1_EPNC-P2-BD-Plans_GI001-CC103.pdf
PDF 19 MB Posted
- Solicitation number
- 36C78621B0008
About this file
This document provides details for a federal contract solicitation for construction services. The Department of Veterans Affairs National Cemetery Administration is seeking bids for expansion construction at the Eagle Point National Cemetery in Oregon. The scope of work includes installing approximately 2,200 columbarium niches, 595 in-ground cremains sites, and has an option to add 670 additional niches. The contract is valued between $1 million and $5 million. This procurement is set aside solely for service-disabled veteran-owned small businesses. Bids are due by May 17, 2020 and must be submitted through the Beta SAM and Login.gov websites. Offerors should monitor the websites for any amendments to the solicitation. The point of contact for additional information is Flora Taylor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Eagle Point National Cemetery Geotechnical.pdf | ||
| 36C78621B0008 0005.docx | DOCX document | |
| 36C78621B0008 0004.docx | DOCX document | |
| 36C78621B0008 0003.docx | DOCX document | |
| COLUMBARIUM DETAILS-CC501 COLUMBARIUM DETAILS 1-Revision20210803.pdf | ||
| 36C78621B0008 0002.docx | DOCX document | |
| 36C78621B0008 0001.docx | DOCX document | |
| P07 Eagle Point.docx | DOCX document | |
| 2_EPNC-P2-BD-Plans_CC104-CC507.pdf | ||
| 4_EPNC-P2-BD-Plans_LI201-SS502.pdf | ||
| 210318 Eagle Point 906-016 Bid Doc Specfications.pdf | ||
| 3_EPNC-P2-BD-Plans_LP101-LI104.pdf | ||
| IFB Lump Sum Division Spreadsheet.xlsx | XLSX spreadsheet | |
| 36C78621B0008_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2020 Microsoft Corporation © 2020 HERE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s g i c o v e r d w g e d i t j f a h r e n k a m p s a v e d
A
M l o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J
O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
DEPARTMENT OF VETERANS AFFAIRS
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
VA PROJECT NO. 906CM3016
CONSULTANTS
ANDERSON ENGINEERING OF MN, LLC
PROJECT MANAGEMENT, ARCHITECTURE, LANDSCAPE ARCHITECTURE,
PLANNING, ENVIRONMENTAL, CIVIL ENGINEERING, LAND SURVEY
13605 1ST AVENUE NORTH, SUITE 100
PLYMOUTH, MN 55441
CONTACT: JOE LUCHT, PROJECT MANAGER
PHONE: (763) 412-4000
AST
STRUCTURAL ENGINEERING
7301 OHMS LANE
EDINA, MN 55429
CONTACT: JOHN LEVAR
PHONE: (952) 854-9302
WATER IN MOTION
IRRIGATION
175 JAMES AVE. N.
MINNEAPOLIS, MN 55405
CONTACT: TIM MALOOLY
PHONE: (763) 559-1010
LELAND SAYLOR
COST ESTIMATOR
505 MONTGOMERY ST. 11th FLR
SAN FRANCISCO, CA 94111
CONTACT: TOMMY VEST
PHONE: (415) 399-9990
AGEGC
GEOTECHNICAL ENGINEER
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
CONTACT: ROBIN WARREN
PHONE: (541) 226-6658
VICINITY MAP LOCATION MAP
N.T.S. N.T.S.
N
GI001
JFJL
COVER
N
SHEET INDEX
Sheet Sheet Title
GENERAL
GI001 COVER 1
CG101 OVERALL SITE PLAN 2
GC102 CONSTRUCTION SEQUENCING PLAN 3
GC701 EROSION AND SEDIMENT CONTROL NARRATIVE 4
GC702 EROSION AND SEDIMENT CONTROL PLAN 5
GC703 EROSION AND SEDIMENT CONTROL DETAILS 6
EXISTING CONDITIONS SURVEY
VF101 EXISTING CONDITIONS SURVEY 7
BORING LOCATIONS
BL100 GEOTECHNICAL TEST PITS 8
DEMOLITION
CD101 DEMOLITION PLAN OVERALL 9
CD102 DEMOLITION ENLARGEMENT PLANS 10
GRAVESITE PLANS
CS101 SECTION 39 GRAVESITE SITE LAYOUT AND NUMBERING PLAN 11
CS102 SECTION 39 GRAVESITE GRADING PLAN 12
CS501 SITE DETAILS 1 13
CS502 SITE DETAILS 2 14
CS503 SITE DETAILS 3 15
CS504 SITE DETAILS 4 16
COLUMBARIUM PLANS
CC101 COLUMBARIUM SITE LAYOUT & PAVING PLAN 17
CC102 COLUMBARIUM NUMBERING & FOUNDATION PLAN 18
CC103 COLUMBARIUM GRADING PLAN 19
CC104 COLUMBARIUM UTILITY PLAN 20
CC105 COLUMBARIUM ADD ALTERNATE 21
CC106 COLUMBARIUM ADD ALTERNATE 22
CC501 COLUMBARIUM DETAILS 1 23
CC502 COLUMBARIUM DETAILS 2 24
CC503 COLUMBARIUM DETAILS 3 25
CC504 COLUMBARIUM DETAILS 4 26
CC505 COLUMBARIUM DETAILS 5 27
CC506 COLUMBARIUM DETAILS 6 28
CC507 RETAINING WALL DETAILS 1 29
PLANTING
LP101 COLUMBARIUM PLANTING PLAN - BASE BID 30
LP102 COLUMBARIUM PLANTING PLAN - ADD ALTERNATE 31
LP103 SECTION 39 PLANTING PLAN 32
LP501 PLANTING DETAILS 33
IRRIGATION
LI101
COLUMBARIUM IRRIGATION PLAN AT EXPANSION LAYOUT -
BASE BID
LI102 IRRIGATION DEMO PLAN AT EXPANSION LAYOUT 35
LI103 IRRIGATION DEMO PLAN AT SEC 39 36
LI104 IRRIGATION DEMO PLAN AT EXPANSION LAYOUT 37
LI201
COLUMBARIUM IRRIGATION PLAN AT EXPANSION LAYOUT -
BASE BID
LI202
COLUMBARIUM IRRIGATION PLAN AT EXPANSION LAYOUT -
ADD ALT
LI203 IGC IRRIGATION PLAN AT SEC 39 40
LI204 STAGING AREA IRRIGATION PLAN 41
LI501 IRRIGATION DETAILS 42
LI502 IRRIGATION DETAILS 43
LI503 IRRIGATION DETAILS 44
STRUCTURAL
SS001 TITLE SHEET - STRUCTURAL NOTES 45
SS101 FOUNDATION PLAN 46
SS501 SECTIONS AND DETAILS 47
SS502 SECTIONS AND DETAILS 48
EAGLE POINT
NATIONAL CEMETERY
PROJECT LOCATION SITE 1:
NEW COLUMBARIUM
EXPANSION; WEST OF
RILEY ROAD
