Summary: Water Station 14 PFAS Treatment - Invitation to Bid #26-14
This Invitation to Bid (ITB) #26-14 document contains the complete proposal and contract requirements for the City of Vancouver, Washington, to construct a new PFAS (per- and polyfluoroalkyl substances) treatment system at Water Station 14. The project involves installation of pressure vessels with granular activated carbon for PFAS removal, along with support systems including a rinse water tank, restroom and storage building, modifications to existing booster pumps, and associated stormwater, site civil, electrical, and instrumentation/control improvements. The Engineer's Estimate is $10,217,000. The contract requires physical completion within 290 working days from the Notice to Proceed, with all work completed by December 31, 2027. A pre-bid meeting was scheduled for March 11, 2026, at 9:00 a.m. at Water Station 14 (6803 NE 78th Street, Vancouver, WA 98665). Questions were due by March 20, 2026, addenda by March 31, 2026, and sealed bids were due by 11:00 a.m. Pacific Time on April 7, 2026, at Vancouver City Hall (415 W 6th Street, Vancouver, WA 98660). The bid opening was held on April 7, 2026, and bids could be submitted online through the City's Procurement Portal (cityofvancouver.bonfirehub.com) or by in-person delivery.
The project is funded through the Washington State Drinking Water State Revolving Fund (DWSRF) program with federal funds from the Environmental Protection Agency and City of Vancouver funding. Contractors must meet all DWSRF requirements including American Iron and Steel (AIS) compliance, Davis-Bacon prevailing wage requirements, and disadvantaged business enterprise (DBE) utilization goals of 10 percent for minority-owned businesses and 6 percent for women-owned businesses in construction. A bid deposit of 5 percent of the total bid amount is required, along with performance and payment bonds equal to the contract price. Contractor responsibility criteria include current Washington Unified Business Identifier (UBI), industrial insurance coverage, compliance with prevailing wage laws, apprenticeship utilization requirements (minimum 15 percent for this estimate range), and successful completion of three similar public works projects exceeding $5 million within the last 15 years. The successful bidder must demonstrate experience with pressure vessel construction for municipal drinking water projects and comply with all applicable federal and state labor standards, equal employment opportunity provisions, and environmental compliance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Vancouver
PROPOSAL AND CONTRACT
DOCUMENTS
FOR
BID # 26-14: WATER STATION 14 PFAS TREATMENT
MARCH 2026
PROJECT NO. PRJ100893
Federal Contract No. DWL28208-0
ITB 26-14: Water Station 14 PFAS Treatment Page 2 of 51
INVITATION TO BID (ITB) #26-14:
WATER STATION 14 PFAS TREATMENT
Invitation to Bid Information:
ITB Number: 26-14 ITB Title: Water Station 14 PFAS Treatment Date Issued: Tuesday, March 3, 2026
Contact Person: Julie Denton Email Address: Julie.Denton@cityofvancouver.us Contact Phone: 360-487-8435 Project Manager: Mehrin Selimgir
Engineer’s Estimate: $10,217,000
Pre-Bid Meeting: Wednesday, March 11, 2026 at 9:00am Questions Due: Friday, March 20, 2026 Addendum Due: Tuesday, March 31, 2026 Bid Opening: Tuesday, April 7, 2026
Submit Bids to:
Procurement Portal:
cityofvancouver.bonfirehub.com
For delivery in person, by courier, UPS or FedEx:
Attn: Procurement Services Vancouver City Hall 415 W 6th Street Vancouver, WA 98660
For Delivery by US Postal Service:
Attn: Procurement Services City of Vancouver PO Box 1995 Vancouver, WA 98668
*Please refer to Section 1:
Instructions to Bidders, Submittal Instructions for Further Information
Table of Contents
Volume 1 SECTION 1: Instructions to Bidders SECTION 2: Terms and Conditions
SECTION 3: Bid Submittal Requirements & Procedures
SECTION 4: Bid Form
SECTION 5: Drinking Water State Revolving Fund Supplementary Conditions SECTION 6: State and Federal Wages SECTION 7: EJCDC General Conditions SECTION 8: Supplementary Conditions to EJCDC SECTION 9: Geotechnical Engineering Report
Volume 2 Technical Specifications Sections 01 11 00 – 46 61 16
Volume 3 Drawings file://internal.cityofvancouver.us/FINANCE/Procurement/Resources/Boiler%20Documents/ITB/Updates/cityofvancouver.bonfirehub.com
ITB 26-14: Water Station 14 PFAS Treatment Page 3 of 51
SECTION A: INSTRUCTIONS TO BIDDERS
INVITATION TO BID
Notice is hereby given that sealed bids will be received by the City of Vancouver, Washington, for ITB 26-14: Water Station 14 PFAS Treatment bids up to the hour of 11:00 a.m., Pacific Local Time, Tuesday, April 7, 2026 and will publicly open and read aloud at that time on the same day in the Vancouver City Hall, 415 W 6th St, Vancouver, Washington and via an online platform.
An optional pre-bid meeting is to be held at 9:00 a.m., local time, on Wednesday, March 11, 2026 at Water Station 14, 6803 NE 78th St, Vancouver, WA 98665. Interested prime contractors are encouraged to attend. At this meeting questions concerning the Contract Documents and the proposed work will be discussed.
The City of Vancouver is committed to providing equal opportunities to State of Washington certified Minority, Disadvantaged, and Women’s Business Enterprises in contracting activities.
