1. Statement of Work.pdf
PDF 391 KB Posted
- Attached to
- 127EAW26Q0020 - Pine Canyon Barracks Replacement
- Solicitation number
- 127EAW26Q0020
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for the Pine Canyon Fire Station Barracks Replacement project issued by the U.S. Department of Agriculture Forest Service.
The contract requires the removal and disposal of an existing fire station mobile home-style barracks and replacement with a new wildland urban interface (WUI) rated, barracks-style mobile home at Pine Canyon Fire Station, 8145 CA-166, Santa Maria, California 93454. The contractor must disconnect existing utilities (electrical, water, sewer, phone, internet), remove the old mobile home from the site, and reconnect utilities to the new structure, testing all systems for proper operation. The new mobile home must be AAA Pacific Manufactured Homes Model 5828-4CIK-2BCATH (~1,352 square feet, 26.6 feet by 52 feet, four bedrooms, two baths) or approved equal, manufactured to California zone 3 mobile home specifications, and positioned in the same location as the removed structure. The contractor must provide all access stairs and landings meeting OSHA standards and submit a utility disconnection/connection plan and existing mobile home removal/disposal site/install plan prior to work commencement. The estimated start date is August 2026 with a 60-day period of performance following Notice to Proceed issuance. Work hours are restricted to non-holiday weekdays, Monday through Friday, 0700–1900 hours. All electrical, plumbing, and mechanical work must be performed by California State-licensed contractors with current licenses provided to the Contracting Officer before work begins. The contractor is responsible for all travel costs, equipment security, sediment control installation, construction debris disposal off National Forest Land, and any road damage caused by construction activities. An organized site visit is scheduled for Thursday, June 4, 2026 at 11:00 AM, with RSVP required to Gregory.Cunningham@usda.gov. No government-furnished items, camping, or housing will be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00002 - RFI Responses.pdf | ||
| A00001 - Project name correction.pdf | ||
| 127EAW26Q0020 - Pine Canyon Barracks Replacement.pdf | ||
| 8. RFI Form.xlsx | XLSX spreadsheet | |
| 4. Pine Canyon FS Barracks Plan.pdf | ||
| 127EAW26Q0020 - Pinyon Canyon Barracks Replacement.pdf | ||
| 3. Barracks Specifications.pdf | ||
| 6. Davis-Bacon Act WD # CA20260014 - 05_18_2026.pdf | ||
| 8. RFI Form.xlsx | XLSX spreadsheet | |
| 2. Schedule of Items.docx | DOCX document | |
| 5. Pine Canyon Maps & Photos.pdf | ||
| 7. Contract Administration Information.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Pine Canyon FS Barracks Replacement
Contents Project
General Information
1.0 Scope of Work
2.0 Background
3.0 Location
4.0 Estimated Start Date / Period of Performance
5.0 Drawings and Specifications
6.0 Restrictions on Work
6.0 Camping and Housing
7.0 Required Submittals
Contractor Requirements
8.0 Technical Requirements / Tasks
9.0 Government Furnished
10.0 Deliverables / Schedule
11.0 Travel
12.0 Contractor’s Key Personnel
13.0 Security Requirements
14.0 Data Rights
15.0 Site Visit
Attachment
Project Pine Canyon FS Barracks Replacement
General Information
1.0 Scope of Work
The purpose of this contract is removal and disposal of the existing fire station mobile home-style barracks and replace it with a new wildland urban interface (WUI) rated, barracks-style mobile home. Performance shall include all necessary details to connect utilities for a habitable structure.
2.0 Background
The existing mobile home building needs repairs, and it is a benefit to the Government to replace instead of repairing an old mobile home.
3.0 Location
Pine Canyon Fire Station 8145 CA-166, Santa Maria, CA 93454
4.0 Estimated Start Date / Period of Performance
August 2026 60 Days after NTP issuance
5.0 Drawings and Specifications
Pine Canyon FS Barracks Plan.pdf
6.0 Restrictions on Work
Include any restrictions on work such as the following (edit to fit project)
• Work hours are limited to non-holiday weekdays, Monday – Friday, 0700 – 1900. Work site much be clear by noon the Friday before a Monday holiday.
• In accordance with the fire plan, if included in Section J.
• When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.
