1. Statement of Work.pdf
PDF 202 KB Posted
- Attached to
- 127EAW23Q0008 - Monkey Flower Fence
- Solicitation number
- 127EAW23Q0008
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Monkey Flower Site Protection
General Information
1.0 Scope of Work
Provide and install a 240’ length fence consisting of 2 3/8" diameter round metal pipe set in concrete 8’ on center with two rails consisting of 1 7/8” diameter round metal pipe welded at each end to a post to serve as top and bottom rail. (See attached drawing ”Double Pipe Rail Spec (Monkey Flower)”)
Project Engineer shall stake / mark the locations of the fence prior to site visit date / time.
2.0 Background
Fence is designed and to be installed to close out several user-created vehicle egresses to prevent degradation of the habitat of a sensitive and rare plant species. Project’s funding comes from an approved El Dorado County RAC grant.
Contractor Requirements
3.0 Technical Requirements / Tasks
Placement of the fence will be at Mt. Diablo Meridian, T8 N R13 E, Sec. 13, 38.545462, -120.497579, with a 20’ setback parallel with and to the west of Omo Ranch Road near the intersection with FS road 08N62. COR will meet contractor at the job site before, during, and after construction or when needed to verify location and completion of project.
Contractor will drill and excavate tailings from post holes 10” in diameter and 18” deep and 8’ apart along length of projected location. Posts will need to be set in concrete plumb to the vertical 8’ apart and along projected location. After concrete has cured, top and bottom rails will be welded to each post per drawings.
4.0 Government Furnished
Government will inspect for compliance with above specifications, length, placement, and integrity before granting approval for completion of a project.
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due
1 Acquisition of material All materials should be in stock before installation begins
No later than 10 business days after contract is awarded
2 The setting of posts in concrete at the required specifications
To locate and place the footprint of the fence and have the posts ready for top and bottom rail installation
No later than 5 business days after the acquisition of materials
3 The attachment of top and bottom rails/ project completion
Provide enough time for the concrete to cure before attaching the rails
No later than 15 business days after the concrete has cured
Key Deliverables
Item No.
Deliverable / Item Title
Description Frequency Reference Delivery Format
Due By
1 Status Reports Before, during, and after each deliverable
When needed
Via email or phone call or on-site inspection with COR
No later than three business days after the deliverable has been accomplished
6.0 Travel
There will not be any reimbursement by the government for any travel incurred by the contractor.
7.0 Contractor’s Key Personnel
Project Superintendent is mandatory
8.0 Security Requirements
There are no known security requirements that will be needed for this project. All security for materials and tools will be provided by the contractor.
9.0 Data Rights
Not applicable
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
File details come from the government source that posted it. Updated .