This is a Georgia Department of Transportation (GDOT) materials quality assurance guidance document for Federal-Aid Local Let Projects, establishing the local government responsibilities and procedures for managing materials testing on federally-funded transportation projects. The document outlines three primary options for local governments: requesting GDOT to perform materials testing directly, requesting approval for a consultant to conduct quality assurance testing, or explaining why testing is not required. For projects requiring testing, local governments must submit the OMAT-LAP-1v10 form to the GDOT Project Manager and ensure that only GDOT-certified testing personnel conduct field density testing on embankment, pipe backfill, subgrade, and asphalt layers, as well as concrete testing for any bridge or major structure work. Local governments must notify GDOT's Testing Management Operations Supervisor at least one week prior to asphalt work commencing and provide contact information for certified technicians responsible for roadway and concrete testing.
The document specifies that local governments bear the responsibility for arranging materials testing either through GDOT or by hiring a prequalified consultant with AASHTO-accredited laboratory facilities. All testing must comply with GDOT's Sampling Testing and Inspection Manual and procedures outlined in the GDOT Construction Manual. Local governments must complete and submit quarterly Materials Certificate (MC) Checklists to GDOT's Materials Audit Unit and provide all test results through an approved data collection system or hardcopy format. Independent assurance testing will be performed by GDOT based on technician names submitted on the OMAT-LAP-1v10 form in accordance with GDOT Standard Operating Procedure 30. GDOT maintains regional Testing Management Operations Supervisors across seven districts, with the State Materials Engineer or Assistant State Materials Engineer available at 404-608-4700 for technical guidance and approval of consultant qualifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Special Provisions-Complete.pdf | ||
| 5-RFQ-26-026-Materials Testing.pdf | ||
| 3-VENDOR~1.DOC | DOC document | |
| 4-001502~1-Plans.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal-Aid Local Let Projects Local Government Responsibilities for Materials Quality Assurance
Local Governments must submit the OMAT-LAP-1v10 form to the GDOT Project Manager. Local Governments must arrange with GDOT to perform the Materials Testing
–or- Local Government must hire a consultant prequalified in Area Classes 6.04a and 6.04b to perform the Materials Testing and
• By completing OMAT-LAP-1v10 Local Government has confirmed that consultant has certified testers.
• Notify or have Consultant notify Contractor at the Preconstruction Conference that this is a GDOT Federal-aid project and that QPL sources and the GDOT project number must be utilized
• Notify or have Consultant notify GDOT TMOS* at least one week prior to any asphalt work
• Ensure or have Consultant ensure that only testing personnel with GDOT certifications perform testing on the project, and all testing must be in accordance with GDOT’s Sampling Testing and Inspection Manual
• Complete or require Consultant to complete quarterly Materials Certificate (MC) Checklist and submit to the Materials Audit Unit at GDOT Office of Materials and Testing (OMAT) as required in GDOT Construction Manual.
Contact OM if you do not have a Checklist prior to work starting on the project
• Provide test results to GDOT through GDOT approved Data Collection System or hardcopy
• Complete or require Consultant to complete final MC Checklist and submit to the Materials Audit Unit at OMAT as required in GDOT Construction Manual
Independent Assurance testing will be performed by GDOT based on the names of the technicians submitted on form OMAT-LAP-1v10 in accordance with SOP 30.
*Testing Management Operations Supervisor (TMOS) Phone Numbers:
District Number
1/Gainesville 770-531-5879
2/Tennille 478-553-3464
3/Thomaston 706-646-6614
4/Tifton 229-391-5560
5/Jesup 912-530-4470 0 6/Cartersville 678-721-5367
7/Metro Atlanta 404-608-4837
Office of Materials & Testing
Contact Information State Materials Engineer or Asst. State Materials
Engineer (Testing Bureau) 404-608-4700
OMAT-LAP-1v10 Revised April 1, 2021
SELECT ONE:
Federal-Aid Local Let Projects Materials Quality Assurance (Complete for ALL Federal-Aid Local Let projects)
Request GDOT to perform Materials Testing (Complete Section 1)
Request Approval for Consultant Quality Assurance Materials Testing (Complete Sections 1 and 2)
Testing not required – Explain____________________________________________ ________________________________________________________________________(Complete Section 1)
Section 1 Project Number/County:
GDOT Contract ID Number/Proposed Let Date:
Project Description:
Local Government Responsible for Letting Project:
Local Govt. Project Manager Contact Name & Number:
Section 2 GDOT Certified Technicians to be responsible for testing on the project:
1) Roadway Testing Technicians (RTT)- are required to perform field density testing on embankment, pipe backfill, subgrade and all asphalt layers, along with sampling misc. materials.
_____________________ (consultant firm) has ______(number of certified RTT Technicians) on staff.
2) Concrete **– GDOT Certified Concrete technician(s) are required to perform all field concrete testing (slump, air, cylinders)
___________________ (consultant firm) has ______(number of certified Concrete Technicians) on staff.
**Please note if a Bridge or other major structure is involved:
NOTE: Labs performing any testing shall be accredited in the testing to be performed (i.e. AASHTO T-22 or ASTM C-39 for concrete cylinders) by the AASHTO Accreditation Program (AASHTO resource and/or CCRL).
3) Hot Mix Asphalt GDOT specifications require the Contractor to perform mixture Acceptance testing at the plant. GDOT will perform Verification Testing at the asphalt plant as a part of the existing QPL process. The Local Government is responsible for notifying GDOT’s Testing Management Operations Supervisor (TMOS) at least one week prior to start of work.
* Send completed form to State Materials Engineer or Testing Bureau Chief.
APPROVED:
State Materials Engineer Date
Initial Application ________
Revised Application ________ *Please put “X” to indicate if this is first request for approval or if revision to original request was made.