Winchester Well Project - Invitation for Bid
This Invitation for Bid (IFB) document for Murray City, Utah outlines the construction of a new municipal production well designated as the Winchester Well Project (IFB Number 25-60). The project involves drilling and constructing a new production well to an anticipated depth of approximately 800 feet to support the city's public drinking water system. The scope of work includes mobilization and demobilization, drilling and reaming of the production borehole using flooded reverse mud rotary methods, geophysical logging, caliper surveys, formation water zone testing, installation of 16-inch stainless steel wire-wrap well screen and mild steel casing, gravel pack and grout seal installation, initial well development, pump development and testing (including step-rate drawdown and constant-rate discharge tests), video camera survey, plumbness and alignment testing, disinfection, wellhead construction, and site restoration. All work must comply with Utah Division of Water Rights requirements (R655-4 UAC) and Utah Division of Drinking Water requirements (R309-515-6 UAC). The bid was issued on January 5, 2026, with an optional pre-bid meeting scheduled for January 14, 2026, at 2:00 p.m. at the well site (1100 West Winchester Street, Murray). Bids are due on January 22, 2026, at 2:00 p.m. MST, with submission accepted via hand delivery, mail, or through the Utah Public Procurement (UP3) platform via Euna Procurement. The contract completion date is May 29, 2026, with Substantial Completion and final payment both required by that date.
Bidders must submit a 5 percent bid security (certified check, cashier's check, or bid bond) along with their bid and are required to furnish a 100 percent performance bond and 100 percent payment bond upon contract award. The bid schedule includes multiple lump sum and unit price items covering mobilization/demobilization/cleanup, conductor casing installation, drilling operations (pilot hole and reaming), geophysical logging, caliper surveys, zone testing, casing and screen installation, gravel pack and seal installation, well development and testing, video surveys, plumbness testing, disinfection, wellhead completion, and well capping. Liquidated damages of $500 per day apply for failure to achieve Substantial Completion or final completion by the contract deadline. Contractors must maintain workers' compensation insurance (statutory limits for Utah), commercial general liability insurance ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability insurance ($1,000,000 combined single limit), umbrella/excess liability ($4,000,000), and pollution liability insurance. The contractor is responsible for obtaining all necessary permits, managing drilling fluid disposal, and coordinating work with existing utilities and adjacent property owners. A preconstruction conference will be held prior to work commencing to establish schedules, procedures, and authorized representatives. The project is funded through Murray City's capital budget, with all costs for labor, materials, equipment, permits, testing, and documentation included in the bid price.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MURRAY CITY, UTAH
IFB Title: Winchester Well Project
IFB Number: 25-60
Issue Date: Monday January 5, 2026, 2:00 pm MST
Bid Due Date and Time: Friday January 22, 2025, 2:00 pm MST
Submitting Agency:
Murray City Corporation Division of Purchasing 10 East 4800 South, Room 155 Murray, Utah 84107
Purchasing Agent:
Amandah Maudsley Email: amaudsley@murray.utah.gov Phone: (801) 264-2663
Key Dates:
Event Date
IFB Issued Monday January 5, 2026, 2:00 pm MST
Optional Pre-Bid Meeting
Bids Due
Wednesday January 14, 2026, 2:00 pm MST at 1100 West Winchester St in Murray. Please meet at the Golf Course Maintenance Building.
Friday January 22, 2026, 2:00 pm MST
Project Summary
The Winchester Well Project will construct a new municipal production well for Murray City to support the City’s public drinking water system. The work includes mobilization, drilling and reaming of a production well to an anticipated depth of approximately 800 feet, geophysical logging, formation testing, installation of casing and well screens, gravel pack and grout seals, well development and aquifer testing, disinfection, wellhead construction, and site restoration.
All work must comply with Utah Division of Water Rights and Utah Division of Drinking Water requirements, applicable Utah Administrative Code provisions, and Murray City standards. The contractor is responsible for all labor, materials, equipment, permits, testing, and documentation required to deliver a complete and functional production well.
BC&A PROJECT TITLE PAGE
MURRAY CITY PAGE 00 01 01-1
WINCHESTER WELL PROJECT
CONSTRUCTION
DOCUMENTS FOR THE
WINCHESTER WELL PROJECT
CONSULTANT PROJECT NO.: 005-25-02
OWNER PROJECT NO.: 25-60
December 2025
OWNER
Murray City
ENGINEER
Hand delivered bids will be received at the office of the Murray City Recorder located at 10 East 4800 South, Room 155, Murray, Utah 84107 until 2:00 pm on January 22, 2026.
