127EAW21R0033 - Renovate Boulder Oaks Campground
Solicitation number
127EAW21R0033
Issued by

About this file

This statement of work and related federal contract opportunity outline requirements for renovations to Boulder Oaks Campground on the Descanso Ranger District of the Cleveland National Forest. The statement of work specifies accessible parking and walkway construction at two sites to meet ADA/ABA standards, as well as aggregate road surfacing, pump house design and installation, and optional additional aggregate work. It provides construction specifications and outlines deliverables including work plans, erosion control and waste management plans, and emergency response procedures. The solicitation is a total small business set-aside between $200,000 and $300,000 to be awarded by the USDA Forest Service. The response deadline for requests for information is June 29, 2021, with site visits expected of all offerors.

View the file

Other files

File Type Posted
RFI Official Responses - 3.pdf PDF
RFI Official Responses - 4.pdf PDF
RFI Official Responses - 5.pdf PDF
RFI Official Responses - 2.pdf PDF
A00002 - RFI _ Time Extension.pdf PDF
RFI Official Responses - 1.pdf PDF
SCALED_36x24_3 4 5.pdf PDF
A00001 - Site Visit Info.pdf PDF
4. Fire Plan.pdf PDF
5. Davis-Bacon Act WD # CA20210001.pdf PDF
2. Supplemental Specifications.pdf PDF
3. Drawings.pdf PDF
6. RFI Form.docx DOCX document
127EAW21R0033.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA Renovate Boulder Oaks CG ADA Parking & Path, Pumphouse, Aggregate

STATEMENT OF WORK SECTION C - 1

SECTION C

STATEMENT OF WORK

C.1 SCOPE OF WORK

Work shall include installation of accessible parking spaces with associated accessible walkway and rock barrier, placing aggregate road surface as shown on the drawing. This contract also has Additive1- pump house - including wellhead and pump closure, electric meter relocation to meet current regulations and codes, and Additive 2 – additional aggregate, for Cleveland National Forest Boulder Oaks Campground on Descanso Ranger District, San Diego CA.

This contract provides for the equipment, labor, materials, design, testing, and permits necessary to perform work ordered by the Government, in compliance with its terms, specifications, drawings and provisions, for removal and disposal of associated wood bollards, grading, compaction and installing concrete accessible parking and connecting concrete walkway for two recently installed toilet buildings.

Accessible walkways, buildings, and parking shall meet the minimum requirements of Americans with

Disabilities Act and Architectural Barriers Act (ADAABA) and the Forest Service Outdoor Accessibility

Guidelines (FSOAG). Aggregate surfacing shall have separation geotextile installed and secured to prevent migration of aggregate into native soil where required/shown on the drawing.

Construction elements include, but are not limited to; site work, surveying, demolition, clearing and grubbing, excavation and placement, best management practices (BMP’s), aggregate base, portland cement concrete, concrete reinforcement, sampling and testing, traffic control. All associated work not listed under Pay Items are incidental.

The design of the new pump house shall be submitted to the Contracting Officer (CO) for review and approval prior to material procurement and installation.

A Forest Service archeological monitor shall be onsite during all ground disturbance and vegetation clearance. The contractor shall work closely with the Contracting Officer Representative (COR) to schedule required archeological oversight.

The Contractor shall exercise caution to minimize ground disturbance and existing improvements.

CG group

Includes but is not limited to the following work items.

Leveling road surface, compact subgrade, place and compact Caltrans Class 2 aggregate base 3/4 in. max.

Within FAMILY LOOP place and secure separation geotextile without ground disturbance, place and compact aggregate surfacing.

Concrete accessible parking and walkway, site 1

STATEMENT OF WORK SECTION C - 2

Construction of concrete accessible parking and new concrete walkway to connect the parking to the building and tie to existing site features (bulletin board and relocation of fee tube). Accessible parking and walkway shall meet the ADAABA and shall be constructed AS SHOWN ON THE DRAWINGS and in accordance with contract specifications. Site 1 also includes the installation of rock barriers, pavement markings, fiber rolls, clearing and grubbing, demolition, excavation and compaction, concrete reinforcement, portland cement, aggregate base, and sampling and testing.

Concrete accessible parking and walkway, site 2

Construction of concrete accessible parking shall meet the ADAABA and shall be constructed AS

SHOWN ON THE DRAWINGS and in accordance with contract specifications. Site 2 also includes the installation of rock barriers, pavement markings, fiber rolls, excavation and placement, clearing and grubbing, demolition, concrete reinforcement, portland cement, aggregate base, and sampling and testing.

Additive 1: Pump house

Includes but is not limited to design and installation of the following work items.

Installation of new pump house, including Contractor’s complete Design proposal of site, pump house, electric meter relocation, fencing, gate and associated work.

Additive 2: Additional aggregate surfacing

Increase aggregate quantity and expand aggregate surfacing to include day use parking area and camp spurs, with separation geotextile.

C.2 PROJECT LOCATION

Boulder Oaks Campground– San Diego County

Travel on I-8 East, Exit Buckman Springs Road. Turn Right onto Buckman Springs Road. Make a left on Old Hwy 80 and travel approximately 3 miles, the campground is on the right.

C.3 FOREST CONTACT

For information regarding site conditions, contact Trien Le at 619-540-6661 or trien.le@usda.gov, Monday through Friday, except federal holidays.

C.4 PROJECT MANAGEMENT

The contractor shall appoint a Project Manager and/or engineer to coordinate all contractor activities during construction and to liaise with the Contracting Officer Representative (COR) and/or Contracting

Officer (CO) and Project Engineer for the USDA Forest Service. Surveyor shall be licensed in the State mailto:trien.le@usda.gov

STATEMENT OF WORK SECTION C - 3

of California. Contractor shall designate in writing an on-site superintendent to be on-site at all times that any construction activities take place and to coordinate all site work.

C.5 GENERAL INFORMATION

C.5 - 1 Parking and Storage

The Contractor shall coordinate parking of their vehicles and temporary storage of equipment and materials with the Contracting Officer. Contractor shall have all heavy equipment washed prior to entering the project area to remove soil, seeds and plant material from noxious weeds to prevent the introduction and spread of weeds not already present on Descanso Ranger District or the Cleveland

National Forest. Inspections shall be coordinated and scheduled with the Contracting Officer’s

Representative.

C.6 SPECIFICATIONS

The Construction Specification Institute (CSI) specifications applicable to this contract are listed below:

00 01 10 TABLE OF CONTENTS

01 01 11 PROJECT DESIGN REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 23 SURVEY AND LAYOUT DATA

01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SUBMITTALS

01 40 00 QUALITY REQUIREMENTS

01 41 00 REGULATORY REQUIREMENTS

01 57 24 STORMWATER POLLUTION CONTROL

01 71 13 MOBILIZATION

01 74 00 CLEANING AND WASTE MANAGEMENT

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

02 41 00 DEMOLITION

03 11 00 CONRETE FORMING

03 20 00 CONCRETE REINFORCEMENT

03 30 00 CAST-IN-PLACE CONCRETE

10 14 53 TRAFFIC SIGNAGE

13 34 23 WELL HEAD & PUMP ENCLOSURE (PUMP HOUSE)

31 10 00 SITE CLEARING

31 20 00 EARTH MOVING

32 10 00 BASES BALLAST AND PAVING (PAVEMENT MARKINGS)

32 30 00 SITE IMPROVEMENTS

32 31 13 CHAIN LINK FENCES AND GATES

C.7 DELIVERABLES

STATEMENT OF WORK SECTION C - 4

C.7-1 Fire Plan

See the Fire Plan for fire restrictions and requirements, emergency contact information, and fire activity levels.

C.7-2 Work Plan

The Contractor(s) shall provide the Government with two (2) copies of the Work Plan for the project prior to mobilization. This Work Plan shall include, but is not limited to, the following:

• A description of how the work will be performed.

• Specific exclusions/ assumptions regarding the specific work to be performed.

• A listing of personnel, including subcontractor(s), working on the project.

• A list of equipment proposed for use on the project.

• A Project Work Schedule.

• Detailed cost estimate/ cost breakdown of work to be performed that can be used for partial payments as work is completed and accepted.

• Description of what material(s) or method of concrete washout will be used on the project.

C.7-3 Storm Management Plan

Contractor shall develop an Erosion Control/Stormwater Control Plan. Contractor shall identify all types and specific locations of erosion control measures.

C.7-4 Construction Waste Management Plan

Contractor shall develop a proposal on how to collect, segregate, and dispose of all construction wastes and debris produced by the work of this contract. Include description of on-site reprocessing and re-use opportunities.

C.7-5 Spill Prevention Control and Countermeasures (SPCC), spill response plan and an emergency response plan for refueling and servicing vehicles.

Identify and use suitable measures around vehicle service, storage and refueling areas, and waste dumps to fully contain spills and avoid or minimize soil contamination and seepage to groundwater. Use suitable measures to avoid spilling fuels, lubricants, cleaners, and other chemicals during handling and transporting. Report spills to the Contracting Officer’s

Representative and initiate suitable cleanup action in accordance with applicable State and

Federal laws, rules, and regulations.

END OF STATEMENT OF WORK