(Section 4 of Chapter 56, Laws of 1975, 1st Ex. Sess., State of Washington).
The City of Vancouver in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, herby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The City reserves the right to cancel this Invitation to Bid or reject any and all bids submitted or to waive any minor formalities of this call if the best interest of the City would be served.
Julie Denton, Senior Procurement Specialist
BACKGROUND
The City of Vancouver encompasses 51.84 square miles, has an estimated 2024 population of 202,600 and it is projected to exceed 268,000 by 2042. The City is located on the I-5 corridor and extends along the shore of the Columbia River, 100 miles upstream from the Pacific Ocean.
It lies directly across the river from Portland, Oregon and is the southwestern gateway to the State of Washington.
The City is responsible for vital municipal infrastructure and urban services. It builds and repairs roads, maintains water and sewer service, provides fire and police protection as well as parks & recreation programs, administers land use policy and takes an active role in Vancouver’s commercial and industrial development.
Vancouver has a Council/Manager form of government with a City Council comprised of the Mayor and six councilmembers who set policy and direction. The City Manager oversees the day-to-day operations of the City.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2Q0NjRkYmEtNTJlNS00NTFhLTk3MDUtYzM4MzVlYWJjYzIw%40thread.v2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a-50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d
ITB 26-14: Water Station 14 PFAS Treatment Page 4 of 51
ITB SCHEDULE
These dates are estimates and subject to change by the City.
Event Date Pre-Bid Meeting Wednesday, March 11, 2026 at 9:00 am Questions Due by 5:00pm PST Friday, March 20, 2026 Addendum Issuance by 5:00pm PST Tuesday, March 31, 2026 Bid Opening at 11:00am PST Tuesday, April 7, 2026
SCOPE OF SERVICES
This Contract provides for the improvement of a new PFAS treatment system that ties into existing water treatment system. Equipment will be installed at the existing facility and include pressure vessels with granular activated carbon for PFAS removal, along with support systems such as rinse water tank, restroom and storage building, modifications to existing booster pumps, associated stormwater, site civil, electrical and instrumentation/control improvements and other work, all in accordance with the attached Plan Set, these Contract Provisions, and the Standard Specifications, hereafter referred to as “Work.”
The Contract Work shall be Physically Complete within 290 Working Days from the Notice to Proceed. All Contract Work must be completed by December 31, 2027.
FUNDING SOURCES
This project is funded through the Washington State Drinking Water State Revolving Fund program with federal funds from the Environmental Protection Agency and City of Vancouver.
The Contractor and Subcontractors must meet all Drinking Water State Revolving Fund requirements and provisions.
DELIVERY REQUIREMENTS
Bids shall be delivered by or before 11:00 a.m., Pacific Local Time, on Tuesday, April 7, 2026 to:
The City will not accept any submittals after that day and time. Bidder accepts all responsibility and risk for method of delivery.
The bid opening will be held in person and via an online platform. Contractors are invited to join in person, online, or by phone by calling (347) 941-5324 (access code: 787831137#).
SUBMITTAL INSTRUCTIONS
Bids are to be submitted to Procurement Services on the bid forms provided for this purpose, in a sealed container. The outside of envelope(s) or package(s) shall clearly state the project name, Bid number, Bidder’s name and return address, and the date and time of the Bid opening.
Bidders may submit sealed bids online through the City of Vancouver’s Procurement Portal cityofvancouver.bonfirehub.com or select one of the following options for delivery of the Bid proposal:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2Q0NjRkYmEtNTJlNS00NTFhLTk3MDUtYzM4MzVlYWJjYzIw%40thread.v2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a-50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d http://cityofvancouver.bonfirehub.com/
ITB 26-14: Water Station 14 PFAS Treatment Page 5 of 51
Delivery Address:
(In Person, Courier, UPS, or FedEx) Procurement Services Manager City of Vancouver Customer Service Desk - 1st floor lobby 415 W. 6th Street Vancouver, WA 98660
Mailing Address:
(USPS)
Procurement Services Manager City of Vancouver PO Box 1995 Vancouver, WA 98668
Bids delivered to locations other than as indicated in this document or received after the designated time will not be accepted.
It is the Bidder’s responsibility to allow enough time for delivery to occur before the designated Bid due date and time. Please be advised that Bid deliveries requiring signature may not be delivered to Procurement Services in a timely manner as our receiving point is not staffed at all times and there may be no one available to sign at the time of delivery. Bids delivered to locations other than as indicated above or received after the designated time will not be accepted.
Bids submitted via FAX or EMAIL will not be accepted.
Bids will be opened and publicly read in person and via an online platform at the Vancouver City Hall, 415 W 6th Street, Vancouver, WA 98660 at the time and date specified. Contractors are invited to join in person, through the website, or by phone:
Online:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGE1NWNhNjQtZjg0OS00N2MzLTk3YmItZDkzMDMwM2Q2NjQ5%40thread.v 2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a- 50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d
By Phone:
(347) 941-5324 Meeting number (access code): 787831137#
No bidder may withdraw his/her bid after the hour set for the opening thereof, unless the award of contract is delayed for a period exceeding forty-five (45) days. If it is determined to be in the best interest of the City, the City reserves the right to request an extension of bid prices during the review process.
The City of Vancouver, at its sole discretion, reserves the right to cancel this invitation or reject any and all bids submitted or to waive any minor formalities if the best interests of the City would be served.
BIDDING DOCUMENTS
Bidding documents may be obtained from the City of Vancouver Procurement Services website at: cityofvancouver.bonfirehub.com. These are available for viewing, downloading and printing on your own equipment, free of charge.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGE1NWNhNjQtZjg0OS00N2MzLTk3YmItZDkzMDMwM2Q2NjQ5%40thread.v2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a-50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGE1NWNhNjQtZjg0OS00N2MzLTk3YmItZDkzMDMwM2Q2NjQ5%40thread.v2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a-50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGE1NWNhNjQtZjg0OS00N2MzLTk3YmItZDkzMDMwM2Q2NjQ5%40thread.v2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a-50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGE1NWNhNjQtZjg0OS00N2MzLTk3YmItZDkzMDMwM2Q2NjQ5%40thread.v2/0?context=%7b%22Tid%22%3a%22bf6d19b6-9266-4686-a93a-50b537dc583a%22%2c%22Oid%22%3a%22c58d7094-c394-48f9-9b8d-2dfaaf95cfd5%22%7d
ITB 26-14: Water Station 14 PFAS Treatment Page 6 of 51
Bids shall be in accordance with the Plans, Specifications, General Conditions, Special Provisions and all other contract documents prepared for the above referenced project, on file in the office of Procurement Services, phone (360) 487-8430. Bid results may be obtained within 24 hours after the Public Bid Opening by accessing The City of Vancouver Procurement Services website at: cityofvancouver.bonfirehub.com. Bids are to be submitted to Procurement Services on the proposal forms provided for this purpose, in a sealed container. The outside of envelope(s) or package(s) must clearly state the project name, Bid number, Bidder’s name and return address, and the date and time of the Bid opening.
All Bids must be accompanied by a bid deposit in cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid l deposit may be forfeited to the City of Vancouver.
ADDENDA
All project-specific questions, requests for clarification, and requests for substitutions must be submitted in writing, via email, by Tuesday, March 31, 2026 to procurement.services@cityofvancouver.us. If required, an addendum will be prepared and issued by the City of Vancouver no later than Friday, March 20, 2026.
It is the sole responsibility of the Bidder to learn of and obtain any and all issued Addenda.
Addenda may be obtained from the City of Vancouver Procurement Services website at:
cityofvancouver.bonfirehub.com. The City of Vancouver accepts no responsibility or liability and will provide no accommodation to Bidders who fail to check for addenda and as a result, submit a non-responsive Bid submittal.
RESPONSIBILITY CRITERIA
It is the intent of City to award a contract to the lowest responsive and responsible bidder. In accordance with RCW 39.04.350, before award, the bidder must meet the following bidder responsibility criteria to be considered a responsible bidder.
The bidder may be required to provide the City documentation demonstrating compliance with the criteria.
1) At the time of bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW, a plumbing contractor license in compliance with chapter 18.106 RCW, an elevator contractor license in compliance with chapter 70.87 RCW, or an electrical contractor license in compliance with chapter 19.28 RCW, as required under the provisions of those chapters;
2) Before award of contract, A. Have a current Washington Unified Business Identifier (UBI) number;
B. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3);
C. If applicable, have industrial insurance coverage for the bidder's employees working in Washington as required in Title 51 RCW; an employment security department number as required in Title 50 RCW; and a state excise tax registration number as required in Title 82 RCW;
http://cityofvancouver.bonfirehub.com/ http://cityofvancouver.bonfirehub.com/
ITB 26-14: Water Station 14 PFAS Treatment Page 7 of 51
D. If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation;
E. Have received training on the requirements related to public works and prevailing wage under Chapter 39.04 RCW and Chapter 39.12 RCW;
F. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW.
3) Before award of contract, if applicable:
A. Have Industrial Insurance (workers’ compensation) coverage for the bidder’s employees working in Washington, as required in Title 51 RCW;
B. Have a Washington Employment Security Department reference number, as required in Title 50 RCW;
C. Have a Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW;
4) Supplemental responsible bidder criteria, if applicable.
Pursuant to RCW 39.06.020, the bidder who is awarded the contract must verify responsibility criteria in accordance with RCW 39.04.350 and as listed in 1) – 3) above for each first tier subcontractor, and a subcontractor of any tier that hires other subcontractors must verify responsibility criteria for each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract execution, meets the responsibility listed in 1) – 3) above and possesses an electrical contractor license, if required by chapter 19.28 RCW, or an elevator contractor license, if required by Chapter 70.87 RCW. This verification requirement, as well as the responsibility criteria, must be included in the project contract and in each subcontract of every tier.
SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA
In addition to the mandatory bidder responsibility criteria, the bidder must also meet the following relevant supplemental bidder responsibility criteria applicable to the project. As evidence that a bidder meets the supplemental bidder responsibility criteria, the Apparent Successful Bidder must submit, upon request, the required documentation to the City of Vancouver, within 72 hours of notification. The City reserves the right to request such documentation from other bidders as well.
1. Federal Debarment – The bidder shall not currently be debarred or suspended from bidding on Public Works Projects by the Federal government.
2. Claims against Retainage and Bonds – The bidder shall not have a record of excessive claims filed against the retainage or payment bonds for public works projects during the previous three years, that demonstrate a lack of effective management by the bidder of making timely and appropriate payments to its subcontractors, supplies, and workers, unless there are extenuating circumstances acceptable to the City.