Electronic submissions shall be through the Utah Public Procurement (UP3) platform via Euna Procurement, formerly known as Bonfire, by 2:00 pm on January 22, 2026.
12/31/25
BC&A TABLE OF CONTENTS
MURRAY CITY PAGE 00 01 10-1
SECTION 00 01 10
TABLE OF CONTENTS
Section Page
BIDDING DOCUMENTS
00 11 16 Invitation to Bid ......................................................................................................... 00 11 16-1 – 00 11 16- 00 21 13 Instructions to Bidders ........................................................................................... 00 21 13-1 – 00 21 13- 00 41 00 Bid Form ....................................................................................................................... 00 41 00-1 – 00 41 00- 00 43 13 Bid Bond (Penal Sum) ............................................................................................. 00 43 13-1 – 00 43 13- 00 43 70 Proposed Subs and Major Material Suppliers ............................................... 00 43 70-1 – 00 43 70- 00 45 10 Contractor’s Current Business License Information .................................. 00 45 10-1 – 00 45 10- 00 45 13 Bidder’s Qualifications ............................................................................................ 00 45 13-1 – 00 45 13- 00 45 15 Resumes of Key Personnel .................................................................................... 00 45 15-1 – 00 45 15- 00 45 16 Signing Authority Requirements ........................................................................ 00 45 16-1 – 00 45 16- 00 51 00 Notice of Award ......................................................................................................... 00 51 00-1 – 00 51 00- 00 52 13 Agreement ................................................................................................................... 00 52 13-1 – 00 52 13- 00 55 00 Notice to Proceed ...................................................................................................... 00 55 00-1 – 00 55 00- 00 61 14 Performance Bond .................................................................................................... 00 61 14-1 – 00 61 14- 00 61 15 Payment Bond ............................................................................................................ 00 61 15-1 – 00 61 15- 00 62 76 Contractors Application for Payment ............................................................... 00 62 76-1 – 00 62 76- 00 63 63 Change Order .............................................................................................................. 00 63 63-1 – 00 63 63- 00 65 16 Substantial Completion .......................................................................................... 00 65 16-1 – 00 65 16- 00 65 19 Certificate of Final Completion............................................................................ 00 65 19-1 – 00 65 19- 00 65 20 Consent of Surety for Final Payment ................................................................ 00 65 20-1 – 00 65 20- 00 65 21 Affidavit of Payment ................................................................................................ 00 65 21-1 – 00 65 21-
CONDITIONS OF THE CONTRACT
00 70 00 General Conditions ................................................................................................... 00 70 00-1 – 00 70 00- 00 73 00 Supplemental General Conditions ..................................................................... 00 73 00-1 – 00 73 00-
MURRAY CITY PAGE 00 01 10-2
(CONTINUED)
TECHNICAL SPECIFICATIONS
Section Page
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work ............................................................................................................ 01 11 00-1 – 01 11 00-6
DIVISION 2 – EXISTING CONDITIONS
02 32 30 Special Conditions for Drilling .................................................................................... 02 32 30-1 – 02 32 30-24
DIVISION 33 – SITE WORK
33 20 00 2015 Mobilization/Demobilization/Cleanup ..................................................................... 2015-1 – 2015-4 33 20 00 2020 Conductor Casing and Seal ............................................................................................. 2020-1 – 2020-3 33 20 00 2035 Production Well Borehole Drilling .............................................................................. 2035-1 – 2035-6 33 20 00 2040 Geophysical Logging .......................................................................................................... 2040-1 – 2040-2 33 20 00 2046 Caliper Survey ...................................................................................................................... 2046-1 – 2046-2 33 20 00 2047 Formation Water Zone Testing ..................................................................................... 2047-1 – 2047-3 33 20 00 2050 Production Well Installation .......................................................................................... 2050-1 – 2050-6 33 20 00 2052 Installation of Gravel Pack and Seal between Well Screens ............................. 2052-1 – 2052-4 33 20 00 2054 Installation of Annular Grout Seal ............................................................................... 2054-1 – 2054-2 33 20 00 2060 Initial Well Development ................................................................................................ 2060-1 – 2060-4 33 20 00 2062 Install Pump for Well Development and Testing .................................................. 2062-1 – 2062-2 33 20 00 2064 Well Development by Pumping .................................................................................... 2064-1 – 2064-2 33 20 00 2066 Step-Rate Drawdown Test .............................................................................................. 2066-1 – 2066-2 33 20 00 2068 Constant-Rate Discharge Test ....................................................................................... 2068-1 – 2068-4 33 20 00 2070 Video Camera Survey ........................................................................................................ 2070-1 – 2070-2 33 20 00 2072 Plumbness and Alignment .............................................................................................. 2072-1 – 2072-2 33 20 00 2080 Disinfecting ........................................................................................................................... 2080-1 – 2080-2 33 20 00 2082 Well Head ............................................................................................................................... 2082-1 – 2082-2 33 20 00 2084 Well Capping......................................................................................................................... 2084-1 – 2084-2 33 20 00 2095 Drilling Fluids, Cuttings, and Pumped Water Disposal ....................................... 2095-1 – 2095-4
FIGURES
1 Site Location Map 2 Nearby Wells 3 Winchester Well Site Layout
MURRAY CITY PAGE 00 01 10-3
DRAWINGS
1 Well Construction Schematic and Details – Winchester Well
ATTACHMENTS
A Nosie Ordinance Information B Existing Well Logs C Standard Requirements and Regulatory Citations D DWQ Water Discharge Fact Sheet
BC&A INVITATION TO BID
MURRAY CITY PAGE 00 11 16 - 1
WINCHESTER WELL PROJECT
SECTION 00 11 16
INVITATION TO BID
RECEIPT OF BIDS: Sealed Bids will be received at the office of Murray City Recorder, Owner of the Work, located at 10 E 4800 S, Room 155, Murray, Utah, 84107 until 2:00 pm, on January 22, 2026, for the Winchester Well Project. Bids may also be submitted electronically (preferred) through the Utah Procurement Place (UP3) platform via Euna Procurement, formerly known as Bonfire. Any Bids received after the specified time will not be considered.
OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled Documents for the Winchester Well Project. Electronic copies (pdf file) of the Contract Documents may be obtained at no cost from the bid document platform Utah Public Procurement Place (U3P) platform via Euna Procurement, formerly known as Bonfire (https://utah.bonfirehub.com/portal/?tab=openOpportunities) . All Contract Documents may be obtained at the office of the Engineer beginning January 5, 2026, upon payment of $25 (non-refundable), for each set of Contract Documents (including specifications and reduced drawings).
DESCRIPTION OF WORK: Work includes the drilling and construction of a new municipal production well (Winchester Well), which is to be completed at 16-inch diameter. The well will be drilled using the flooded reverse mud rotary drilling method. The depth of the well is expected to be approximately 800 feet deep. Work includes production well drilling (pilot and reamed), construction, development and pump testing the well. The well is expected to be completed in early 2026.
SITE OF WORK: The Winchester Well site is located in Murray, at approximately 751 Winchester Street.
PRE-BID SITE VISIT: A pre-bid meeting will be held on site on January 14, 2026, beginning at 2:00 p.m at 1100 W Winchester Street in Murray, UT. Access the site from Winchester Street at the entrance gate. Please meet at the Golf Course Maintenance Building. We strongly encourage bidders to attend the pre-bid meeting.
COMPLETION OF WORK: All Work shall be completed by May 29, 2026. Time is of the essence.
OPENING OF BIDS: The Bids will be opened publicly and read at 2:00 pm on January 22, 2026, at the above-mentioned office of the Owner.
BID SECURITY: Each Bid shall be accompanied by a certified or cashier’s check, or bid bond in the amount of five percent (5%) of the total bid price payable to Owner as a guarantee that the Bidder, if their Bid is accepted, will promptly execute the contract, provide evidence of insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price.
ADDRESS AND MARKING OF BID: For hand delivery or mail submissions, the envelope enclosing the Bid shall be sealed and addressed to Amandah Maudsley, Purchasing Agent. The envelope shall be plainly marked in the upper left-hand corner with the name and address of the Bidder and shall bear the words "BID No. 25-60, Winchester Well Project," followed by the title of the https://utah.bonfirehub.com/portal/?tab=openOpportunities
BC&A INVITATION TO BID
MURRAY CITY PAGE 00 11 16 - 2
WINCHESTER WELL PROJECT
Contract Documents for the Work and the date and hour of opening of Bids. The certified or cashier’s check, or Bidder's bond shall be enclosed in the same envelope with the Bid.
