn during the course of the WORK.
DRAWINGS AND SPECIFICATIONS
4.1 The intent of the DRAWINGS and SPECIFICATIONS is that the CONTRACTOR shall furnish all labor, materials, tools, equipment, and transportation necessary for the proper execution of the WORK in accordance with the CONTRACT DOCUMENTS and all incidental work necessary to complete the PROJECT in an acceptable manner, ready for use, occupancy or operation by the OWNER.
4.2 In case of conflict between the DRAWINGS and SPECIFICATIONS, the SPECIFICATIONS shall govern. Figure dimensions on DRAWINGS shall govern over scale dimensions, and detailed DRAWINGS shall govern over general DRAWINGS.
4.3 Any discrepancies found between the DRAWINGS and SPECIFICATIONS and site conditions or any inconsistencies or ambiguities in the DRAWINGS or SPECIFICATIONS shall be immediately reported to the ENGINEER, in writing, who shall promptly correct such
119.08.100 00700 - 5 inconsistencies or ambiguities in writing. WORK done by the CONTRACTOR after his discovery of such discrepancies, inconsistencies or ambiguities shall be done at the CONTRACTOR'S risk.
SHOP DRAWINGS
5.1 The CONTRACTOR shall provide SHOP DRAWINGS as may be necessary for the prosecution of the WORK as required by the CONTRACT DOCUMENTS. The ENGINEER shall promptly review all SHOP DRAWINGS. The ENGINEER'S approval of any SHOP DRAWING shall not release the CONTRACTOR from responsibility for deviations from the CONTRACT DOCUMENTS. The approval of any SHOP DRAWING which substantially deviates from the requirement of the CONTRACT DOCUMENTS shall be evidenced by a
CHANGE ORDER.
5.2 When submitted for the ENGINEER'S review. SHOP DRAWINGS shall bear the CONTRACTOR'S certification that he has reviewed, checked and approved the SHOP DRAWINGS and that they are in conformance with the requirements of the CONTRACT
5.3 Portions of the WORK requiring a SHOP DRAWING or sample submission shall not begin until the SHOP DRAWING or submission has been approved by the ENGINEER. A copy of each approved SHOP DRAWING and each approved sample shall be kept in good order by the CONTRACTOR at the site and shall be available to the ENGINEER.
MATERIALS, SERVICES AND FACILITIES
6.1 It is understood that, except as otherwise specifically stated in the CONTRACT
DOCUMENTS, the CONTRACTOR shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of any nature, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the WORK within the specified time.
6.2 Materials and equipment shall be so stored as to insure the preservation of their quality and fitness for the WORK. Stored materials and equipment to be incorporated in the WORK shall be located so as to facilitate prompt inspection.
6.3 Manufactured articles, materials, and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer.
6.4 Materials, supplies and equipment shall be in accordance with samples submitted by the
CONTRACTOR and approved by the ENGINEER.
119.08.100 00700 - 6
6.5 Materials, supplies or equipment to be incorporated into the WORK shall not be purchased by the CONTRACTOR or the SUBCONTRACTOR subject to a chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller.
INSPECTION AND TESTING
7.1 All materials and equipment used in the construction of the PROJECT shall be subject to adequate inspection and testing in accordance with generally accepted standards, as required and defined in the CONTRACT DOCUMENTS.
7.2 The OWNER shall provide all inspection and testing services not required by the CONTRACT
7.3 The…