• For sites requiring archaeology monitoring, contractor must notify COR at least 24 hours prior to any ground disturbing activities and no ground disturbing activities may occur without a Forest Service archaeologist on site.
• When the Contracting Officer or designated representative determines that work must stop due to the presence of archaeological artifacts.
• Contractor is responsible for the security of their tools and equipment at all times.
• Contractor is responsible for removal and disposal all excavated dirt and shall not leave excavated dirt scattered over the site, unless approved by the COR.
• All trash and loose materials shall be secured by the contractor daily.
• The Contractor is responsible for installing sediment control devices, such as straw wattles, to prevent sediment runoff to nearby areas. Excavation work shall not commence until sediment control devices have been installed and approved by the
COR.
• The Contractor shall not use Government trash facilities without the COR’S approval.
• All construction debris remains the property of the Contractor and shall be properly disposed of off National Forest Land.
• The contractor will be able to utilize the Forest Service Roads; however, the Contractor will be responsible for any damage to the roads due to construction activities. The contractor shall be responsible for obtaining permission to use all other roads and staging areas.
6.0 Camping and Housing
No Camping or Housing will be provided.
7.0 Required Submittals
Floor Plans with all building specifications per the attached barracks specifications.
Contractor Requirements
8.0 Technical Requirements / Tasks
• The contractor will be required to disconnect existing utilities (Elec, water, sewer, phone, internet), bolt on axels to existing axel mounts as well as the tow bar and drive the existing mobile home off the site.
• Disposal or repurpose of the existing mobile home is the Contractors responsibility. The Contractor will deliver and install the new mobile home in the same footprint as the old mobile home. The new design required is four
(4) feet longer than the existing mobile home. The site can accommodate the extra 4 feet needed with no difficulties.
• The Contractor will be required to reconnect the existing utilities and test to ensure all utilities are working correctly.
• All access stairs and landings will be provided by the Contractor. Must meet OSHA standards.
• All ground disturbance shall be minimized. The contract work area is twenty feet beyond building footprint in all directions. No other ground disturbance shall take place.
• Mobile home shall be AAA Pacific Manufactured Homes, phone number 619-449-3800, Model 5828-4CIK-2B- CATH, ~1352 square feet, 26.6 feet by 52 feet, four bedrooms, and two baths, barracks style, with details and layout as shown in attached plan or approved equal. Any “or equal” must be approved during solicitation via
RFI.
• The location of the new building shall be in the same location as the building that was removed
• The mobile home must be manufactured for the California zone 3 mobile home specifications.
• The Pine Canyon Fire Station has barracks, engine garage, offices, residences and storage buildings near the proposed work. These areas shall not be disturbed.
• All electrical work performed under this contract shall be performed by a California State licensed electrical contractor. Prior to commencing work, the contractor shall present a copy of his/her current license to the Contracting Officer.
• All plumbing work performed under this contract shall be performed by a California State-licensed plumbing contractor. Prior to commencing work, the contractor shall present a copy of his/her current license to the Contracting Officer.
• All mechanical work performed under this contract shall be performed by a California State licensed mechanical contractor. Prior to commencing work, the contractor shall present a copy of his/her current license to the Contracting Officer.
9.0 Government Furnished
None
10.0 Deliverables / Schedule
• A utility disconnection/connection plan will be required.
• Existing mobile home removal/ disposal site/install plan will be required.
• Schedule of Performance
11.0 Travel
Travel is the responsibility of the Contractor.
12.0 Contractor’s Key Personnel
The Project Manager will be required to be present when performing the duties needed to complete this contract.
13.0 Security Requirements
The location is at a Fire Station behind a locked gate when no Fire personnel are present. The Government is not responsible for any equipment or supplies left on site. A temporary lock will be added to the gate for the Contactor to access the site to perform the needed work.
14.0 Data Rights
N/A
15.0 Site Visit
Organized Site Visit Details: PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV
• Date / Time: Thursday, June 4th, 2026 at 11:00 AM
• Address: Pine Canyon Fire Station – 8145 CA-166, Santa Maria, CA 93454
FS personnel leading Site Visit Contact Info
• Title: CNF Engineering Technician
• Name: Foster Kuramata
• Phone #: 858-395-2745
Attachment N/A