PROJECT ADMINISTRATION AND PROCUREMENT AUTHORITY:
This solicitation is conducted under the authority of the City Purchasing Agent as defined in HYPERLINK "https://codelibrary.amlegal.com/codes/murrayut/latest/murray_ut/0-0-0-2674"§ 3.10.050–.HYPERLINK "https://codelibrary.amlegal.com/codes/murrayut/latest/murray_ut/0-0 0 2676"060. All communications must be directed to the Purchasing Agent or designee.
To maintain a fair and transparent procurement process, all Offerors must direct communications regarding this solicitation only to the City’s Purchasing Agent or authorized designee. Offerors shall not contact any City elected officials, employees, or evaluation committee members about this IFB outside of the formal process. Questions, clarifications, or requests for information must be submitted in writing through the Euna Procurement Q&A Section.
Any direct or indirect contact with City officials or staff concerning this solicitation—except as specifically authorized—is strictly prohibited under City Municipal Code HYPERLINK "https://codelibrary.amlegal.com/codes/murrayut/latest/murray_ut/0-0-0-3121"§ 3.10.600 and may result in immediate disqualification from further consideration. This restriction is intended to preserve the integrity of the City’s competitive process and ensure equal access to information for all Offerors."
It shall be understood, however, that no interpretations of the drawings or specifications will be made except in writing signed by the Engineer, nor will any "or equal" products be considered for approval prior to award of a contract.
OWNER'S RIGHTS RESERVED: The Owner may, at reasonable times, inspect the part of the plant or place of business of a contractor or any subcontractor, which is related to the performance of any contract awarded or to be awarded by the Owner. The Owner reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards in the interest of the Owner.
Owner
12/29/25 Aron Frisk, Water Superintendent Date Name, Title
BC&A
MURRAY CITY INSTRUCTIONS TO BIDDERS
WINCHESTER WELL PROJECT PAGE 00 21 13 - 1
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
This document is a MODIFIED version of EJCDC® C-200, Copyright © 2013 by the National Society of Professional
Engineers, American Society of Civil Engineers, and American Council of Engineering Companies, or is based in part on excerpts from EJCDC documents. Those portions of the text that originated in published EJCDC documents remain subject to the copyright.
Page ARTICLE 1 – Defined Terms
ARTICLE 2 – Copies of Bidding Documents
ARTICLE 3 – Qualifications of Bidders
ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other Work at the Site
ARTICLE 5 – Bidder’s Representations
ARTICLE 6 – Pre-Bid Conference
ARTICLE 7 – Interpretations and Addenda
ARTICLE 8 – Bid Security
ARTICLE 9 – Contract Times
ARTICLE 10 – Liquidated Damages
ARTICLE 11 – Substitute and “Or-Equal” Items
ARTICLE 12 – Subcontractors, Suppliers, and Others
ARTICLE 13 – Preparation of Bid
ARTICLE 14 – Basis of Bid
ARTICLE 15 – Submittal of Bid
ARTICLE 16 – Modification and Withdrawal of Bid
ARTICLE 17 – Opening of Bids
ARTICLE 18 – Bids to Remain Subject to Acceptance
ARTICLE 19 – Evaluation of Bids and Award of Contract
ARTICLE 20 – Bonds and Insurance
ARTICLE 21 – Signing of Agreement
WINCHESTER WELL PROJECT PAGE 00 21 13 - 2
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered. For the purpose of this document, the issuing office is Bowen Collins & Associates, 154 East 14075 South, Draper, Utah 84020.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit information regarding valid State of Utah licensure, experience, organization, personnel, and equipment required by the Bidding Documents. Additional information such as financial data, previous experience, and present commitments, and such information that may be required to confirm qualifications and competence to perform the Work may be also requested by the Owner.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
WINCHESTER WELL PROJECT PAGE 00 21 13 - 3
1. The Supplementary Conditions identify:
a. Those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. Those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary
WINCHESTER WELL PROJECT PAGE 00 21 13 - 4
for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. Examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. Visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. Become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. Carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and
(2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. Consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such
WINCHESTER WELL PROJECT PAGE 00 21 13 - 5
information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. Agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. Become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. Promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and
J. Agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted through Euna (UP3) questions and answers page located on the website and will be answered publicly. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered through the website and/or by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in
WINCHESTER WELL PROJECT PAGE 00 21 13 - 6
the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and
6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
9.01 Bidder shall set forth in the Bid the time by which Bidder shall achieve Substantial Completion, subject to the restrictions established in Paragraph 14.04 of these Instructions.
