1. Statement of Work.pdf

PDF 255 KB Posted

Attached to
Sign Replacement
Solicitation number
FA441824Q0066
Issued by

About this file

This document is a Statement of Work (SOW) for the replacement of directional signage at the Naval Nuclear Power Training Command (NNPTC) Building 2400 Rickover Center in Goose Creek, South Carolina. The SOW outlines the requirements for the procurement and installation of new building signs, including specifications for sign materials, sizes, placement, and Braille. The work includes removing existing signs, repairing and painting the affected wall surfaces, and installing over 700 new signs throughout the facility. The work must be performed during normal business hours, with caution taken to avoid damage to government property. The related federal contract opportunity is Solicitation Number FA441824Q0066, issued by the Department of the Air Force Air Mobility Command, for the replacement of the building signs in accordance with this SOW.

View the file

Other files

File Type Posted
1. Statement of Work Ammended.pdf PDF
Site Visit Questions and Answers.pdf PDF
2. Salient Characteristics.pdf PDF
4. RFQ Pricing Sheet.pdf PDF
6. Provisions and Clauses.pdf PDF
5. Chapter 4 UFC.pdf PDF
FA441824Q0066.pdf PDF
3. Salient Characteristics Extension.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NNPTC Building 2400 Rickover Building Signs

GENERAL INFORMATION:

1. SCOPE: The current building directional signs need replacement. This Statement of Work (SoW) outlines the requirements for the procurement and installation of new directional signage.

a. Labeling Specifications and instructions for signs will be attached Salient Characteristics

b. All signs and work accomplished will be Chapter 4 Unified Facilities Criteria (UFC) complaint

(Attachment 4)

c. All signs will have Sherwin-Williams Needle Point Navy Color (SW 0032) 1/8” Thick raised tactile text/pictogram

d. All signs will have White raised text with braille below or to the side

e. All signs will have Grade 2 Braille on one side color-white background

f. Refer to the Salient Characteristics Extension for labeling and sign placement instructions

(Attachment 3).

2. LOCATION: All work is to be performed at the Naval Nuclear Power Training Command (NNPTC), Building 2400 Rickover Center, Joint Base Charleston Naval Weapons Station, Goose Creek, SC.

DESCRIPTION OF WORK:

1. The contractor shall remove the existing signs and dispose of them. The contractor shall limit damage to the wall surface.

2. The contractor shall point, patch, prepare, and paint, all damaged drywall where the extant signs were removed. All repairs performed on the walls will be uniform in appearance. The paint used will be Sherwin-Williams SW0032.

3. The contractor shall provide and install the following signs:

109 Each: 9”X6” Wall Mounted Room Signs:

a. Mounted 48” vertically from floor

b. Figure 1 in attached Salient Characteristics

345 Each: 8”X6” Wall Mounted Room Signs:

b. Figure 1 in attached Salient Characteristics

c. The mother's room is referenced in Figure 1 of the characteristics.

162 Each: 6”X15”X1/8” Wall Mounted Overhead Signs:

a. Mounted parallel to door frame +/- 5” horizontally from door frame

b. Fixated unto a horizontal brushed metal mounting bracket, mounted with toggle bolts

c. Figure 2 in attached Salient Characteristics

58 Each: 24”X20” Wall Mounted Directional Signs:

b. Figure 3 in attached Salient Characteristics

38 Each: 3” x 3” Zone Number:

b. Figure 4 in attached Salient Characteristics

18 Each: 1’-7 ½” x 1’-2” Stairwell Identification Signs:

9 Each: 1’-1” x 9” Stairwell Exit Level Signs:

GENERAL SITE REQUIREMENTS:

1. The Requirement Owner will maintain the right to final discretion of every sign’s placement and orientation to ensure uniformity and aesthetics.

2. The project site will be occupied by building personnel during the course of performance of the requirement. Caution must be taken to ensure all safety work practices are adhered to while work is performed.

3. All work will be performed between the hours of 7:30 AM - 4:30 PM, Monday-Friday, excluding

Federal Holidays.

4. Caution must be taken in all work areas of the facility to avoid physical or cosmetic damage to existing government property. Any damage to government property that resulting from the contractor’s actions during installation shall be repaired to the cost of the contractor.

5. The location of performance for this requirement has controlled access requirements. The contractor shall ensure all representatives of their company that perform this requirement meet the security requirements IAW with Clause 5352.242-9000 - Contractor Access to Air Force Installations.