ITB 26-14: Water Station 14 PFAS Treatment Page 8 of 51
3. Experience Modification Rate – The bidder’s Experience Modification Rate should be at or below 1.0. EMR rates above 1.0 are cause for Determination of Non-Responsibility unless the circumstances raising the rate have been accepted by the City.
4. Completion of Similar Projects: The bidder shall have successfully completed 3 projects of similar size and scope as required by the contract documents for this project within the last 15 years. In evaluating whether the projects were “successfully completed” the Owner may check references for the previous projects and may evaluate the owner’s assessment of the Bidder performance, including but not limited to:
a. Quality Control
b. Safety Record
c. Timeliness of performance
d. Use of skilled personnel
e. Management of subcontractors
f. Availability of and use of appropriate equipment
g. Compliance with contract documents
h. Management of submittals process, change orders, and close-out.
i. Compliance with federal and state funding sources, such as the State Revolving
Fund (SRF), and experience with requirements, such as American Iron and Steel (AIS), Davis Bacon, and Disadvantaged Business Enterprises (DBE)
5. Apprenticeship Utilization – The table below reflects the required minimum apprenticeship utilization labor hours. The City encourages Contractors to exceed these minimum utilization hours. These goals must include the labor hours of the prime and any subcontractor's working the project. Before final payment, the Prime Contractor and all subcontractors will be required to file an approved Affidavit of Wages Paid form.
If the Contractor does not meet the minimum established utilization requirement, they will be assessed a penalty of $100.00 for each unmet apprenticeship labor hour. For projects with an engineer’s estimate of less than $2,000,000 the contractor will be assessed a penalty of $25.00 for each unmet hour for the first time the contractor is unable to meet the goal. Each subsequent failure to meet the goal will be at the $100.00 per hour for each unmet hour. If the Contractor is able to meet or exceed the minimum utilization hours the Contractor will receive a incentive as noted on the bid form. For additional information on the City’s updated apprenticeship program, please visit the City’s website. The apprenticeship utilization requirement will be based on the Engineer’s Estimate for the project, not the bid amount.
Engineer’s Estimate Required Minimum
Utilization Labor Hours Under $500,000 N/A $500,000 - $1,000,000 3% $1,000,000 - $1,500,000 5% $1,500,000 - $2,000,000 10% $2,000,000 and greater 15% https://www.cityofvancouver.us/wp-content/uploads/2024/06/Apprenticeship-Policy-2024-Update.pdf
ITB 26-14: Water Station 14 PFAS Treatment Page 9 of 51
For more information on apprenticeship programs, you can visit the Washington State Department of Labor & Industries website at Apprenticeship Registration & Tracking System (ARTS).
6. A Bidder may be deemed not responsible if:
a. Evidence of collusion exists with any other Bidder or potential Bidder.
Participants in collusion will be restricted from submitting further bids; or
b. The Bidder, in the opinion of the City, is not qualified for the work or to the full extent of the bid, or to the extent that the bid exceeds the authorized prequalification amount as may have been determined by a prequalification of the Bidder; or
c. An unsatisfactory performance record exists based on past or current City work or for work done for others, as judged from the standpoint of conduct of the work; workmanship; or progress; affirmative action; equal employment opportunity practices; termination for cause; or Disadvantaged Business Enterprise, Minority Business Enterprise, or Women’s Business Enterprise utilization; or
d. There is uncompleted work (City or otherwise), which in the opinion of the City might hinder or prevent the prompt completion of the work bid upon; or
e. The Bidder failed to settle bills for labor or materials on past or current contracts, unless there are extenuating circumstances acceptable to the City; or
f. The Bidder has failed to complete a written public contract or has been convicted of a crime arising from a previous public contract, unless there are extenuating circumstances acceptable to the City; or
g. The Bidder is unable, financially or otherwise, to perform the work, in the opinion of the City; or
h. There are any other reasons deemed proper by the City; or
i. More than one proposal is submitted for the same project from a Bidder under the same or different names.
As evidence that the bidder meets the bidder responsibility criteria 1 A above, the apparent low bidder must submit, upon request, the following documentation to the Owner within72 hours of notification. The Owner reserves the right to request such documentation from other bidders also.
1. Federal Debarment – The bidder shall not be listed as a current debarred or suspended bidder on the U.S. Governments System for Award Management (SAM) website:
http://www.sam.gov.
2. Claims against Retainage and Bonds – The bidder shall submit a list of any public works projects over $500,000 completed within the last five years (5) that have had a claim against the retainage and/or payment or performance bond. Documentation provided should include a written explanation of the circumstances surrounding each claim and the ultimate resolution of the claim.
3. Experience Modification Rate – The bidder shall not have an Experience Modification Rate that exceeds 1.0 as indicated on the Department of Labor & Industries website. If the bidder’s score exceeds 1.0 additional information may be requested.
https://lni.wa.gov/licensing-permits/apprenticeship/apprenticeship-registration-and-tracking-system https://lni.wa.gov/licensing-permits/apprenticeship/apprenticeship-registration-and-tracking-system http://www.sam.gov/
ITB 26-14: Water Station 14 PFAS Treatment Page 10 of 51
4. Completion of Similar Projects - The Bidder shall submit a list of projects of similar size and scope that either they or a named sub-contractor have successfully completed.
