1-FINAL Plan Set - Teek Parkway NB Bridge (09-05-2025) (1).pdf
PDF 393 MB Posted
- Attached to
- TEEL PARKWAY NB BRIDGE AT PANTHER CREEK
- Solicitation number
- 2505-084
- Issued by
- Collin County, Garland City, Texas
About this file
The file is a final plan set for the Teel Parkway NB Bridge project located in Texas, involving the construction of a comprehensive roadway infrastructure improvement initiative. The project encompasses grading, drainage, roadway pavement, bridge construction, sidewalks, hike/bike trail, signing, markings, illumination, and median landscaping with irrigation. The project limits extend from north of Fields Parkway's existing roundabout intersection to a point south of Olive Branch Road. Critical timeline requirements include bridge substructure completion within 210 calendar days, with liquidated damages of $2,000 per day for overruns, and roadway, sidewalk, and trail concrete paving work must be completed within 300 calendar days, with liquidated damages of $2,500 per day for subsequent delays.
The contract opportunity involves significant infrastructure development with specific performance milestones and financial penalties for non-compliance. While precise budget details are not explicitly stated, the project indicates substantial municipal investment in transportation infrastructure improvements. The scope suggests a complex engineering and construction project requiring specialized skills in civil engineering, bridge construction, and municipal infrastructure development. The liquidated damages clauses demonstrate the project's time-sensitive nature and the municipal entity's commitment to timely project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .