1. Skydio Statement of Work - 5 September 2025.pdf

PDF 130 KB Posted

Attached to
Skydio Drones and Dock System
Solicitation number
FA448425Q0063
Issued by

About this file

This Statement of Work (SOW) details the 87th Air Base Wing's small Unmanned Aerial System (sUAS) Program requirements for Skydio X10D drone equipment at Joint Base McGuire-Dix-Lakehurst, NJ. The project involves procuring 3 Skydio X10D Starter Solutions with multi-band capabilities, 3 Nightsense IR attachments, 6 speakers/microphones, 6 spotlights, 1 X10 Dock Bundle, a maintenance warranty plan, deployment and training services, and an on-premise remote operations license. The contractor must provide all necessary personnel, equipment, and support for delivery and installation, with a performance period of 90 calendar days from award. Additional responsibilities include site restoration, debris removal, base entry coordination, adhering to safety regulations, and scheduling a final inspection with the government quality assurance evaluator 24 hours prior to project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SKYDIO X10D and Components

87th ABW sUAS Program – Joint Base McGuire-Dix-Lakehurt, NJ 08641

MISSION/BACKGROUND: The 87th Air Base Wing sUAS Program supports the entirety of Joint Base McGuire-Dix- Lakehurst sUAS operations, with the goal of modernizing current processes with emerging technologies. The program supplements programs in support of perimeter defense, building inspections, road/airfield inspections, aircraft inspections, utility system inspections, livestream and emergency response.

PROJECT REQUIREMENTS: Skydio X10D Platform and Components

The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary for the delivery and installation or deployment of all products listed below.

1. 3 EA - Skydio X10D Starter Solution (Multi-Band) IR NA+ VT300-Z

2. 3 EA – Skydio Nightsense with IR Attachment for X10D

3. 6 EA – Skydio Speaker/Mic for X10D

4. 6 EA – Skydio Spotlight for X10D

5. 1 EA – Skydio X10 Dock Bundle (2.4/5 GHz with Cellular Visible Light) NA+ VT300-Z

6. Skydio X10 Dock – Maintenance and Repair Warranty plan

7. Skydio X10 Dock – Deployment and Training

a. Deployment to include contractor guidance on feasibility of government site selection (i.e. optimal placement for connectivity and service)

b. Training will be on-site instruction on dock operation, to include radio usage and remote operation from a secondary location

8. Skydio On-Prem Remote Ops License

DATA: All information and data, to include, but not limited to, drawing, schematics, diagrams, manuals, guides and documentation shall be provided to the Government upon request.

ADDITIONAL CONTRACTOR RESPONSIBILITIES: Any adjacent areas disassembled, damaged or removed by the contractor during execution shall be properly repaired by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off base in accordance with all federal, state and local directives and regulations. The contractor shall not utilize any government owned/furnished waste disposal facilities or receptacles. The contractor or his representative shall be on site during duty hours or the hours of work being accomplished.

The contractor shall coordinate the time work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean-up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.

SPECIAL REQUIREMENTS. The work site shall remain clean and clutter free. All dumpsters or other containers for trash and debris shall be located in areas designated by government personnel and shall be subject to removal and/or relocation at any time. These requirements shall not impact the performance period.

BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into JB-MDL for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building is located inside the twenty-four (24) hour gate right off of Wrightstown / Cookstown Rd.

SECURITY FORCE AND FIRE PROTECTION: The Base Security Police telephone number is 609-754-2001 and the Base Fire Department telephone number is 911 for reporting a fire. General information telephone number is 609-754-3326.

PERFORMANCE PERIOD: All items shall be delivered 90 calendar days from award.

INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: A final inspection will be scheduled upon completion of all work. Contact the Government Quality Assurance Evaluator / Point of Contact 24 hours prior to completion for a site visit.

END OF THE STATEMENT OF WORK

PERFORMANCE PERIOD: All items shall be delivered 90 calendar days from award.

File details come from the government source that posted it. Updated .