For the purposes of meeting this criterion, the Owner has determined that “similar size and scope to this project” means projects having the following characteristics:
construction of pressure vessels for municipal drinking water and associated support facilities as described in Technical Specification 01 11 00.
The Bidder must have all the following minimum work experience while acting as the Prime the Contractor:
a. Successfully completed three public works projects exceeding in $5,000,000 in construction cost.
b. Successfully completed three municipal drinking water public works projects in which each project included the construction of pressure vessels.
The information about each project shall include the following:
• Owner’s name and contact information for the owner’s representative
• Awarded contract amount
• Final contract amount
• A description of the scope of the project and how the project is similar to this project
• The Bidder’s assessment of its performance of each project, including but not limited to the following:
o Quality control;
o Safety record;
o Timeliness of performance;
o Use of skilled personnel;
o Management of subcontractors;
o Availability of and use of appropriate equipment;
o Compliance with contract documents;
o Management of submittals process and change orders
5. Apprenticeship Utilization - The Bidder shall submit an Apprenticeship Utilization Plan that demonstrates how the company plans to achieve the Apprenticeship Utilization Requirement. The Plan shall:
a. Provide an estimated outcome for utilization of apprentices for the prime contractor and all subcontractors.
b. Provide an estimated total hours and work times that are reasonable to complete the scope of the project.
c. Demonstrate how the contractor (and subcontractors) intends to meet or exceed the requirement, including the labor type and approved program(s) from which the labor is obtained.
d. Quantify the cost of the apprenticeship utilization on this particular project.
6. By signing the Signature page of the Bid, the Contractor confirms to be in compliance with all items listed under Supplemental Bidder Criteria item 6 above. The City may request additional information or confirmation of compliance with the above items.
ITB 26-14: Water Station 14 PFAS Treatment Page 11 of 51
If the City determines the bidder does not meet the bidder responsibility criteria and is therefore not a responsible bidder, the City shall notify the bidder in writing with the reasons for its determination. If the bidder disagrees with this determination, they may appeal the determination within 24 hours of receipt of the City’s determination by presenting additional information to the City. The City will consider the additional information before issuing its final determination. If the final determination affirms that the bidder is not responsible, the City will not execute a contract with any other Bidder until two (2) business days after the bidder determined to be not responsible received the City’s final written determination as required by RCW 39.04.350(3)(d).
The time deadline for a bidder to appeal a determination that they are not responsible, as indicated here, may be modified by the City, adopting either a standard for all projects or changing it on a project-by-project basis.
ITB 26-14: Water Station 14 PFAS Treatment Page 12 of 51
SECTION 2: TERMS AND CONDITIONS
RECIPROCAL PREFERENCE FOR RESIDENT CONTRACTORS
In accordance with RCW 39.04.380 the State of Washington is enforcing a Reciprocal Preference for Resident Contractors. Any public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a comparable percentage disadvantage must be applied to the bid of that nonresident contractor.
A nonresident contractor from a state that provides a percentage bid preference means a contractor that:
a. is from a state that provides a percentage bid preference to its resident contractors bidding on public works contracts.
b. at the time of bidding on a public works project, does not have a physical office located in Washington.
The state of residence for a nonresident contractor is the state in which the contractor was incorporated or, if not a corporation, the state where the contractor's business entity was formed.
All nonresident contractors will be evaluated for out of state bidder preference. If the state of the nonresident contractor provides an in-state contractor preference, a comparable percentage disadvantage will be applied to their bid prior to contract award.
This section does not apply to public works procured pursuant to RCW 39.04.155, 39.04.280, or any other procurement exempt from competitive bidding.
PREVAILING WAGE REQUIREMENTS
The contract will require the payment and tracking of federal wages through Davis Bacon and will be subject to regulations of the U.S. Department of Labor. The higher wage rate between the Federal and State rates, at minimum shall prevail per WAC 296-127-025.
If awarded the project, the contractor and each subcontractor shall have on file current project specific "Statement of Intent to Pay Prevailing Wages" with the Washington State Department of Labor and Industries before payment will be made for work performed. An approved "Affidavit of Wages Paid" form must be filed upon completion of the project before release of retainage.
In addition, the Contractor and each subcontractor shall submit weekly certified payrolls as required by the contract.
E-VERIFY PROGRAM
Contractor shall register and enter into a Memorandum of Understanding (MOU) with the Department of Homeland Security E-Verify program within sixty (60) days after execution of this Agreement. Contractor shall ensure all Contractor employees and any sub-contractor(s) assigned to perform work under this Agreement are eligible to work in the United States.
Contractor shall provide verification of compliance upon City request. Failure by Contractor to comply with this subsection shall be considered a material breach.
ITB 26-14: Water Station 14 PFAS Treatment Page 13 of 51
CITY BUSINESS AND OCCUPATIONAL LICENSE
The Contractor, at no expense to the City, shall be responsible to obtain all necessary licenses, permits, and similar legal authorizations required to perform the work associated with this Agreement. The Contractor will be required to hold a city business license if working within Vancouver city limits. The Contractor shall apply for city license via the State of Washington Department of Revenue (DOR), Business Licensing Service (BLS), at:
https://secure.dor.wa.gov/. For application assistance, contact DOR BLS at 360-705-6741. For more information about city business license regulations and fees, see:
www.cityofvancouver.us/businesslicense or call 360-487-8410 option 3.
REJECTED BIDS
The City will not be responsible for any errors in bids. Bidders will not be allowed to alter bids after the submittal deadline. The City may consider a bid irregular and reject it if any of the Bid Item prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential detriment of the City. Bids submitted must be complete and include pricing for the work to be completed, in whole, per the attached plans and specifications.
Qualified bids will be deemed non-responsive and will not be accepted.
The City reserves the right to adjust the scope of this work to match available funds. The City of Vancouver, at its sole discretion, reserves the right to cancel this invitation, reject any or all bids submitted, and to waive any minor formalities if deemed to be in the best interest of the City.
TIE BREAKING
After opening Bids, if two or more lowest responsive, responsible Bid totals are exactly equal, then the tie-breaker will be determined by a coin toss by the Procurement Manager or their designee before at least two (2) witnesses. Bidders shall choose “Heads” or “Tails” in alphabetic order by the name of the firm as registered with the Washington State Department of Licensing prior to the Coin Flip. Only those Bidders who submitted a Bid total that is exactly equal to the lowest responsive, responsible Bid are to participate.
CLAIM ERRORS
A Bidder who wishes to claim error after the Bids have been publicly opened and read shall promptly notify the City that an error occurred. The Bidder shall submit a declaration under penalty of perjury signed by the Bidder and accompanied by the work sheets used in the preparation of the Bid, requesting relief from the responsibilities of Award. The affidavit or declaration shall describe the specific error(s) and certify that the work sheets are the ones used in preparing the Bid.
BID AWARD
Once bids have been received and reviewed, staff will prepare a Staff Report to be presented to Council. Once Council has formally awarded this contract, an Award email will be sent as evidence of the acceptance of the bid. No other act of the City shall constitute acceptance of a bid.
Bidders may not alter their bid prices after the hour set for the public Bid Opening, unless the award of contract is delayed for more than forty-five (45) days. The City reserves the right to http://www.cityofvancouver.us/businesslicense
ITB 26-14: Water Station 14 PFAS Treatment Page 14 of 51 request an extension of time for firm bid prices during any such delay to allow for the review process.
FAILURE TO EXECUTE CONTRACT
Failure to return the required insurance certificate, performance and payment bonds, and labor and materials bonds (if applicable), or failure or refusal to sign the Contract within 10 calendar days, shall be considered failure to execute the contract. The City may then Award the Contract to the second lowest responsible Bidder or reject all remaining Bids. If the second lowest responsible Bidder fails to return the required documents as stated above within the time provided after Award, the Contract may then be Awarded successively in a like manner to the remaining lowest responsible Bidders until the above requirements are met or the remaining Proposals are rejected. The City may grant an extension to the contractor to submit the required insurance and bonds for up to an additional 20 calendar days for extenuating circumstances. The extension shall be granted at the City’s sole discretion.
PROTESTS
Pre-Bid or Solicitation Phase Protest The City must receive a Pre-Bid or Solicitation Protest at least five (5) Days before the bid open date or proposal/qualifications response due date. These protests are to be submitted to the Procurement Specialist overseeing the project.
Upon receipt of the Protest the Procurement Specialist shall review the concerns outlined and consult with the necessary parties as need. The Procurement Specialist shall reply to the protest within three (3) Days.
Pre-Award Protest The City must receive a Pre-Award Protest within five (5) Days after the date of publication of the bid tab to the City’s website for bids or notification of Intent to Award for a Solicitation.
These protests are to be submitted to the Procurement Manager. The City may provide copies of the Protest to the bidder/proposer against whom the Protest is made if the Protestor does not copy them on the Protest. The bidder/proposer subject of the Protest will have two (2) Days to respond to the City about the Protest following its receipt of copies of the Protest, either from the Protestor or the City.
Upon receipt of the Protest, the Procurement Manager, upon receipt of the protest, shall review all of the issues brought forward in the protest and consult with the necessary parties as needed. All available facts will be considered. The Procurement Manager shall respond, in writing, to all parties within ten (10) Days. The Procurement Manager may extend this deadline to respond at any time during the ten (10) Day period with written notice to all parties. The Procurement Manager will respond to the Protest in writing by email if an email address is provided, requesting acknowledgement of receipt or will mail a response using certified mail.
The Procurement Manager will not execute a contract for the project with anyone other than the Protestor without first providing at least two (2) Days’ written notice of the City’s Intent to Award.
For more information see the City of Vancouver Procurement’s Protest Policy at: Procurement Services -The City of Vancouver, WA https://www.cityofvancouver.us/business/procurement-services/ https://www.cityofvancouver.us/business/procurement-services/
ITB 26-14: Water Station 14 PFAS Treatment Page 15 of 51
FEDERAL REQUIREMENTS:
BYRD ANTI-LOBBYING AMENDMENT (31 U.S.C. 1352)
Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.
ITB 26-14: Water Station 14 PFAS Treatment Page 16 of 51
SECTION 3: BID SUBMITTAL REQUIREMENTS
PHASE 1: BID SUBMITTAL CHECKLIST
The bidder's attention is especially called to the following forms, which must be executed in full as required. This checklist has been prepared and furnished to aid bidder in including all necessary supporting information with their bid. It is not guaranteed to be complete or accurate, and the responsibility for compliance with all bidding requirements remains with the bidder. Items in bold shall be submitted with your bid. Failure to do so shall render your bid non-responsive.