The Owner will take Bidder’s time commitment regarding Substantial Completion into consideration during the evaluation of Bids, and it will be necessary for the apparent Successful Bidder to satisfy Owner that it will be able to achieve Substantial Completion within the time such Bidder has designated in the Bid. The Successful Bidder’s time commitments will be entered into the Agreement (or incorporated in the Agreement by reference to the specific terms of the Bid).
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or
WINCHESTER WELL PROJECT PAGE 00 21 13 - 7
materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and
7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post- Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for use on the project.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
WINCHESTER WELL PROJECT PAGE 00 21 13 - 8
13.04 A Bid by an individual shall show the Bidder’s name and official address.
13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
13.06 All names shall be printed in ink below the signatures.
13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Unit Price
A. Bidders shall submit a Bid on lump sum or unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”;
such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
14.02 Allowances
A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.
15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package
WINCHESTER WELL PROJECT PAGE 00 21 13 - 9
with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.”
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
15.04 Murray City will be accepting had delivered, mailed, and electronic online submittals through Utah Public Procurement Place (U3P) platform via Euna Procurement (formerly known as Bonfire).
A. Electronic Submittals (Preferred Method of Delivery): The Division of Purchasing utilizes the Utah Public Procurement Place (U3P) platform via Euna Procurement, formerly known as Bonfire. To respond to this solicitation, register at the new U3P Euna Procurement platform. For first-time users, click "Register" and complete the registration process before reviewing and responding to the solicitation. For registration assistance, consult the online knowledge base, explore the FAQs, or contact the Bonfire Support Team at support@gobonfire.com.
B. Hand Delivery or Mail Submissions (If you elect to not submit using the preferred electronic method): All bids must be contained in a sealed envelope with the IFB number, project title, and company name on the lower right-hand corner:
Submit to:
Murray City Corporation Attn: Amandah Maudsley, Purchasing Agent 10 East 4800 South, Room 155 Murray, UT 84107
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the mailto:support@gobonfire.com
WINCHESTER WELL PROJECT PAGE 00 21 13 - 10
base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner shall announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
C. Bid prices will be compared after adjusting for differences in time of Substantial Completion (total number of calendar days to substantially complete the Work) designated by Bidders. The adjusting amount will be determined at the rate set forth in the Agreement for liquidated damages for failing to achieve Substantial Completion, or such other amount that Owner has designated in the Bid Form.
1. The method for calculating the lowest bid for comparison will be the summation of the Bid price shown in the Bid Form plus the product of the Bidder-specified time
WINCHESTER WELL PROJECT PAGE 00 21 13 - 11
of Substantial Completion (in calendar days) times the [Choose/Specify daily rate] (in dollars per day).
2. This procedure is only used to determine the lowest bid for comparison and contractor selection purposes. The Contract Price for compensation and payment purposes remains the Bid price shown in the Bid Form.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 It is customary for Owner to fill in the date on the signature page of the Agreement in order to indicate when it is to become effective (the Effective Date of the Contract) so that the required bonds may be properly dated. When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
END OF SECTION
WINCHESTER WELL PROJECT PAGE 00 21 13 - 12
THIS PAGE INTENTIONALLY BLANK
MURRAY CITY BID FORM
WINCHESTER WELL PROJECT PAGE 00 41 00 - 1
SECTION 00 41 00
BID FORM
Copyright © 2013 (EJCDC® C-410) National Society of Professional Engineers, American Council of Engineering
Companies, and American Society of Civil Engineers. All rights reserved.
Bid No. 25-60
Page
ARTICLE 1 – Bid Recipient
ARTICLE 2 – Bidder’s Acknowledgements
ARTICLE 3 – Bidder’s Representations
ARTICLE 4 – Bidder’s Certification
ARTICLE 5 – Basis of Bid
ARTICLE 6 – Time of Completion
ARTICLE 7 – Attachments to this Bid
ARTICLE 8 – Defined Terms
ARTICLE 9 – Bid Submittal
BC&A BID FORM
MURRAY CITY PAGE 00 41 00-1
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
Murray City Recorder, Attn: Amandah Maudsley, Purchasing Agent, 10 East 4800 South, Room 155, Murray, UT 84107 or electronically through the UP3 Platform, Euna Procurement.
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
MURRAY CITY PAGE 00 41 00-2
WINCHESTER WELL PROJECT
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and…