PROJECT LOCATION SITE 2:
IGC IN SECTION 39; WEST OF
RILEY ROAD
GRAVESITE SUMMARY
BASE BID
COLUMBARIUM NICHES
2,200
IN-GROUND CREMAINS
ADD ALTERNATE
COLUMBARIUM NICHES
IRRIGATION DEMO PLAN AT CONTRACTORS STAGING AREA
OVERALL
RILEY ROAD
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s c s s i t e p l a n d i t e f r a n c i v e d
P o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
CG101
JFJL
OVERALL SITE PLAN
N
0 60' 120'
SCALE:
OVERALL SITE PLAN
1" = 60' (30" x 42" PAPER SIZE)
CS101
IGC SECTION 39
CC101
PHASE 2 COLUMBARIUM
WATER TANK
CITY OF EAGLE
POINT
ROSTRUM
CARILLON
EXISTING IGC
SECTION 38
EXISTING CRYPT
SECTION 32
EXISTING OSSUARY
AND MEMORIAL WALL
EXISTING COLUMBARIUM
RETAINING WALL
SECTION A1
SECTION B
SECTION B1
SECTION C
SECTION
C1
SECTION D
SECTION 14
SECTION A
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
S E
C T
I O
N
S E
C T
I O
N
SECTION F4
SECTION F3
SECTION F2
SECTION F1
SECTION F
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION 1
SECTION 5
SECTION 9
SECTION 2
SECTION 6
SECTION 10
SECTION E
MBMCMDME
SECTION MA
SECTION
AA
FLAGPOLE
VEHICLE
STORAGE
BUILDING
ADMINISTRATION
BUILDING
MAINTENANCE
BUILDING
COLUMBARIUM 1
COMMITTAL
SHELTER
LEGEND
PROPERTY LIMITS
SILT FENCE
TEMPORARY CONSTRUCTION
FENCE
NEW BURIAL SECTION
HEADSTONE DIRECTION
ROAD
RILEY
RILEY ROAD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s o o p e r a t i o n s d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
GC102
CONSTRUCTION SEQUENCING
PLAN
N
0 60' 120'
SCALE:
CONSTRUCTION SEQUENCING PLAN
1" = 60' (30" x 42" PAPER SIZE)
WATER TANK
CITY OF EAGLE
POINT
ROSTRUM
CARILLON
SECTION 38
SECTION 32
EXISTING OSSUARY
AND MEMORIAL WALL
CONTRACTOR
STAGING AREA
SECTION A1
SECTION B
SECTION B1
SECTION C
SECTION
C1
SECTION D
SECTION 14
SECTION A
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
S E
C T
I O
N
S E
C T
I O
N
SECTION F4
SECTION F3
SECTION F2
SECTION F1
SECTION F
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION 1
SECTION 5
SECTION 9
SECTION 2
SECTION 6
SECTION 10
SECTION E
MBMCMDME
SECTION MA
SECTION
AA
FLAGPOLE
VEHICLE
STORAGE
BUILDING
ADMINISTRATION
BUILDING
MAINTENANCE
BUILDING
COLUMBARIUM 1
COMMITTAL
SHELTER
EXISTING
GRAVEL ROAD,
ACCESS TO
PROJECT AREAS
1. CONTRACTOR TO PROVIDE TRAFFIC CONTROL
DURING CLOSURES. DISCUSS ALL ROAD CLOSURES
WITH CEMETERY STAFF AT LEAST 72 HOURS IN
ADVANCE OF CLOSURE.
2. CONTRACTOR REQUIRED TO PROVIDE SAFETY
SIGNAGE, BARRICADES, AND/OR CONSTRUCTION
FENCING TO PROTECT AREAS OF CONSTRUCTION
FROM GENERAL PUBLIC ACCESS.
3. ALL CONSTRUCTION SHALL COMPLY WITH
RECOMMENDATIONS OF THE GEOTECHNICAL
ENGINEER AND GEOTECHNICAL REPORT UNLESS
DIRECTED OTHERWISE.
4. ALL CONSTRUCTION SHALL COMPLY WITH MOST
CURRENT NCA SPECIFICATIONS UNLESS SPECIFIED
OTHERWISE. WHERE WORK IS NOT COVERED BY NCA
SPECIFICATIONS, CONTRACTOR TO COMPLY WITH
2021 EDITION OF ODOT STANDARD CONSTRUCTION
SPECIFICATIONS.
5. ALL WORK TO BE PERFORMED IN A LEGAL MANNER
AND IN ACCORDANCE WITH FEDERAL, STATE, AND
LOCAL REGULATIONS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. PHASE DEMOLITION AS NEEDED TO MAINTAIN
DRAINAGE AND UTILITIES FOR MINIMAL DISRUPTION.
8. THE LOCATION AND TYPE OF EXISTING UTILITIES
SHOWN ON THE PLANS ARE FOR GENERAL
INFORMATION ONLY. THE INFORMATION IS NOT
WARRANTED TO BE ACCURATE OR COMPLETE. THE
CONTRACTOR, IN COOPERATION WITH THE
APPROPRIATE UTILITY COMPANY OR MUNICIPALITY,
IS RESPONSIBLE FOR VERIFYING THE LOCATION AND
DEPTH OF ALL UNDERGROUND UTILITIES.
9. LOCATE AND PROTECT EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
10. SUBSTITUTIONS FROM INFORMATION SHOWN
HEREON SHALL BE REVIEWED AND APPROVED BY
THE COR.
11. EXISTING STORM SEWER SYSTEM TO REMAIN ACTIVE
THROUGHOUT CONSTRUCTION. CONTRACTOR TO
PHASE CONSTRUCTION ACTIVITIES AND PROVIDE
DEWATERING AS NECESSARY.
12. ALL CONSTRUCTION AREAS, INCLUDING
CONTRACTOR STAGING AREAS, TO BE FENCED OFF
WITH TEMPORARY CHAIN LINK FENCE. TEMPORARY
FENCING OR GATES ON PAVED AREAS SHALL BE ON
STANDS.
13. RESTORE ALL DISTURBED AREA TO ITS ORIGINAL
CONDITION; CONTRACTORS STAGING ARE SHALL BE
RESTORED/REPLACED BY HYDROSEEDING WITH TALL
FESCUE.
14. SUBMIT TRAFFIC CONTROL PLAN IN ACCORDANCE
WITH LOCAL JURISDICTION/ODOT REQUIREMENTS
FOR INGRESS & EGRESS TO CEMETERY PROPERTY.
15. CONTRACTOR IS PROHIBITED TO USE CEMETERY
ROADS FOR CONSTRUCTION ACCESS, UNLESS
SHOWN. CONTRACTOR MAY BE REQUIRED TO
PROVIDE TEMPORARY SHORING, RETAINING WALLS,
ETC TO MAINTAIN ACCESS FROM STAGING AREA TO
PROJECT AREAS.
16. REMOVE & REPLACE ROCK MULCH.
COLUMBARIUM
PROJECT AREA
CONSTRUCTION SIGN
SAFETY SIGN
CONTRACTORS
ROUTE TO GRAVESITE
SECTION 39
IMPROVEMENTS
CONTRACTORS
ROUTE TO
COLUMBARIUM
IMPROVEMENTS
DRIVING ON
CEMETERY ROADS IS
PROHIBITED
GRAVESITE
SECTION 39
PROJECT AREA
EXISTING COLUMBARIUM
LEGEND
PROPERTY LIMITS
SILT FENCE
TEMPORARY CONSTRUCTION
FENCE
OPTIONAL
ACCESS/LOOP FOR
PROJECT AREAS
ACCESS FROM
STAGING AREA
TO COLUMBARIUM
PROJECT AREA.