BID FORM
Bids shall be completed and submitted on the bid forms provided.
ADDENDA ACKNOWLEDGEMENT
The bidder must sign, where indicated on the last page of the bid documents, acknowledgement of any addenda prior to the bid opening. Failure to comply with this provision will render the bid non-responsive and therefore void.
It is the sole responsibility of the Supplier to learn of Addendum, if any. Such information may be obtained from the City of Vancouver Procurement Services' website at: cityofvancouver.bonfirehub.com;
However the sole responsibility for obtaining and learning of Addendum belongs to the Bidder. The City of Vancouver accepts no responsibility or liability and will provide no accommodation to bidders who fail to check for addendums and submit inadequate or incorrect responses.
NON-DISCRIMINATION CLAUSE
Bidders must provide evidence of compliance as required by RCW 35.22.650 on the attached form.
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
Bidders are required to submit a statement verifying that within the three-year period immediately preceding the date of the bid solicitation, they not have been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW.
LIST OF SUBCONTRACTORS
The City has determined that requirements of RCW 39.30.060(1) applies to this solicitation and requires each bidder to submit, as a part of the bid, the names of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation and air conditioning, plumbing as described in RCW 18.106, electrical as described in RCW 19.28, structural steel, and rebar installation or to name itself for the work. The City requires that this information is required to be submitted as a part of the bid, otherwise this shall deem the bidder non-responsive. The bidder shall not list more than one subcontractor for each category of
ITB 26-14: Water Station 14 PFAS Treatment Page 17 of 51 work identified, unless subcontractors vary with bid alternates, in which case the bidder must indicate which subcontractor will be used for which alternate. The requirement of this section is to name the bidder’s proposed heating, ventilation and air conditioning, plumbing, electrical subcontractors, structural steel and rebar installation who will contract directly with the general contractor submitting the bid to the public entity.
NON-COLUSION AND DEBARMENT AFFIDAVIT
Shall be completed and submitted on the form provided.
CERTIFICATION FOR FEDERAL AID CONTRACTS
Shall be completed and submitted on the form provided.
CERTIFICATION OF COMPLIANCE WITH SRF CONDITIONS
Shall be completed and submitted on the form provided.
CERTIFICATION OF NONSEGREGATED FACILITIES
CERTIFICATION OF NOTICE TO LABOR UNIONS OR OTHER ORGANIZATION OF WORKERS:
Non-Discrimination in Employment Facilities
BIDDERS LIST FOR ALL FIRMS THAT BID OR QUOTE ON SUBCONTRACT
BID SECURITY FORM
The bid bond, or acceptable form is to be executed by the bidder and a surety company licensed to do business in Washington, unless the bid is accompanied by a cashier’s check. No such bid bond will be required where a cashier's check is submitted in lieu of a bond. The amount of the bond or cashier’s check shall be not less than five percent (5%) of the total amount bid and may be shown in dollars or on a percentage basis. If a surety company form is submitted, please attach the form to the Bid Documents submitted. The submitted bid bond is subject to forfeiture if the successful bidder fails to enter into the contract.
SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA
Additional Supplemental Bidder Responsibility criteria will be required of the Apparent Successful Bidder (lowest, responsive, responsible Bidder). Bidder must submit required information to City within 72 hours after receipt of the request by the City of Vancouver. Bidders are not required to submit this information with their Bid.
NOTE: If during the Bidding period, a potential Bidder believes that the Supplemental Bidder Responsibility Criteria will exclude them from bidding, Bidder may request the City to consider modifying the criteria. The request must be submitted by the question deadline. Such modification, if accepted by the City, will be communicated via the issuance of an addendum to the Bidding documents.
ITB 26-14: Water Station 14 PFAS Treatment Page 18 of 51
PHASE 2: CONTRACT AWARD
The following is to be signed and/or delivered by the awarded contractor to the City within ten
(10) days after the award date.
CONTRACT
This agreement is to be signed by the successful bidder.
PERFORMANCE BOND
This shall be submitted by the successful bidder and a surety company, licensed to do business within the State of Washington on the approved City of Vancouver form.
PAYMENT BOND
This shall be submitted by the successful bidder and a surety company, licensed to do business within the State of Washington on the approved City of Vancouver form.
INSURANCE CERTIFICATE
The City shall be named as an additional named insured on all insurance policies. These policies shall comply with the requirements as stated in the Contract.
ITB 26-14: Water Station 14 PFAS Treatment Page 19 of 51
BID FORM
To the City Council City of Vancouver Vancouver, Washington 98660
The undersigned hereby certifies that the locations and construction details of work outlined in the Plans and Specifications have been personally examined for the:
This Contract provides for the improvement of a new PFAS treatment system that ties into existing water treatment system. Equipment will be installed at the existing facility and include pressure vessels with granular activated carbon for PFAS removal, along with support systems such as rinse water tank, restroom and storage building, modifications to existing booster pumps, associated stormwater, site civil, electrical and instrumentation/control improvements and other work, all in accordance with the attached Plan Set, these Contract Provisions, and the Standard Specifications, hereafter referred to as “Work.”
The Contract Work shall be Physically Complete within 290 Working Days from the Notice to Proceed. All Contract Work must be completed by December 31, 2027.
Bidder certifies they have read and thoroughly understand the Plans and Specifications and contract governing the work included in this improvement and the method by which payment will be made for said work and hereby propose to undertake and complete the work included in this improvement in accordance with said Plans, Specifications and Contract and at the fol-lowing schedule of rates and prices.
The City reserves the right to adjust the scope of this work to match available funds, including if necessary, the elimination of specific work or all work associated with specific buildings included in this Invitation to Bid.
NOTE:
Show prices in legible figures (not words) written in ink or typed and expressed in U.S.
dollars and cents.
Where conflict occurs unit price shall prevail.
Unit Prices required for all non-Lump Sum bid items.
The Total Price for Non-Lump Sum Bid Items should be calculated as follow:
o Approx. Quantity (as listed for that bid item) x Unit Price = Total Price Your proposal will be considered irregular and will be rejected if the unit price is left blank and a price per unit cannot be determined by equally dividing the “Approx. Quantity” into the Total Price and rounding the result to the nearest two decimal places.
Your Bid shall be considered non-responsive and therefore, void if:
o Figures are illegible o Minimum proposal requirements are not met (when applicable) o Bid is qualified or conditions are added to your Bid.
ITB 26-14: Water Station 14 PFAS Treatment Page 20 of 51
Item Number
Approx Qty
Unit of Measure Description Unit
Price Total Price
1 1 LS Mobilization Lump Sum $
2 1 LS B01 - Treatment Building – Process Mechanical Lump Sum $
3 1 LS B02 - Restroom and Storage Building Lump Sum $
4 1 LS Coatings Lump Sum $
5 1 LS Electrical and Instrumentation Lump Sum $
6 3 EA
P01 - PFAS Treatment Pressure Vessel Pairs and Appurtenances, Excluding Media
7 240,000 Lbs P01- PFAS Treatment Media $ $
8 1 LS P01 – All Other Equipment, Materials and Labor Lump Sum $
9 1 LS P02 - Rinse Water Tank Lump Sum $
10 1 LS General Site Lump Sum $
11 1 LS U03 - Valve Vault 3 Lump Sum $
12 1 LS U04/U05 - Grinder Pump and Grinder Pump Flow Meter Vault Lump Sum $
13 1 EST Apprentice Incentive $10,000 $ 10,000
Base Bid Subtotal Total $
Washington State Sales Tax – 8.8% $
Base Bid Grand Total $
ITB 26-14: Water Station 14 PFAS Treatment Page 21 of 51
Addendum Date of Signed Acknowledgment
No. Addendum/Addenda
1.
2.
3. _______
4. ______
NOTE: The listed addenda is hereby incorporated by reference into the Bid form. Failure to acknowledge any issued Addenda will render proposal non-responsive and therefore void. It is the sole responsibility of the Bidder to learn of Addendum, if any. Such information may be obtained from the City of Vancouver Procurement Services' website at: cityofvancouver.bonfirehub.com
ITB 26-14: Water Station 14 PFAS Treatment Page 22 of 51
The undersigned, under penalty of perjury, hereby certifies that said person(s), firm, association, LLC, or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.
The undersigned declares that they have reviewed the insurance requirements listed in the Contract and have discussed both cost and availability of these insurance requirements with my insurance broker/agent. The bid being submitting accurately reflects the cost and availability of the insurance requirements as outlined by the City of Vancouver, which I will abide by if awarded the contract.
The Contractor hereby certifies that the Contractor has an Employment Security Department number as required to conduct public works projects pursuant to RCW 39.04.350.
The undersigned declares that before preparing their bid, they read carefully the specifications and requirements for bidders and that their bid is made with the full knowledge of the kind, quality and quantity of services and equipment to be furnished, and their said bid is as stated on these pages. By signing this page of the bid, the Contractor acknowledges and agrees to the terms and conditions of each of the forms (the bid bond form must be signed separately), included in the bid documents.
Authorized Official (Signature) Date
Print Name of Authorized Official Title of Authorized Official
Company Name Telephone Number
Address City, State, Zip
E-mail Address Federal Employee I.D. #
State Contractor's License Number Washington Unified Business Identifier
(UBI#)
Employment Security Reference Number
NOTE:
1. If the bidder is a co-partnership, so state, giving firm name under which business is transacted.
2. If the bidder is a corporation or LLC, this proposal must be executed by a duly authorized official.
ITB 26-14: Water Station 14 PFAS Treatment Page 23 of 51
3. Proposals submitted must be complete and include pricing for the work to be completed, in whole, per the attached plans and specifications.
ITB 26-14: Water Station 14 PFAS Treatment Page 24 of 51
NON-DISCRIMINATION CLAUSE
RCW 35.22.650-Public Works or Improvements-Minority Business, Employees-Contract, Contents
All contracts by and between a first class city and contractors for any public work or improvement exceeding the sum of ten thousand dollars, or fifteen thousand dollars for construction of water mains, shall contain the following clause:
“Contractor agrees that they shall actively solicit the employment of minority group members. Contractor further agrees that they shall actively solicit bids for the subcontracting of goods or services from qualified minority businesses.
Contractor shall furnish evidence of his/her compliance with these requirements of minority employment and solicitation. Contractor further agrees to consider the grant of subcontracts to said minority bidders on the basis of substantially equal proposals in the light most favorable to said minority businesses. The Contractor shall be required to submit evidence of compliance with this section as part of the bid.”
As used in this section, the term “minority business” means a business of at least fifty-one percent of which is owned by minority group members.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .