1-New Layout Plan.pdf

PDF 396 KB Posted

Attached to
Replace Security Poles at Tengan Federal contract opportunity
Solicitation number
FA527023R0010
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Replace Security Poles at Tengan, newest first.
File Type Posted
RFI Answers .docx DOCX document
23R0010 Amendment 02.pdf PDF
PWM02388 SOW 1 Feb 2023.docx DOCX document
RFI Answers.docx DOCX document
Solicitation Amendment FA527023R00100001 SF 30.pdf PDF
Solicitation - FA527023R0010.pdf PDF
7-As-Built.pdf PDF
PWM02388 SOW.docx DOCX document
10-Request for Information Form.docx DOCX document
11-Site Visit Reservation Form.docx DOCX document
3-Bollard Detail.pdf PDF
4-Duct section.pdf PDF
2-Removal Plan.pdf PDF
8-Statement of Work.docx DOCX document
5-Torii standard.pdf PDF
6-Wiring Connection Diagram.pdf PDF
9-Location map.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-6

M-1

M-2 M-3

M-4

M-5

Install new concrete pole, 3ea LED lighting fixtures, steel arms, conduit wiring and grounding system

TH-308

Install new concrete pole, lighting control box, NEMA 4X, lockable type 2ea LED lighting fixtures, steel arms, conduit wiring and grounding system

Install new underground cable in new FEP, size as required

Install new underground cable in new FEP, size as required

Install new electrical handhole with cover

Exst electrical handhole

Install new circuit breakers, NEMA 1 Encl for security light and pavilion

Install new concrete pole, 1ea LED lighting fixtures, steel arms, conduit wiring and grounding system

Install new concrete pole, 3ea LED lighting fixtures, steel arms, conduit wiring, grounding system and safety switch, NEMA 4X Encl for pavilion

Install new concrete pole, 2ea LED lighting fixtures, steel arms, conduit wiring and grounding system

Install new concrete pole, 3ea LED lighting fixtures, steel arms, conduit wiring and grounding system

Install new underground cable in new FEP, size as required