GENERAL NOTES:
INSTALL PERMANENT
ORNAMENTAL GATE
(MATCH EXISTING ON SITE)
JFJL
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s c e s w p p p d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
GC701
JFJL
EROSION AND SEDIMENT CONTROL
NARRATIVE
PROJECT SITE
1-MILE RADIUS
AROUND PROJECT
LITTLE BUTTE CREEK
INITIAL
A COMPREHENSIVE LIST OF AVAILABLE BEST MANAGEMENT PRACTICES (BMP) OPTIONS BASED ON DEQ's GUIDANCE
MANUAL HAS BEEN REVIEWED T0 COMPLETE THIS ER0SION AND SEDIMENT C0NTR0L PLAN SOME OF THE ABOVE
LISTED BMP's WERE NOT CHOSEN BECAUSE THEY WERE DETERMINED T0 NOT EFFECTIVELY MANAGE ER0SION
PREVENTI0N AND SEDIMENT C0NTR0L F0R THIS PROJECT BASED ON SPECIFIC SITE CONDITI0NS INCLUING SOIL
C0NDITIONS TOPOGRAPHIC CONSTRAINTS ACESSIBILITY TO THE SITE AND OTHER RELATED CONDITIONS AS THE
PROJECT PROGRESSES AND THERE IS A NEED TO REVISE THE ESC PLAN, AN ACTION PLAN WILL BE SUBMITTED
EROSION AND SEDIMENT CONTROL PLANS
SHEET INDEX
RATIONALE STATEMENT
REFER TO DEQ GUIDANCE MANUAL FOR A COMPREHENSIVE LIST OF
AVAILABLE BMP'S
BMP MATRIX FOR CONSTRUCTION PHASES
LOCAL AGENCY-SPECIFIC EROSION
CONTROL NOTES:
VICINITY MAP
PROJECT LOCATION: PROPERTY DESCRIPTION:
ATTENTION EXCAVATORS:
SITE MAP
SITE CONDITION MINIMUM FREQUENCY
STANDARD EROSION AND SEDIMENT
CONTROL PLAN DRAWING NOTES:
DEVELOPER
NARRATIVE DESCRIPTIONS
EXISTING SITE CONDITIONS
DEVELOPED CONDITIONS
NATURE OF CONSTRUCTION ACTIVITY AND ESTIMATED TIME TABLE
* CLEARING (DATES, FROM & TO:_________________________ )
* MASS GRADING (DATES, FROM & TO ___________________________ )
* UTILITY INSTALLATION (DATES, FROM & TO ____________________________ )
* STREET CONSTRUCTION (DATES, FROM & TO_____________________________ )
* FINAL STABILIZATION DATES, FROM & TO______________________________ )
PERMITTEES SITE INSPECTOR
DESCRIPTION OF EXPERIENCE:
FAX:
PHONE:
COMPANY/AGENCY:
EMAIL:
INSPECTI0N FREQUENCY:
NOT TO SCALE
N
EROSION AND SEDIMENT CONTROL PLAN (ESCP) DRAWINGS
NOT TO SCALE
N
ENGINEERING & SURVEY FIRM: ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVENUE NORTH, SUITE 100
PLYMOUTH, MN 55441
CONTACT: GARY JOHNSON, PROJECT MANAGER
PHONE: (763) 412-4000
DEVELOPER/OWNER: EAGLE POINT NATIONAL CEMETERY
2763 RILEY ROAD
EAGLE POINT, OR 97524
CONTACT:
PHONE:
THE EXISTING SITE IS A NATIONAL CEMETERY WITH AN INCLUSION OF
IN GROUND BURIAL SECTIONS, FLAG ASSEMBLY AREA,
COLUMBARIUM, P.I.C. BUILDING WITH ROADWAYS COMPLETE WITH
CURB AND GUTTER.
SITE 1 IS THE CONSTRUCTION OF THE COLUMBARIUM AREA. THE NEW
COLUMBARIUM WILL BE LOCATED WEST OF RILEY ROAD. THE
COLUMBARIUM WALLS ARE RELATIVELY LIGHTLY LOADED
STRUCTURES SUPPORTED ON SPREAD FOOTING FOUNDATIONS.
CONCRETE WALKWAYS WILL BE LOCATED ADJACENT TO THE
COLUMBARIA WALLS AND FOR ACCESS TO THE WALLS.
SITE 2 INCLUDES THE EXPANSION OF IGC SECTION 39. THIS SECTION
IS LOCATED SOUTH OF THE NEW COLUMBARIUM AREA.
SITE SOIL CLASSIFICATION:
T.B.D.
TEST PIT 1
0.0 TO 1.5 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT; MODERATELY TO HIGHTLY EXPANSIVE, ROOTED ZONE AT A DEPTH OF ABOUT 9 IN.
1.5 TO 2.0 FT HARD (RH-3), BROWN SANDSTONE, SLIGHTLY WEATHERED, CLOSE FRACTURES,
BECOMES RH-4 BELOW 2.0 FT.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
TEST PIT 2
0.0 TO 0.5 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT; MODERATELY TO HIGHLY EXPANSIVE, ROOTED.
0.5 TO 2.0 FT MEDIUM HARD (RH-2), BROWN SANDSTONE; SLIGHTLY WEATHERED, CLOSE
FRACTURES, BECOMES RH-3/RH-4 BELOW 2.0 FT.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
TEST PIT 3
0.0 TO 2.0 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT; MODERATELY TO HIGHLY EXPANSIVE, ROOTED ZONE TO A DEPTH OF ABOUT 6 IN.
2.0 TO 3.0 FT MEDIUM HARD (RH-2), BROWN SANDSTONE; SLIGHTLY WEATHERED, CLOSE
FRACTURES, BECOMES RH-4 BELOW 3.0 FT.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
TEST PIT 4
0.0 TO 3.0 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT; MODERATELY TO HIGHLY EXPANSIVE, ROOTED ZONE TO A DEPTH OF ABOUT 6 IN.
3.0 TO 5.0 FT FILL: MEDIUM STIFF, BROWN SILT; SOME CLAY.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
NOTE: TEST PITS COMPLETED APRIL 23, 2020. SEE COMPLETE GEOTECHNICAL REPORT BY AGEGC, JUNE 30, 2020 FOR ADDITIONAL TEST PIT LOG DATA AND INFORMATION.
RECEIVING WATER BODIES:
NEAREST WATER BODY: LITTLE BUTTE CREEK
GC701 EROSION AND SEDIMENT CONTROL NARRATIVE
GC702 EROSION AND SEDIMENT CONTROL PLAN
GC703 EROSION AND SEDIMENT CONTROL DETAILS
TOTAL SITE AREA = 1,888,291 SF = 43.35 ACRES
TOTAL DISTURBED AREA = 37,026 SF = 0.85 ACRES
2763 RILEY ROAD
EAGLE POINT, OR 97524,
JACKSON COUNTY, OREGON
LATITUDE = 42.4635
LONGITUDE = -122.7872
TAX LOTS 361W02CD-100
(JACKSON COUNTY TAX MAP)
PLANNING/ENGINEERING/
SURVEYING FIRM
OREG0N LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER THOSE RULES
ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THESE RULES FROM THE
CENTER BY CALLING 503-232-1987. IF YOU HAVE ANY QUESTIONS ABOUT THE RULES, YOU MAY CONTACT THE CENTER.
YOU MUST NOTIFY THE CENTER AT LEAST TWO BUSINESS DAYS BEF0RE COMMENCING AN EXCAVATION CALL 503-246-6699.
· HOLD A PRE-CON MEETING OF PROJECT CONSTRUCTION PERSONNEL THAT INCLUDES THE EC
INSPECTOR.
· ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH DEQ 1200 C PERMIT REQUIREMENTS.
· INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200 C PERMIT REQUIREMENTS.
· REVISIONS TO THE APPROVED ESC PLAN MUST BE SUBMITTED TO DEQ OR AGENT IN ACCORDANCE
WITH CURRENT 1200-C PERMIT.
1. ACTIVE PERIOD
2. PRIOR TO THE SITE BECOMING INACTIVE OR IN
ANTICIPATION OF SITE INACCESSIBILITY
3. INACTIVE PERIODS GREATER THAN FOURTEEN (14)
CONSECUTIVE CALENDAR DAYS
4. PERIODS DURING WHICH THE SITE IS INACCESSIBLE
DUE TO INCLEMENT WEATHER
5. PERIODS DURING WHICH DISCHARGE IS UNLIKELY
DUE TO FROZEN CONDITIONS.
IF PRACTICAL, INSPECTIONS MUST OCCUR DAILY AT A
RELEVANT AND ACCESSIBLE DISCHARGE POINT OR
DOWNSTREAM LOCATION
0NCE EVERY MONTH.
ONCE T0 ENSURE THAT EROSION AND SEDIMENT CONTROL
MEASURES ARE IN WORKING ORDER . ANY NECESSARY
MAINTENANCE AND REPAIR MUST BE MADE PRIOR TO LEAVING
THE SITE
DAILY WHEN STORMWATER RUNOFF, INCLUDING RUNOFF
FROM SNOW MELT, IS OCCURRING.
AT LEAST ONCE EVERY 14 DAYS, REGARDLESS OF WHETHER
STORMWATER RUNOFF IS OCCURRING.
1. OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND MAINTENANCE OF ALL
EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS
2. PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING LIMITS, VEGETATED BUFFERS, AND ANY SENSITIVE AREAS SHOWN ON THIS PLAN SHALL BE CLEARLY DELINEATED IN THE FIELD DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS THE OWNER/PERMITTEE
MUST MAINTAIN IN THE DELINEATION FOR THE DURATION OF THE PROJECT. NOTE: VEGATATED CORRIDORS TO BE
DELINEATED WITH ORANCE CONSTRUCTION FENCE OR APPROVED EQUAL.
3. PRIOR TO ANY LAND DISTURBING ACTIVITIE, THE BMP's THAT MUST BE INSTALLED ARE A GRAVEL CONSTRUCTION
ENTRANCE, PERIMETER SEDIMENT CONTROL, AND INLET PROTECTI0N THESE BMPs MUST BE MAINTAINED FOR THE
DURATION 0F THE PROJECT.
4. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAT SEPTEMBER 1; THE TYPE AND
PERCENTAGES OF SEED IN THE MIX MUST BE IDENTIFIED ON THE PLANS
5. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER AN UNDISTURBED, PREFERABLY VEGETATED
AREA, AND THR0UGH A SEDIMENT CONTROL BMP i.e. (FILTER BAG).
6. THE ESC PLAN MUST BE ΚEPT ON SITE. ALL MEASURES SHOWN ON THE PLAN MUST BE INSTALLED PR0PERLY T0
ENSURE THAT SEDIMENT OR SEDIMENT LADEN WATER DOES NOT ENTER A SURFACE WATER SYSTEM ROADWAY OR
OTHER PROPERTIES.
7. THE ESC MEASURES SHOWN ON THIS PLAN ARE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITI0NS. DURING
THE CONSTRUCTION PERIOD, THESE MEASURES SHALL BE UPGRADED AS NEEDED TO COMPLY WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL EROSION CONTROL REGULATIONS . CHANGES TO THE APPROVED ESC PLAN MUST BE
SUBMITTED IN THE FORM OF AN ACTION PLAN TO DEQ PER THE 1200 C PERMIT.
8. IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMP's MUST BE USED WHICH MAY INCLUDE THE APPLICATION 0F
FINE WATER SPRAYING, PLASTIC SHEETING, MULCHING, OR OTHER APPROVED MEASURES.
9. ALL EXPOSED SOILS MUST BE COVERED DURING THE WET WEATHER PERIOD.
THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITI0NS OF THE 1200C PERMIT. THIS ESCP AND
GENERAL CONDITIONS HAVE BEEN DEVELOPED TO FACILITATE COMPLIANCE WITH THE 1200C PERMIT
REQUIREMENTS. IN CASES OF DISCREPANCIES OR OMISSIONS, THE 1200C PER IT REQUIREMENTS
SUPERCEDE REQUIREMENTS OF THIS PLAN.
1. Hold a pre-construction meeting of project construction personnel that includes the inspector to discuss erosion and sediment control measures and construction limits. (Schedule A.8.c.i.(3))
2. All inspections must be made in accordance with DEQ 1200-C permit requirements. (Schedule A.12.b and Schedule B.1)
3. Inspection logs must be kept in accordance with DEQ’s 1200-C permit requirements. (Schedule B.1.c and B.2)
4. Retain a copy of the ESCP and all revisions on site and make it available on request to DEQ, Agent, or the local municipality.
During inactive periods of greater than seven (7) consecutive calendar days, the above records must be retained by the permit registrant but do not need to be at the construction site. (Schedule B.2.c)
5. All permit registrants must implement the ESCP. Failure to implement any of the control measures or practices described in the
ESCP is a violation of the permit. (Schedule A 8.a)
6. The ESCP must be accurate and reflect site conditions. (Schedule A.12.c.i)
7. Submission of all ESCP revisions is not required. Submittal of the ESCP revisions is only under specific conditions. Submit all necessary revision to DEQ or Agent within 10 days. (Schedule A.12.c.iv. and v)
8. Phase clearing and grading to the maximum extent practical to prevent exposed inactive areas from becoming a source of erosion. (Schedule A.7.a.iii)
9. Identify, mark, and protect (by construction fencing or other means) critical riparian areas and vegetation including important trees and associated rooting zones, and vegetation areas to be preserved. Identify vegetative buffer zones between the site and sensitive areas (e.g., wetlands), and other areas to be preserved, especially in perimeter areas. (Schedule A.8.c.i.(1) and (2))
10. Preserve existing vegetation when practical and re-vegetate open areas. Re-vegetate open areas when practicable before and after grading or construction. Identify the type of vegetative seed mix used. (Schedule A.7.a.v)
11. Maintain and delineate any existing natural buffer within the 50-feet of waters of the state. (Schedule A.7.b.i.and (2(a)(b))
12. Install perimeter sediment control, including storm drain inlet protection as well as all sediment basins, traps, and barriers prior to land disturbance. (Schedule A.8.c.i.(5))
13. Control both peak flow rates and total stormwater volume, to minimize erosion at outlets and downstream channels and streambanks. (Schedule A.7.c)
14. Control sediment as needed along the site perimeter and at all operational internal storm drain inlets at all times during construction, both internally and at the site boundary. (Schedule A.7.d.i)
15. Establish concrete truck and other concrete equipment washout areas before beginning concrete work. (Schedule A.8.c.i.(6))
16. Apply temporary and/or permanent soil stabilization measures immediately on all disturbed areas as grading progresses.
Temporary or permanent stabilizations measures are not required for areas that are intended to be left unvegetated, such as dirt access roads or utility pole pads.(Schedule A.8.c.ii.(3))
17. Establish material and waste storage areas, and other non-stormwater controls. (Schedule A.8.c.i.(7))
18. Prevent tracking of sediment onto public or private roads using BMPs such as: construction entrance, graveled (or paved) exits and parking areas, gravel all unpaved roads located onsite, or use an exit tire wash. These BMPs must be in place prior to landdisturbing activities. (Schedule A 7.d.ii and A.8.c.i(4))
19. When trucking saturated soils from the site, either use water-tight trucks or drain loads on site. (Schedule A.7.d.ii.(5))
20. Control prohibited discharges from leaving the construction site, i.e., concrete wash-out, wastewater from cleanout of stucco, paint and curing compounds. (Schedule A.6)
21. Use BMPs to prevent or minimize stormwater exposure to pollutants from spills; vehicle and equipment fueling, maintenance, and storage; other cleaning and maintenance activities; and waste handling activities. These pollutants include fuel, hydraulic fluid, and other oils from vehicles and machinery, as well as debris, fertilizer, pesticides and herbicides, paints, solvents, curing compounds and adhesives from construction operations. (Schedule A.7.e.i.(2))
22. Implement the following BMPs when applicable: written spill prevention and response procedures, employee training on spill prevention and proper disposal procedures, spill kits in all vehicles, regular maintenance schedule for vehicles and machinery, material delivery and storage controls, training and signage, and covered storage areas for waste and supplies. (Schedule A.
7.e.iii.)
23. Use water, soil-binding agent or other dust control technique as needed to avoid wind-blown soil. (Schedule A 7.a.iv)
24. The application rate of fertilizers used to reestablish vegetation must follow manufacturer’s recommendations to minimize nutrient releases to surface waters. Exercise caution when using time-release fertilizers within any waterway riparian zone.
(Schedule A.9.b.iii)
25. If an active treatment system (for example, electro-coagulation, flocculation, filtration, etc.) for sediment or other pollutant removal is employed, submit an operation and maintenance plan (including system schematic, location of system, location of inlet, location of discharge, discharge dispersion device design, and a sampling plan and frequency) before operating the treatment system. Obtain plan approval before operating the treatment system. Operate and maintain the treatment system according to manufacturer’s specifications. (Schedule A.9.d)
26. Temporarily stabilize soils at the end of the shift before holidays and weekends, if needed. The registrant is responsible for ensuring that soils are stable during rain events at all times of the year. (Schedule A 7.b)
27. As needed based on weather conditions, at the end of each workday soil stockpiles must be stabilized or covered, or other BMPs must be implemented to prevent discharges to surface waters or conveyance systems leading to surface waters. (Schedule A
7.e.ii.(2))
28. Construction activities must avoid or minimize excavation and bare ground activities during wet weather. (Schedule A.7.a.i)
29. Sediment fence: remove trapped sediment before it reaches one third of the above ground fence height and before fence removal.
(Schedule A.9.c.i)
30. Other sediment barriers (such as biobags): remove sediment before it reaches two inches depth above ground height and before
BMP removal. (Schedule A.9.c.i)
31. Catch basins: clean before retention capacity has been reduced by fifty percent. Sediment basins and sediment traps: remove trapped sediments before design capacity has been reduced by fifty percent and at completion of project. (Schedule A.9.c.iii & iv)
32. Within 24 hours, significant sediment that has left the construction site, must be remediated. Investigate the cause of the sediment release and implement steps to prevent a recurrence of the discharge within the same 24 hours. Any in-stream clean-up of sediment shall be performed according to the Oregon Division of State Lands required timeframe. (Schedule A.9.b.i)
33. The intentional washing of sediment into storm sewers or drainage ways must not occur. Vacuuming or dry sweeping and material pickup must be used to cleanup released sediments. (Schedule A.9.b.ii)
34. The entire site must be temporarily stabilized using vegetation or a heavy mulch layer, temporary seeding, or other method should all construction activities cease for 30 days or more. (Schedule A.7.f.i)
35. Provide temporary stabilization for that portion of the site where construction activities cease for 14 days or more with a covering of blown straw and a tackifier, loose straw, or an adequate covering of compost mulch until work resumes on that portion of the site. (Schedule A.7.f.ii)
36. Do not remove temporary sediment control practices until permanent vegetation or other cover of exposed areas is established.
Once construction is complete and the site is stabilized, all temporary erosion controls and retained soils must be removed and disposed of properly, unless doing so conflicts with local requirements. (Schedule A.8.c.iii(1) and D.3.c.ii and iii)
MONTHLY. RESUME MONITORING IMMEDIATELY UPON MELT,
OR WHEN WEATHER CONDITIONS MAKE DISCHARGE LIKELY.
B
B
C
D
C
D
E
F
E
G
H
G
H
A
J
J
I
I
E
X
IS
T
IN
G
F
RILEY ROAD
C O
CO
C O
CO
C O
CO
C O
CO
C
O
C O
CO
C O
CO
C O
CO
C O
CO
C O
CO
C O
CO
C O
CO
C O
C
O
C O
C
O
C O
CO
C O
CO
C O
C
O
C O
CO
C O
CO
C O
C
O
C O
C
O
C O
C
O
C O
C
O
C O
C
O
C O
C
O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s c e e r o s i o n c o n t r o l p l a n d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
GC702
JFJL
EROSION AND SEDIMENT CONTROL
PLAN
N
0 60' 120'
SCALE:
EROSION AND SEDIMENT CONTROL PLAN
1" = 60' (30" x 42" PAPER SIZE)
WATER TANK
CITY OF EAGLE
POINT
ROSTRUM
CARILLON
EXISTING IGC
SECTION 38
SECTION 32
EXISTING CRYPTS
EXISTING OSSUARY
AND MEMORIAL WALL
EXISTING COLUMBARIUM
RETAINING WALL
SECTION A1
SECTION B
SECTION B1
SECTION C
SECTION
C1
SECTION D
SECTION 14
SECTION A
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
S E
C T
I O
N
S E
C T
I O
N
SECTION F4
SECTION F3
SECTION F2
SECTION F1
SECTION F
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION 1
SECTION 5
SECTION 9
SECTION 2
SECTION 6
SECTION 10
SECTION E
MBMCMDME
SECTION MA
SECTION
AA
FLAGPOLE
VEHICLE
STORAGE
BUILDING
ADMINISTRATION
BUILDING
MAINTENANCE
BUILDING
COLUMBARIUM 1
COMMITTAL
SHELTER
LEGEND
PROPERTY LIMITS
GRADING LIMITS
SILT FENCE
TEMPORARY CONSTRUCTION
FENCE
NEW HDPE STORM SEWER
EXISTING HDPE STORM SEWER
CONTRACTOR STAGING AREA. VERIFY WITH COR
AND CEMETERY PRIOR TO MOBILIZATION.
PROTECT EXISTING TREES.
INSTALL & MAINTAIN PERIMETER SEDIMENT
PROTECTION (SILT FENCE OR BIO-ROLL AS PHASE
APPROPRIATE.
INSTALL & MAINTAIN INLET SEDIMENT
PROTECTION, INLET PROTECTION TO BE
MAINTAINED UNTIL SURFACE IS FULLY RESTORED.
INSTALL TEMP ROCK ENTRANCE AT
CONSTRUCTION VEHICLE INGRESS AND EGRESS
LOCATION(S).
KEY NOTES:
LONGITUDINAL OVERLAP OVERLAP
EDGES 6" AND STAPLE 12" O.C.
TERMINAL FOLD
TURN END UNDER 6" AND
STAPLE 12" O.C.
TRANSVERSE OVERLAP OVERLAP
ENDS 18" AND STAPLE 12" O.C.
BRING TO LEVEL GROUND TO
TERMINATE
UNROLL MATTING DOWNSLOPE FROM THE
TOP. STAPLE DOWN CENTER OF ALL ROWS
3' O.C.
ANCHOR SLOT
BURY UPHILL END IN TRENCH 6"
DEEP AND STAPLE 12" O.C.
ANCHOR AT WALL BURY
EDGE/END IN TRENCH 6" DEEP
AND STAPLE 12" O.C.
6"
METAL
STAPLE
1"
SLOPE EROSION CONTROL MEASURE
NOTES:
1. PROVIDE EROSION CONTROL MATTING ON ALL
DISTURBED SLOPES THAT EXCEED 3:1 AND/OR AS
DIRECTED BY THE RESIDENT ENGINEER.
5'-0" MAX
" M
IN
2'-
0" M
IN
FASTNER- MIN. NO 10 GAGE
WIRE, 4 PER POST REQUIRED
(EVENLY SPACED)
WOOD POST
FILTER FABRIC
ELEVATION
6"
6"18 " M
IN
FABRIC ANCHOR DETAIL
FASTNER- MIN. NO 10 GAGE WIRE, 4 PER
POST REQUIRED (EVENLY SPACED)
WOOD POST
FILTER FABRIC
COMPACTED BACKFILL
DIRECTION OF FLOW
NOTES
1. TEMPORARY SEDIMENT FENCE SHALL BE INSTALLED PRIOR TO ANY GRADING WORK IN THE AREA TO BE PROTECTED. THEY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD AND REMOVED IN CONJUNCTION WITH THE FINAL GRADING AND SITE STABILIZATION.
2. FILTER FABRIC SHALL MEET THE REQUIREMENTS OF MATERIAL SPECIFICATION 592 GEOTEXTILE TABLE 1 OR 2, CLASS WITH EQUIVALENT OPENING
SIZE OF AT LEAST 30 FOR NONWOVEN AND 50 FOR WOVEN.
3. FENCE POSTS SHALL BE EITHER STANDARD STEEL POST OR WOOD POST WITH A MINIMUM CROSS-SECTIONAL AREA OF 3.0 SQ. IN.
UNDISTURBED SUBGRADE
EXTEND FABRIC TO 6" BELOW
GRADE AS SHOWN
NOTES:
1. PLACE THE END POST OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST
FENCE.
2. ROTATE BOTH POSTS AT LEAST 180 DEGREES IN A CLOCKWISE DIRECTION TO
CREATE A TIGHT SEAL WITH THE FABRIC MATERIAL.
3. DRIVE BOTH POSTS A MINIMUM OF 18 INCHES INTO THE GROUND AND BURY THE
FLAP.
STEP 1
POSTS
FILTER FABRIC
FILTER FABRIC
STEP 2
STEP 3
TREE TRUNK - WRAP WITH BLACK 4" FLEX PIPE (3
ROWS- TOP, MIDDLE AND BOTTOM).
VERTICAL 2X4'S, 6' LONG, BEGINNING 6" ABOVE GRADE.
3" GAP BETWEEN 2X4'S.
SECURE 2X4'S WITH METAL STRAPS OR OTHER MEANS
ACCEPTABLE TO OWNER
APPLICATION OF BURLAP, 2X4'S OR STRAPS SHALL
NOT DAMAGE ANY PART OF TREE
NOTE:
1. IN AREAS WHERE CONSTRUCTION ACTIVITIES
MUST OCCUR WITHIN DRIP-LINE PROTECT TREE
AS NOTED.
2. AVOID COMPACTING GRADE WITHIN THE
DRIP-LINE AND DO NOT STORE CONSTRUCTION
MATERIALS ADJACENT TO OR WITHIN DRIP-LINE.
3. OBTAIN APPROVAL BY RESIDENT ENGINEER
PRIOR TO WORKING WITHIN DRIP-LINE.
RECTANGLE INLET FILTERS
(REAR CURB GUARD FLAP
INCLUDED FOR CURB BOX
INLET FILTERS)
NOTE:
TEMPORARY INLET SEDIMENT FILTER TO BE INSTALLED ON ALL CATCH
BASINS AND STORM INLETS. INLET FILTER TO BE ROUND IPP INLET FILTER
AS MANUFACTURED BY INLET & PIPE PROTECTION, INC (847-722-0690) OR
APPROVED OTHER. CLEAN FILTER AS NEEDED.
NOTE:
TEMPORARY INLET SEDIMENT FILTER TO BE INSTALLED ON ALL CATCH
BASINS AND STORM INLETS. INLET FILTER TO BE RECTANGLE IPP INLET
FILTER AS MANUFACTURED BY INLET & PIPE PROTECTION, INC
(847-722-0690) OR APPROVED OTHER. CLEAN FILTER AS NEEDED.
ROUND INLET FILTER
OVERFLOW FEATURE
GEOTEXTILE FILTER BAG
WITH REINFORCED
POLYESTER OUTER
MEMBRANE (REAR GUARD
FLAP INCLUDED FOR
CURB BOX INLET FILTERS)
STAINLESS
STEEL LOCKING
BAND
LIFT HANDLES
GALVANIZED STEEL FRAME
GALVANIZED
STEEL
FRAME
LIFT HANDLES
OVERFLOW FEATURESTAINLESS STEEL
LOCKING BAND
GEOTEXTILE FILTER BAG
WITH REINFORCED
POLYESTER OUTER MESH
NOTE:
1. IN AREAS WHERE CONSTRUCTION ACTIVITIES
MUST OCCUR WITHIN DRIP-LINE PROTECT TREE
AS NOTED.
2. AVOID COMPACTING GRADE WITHIN THE
DRIP-LINE AND DO NOT STORE CONSTRUCTION
MATERIALS ADJACENT TO OR WITHIN DRIP-LINE.
3. OBTAIN APPROVAL BY RESIDENT ENGINEER
PRIOR TO WORKING WITHIN DRIP-LINE.
PROFILE
EXISTING GROUND
12' MINIMUM
WIDTH
10' MIN.
10' MIN.
NON-WOVEN GEOTEXTILE FABRIC
2"-3" CRUSHED ROCK (8" DEPTH)
* 50' MINIMUM LENGTH
LENGTH OF STABILIZED ROAD
PLAN VIEW
50' MINIMUM LENGTH
LENGTH OF STABILIZED ROAD
NOTES:
SEDIMENT
SUMP
FLOW
SEDIMENT SUMP
SEDIMENT SUMP
1. ESTABLISH STABILIZED CONSTRUCTION ENTRANCE PRIOR TO THE INITIATION OF SITE CONSTRUCTION
ACTIVITIES.
2. CARE SHOULD BE TAKEN TO PREVENT MATERIAL MOVEMENT INTO ADJACENT WATERBODIES.
3. CARE SHOULD BE TAKEN TO MAINTAIN EXISTING ROADSIDE DRAINAGE VIA CULVERT INSTALLATION, WITH
SEDIMENT SUMP PLACED DOWNFLOW OF CULVERT.
4. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT
OF ANY MEASURES USED TO TRAP SEDIMENT.
5. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY.
6. WHEN WASHING IS REQUIRED. IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT
DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN.
EXISTING
PAVEMENT/
ROAD
CONSTRUCTION
FENCE
CONSTRUCTION
ACCESS GATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s c e e r o s i o n c o n t r o l d e t a i l s d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
GC703
JFJL
EROSION AND SEDIMENT CONTROL
DETAILS
SCALE:
SILT FENCE
NTS SCALE:
ATTACHING TWO SILT FENCES
NTS
SCALE:
SLOPE EROSION CONTROL MEASURE
NTS
SCALE:
CONSTRUCTION GRAVEL ACCESS ENTRY
NTS
SCALE:
SILT SACK FOR STORM INLET
NTS SCALE:
TREE TRUNK PROTECTION
NTS
SCALE:
BIO-ROLL
NTS
BUTT JOINTS. ENDS OF ROCK/COMPOST LOG
TO BE SECURELY CLOSED TO PREVENT LOSS
OF OPEN GRADED AGGREGATE FILL. SECURE
WITH 50 PSI ZIP TIE. (TYP.)
GEOTEXTILE SOCK BETWEEN 4-10 FEET LONG
AND 4-6 INCHES IN DIAMETER. SEAM TO BE
JOINED BY TWO ROWS OF STITCHING WITH A
PLASTIC MESH BACKING OR PROVIDE A HEAT
BONDED SEAM (OR APPROVED EQUIVALENT).
FILL LOG WITH AN OPEN GRADED AGGREGATE
CONSISTING OF SOUND DURABLE PARTICLES
OF COARSE AGGREGATE CORRESPONDING TO
ODOT SPEC. SECTION 02690.
SEE 8/GC703 FOR TREE
PROTECTION DETAIL
SCALE:
TREE PROTECTION DETAIL
NTS
ZONE A
DIA=
1/2X
ZONE B; DIA=X
ZONE C; DIA=2X
PLAN VIEW
ELEVATION
VIEW
D
R I P
L I N
E
FENCING/ROOT PROTECTION
4' HIGH FENCING SHALL BE PROVIDED AND MAINTANED AT THE
DRIPLINE OF EACH TREE OR AROUND A GROUP OF TREES AT THE
DRIPLINE OF OUTSIDE TREES.
RE APPROVAL IS REQUIRED FOR USE/ACCESS WITHIN ZONE B.
PERMISSION FOR USE/ACCESS REQUIRES SURFACE PROTECTION
FOR ALL UNFENCED, UNPAVED SURFACES WITHIN ZONE B AT ALL
TIMES.
* SURFACE PROTECTION MEASURES
1. MULCH LAYER, @ 6"-8"DEPTH
2. 3/4" PLYWOOD
3. STEEL PLATES
X
D
R I P
L I N
E
TRENCHING / EXCAVATION
ZONE A (CRITICAL ROOT ZONE)
[DEFINED AS TRUNK DIAMETER MULTIPLIED BY 0.5]
1. NO DISTURBANCE ALLOWED WITHOUT SITE-SPECIFIC
INSPECTION AND APPROVAL OF METHODS TO MINIMIZE ROOT
DAMAGE
2. SEVERANCE OF ROOTS LARGER THAN 2 INCHES IN DIAMETER
REQUIRES AN ENGINEER'S APPROVAL
3. TUNNELLING REQUIRED TO INSTALL LINES 3 FEET BELOW
GRADE OR DEEPER
ZONE B (DRIPLINE)
[MAXIMUM WIDTH OF BRANCH EXTENSION ON TREE]
1. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF
MATERIALS SUBJECT TO RE APPROVAL
2. SURFACE PROTECTION MEASURES REQUIRED
TRENCHING ALLOWED AS FOLLOWS:
- EXCAVATION BY HAND OR WITH HAND-DRIVEN TRENCHER
MAY BE REQUIRED
- LIMIT TRENCH WIDTH. DO NOT DISTURB ZONE A (CRITICAL
ROOT ZONE) MAINTAIN 2/3 OR MORE OF ZONE B (DRIPLINE) IN
UNDISTURBED CONDITION
3. TUNNELLING MAY BE REQUIRED FOR TRENCHES DEEPER
THAN 3 FOOT
4. USE OF PNEUMATIC AIR WAND AND EXCAVATION MAY BE
CONSIDERED WHERE THE TRENCH DEPTH DOES NOT EXCEED
4 FEET
ZONE C (ABSORBING ROOT ZONE)
[DEFINED AS TRUNK DIAMETER MULTIPLIED BY 2.0]
1. OPERATION OF HEAVY EQUIPMENT AND OR STOCKPILING OF
MATERIALS SUBJECT TO RE APPROVAL
2. SURFACE PROTECTION MEASURES MAY BE REQUIRED AND IS
TO BE DETERMINED BY RE
TRENCHING WITH HEAVY EQUIPMENT ALLOWED AS FOLLOWS:
- MINIMIZE TRENCH WIDTH
- MAINTAIN 2/3 OR MORE OF ZONE C IN UNDISTURBED
CONDITION
- OR AS SPECIFIED BY RE
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h s u r v e y c a d f i l e s s h e e t s v f e x i s t i n g c o n d i t i o n s s u r v e y d i t n h i l l m r v e d o t
A
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
VF101
EXISTING CONDITIONS SURVEY
SURVEY FOR:
Anderson Engineering of MN, LLC
13605 1st Ave N, Suite 100
Plymouth, MN 55441
SURVEY BY:
Pariani Land Surveying
P.O. Box 551
Shady Cove, Oregon 97539
SURVEY DATA:
Horizontal: Provided by Anderson Engineering of MN, LLC
Vertical: Provided by Anderson Engineering of MN, LLC
Contour interval is 1.0 feet
Field survey completed April 16, 2020.
Topographic Survey
Located at:
Eagle Point National Cemetery
SE 1/4 Section 2, Township 36 South, Range 1 West, W. M., Eagle Point, Jackson County, Oregon
SDMH
Grt=1542.50
Full of Debris
SDMH-5
Rim=1473.20
6"IE(n)=1466.0
8"IE(s)=1465.2
SD Inlet-6
Grt=1473.00
12"IE(e)=1465.0
12"IE(s)=1464.9
SDMH-7
Rim=1455.72
12"IE(n)=1448.9
18"IE(w)=1447.8
SDMH-8
Rim=1454.04
12"IE(e)=1448.7
12"IE(n)=1448.0
12"IE(s)=1446.8
SDMH-9
Rim=1454.13
6"IE(w)=1445.95
18"IE(n)=1445.9
12"IE=1448.7
12"IE=1446.7
SD Inlet-10
Top Grt=1440.00
8"IE(s)=1435.0
SD Inlet-11
Top Grt=1435.18
8"IE(n-s)=1429.6
SDMH-12
Rim=1452.96
18"IE(n)=1445.0
SD Inlet-13
Grt=1453.15
12"IE(e)=1449.5
SD Inlet-14
Grt=1453.08
12"IE(e)=1448.7
12"IE(nw)=1448.6
12"IE(s)=1448.5
SD Inlet-15
Grt=1458.00
12"IE(nw)=1454.1
12"IE(e)=1454.0
SD Inlet-16
Grt=1475.29
12"IE(w)=1468.45
Site Plan B - Existing Conditions
Scale 1" = 20'
Site Plan A - Existing Conditions
Scale 1" = 20'
B
A
REGISTERED
PROFESSIONAL
LAND SURVEYOR
July 13, 1999
JOHN R. PARIANI
#51382
Renews: December 31, 2020
OREGON
Pariani Land Surveying
17 South Platt Street, Suite A
Eagle Point, OR 97524
541-890-1131
May 5, 2020 1" = 20' 2016-314
ParianiLS@yahoo.com
POINT 718
POINT 10
SURVEY CONTROL POINT SCHEDULE
# NORTHING EASTING ELEVATION DESCRIPTION
5188.16 4486.41 1455.67 MAG NAIL SDMH
5718.06 4405.47 1462.97 MAG NAIL IN TC
5555.09 5172.19 1529.88 MAG NAIL
5722.18 5236.86 1544.63 MAG NAIL ICV32
12" HDPE
12" HDPE
8" HDPE
12" HDPE
18" HDPE
12" HDPE
LEGEND
PINE
MAPLE
PEAR
PINE
OAK
PINE
MAPLE
CEDAR
PINE
PEAR
PEAR
PEAR
PEAR
OAK
OAK
OAK
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s b l b o r i n g s d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
BL100
JFJL
GEOTECHNICAL TEST PITS
N
0 60' 120'
SCALE:
GEOTECHNICAL TEST PITS
1" = 60' (30" x 42" PAPER SIZE)
WATER TANK
CITY OF EAGLE
POINT
ROSTRUM
CARILLON
SECTION 38
SECTION 32
EXISTING OSSUARY
AND MEMORIAL WALL
EXISTING RETAINING WALL
MAX 8' HT w/5H NICHE HT.
COLUMBARIUM
SECTION A1
SECTION B
SECTION B1
SECTION C
SECTION
C1
SECTION D
SECTION 14
SECTION A
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
S E
C T
I O
N
S E
C T
I O
N
SECTION F4
SECTION F3
SECTION F2
SECTION F1
SECTION F
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION 1
SECTION 5
SECTION 9
SECTION 2
SECTION 6
SECTION 10
SECTION E
MBMCMDME
SECTION MA
SECTION
AA
FLAGPOLE
VEHICLE
STORAGE
BUILDING
ADMINISTRATION
BUILDING
MAINTENANCE
BUILDING
COLUMBARIUM 1
COMMITTAL
SHELTER
LEGEND
PROPERTY LIMITS
GEOTECHNICAL
TEST PITS
TP-1
TP-1
TP-2
TP-3
TP-4
TP-5
TEST PIT TP-1
· 0.0 TO 1.5 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT,
MODERATELY TO HIGHLY EXPANSIVE, ROOTED ZONE TO A
DEPTH OF ABOUT 9 IN.
· 1.5 TO 2.0 FT HARD (RH-3), BROWN SANDSTONE; SLIGHTLY
WEATHERED, CLOSE FRACTURES, BECOMES RH-4 BELOW 2.0
FT.
PRACTICAL REFUSAL ON HARD SANDSTONE AT A DEPTH OF 2.0 FT.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
COMPLETED APRIL 23, 2020.
TEST PIT TP-2
· 0.0 TO 0.5 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT,
MODERATELY TO HIGHLY EXPANSIVE, ROOTED.
· 0.5 TO 2.0 FT MEDIUM HARD (RH-2), BROWN SANDSTONE;
SLIGHTLY WEATHERED, CLOSE FRACTURES, BECOMES
RH-3/RH-4 BELOW 2.0 FT.
PRACTICAL REFUSAL ON HARD SANDSTONE AT A DEPTH OF 2.0 FT.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
COMPLETED APRIL 23, 2020.
TEST PIT TP-3
· 0.0 TO 2.0 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT,
MODERATELY TO HIGHLY EXPANSIVE, ROOTED ZONE TO A
DEPTH OF ABOUT 6 IN.
· 2.0 TO 3.0 FT MEDIUM HARD (RH-2), BROWN SANDSTONE;
SLIGHTLY WEATHERED, CLOSE FRACTURES, BECOMES RH-4
BELOW 3.0 FT.
PRACTICAL REFUSAL ON HARD SANDSTONE AT A DEPTH OF 2.0 FT.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
COMPLETED APRIL 23, 2020.
TEST PIT TP-4
· 0.0 TO 3.0 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT,
MODERATELY TO HIGHLY EXPANSIVE, ROOTED ZONE TO A
DEPTH OF ABOUT 6 IN.
· 3.0 TO 5.0 FT FILL: MEDIUM STIFF, BROWN SILT, SOME CLAY.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
COMPLETED APRIL 23, 2020.
TEST PIT TP-5
· 0.0 TO 2.0 FT FILL: MEDIUM STIFF, BLACK CLAYEY SILT,
MODERATELY TO HIGHLY EXPANSIVE, ROOTED ZONE TO A
DEPTH OF ABOUT 6 IN.
· 2.0 TO 5.0 FT FILL: MEDIUM STIFF, BROWN SILT, SOME CLAY.
GROUNDWATER SEEPAGE NOT OBSERVED.
NO SIGNIFICANT CAVING OF TEST PIT SIDEWALLS.
COMPLETED APRIL 23, 2020.
NOTES
1. SEE GEOTECHNICAL REPORT FOR MORE INFORMATION.
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s d d e m o l i t i o n p l a n d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
CD101
JFJL
DEMOLITION PLAN OVERALL
N
0 60' 120'
SCALE:
DEMOLITION PLAN OVERALL
1" = 60' (30" x 42" PAPER SIZE)
CD102
CD102
WATER TANK
CITY OF EAGLE
POINT
ROSTRUM
CARILLON
SECTION 38
SECTION 32
EXISTING OSSUARY
AND MEMORIAL WALL
CONTRACTOR
STAGING AREA,
SEE O-100
SECTION A1
SECTION B
SECTION B1
SECTION C
SECTION
C1
SECTION D
SECTION 14
SECTION A
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
S E
C T
I O
N
S E
C T
I O
N
SECTION F4
SECTION F3
SECTION F2
SECTION F1
SECTION F
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION 1
SECTION 5
SECTION 9
SECTION 2
SECTION 6
SECTION 10
SECTION E
MBMCMDME
SECTION MA
SECTION
AA
FLAGPOLE
VEHICLE
STORAGE
BUILDING
ADMINISTRATION
BUILDING
MAINTENANCE
BUILDING
COLUMBARIUM 1
COMMITTAL
SHELTER
EXISTING
GRAVEL ROAD
ACCESS FROM
RILEY ROAD,
SEE O-100
CD102
EXISTING COLUMBARIUM
LEGEND
PROPERTY LIMITS
GRADING LIMITS
SILT FENCE
TEMPORARY CONSTRUCTION
FENCE
EXISTING CRYPTS
EXISTING IN-GROUND
CREMAINS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h y e p n c p h c i v i l c a d f i l e s s h e e t s d d e m o l i t i o n p l a n d i t j d o b i v e d o t
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15795
EAGLE POINT NATIONAL CEMETERY
GRAVESITE EXPANSION - PHASE 2
906CM3016
03/02/2021
2763 RILEY RD, EAGLE POINT, OR 97524
BID
DOCUMENTS
Date: Dwg. of 47
BID DOCUMENTS
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
AST
7301 OHMS LANE
EDINA, MN 55429
952-854-9302
MICHELLE SCHMIDT
WIM
175 JAMES AVE N,
MINNEAPOLIS, MN 55405
763-559-1010
TIM MALOOLY
AGEGC
1314-B CENTER DRIVE #452
MEDFORD, OR 97501
541-226-6658
ROBIN WARREN
LELAND SAYLOR
505 MONTGOMERY ST. 11TH FLR
SAN FRANCISCO, CA 94111
415-399-9990 0
TOMMY VEST
KEY MAP N.T.S.
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I N
E
E
R
83168
OREGON
G
A
R
Y
R
. J O
H
N
S
O
N
J
U
L
Y
EXP. JUNE 30, 2021
CD102
JFJL
DEMOLITION ENLARGEMENT PLANS
LEGEND
PROPERTY LIMITS
REMOVE CURB AND GUTTER
REMOVE STORM SEWER
SILT FENCE
INLET PROTECTION
TEMPORARY CONSTRUCTION
FENCE
GRADING LIMITS
TREE PROTECTION
REQUIRED;
SEE 7 /GC703 & 8 /GC703
TREE TO BE RELOCATED
(SEE LP SERIES FOR
RELOCATION)
REMOVE ORNAMENTAL FENCE
AND MOWSTRIP
REMOVE EXISTING COLUMN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .